mid-point review
DESCRIPTION
Mid-Point Review. S.U.A.S. Student Unmanned Aerial System Senior Design Team# 14 . Project Scope. Primary Objectives : Systems Engineering approach for the design and manufacture of an Unmanned Aerial System (UAS) UAS able to complete specified mission. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/1.jpg)
Mid-Point ReviewS.U.A.S.
Student Unmanned Aerial System
Senior Design Team# 14
1
![Page 2: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/2.jpg)
Project Scope
Primary Objectives:Systems Engineering approach for the design and
manufacture of an Unmanned Aerial System (UAS)
UAS able to complete specified mission.
UAS design compliant with the 2012 AUVSI Student UAS Competition requirements.
2
![Page 3: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/3.jpg)
3
Mission Profile
12
34
56
7
1. Warm-up & Take-off2. Climb3. Waypoint Navigation4. Autonomous Area Search5. Waypoint Navigation6. Descent7. Landing
(Constant Target Recognition)
![Page 4: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/4.jpg)
Project Status: Aircraft ConstructionTelemaster Senior test plane assembled and ready
to fly.Hotwire assembly for foam cutting finished. Initial plug for fuselage mold constructed.
4
![Page 5: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/5.jpg)
Modified Fuselage Structure
Three Layer Core
Fiberglass – balsa - Fiberglass
Internal Shear Box
Key Hole for extra support
5
![Page 6: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/6.jpg)
Hot Wire Foam Cutting
6
Wing templates will be cut from aluminum.
Hot Wire
![Page 7: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/7.jpg)
Hot Wire Foam Cutting
7
![Page 8: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/8.jpg)
Composite Layup Schedule
8
Carbon Fiber
Carbon Fiber
Foam Core
Three Layer Core:• Carbon Fiber• Foam Core• Carbon Fiber
![Page 9: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/9.jpg)
Fuselage Construction
9
![Page 10: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/10.jpg)
Project Status:Electronic Systems
Electronics Tested: Imagery SystemAutoPilot SystemPropulsion SystemPower Supply SystemGround Station Interfaces
10
![Page 11: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/11.jpg)
Imagery System TestingTest Rig:
1280 MHz UHF Wireless Data LinkSony KX-181 Camera
11
![Page 12: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/12.jpg)
Imagery System Test Results Successful Range Test Performed from Tallahassee
Capital Building to FSU Parking Garage #3
12
Range = Appx. 1.5 Miles
![Page 13: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/13.jpg)
Autopilot Testing Results
13
![Page 14: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/14.jpg)
Autopilot Future Testing
Waiting on TelemetryFull hardware simulation without aircraft
14
![Page 15: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/15.jpg)
Propulsion System Testing ResultsMotor operation testing (no propeller)
Full Throttle, Ic = 2.03 A½ Throttle, Ic = 1.46 A¼ Throttle, Ic = 1.01 A
15
Battery ESCMoto
r
Ic
![Page 16: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/16.jpg)
Propulsion System Future TestingTest with propeller, on mission profile.Test mounted on Telemaster Test Aircraft
16
![Page 17: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/17.jpg)
Power Supply System TestingDetermined Consumption of:
Video Tx = 450 mA
Test Camera = 90 mA
Autopilot Board = 140 mA
Brushless DC motor = max 2A
17
![Page 18: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/18.jpg)
Power Supply System Test ResultsTested batteries with loadsCharged/Discharged batteries successfullyCurrent Consumptions are within bounds.
18
![Page 19: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/19.jpg)
IssuesVideo TX running hot
Added Fan to test rigAutopilot Telemetry arriving late
Test over spring breakBEC not integrated in ESC
Purchase separate BEC
19
![Page 20: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/20.jpg)
20
Team 14 Spring 2012 Gannt Chart
Planned % Current Week 7
Completion • # Activity Begins Ends Start Dur Done 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Management 1 Project Management 4-Jan-12 27-Apr-12 1 16 40% • • • • • • • 2 Progress Report 4-Jan-12 19-Jan-12 1 2 100% • • 3 Mid-Point Review 19-Jan-12 16-Feb-12 3 5 100% • • • • • 4 Final Project Review 16-Feb-12 5-Apr-12 8 8 0% 5 Final Report 16-Feb-12 5-Apr-12 8 8 0% 6 Operations Manual 16-Feb-12 5-Apr-12 8 8 0% 7 Open House 5-Apr-12 12-Apr-12 14 2 0% 8 Website 4-Jan-12 27-Apr-12 1 16 75% • • • • • • • • • • • • Initial Testing 7 Propulsion System 4-Jan-12 17-Jan-12 1 3 100% • • • 8 Power Supply System 4-Jan-12 17-Jan-12 1 3 100% • • • 9 Imagery System 4-Jan-12 17-Jan-12 1 3 100% • • •
10 Autopilot System 4-Jan-12 17-Jan-12 1 3 100% • • • 11 Avionics 4-Jan-12 17-Jan-12 1 3 100% • • • 13 Comms Testing 4-Jan-12 17-Jan-12 1 3 100% • • • Interim Testing 7 Propulsion System 17-Jan-12 14-Feb-12 4 4 50% • • 8 Power Supply System 17-Jan-12 14-Feb-12 4 4 75% • • • 9 Imagery System 17-Jan-12 14-Feb-12 4 4 50% • •
10 Autopilot System 17-Jan-12 14-Feb-12 4 4 20% • 13 Comms Testing 17-Jan-12 14-Feb-12 4 4 50% • • Aircraft Construction
26 Fuselage Fabrication 17-Jan-12 14-Feb-12 4 1 0% 27 Shear Box Fabrication 17-Jan-12 14-Feb-12 4 1 0% 28 Tail Section Fabrication 17-Jan-12 14-Feb-12 4 1 0% 29 Wing Fabrication 31-Jan-12 7-Feb-12 5 1 0% 30 Aircraft Assembly 7-Feb-12 14-Feb-12 6 1 0% Prototype
31 Complete Assembly 14-Feb-12 28-Feb-12 7 2 0% 32 System Integration 21-Feb-12 6-Mar-12 9 2 0% 33 Shakedown 6-Mar-12 20-Mar-12 11 2 0% 34 SUAS Tweak 20-Mar-12 3-Apr-12 11 2 0% 35 Mission Test 3-Apr-12 24-Apr-12 13 4 0%
![Page 21: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/21.jpg)
SummaryAircraft Construction UnderwayVideo Feed FunctionalPower Supply System Semi-OperationalAutoPilot Telemetry Arriving SoonBlock Camera Testing BegunSystem Testing on Telemaster Aircraft Begins Soon
21
![Page 22: Mid-Point Review](https://reader035.vdocument.in/reader035/viewer/2022070422/56816302550346895dd37abc/html5/thumbnails/22.jpg)
End of Presentation
“Winging It”
22