mid-rise construction
TRANSCRIPT
Mid-Rise Constructionkaterra.com/construction-services
katerra.com/construction-services
Katerra is transforming construction through technology - every process and every product.
Smarter building. Better communities. For everyone.
Katerra was founded due to an overwhelming need for change within the industries that create our built environment.
While other major industries have radically modernized, construction still employs many practices first introduced more than 100 years ago. As a result, productivity is falling, costs are rising, the construction workforce is shrinking, quality is variable, and demand outpaces supply.
As a technology-led, end-to-end construction services partner, Katerra answers all of these challenges. We are creating new value for our partners by optimizing every aspect of building development, design, and construction.
Katerra | Our Vision
https://youtu.be/VhcFD_MjLlU
5
Katerra CLT FactorySpokane, WA
Structural and Finish Material Products
Katerra works with a wide variety of clients to supply a range
of structural and finish material products, along with a robust
set of supply chain services.
We can offer materials customers compelling advantages
by leveraging Katerra’s global supply chain and
aggregating purchasing power across multiple projects
and market sectors.
Our Approach is Different
Katerra is a new kind of company in the building industry, delivering a comprehensive suite of products and services for our clients. This offering is possible because of Katerra’s distinct model, which combines end-to-end integration with significant investment in R&D and innovation.
Learn more about the key aspects that make Katerra’s approach unique.
Katerra takes total control of our materials, logistics, and labor
to drive further cost reductions and operational excellence.
We control factors that commonly drive cost and schedule
variance allowing us to mitigate overall project risk.
Supply Chain Control
Technology & Data
Katerra is embracing technology across the entire building
lifecycle, enabling teams to improve coordination from initial
project phases through building completion, and optimize
products and processes with data feedback loops.
4 katerra.com/construction-services
76 katerra.com/construction-services
Modular Office Solutions designed to take the complexity, cost and waste out
of interior office construction. Each product in the KOVA Commercial line is part
of a thoughtfully designed, cohesive collection, purpose built to bring beautiful,
functional spaces to life. KOVA Commercial is an intelligent ecosystem of products
that includes architectural glass: interior and curtain wall, a modular approach to
conference room design and construction and a standalone, privacy pod solution
constructed of sustainable, structurally superior cross-laminated timber.
KOVA Commercial
Backed by our own world-class manufacturing capabilities and an optimized end-
to-end supply chain, KOVA Windows are designed with one goal in mind: to offer
premium performance at an exceptional value. With superior ratings across all
leading industry certifications, KOVA Windows can go toe-to-toe with, or outdo, the
competition on structural, thermal, and acoustic performance.
KOVA Windows
KOVA is a one-stop-shop for beautifully designed, quality building products at an incomparable value. The KOVA line has every aspect of your
interior and exterior finish needs covered - commercial or residential. Integrated, whole-project solutions available through one efficient source
make specifying, procurement and delivery easier.
Meet KOVA: Katerra’s Integrated Products Line
Plumbing Fixtures | Bath Accessories | Door Hardware | Lighting | Flooring | Kitchen Appliances | Mirrors | Tile | Wood Trim | HVAC | Rough
Materials | Energy & Electrical | Intelligent Home | Windows | Commercial Solutions | Whole-Room Assemblies
Designed to eliminate the usual trade-offs, KOVA Finish materials deliver the
perfect balance of form, function, and value. Cohesive, comprehensive, and cost-
effective across all finish material categories, from flooring to faucets, appliance to
accessories, KOVA helps bring beautiful spaces to life, on time and on budget.
KOVA Finish Materials
Good design doesn’t have to be expensive
+ + + =Curated products that work together across categories
Single trusted materials source rather than many
Global supply chain sourcing & logistics
Reliable quality assurance
Saves your project time & money
Owning our own supply chain, from product design and development through sourcing, manufacturing and logistics allows us to provide material
savings across all projects.
We Aggregate Demand Across Customers to Benefit All
Katerra offers elegant kitchen and bath solutions as well as a thoughtfully curated catalog of products, from sleek faucets and sinks to custom cabinets and countertops, that combine functional ease with sophisticated, timeless design.
KOVA Interior Products
KOVA Intelligent HVAC uses behavior, environmental and occupancy data unique
to each living environment to adapt, personalize and maximize comfort. Occupying
a minimal footprint, KOVA Intelligent HVAC is designed to install between vertical
studs, integrating seamlessly into spaces, elevating design and eliminating the loss
of valuable unit footprint. MEP systems often represents over 20% of construction
and operating costs.
KOVA Intelligent HVAC
The KOVA Bath Kit is an innovative bathroom delivery system engineered to reduce
cost and increase the speed to occupancy. Widely known to be one of the most
challenging components of a building to deliver, we’ve reimagined bathroom
assembly by applying systems-level thinking to optimize and simplify the process.
KOVA Bath Kits
Cross-Laminated Timber is a pre-fabricated, engineered wood building material
with unique and often superior building, aesthetic, environmental, and cost
attributes. CLT can serve as a system-based approach for floors, walls, and roofs
to form a high-performance, sustainable, and beautiful mass timber building of
virtually any type. By integrating traditionally fragmented steps in the design-build
process, Katerra’s end-to-end model offers a unique value proposition: a fully
integrated building partner with robust technology systems. Watch our new video
feature to learn more about Katerra Cross-Laminated Timber .
CLT
Precision-designed, engineered, and fabricated, Katerra’s panelized structural
components streamline field installation, offering schedule and labor cost benefits,
while providing more design flexibility than traditional modular ‘pod’ solutions.
With a range of completion levels and optional sub-assemblies, we supply a broad
range of projects with the highest quality materials, built to meet your needs.
Katerra Structural Components
https://youtu.be/l6PQJxTkV6E
98 katerra.com/construction-services
Katerra Component and Finish Factory - Tracy, CA
Katerra’s 577,000 square foot advanced manufacturing
facility has fully automated wood frame wall production
lines, automated floor lines, automated cabinet and finish
areas, automated roof truss lines, an automated window line
and a light gauge steel production line.
The factory will produce, on an annual basis, the equivalent
of 12,500 multifamily units while bringing more than 500
new jobs to California’s East Bay region.
Cost Savings Delivered Through Innovations in Manufacturing:
• Utilizing offsite manufacturing to bring new efficiencies to building projects.
• Katerra factories act as an extension of job sites, maximizing construction activity within the factory environment to drive improved productivity.
• Katerra factories produce a wide range of structural components, manufactured assemblies, and finish materials.
Today, we have a growing footprint of global factories, which act as an extension of job sites by maximizing construction
activity within the factory environment to drive improved productivity. As our most technologically advanced factory to date,
Tracy provides a template for our future component factories and offers insight into how Katerra is applying technology
offsite to reduce time to completion at the project site. We have hired nearly 200 full-time employees to date. By the end of
2020, we expect to reach full production with three shifts and more than 500 employees who will have the opportunity to
learn and operate some of the most advanced manufacturing equipment available in the industry.
Katerra's Component & Finish Factory - Tracy, CA
30 Fixed Robots
12,500Equivalent umber of multi-family units
the factory will produce, on an annual
basis
577,000Size in square feet of our advanced
manufacturing facility in Tracy
Self-Guided Vehicle technology
12 mobile robots, and a digital
manufacturing process using Self-
Guided Vehicle technology
• Interior Wall Panels
• Exterior Wall Panels
• Roof Truss Assemblies
• Floor Systems
• Utility Walls
• Cabinetry
• Countertops
• Windows
Manufacturing:
Showroom
R&D lab
Katerra’s global material distribution centers ensure cost-effective and timely delivery.
Wood Framing - District at Chandler
Katerra considers Pre-Construction the most important phase of any project. The ability to align the interests, objectives and practices of all team members at this early stage in the construction cycle is an amazingly accurate predictor of project success.
“Realized Construction should never come at the cost of Envisioned Design”
We immediately distance ourselves from our competition by being open and empathetic to the vision you have created. In many cases projects have been in preliminary planning stages for years before we become part of the team. Our first goal is to clearly understand your goals and objectives.
Our place at the table is earned by bringing specific marketplace expertise to design and constructability discussions. Our goal is to take ownership where required and thrive on responsibility and accountability. Our reputation in the industry is that of a great teammate, a claim backed up by the fact that over 85% of our business comes from our existing clientele.
“Listen!”
“Bring Knowledge and Experience“
Our goals as your Pre-construction GC partner are:
Balance concern for schedule, budget, scope, quality, coordination of documents, value engineering, dispute avoidance and minimizing risks for all parties
Maximize results with a streamlined process and work to shorten overall delivery period
Use innovation, technology, and extensive local market experience to create assurance and accuracy on project time and costs
Understand Stakeholders needs; drive down real costs/reduce redundancies
Improve constructability of important details through early involvement of sub-contractors and specialty trades
Fill scope gaps through project understanding, code understanding, previous experience, and constant communication
1110 katerra.com/construction-services
At Katerra we believe in an integrated and collaborative project delivery approach, utilizing the Virtual Design and Construction (VDC) process and Building Information Modeling (BIM) as Lean tools to deliver a safe, cost-effective, timely, and complete project. Katerra is unique in that we create a Single Source of Truth Model (SSTM) for each of our projects, populated by BIM information as early as the Civil, Structural and Landscaping phases. This ensures complete co-ordination at the earliest stages and prevents costly schedule disruptions. Through a transparent, collaborative approach, we can lower the costs of project delivery while increasing efficiency and profitability for our partners.
Virtual Design and Construction (VDC) Our five main goals are:
Use BIM to Virtually construct the building in its entirety - Enable Clash Detection
Create a Collaborative Environment based on a Common Platform – Reduce RFI’s
Manage Change - Minimize Schedule Impacts
Manage Construction Documents – Reduce Costs
Minimize Risk Exposure – Increase Safety
1.
2.
3.
4.
5.
Block Scheduling
Key goals of our Block Schedule approach include:
Prevent schedule disruption and sub-trade bottlenecks through dynamic scheduling
Create predictable outcomes by basing production rates on known man-power
Maximize productivity by continuous communication on a common platform with all trades
At Katerra, we have developed a scheduling system internally known as the “Block Schedule” to allow us to maintain trade flow, minimize crew sizes and identify with certainty the end date of the project. Our project team will work closely with all trades to develop a 5 day work plan, sequencing workflow to produce a predictable production rate with known man-power while days 6 and 7 are used to adjust to stay on schedule.
1312
https://youtu.be/gFF2myTSpt8
Watch our new video feature to learn more
about how Katerra uses VDC.
katerra.com/construction-services
Highlights
Highlights
Highlights
1514 katerra.com/construction-services
Hub II(5) wood framed floors
over podium deckStudent Housing
Oliver Station (4) wood framed floors
over podium deckMarket Rate Apartments
Multifamily construction projects shape and define the communities they are built in. Katerra believes in the transformative value of the buildings that we help plan, design, engineer and build and their positive long-term effect on the people that populate them.
Mid-Rise Multifamily Experience
Katerra has an unrivaled commitment to innovation. Using a collaborative pre-construction process, cutting edge VDC/BIM technology, Lean Construction techniques, a deep roster of experienced builders and an impressive global supply chain, Katerra offers a one of a kind partner laser-focused on your schedule and budget.
Our construction team’s deep experience across a wide variety of markets, combined with our unique approach means that we can provide greater assurance and transparency from feasibility and design all the way through project completion.
Clemson, SC
706 Beds
5 Level Precast Parking Deck
Student Housing
$43M Construction Budget
In the heart of downtown Clemson lies the off-campus student housing
community, 114 Earle. The apartment offers 227 units and 706 beds that are
rented per person. The building is a 4 and 5 story split with over 7,000 sq ft of
retail space. Amenities include a pool with sun deck and jumbotron, fire side
lounge, two-story fitness center, gaming station, Hub by Amazon, and keyless
entry and suite lock systems.
114 Earle
Harrison Urby’s architecture and interiors are designed by Amsterdam-based
firm Concrete, best known for the designs of citizenM Hotels around the
world. Paying homage to the neighborhood’s industrial heritage, Urby’s façade
is inspired from the design of iron bridges. Comprised of a series of buildings,
beautifully landscaped geometric green spaces connect each one and form a
network of courtyards together at the heart of the complex.
Harrison Urby
Harrison, NJ
410 Residential Units
2 Commercial Units
5 Story
4-over-1 Wood Frame
$56M Construction Budget
Market Rate Apartments
$27M Construction Budget
Wood Frame
5-over-1
Commercial Retail Space
RendeZvous Urban Flats is a six story 121,000 sq. ft. building with 104
market-rate apartments that are either one or two bedrooms ranging from
660 to 1,110 sq. ft. with 4,200 sq. ft. of ground floor retail. The project is also
incorporating a ground-level plaza with amenities such as Ben’s Bells salvaged
art, water features, barbecue and more. Aerie Development LLC, is the
developer of this mixed use building and The Davis Experience is the architect.
RendezVous
HighlightsHighlights
HighlightsHighlights
HighlightsHighlights
1716 katerra.com/construction-services
Located in Atlanta’s West Midtown just minutes from Atlantic Station is the
232 unit development, 464 Bishop. The four and five story split apartment
offers an outdoor sky lounge at the top of the parking deck with city views.
Amenities include a club room, fitness center, pool with cabanas, a dog park
and car washing station.
464 Bishop
Atlanta, GA
Wood Frame
Precast Parking Deck
Wrap Style
$30M Construction Budget
232 Units
Richmond, VA
15 Individual Buildings
301 Units
Garden Style
$35M Construction Budget
Voted “Best Amenity Package” at the 2018 RAMMY Awards, Avia Apartments
offers luxury garden style apartments in Richmond, VA. Avia features 15
individual buildings that include 3 and 4 story splits, 4 story conditioned
corridor buildings, 3 story garden style and carriage buildings. Amenities
include two pools, multiple courtyards, clubhouse, fitness studio, fire pits, a
dog salon, and ECV charging stations.
Avia Apartments
The Baker Building is a new community of 83 apartments located in the
Lafayette neighborhood of Jersey City. The building features a diverse
selection of hardwood or concrete for a modern aesthetic in all units, with
high-gloss white cabinets, gray quartz countertops, and stainless steel
appliances. All units have been outfitted with up to date technology, such as
USB outlets, keyless door fobs, and Smartphone controlled intercom systems.
This project was completed in summer 2016.
Baker Building
Jersey City, NJ
83 Units
Wood Frame
Modern Amenities
Bell Glenridge
Located in Sandy Springs, GA, Bell Glenridge offers luxury apartments
centered in the Perimeter. The five story over podium building boasts a seven
level precast parking deck with EVC stations. Amenities include a heated salt
water pool, fire pits, grilling stations, building controlled access, EVC stations
and a 24-hr meditation studio.
Sandy Springs, GA
7 Level Precast Parking Deck
5,000 SF Retail Space
Type IIIA
$22M Construction Budget
Market Rate Apartments
$14M Construction Budget
Wood Frame / Concrete Podium
5-over-1
Proxy 333 is a 118-unit mid-rise apartment project. The six-story multi-façade
building features 10 ground floor live-work apartments and 108 conventional
market-rate units. The building includes a recreation facility, podium courtyard,
wet deck and pool, bike storage and rooftop lounge area. The architect was
Seattle-based Studio Meng Strazzara.
Proxy 333
Student Housing
$56M Construction Budget
Wood Frame / Concrete Podium
6 Acre Development
Fremont Station
Fremont Station, designed by Nequette Architecture and Design of
Birmingham, AL is an all-new student housing complex with luxury flats and
townhome apartments. The project offers resort-style amenities for students
of Northern Arizona University with 227 units on 6 acres with one, two, four,
and five bedrooms apartments. Amenities include a clubhouse with fully
equipped gym, resort-style pool with 2 spas, stand up tanning beds and study
rooms.
HighlightsHighlights
HighlightsHighlights
HighlightsHighlights
1918 katerra.com/construction-services
Cameron Square is a mixed-use complex recently completed in Alexandria,
Virginia, with 302 units, 20,000 square feet of retail space, and 415
parking spaces in a below grade cast-in-place garage. The apartment
complex is National Green Building Standard (NGBS) Bronze-certified.
The Cameron Square Apartments community was developed by Novare
Group in partnership with Mulberry Development and Preferred Apartment
Communities.
Cameron Square
Alexandria, VA
200,000 SF of Podium Slab
Cast-in-Place Garage
302 Units
$61M Construction Budget
Wood Frame
Situated minutes away from the Grove Street PATH station, Charles & Co is
a widely popular apartment building with a mix of apartment units available.
The units feature oak wide plank hardwood flooring, oversized windows,
walk-in closet, and ample space to relax. The seven story building consists
of 99 apartment units, ground floor retail, and a co-working office space.
In addition, there are on-site fitness studio, communal rooftop lounge and
terrace, parking, and a children’s playroom. Charles & Co is the place to be.
Charles & Co.
Jersey City, NJ
410 Residential Units
5 Commercial Units
7 Story
Metal Panel
$26M Construction Budget
Cirrus
Over Podium
7 Stories
350 Parking Spaces
Market Rate Apartments
$70M Construction Budget
Advanced Technology
Cirrus will feature 285 apartments on a 2-acre parking lot west of Mile High
Stadium. The units will be comprised of 41 studios, 186 one bedrooms and 58
two bedrooms. In total, the development would have 286,787 square feet of
residential space. Katerra will be providing General Contracting services and will
self-perform concrete, framing, mechanical, electrical, plumbing, and finishes.
Atlanta, GA
Wood Frame / Concrete Podium
443 Units
Mixed-Use
$60M Construction Budget
80,000 SF Retail Space
Emory Point
In a joint development by Cousins Properties and Gables Residential, Emory
Point offers a community that combines modern luxuries, dining, nightlife,
and convenience located in Atlanta, GA near Emory University. Amenities
include an on-site dog park, two resort-style pools, four club lounges, multiple
courtyards, a theatre and assembly area. The 443 unit complex consists of 4
stories over a concrete podium with a 7-level precast parking deck and 80,000
square feet of retail space.
Millworks
Atlanta, GA
Winner of Judges Choice Award
Seven Level Parking Deck
Market Rate Apartments
$42M Construction Budget
Upgraded Units
Millworks provides 345 units in a four and five-story split high-density wrap
around a seven-story parking deck with electric vehicle charging stations.
The complex includes over 7,000 square feet of amenity space with a club
room, billiards, shuffleboard, wet bar and flat-screen TVs overlooking the pool
courtyard. Outdoor features include two courtyards, a saline pool, Ipe wood
boardwalk, outdoor movie theater, grilling station, dual-sided fireplace, bocce
ball court surrounded by grilling stations, and Ipe benches.
Reserve at the Ballpark
Atlanta, GA
15 Stories
LEED Certified
Student Housing
$35M Construction Budget
Just minutes from the Atlanta Braves Stadium and the Battery Atlanta lies the
406,233 sq ft apartment building; Reserve at the Ballpark. Amenities include a
resort style pool surrounded by cabanas and palm trees, 5th floor sky lounge
with views of the stadium, two story fitness center, bocce ball court, and
saltwater pool.
HighlightsHighlights
HighlightsHighlights
HighlightsHighlights
2120 katerra.com/construction-services
Decatur, GA
Surface Parking with 466 Spaces
298 Units
Mid-Rise Apartments
$29M Construction Budget
Reserve Decatur offers 19 spacious one, two and three bedroom floor plans
just one mile north of downtown Decatur. Amenities include bluetooth audio
sound systems, high-speed fiber services, energy star appliances, fitness
center, saltwater pool, bicycle storage, bocce ball courts, and more.
Reseve Decatur
Charlotte, NC
LEED Silver Certification
360 Units
Mixed-Use
$49M Construction Budget
Post South End is located on the light rail line with the Bland Station adjacent
to the community; just a short trip to Uptown Charlotte and BB&T Ballpark.
This LEED Silver project features 4 stories above concrete podium with a
precast parking deck. Amenities include swimming pool with sun deck, 5
courtyards, controlled access entry, fitness room, and onsite restaurants.
Post South End
Alexandria, VA
290 Units
Type IIIA Construction
Mid-Rise Apartments
$34M Construction Budget
Built on the site where one of the region’s first airfields used to operate, The
Beacon of Groveton offers luxury apartments close to Old Town, National
Harbor, the Huntington Metro and Washington, DC. Amenities include a
saltwater pool, community center, elevated sun deck, game room, club room,
fitness center and guest suite.
The Beacon of Groveton
Market Rate Lofts
$46M Construction Budget
Wood Frame
8 Garden Style Buildings
Developed by Kaplan Management Company, the District at Chandler is a
4-story, 320-unit multifamily project at the NWC of Frye Road and 95th Street.
The project will have 187 one-bedroom and 153 two-bedroom units, ranging
in size from 707SF-1,551SF. Design elements include a variety of window
and balcony styles, colors varied by unit, pop out features, decorative stone
veneers, and vertical and horizontal wall plane variations.
The District at Chandler
Oliver Station consists of two new residential buildings situated above retail/
commercial tenant spaces. The mixed-use development replaces the former
New Copper Penny bar and a gas station, providing 126 units of affordable
housing and 19 market rate apartments. The development has plans for on-
site water management, drought-tolerant landscaping, low flow water fixtures,
LED lighting, electric vehicle charging stations, and extensive rooftop solar
arrays to power the building’s common areas.
Market Rate Apartments
LEED Gold Certified
$32M Construction Budget
Wood Frame
5-over-1
Commercial Retail Space
Oliver Station
The first and second floors will contain 85 garage spots utilizing a triple-
stacking system to maximize space plus 7,500 SF of retail space. The third
and fourth floors of the development will consist of 20,518-square feet of
office space, which includes a rear-facing terrace area. 57 residential units
intended as rentals will take up the next five stories, with apartments on the
higher floors featuring balconies with glass wall components.
170 Erie Street
Jersey City, NJ
57 Residential Units
20,518 SF Office Space
85 Garage Parking Spaces
7,500 SF Retail Space
HighlightsHighlights
HighlightsHighlights
HighlightsHighlights
2322 katerra.com/construction-services
Atlanta, GA
Type IIIA
5 Level Precast Parking Deck
Mid-Rise Apartments
$27M Construction Budget
Although this 280 unit development is located in the bustling Buckhead
neighborhood, the Jane feels magically secluded thanks to the Atlanta
BeltLine trails in its backyard. The pedestrian and bike-friendly path spans 33
miles around the city. The community offers a Grecian-inspired pool with dual
aqua decks, a bocce ball court, fountain courtyard with fire pit, promenade
deck with grilling stations, bar lounge with a live moss wall, athletic club and
more.
The Jane
Wood Frame / Concrete Podium
8 Stories
Student Housing
$60M Construction Budget
The Mark
Developed by Landmark Properties, The Mark will have 154 units, 595-beds in
1 (8) story, 1 (5) story, 2 (4) story, and 1 (3) story buildings for U of A students.
The project architect is Dwell Design Studio. The project broke ground in May
of 2017 and is scheduled to be complete by May of 2019.
Atlanta, GA
Type IIIA Buildings
217 Units
Mid-Rise Apartments
$26M Construction Budget
Developed by Pollack Shores Real Estate Group, The Monroe Apartments
are the second phase of mid-rise apartments in South Buckhead Atlanta. The
community offers 217 units right off of the beltline and with a view of the
newly renovated Bobby Jones Golf Course. Amenities include a rooftop deck,
saline pool, greenspace with a concert stage, fire pit with grilling stations, and
a fitness and yoga studio.
The Monroe
Student Housing
$67M Construction Budget
Wood Frame / Concrete Podium
Wrap Style
Precast Concrete Parking
Developed by Landmark Properties, The Standard will have over 750,000 sf
of occupied building space with 252-units and 763-beds for NAU students.
The buildings will be comprised of 4 and 5 stories and will surround a 7 story,
612-space precast parking garage. An additional 18,000 sf of space will be
reserved for retail purposes. The project architect is Niles Bolton Associates.
The project broke ground in April of 2017 and is scheduled to be complete by
July of 2019.
The Standard Flagstaff
Katerra served as general contractor at The Rivington, a collection of 2
bedroom residences in the heart of Hoboken. These apartments provide
residents with modern amenities, a private courtyard, gym, and private shuttle
services to and from the Hoboken Terminal. An even bigger plus – you can
have a dog and a parking spot.
The Rivington
Hoboken, NJ
Modern Amenities
240 Units
Developed by Lennar Multifamily, Tapestry at Largo Station is 318 unit
apartment complex with over 40,000 sq ft of retail space. The five story
precast parking deck offers 428 spaces. Centrally located just minutes from
the University of Maryland, the Capital Beltway and The Metro Station,
Largo offers an easy commute. Amenities include a yoga room, spin cycle
room, indoor basketball court, 9ft. - 16ft. ceilings and upgraded technology
packages.
Tapestry at Largo Station
Mid-Rise
$44M Construction Budget
4 Stories Over Concrete Podium
Lake Arbor, MD
Wood Frame
40,000 SF Retail Space
HighlightsHighlights
HighlightsHighlights
HighlightsHighlights
2524 katerra.com/construction-services
Raleigh, NC
5 Stories Over Concrete Podium
100,000 sq ft of Retail Space
Mixed-Use
$58M Construction Budget
The Park & Market development fuels the community in North Raleigh.
It features studio, loft, one & two bedroom apartments with exciting and
convenient amenities. This mixed-use complex is located directly above a
Harris Teeter and other shops, offering around 100,00 square feet of retail.
Amenities include a pool, outdoor fire pits, grilling stations, a pet park,
clubhouse and work spaces.
Park & Market
Developed by Silverman, this residential property holds 99 apartments right
at Hamilton Square. There will be a parking garage on site, roof terrace, and
retail stores. Expected completion date late 2017.
Park Francis
Jersey City, NJ
99 Units
7 Stories
6 Commercial Units
Metal Panel
$25M Construction Budget
Gaithersburg, MD
6 Level Precast Parking Deck
4 Stories Over Concrete Podium
Mixed-Use
$54M Construction Budget
Gaithersburg Station is a Type V, 389 unit apartment complex designed by The
Preston Partnership. Amenities include a recording studio, rentable gazebo,
lagoon-style pool, oversized tubs, 9-ft ceilings, courtyards, and business
lounges.
Gaithersburg Station
Phase I of Solis Parkview brings 303 new units to the booming Chamblee,
GA. The mixed-use development creates 30,000 square feet of retail and is
connected to the local public transit station and additional community retail by
a “greenway” style path. Additional amenities include a leasing office, game
room, business center, fitness center, coffee car area, terrace amenity, dog
park, saltwater pool, and a bocce ball court.
Solis Parkview
Chamblee, GA
3 & 4 Stories Over Podium
30,000 Sq Ft of Retail
Mixed-Use
$46M Construction Budget
Garden Style
$32M Construction Budget
13,901 SF Amenity Space
Charlotte, NC
Wood Frame
4 & 6 Bay Free Standing Garages
Solis Berewick is a 275 unit mid-rise, garden-style apartment home in
Charlotte, NC. The complex contains 4 separate, three and four story buildings
with 4 free standing garages. Surface parking includes electric car charging
stations. Amenities include mulch walking trails, club, cafe lounge, game area,
dog park and playground.
Solis Berewick
Highlights
Market Rate Apartments
$59M Construction Budget
Structured Parking
Wood Frame
7 stories
135 Units
135-unit apartment building with 5 stories of Type VA Construction above
grade with 1 story above grade plane and 1 basement level of Type IA
Construction. This project applies the provisions of IBC 504.4.1 utilizing
pressurized stair enclosures for a story increase. An outdoor amenity space
occurs on L5 and at the Courtyard at L1. A separate bicycle structure and the
pool are included.
Issaquah Highlands
HighlightsHighlights
HighlightsHighlights
HighlightsHighlights
2726 katerra.com/construction-services
Shippensburg, PA
834 Units
1846 Beds
Student Housing
$90M Construction Budget
6 Separate Buildings
Winner of the ForeverGreen Award for “Sustainability in Higher Education”,
Shippensburg University Graduate Student Housing project is located on
campus in Shippensburg, PA. The project showcases 6 separate buildings
housing 834 units and 1846 beds. Amenities include central common areas on
each floor, study lounges, computer rooms, structural steel wellness center,
recreational spaces and laundry facilities.
Shippensbug University
Solis Waverly
At the center of Charlotte’s hottest new neighborhood lies the 375 unit
apartment community, Solis Waverly. There are 10 separate garden style
buildings of 2, 3 & 4 stories. The Waverly neighborhood includes restaurants,
single family homes, a bank and a hotel in addition to the apartments.
Amenities include a cyber cafe, game center, media room, elevated terrace,
saltwater pool, grilling stations and a dog park.
Charlotte, NC
10 Buildings
Garden Style Apartments
$37M Construction Budget
Jefferson Park Apartments
Over Podium
High End Retail
Market Rate Apartments
$11M Construction Budget
Our team was selected by Real Architecture to construct Jefferson Park
Apartments, an $11m, 72-unit, 5-story multifamily development near the
popular Highlands Neighborhood.
The project was completed in September 2017.
The apartments at Harrison Station provide a community that promotes a
healthy, sociable, and active lifestyle for the residents. There are an array
of additions that add to the space, including but not limited to the outdoor
fireplace in the courtyard, bocce ball, fitness center, and a relaxing outdoor
pool. In addition to the luxury amenities, the PATH station is right around the
corner for those who are looking to head into the city.
Harrison Station Apartments
Harrison, NJ
270 Residential Units
10 Stories
1 Commercial Unit
Wood Frame over Podium
$41M Construction Budget
Alexandria, VA
290 Units
Type IIIA Construction
Mid-Rise Apartments
$34M Construction Budget
Built on the site where one of the region’s first airfields used to operate, The
Beacon of Groveton offers luxury apartments close to Old Town, National
Harbor, the Huntington Metro and Washington, DC. Amenities include a
saltwater pool, community center, elevated sun deck, game room, club room,
fitness center and guest suite.
The Beacon of Groveton
The Stamford Urby is a transformative residential development set to reinvent
rental housing in Downtown Stamford. This first phase brings nine buildings,
creating 465 rental apartments. Urby’s focus is on the creation of community
space for its occupants, for whom they will provide a gym, communal kitchen,
large landscaped courtyard with fire pits, and a saltwater swimming pool.
Other Spaces include: Café, Leasing, Lobby, Fitness, Oasis, Loading Dock, &
131,647 sqft parking garage.
Stamford Urby
Stamford, CT
465 Residential Units
Various 5 - 7 Stor Buildings
Wood Frame over Podium
HighlightsHighlights
HighlightsHighlights
HighlightsHighlights
2928 katerra.com/construction-services
Rockville, MD
192 Units
Wrap Style
High Density
$33M Construction Budget
Developed by Archstone, Westchester at Rockville Station offers luxury style
apartments in a small tech town. This high density development includes three
buildings wrapping a precast parking deck. Amenities include a leasing office,
exercise room, cyber cafe, swimming pool and an elaborate courtyard with a
running stream.
Westchester Rockville Station
Waldorf, MD
11 Buildings, 4 Carriage Houses
491 Units
Garden Style
$66M Construction Budget
Developed by Archstone, the Westchester at the Pavilions community sits on
38 acres. It includes 11 separate buildings and carriage houses along with an
Olympic size pool with lap lanes, soccer field, 4 tennis courts, 3 fountains. 2
playgrounds and a walking path. The community media room features theater
seating.
Westchester at the Pavilions
Buford, GA
Next to Gwinnett Braves Stadium
206 Units
Mid-Rise Apartments
$18M Construction Budget
Cheer for the beloved Gwinnett Stripers from the comfort of your balcony at
the Views at Coolray Field Apartments. With a courtyard lounge, a rentable
indoor dugout, a sundeck, and a skybox offering direct views of Coolray Field,
these apartments offer a unique living experience. Units boasts first class
features such as ash plank flooring, oversized garden tubs, sleek flat-panel
cabinetry, and stainless-steel appliances.
The Views at Coolray Field
Charlottesville, VA
251 Units
4,500 SF Community Center
Mid-Rise Apartments
$19M Construction Budget
Stonefield Commons consists of four story buildings offering 251 units. The
development includes 3 garage buildings with carriage units above and 2
stand-alone 6-bay garages. Amenities include a resort-style pool with outdoor
cabanas, a fully equipped fitness center, an iMac business center, and a
surround sound movie theater. All buildings feature controlled key fob entry.
Stonefield Commons
Downtown Jersey City’s new boutique five-story luxury rental property has
pushed the standards up and beyond. The property consists of 17 one- and
two-bedroom rentals, with a retail space on the ground level. There are
an abundant number of details that make the Rushmore as special as it is,
including first-floor private backyards, nine-foot by eight-foot energy efficient
windows, abundance of storage and living spaces depending on the unit, and
top of the line appliances.
The Rushmore
Jersey City, NJ
17 Units
5 Stories
1 Commercial Unit
Wood Frame
$4M Construction Budget
Affordable & Market Rate
$4M Construction Budget
Wood Frame
4 Stories
The Residences on Farmer is a 33,000 square foot contemporary 4-story wood
frame multifamily apartment complex with 31 units (mix of affordable and
market rate). The project included covered parking canopies with photovoltaic
solar panels and related site improvements located on .66 acres in the very
popular area of downtown Tempe (adjacent to Arizona State University) at the
corner of Farmer Ave and 7th St. The developer was Todd Marshall with Urban
Development Partners and was designed by Otak out of Portland, OR.
Residences on Farmer
3130 katerra.com/construction-services
Regional Map | Construction Management
Katerra West
Katerra Southwest
• Nevada (Southern)• Arizona• New Mexico
Katerra Upper Midwest
• North Dakota• South Dakota• Minnesota• Wisconsin• Michigan
Katerra Northwest
• Washington• Oregon
Katerra Northern California
• California (Northern)• Nevada (Northern)
Katerra Southern California
• California (Southern)
Katerra Rocky Mountain
• Montana• Idaho• Wyoming• Utah• Colorado
Katerra Central
• Oklahoma• Texas• Arkansas• Louisiana
Katerra Central Midwest
• Nebraska• Kansas• Iowa• Missouri
• Illinois• Indiana• Kentucky• Ohio
Katerra New England
• Maine• New Hampshire• Vermont• Massachusetts• Rhode Island
Katerra Northeast
• New York• Connecticut• Pennsylvania• Rhode Island• New Jersey
Katerra Mid-Atlantic
• Maryland• Delaware• Virginia• West Virginia
Katerra East
Katerra Southeast
• Tennessee• North Carolina• South Carolina• Mississippi• Alabama• Georgia
Katerra Florida
• Florida
Rocky Mountain
Northwest
NorCal
Southwest
Katerra West
Katerra East
Upper Midwest
Central MidwestMid-Atlantic
New England
Northeast
SoCal
Southeast
Florida
Central
3332 katerra.com/construction-services
Construction Management Leadership
Mike’s 30+ years of experience in the construction industry is characterized by a hands-on management style. Over this time, he has acquired a well-rounded understanding of both horizontal and vertical construction systems. Mike provides strategic leadership, operational management and technical direction to the Katerra team. He manages our construction staff, ensuring that our big picture focus is on achieving the goals of our clients.
In Mike’s principal leadership role, he has developed an extraordinary skill set that includes not only construction operations management but also preconstruction services. Whether working on a scale of 500,000sf or 10,000sf, Mike’s thorough knowledge of construction and team management style leads to high quality and smooth project delivery.
Head of Construction, West Head of Construction, California
Michael Hurst
Tom has the unique ability to build a strong team starting in preconstruction. By understanding the goals and values from the client’s perspective, he is generally the person who keeps the team focused on what is most important to the client. His lifetime of experience in construction—from carpentry foreman to superintendent, to project manager, to chief estimator, to development manager/project executive—gives him the big picture expertise to manage a project from the feasibility stage through completion. With an easy communication style, Tom brings clarity to complex issues and he rises to the challenge of balancing quality and aesthetics with sustainable and cost-effective solutions.
Tom Keilty, LEED AP
When Katerra looked for leadership for their construction efforts on the east coast, James and Robert Caulfield, were immediately identified as difference makers. With the acquisition of Fields Construction, Katerra found a company with a long history of success in the New Jersey marketplace. Founded in 1933 by James and Robert’s grandfather, Patrick Caulfield, Sr., Fields Development Group gave the two Caulfield brothers an in-depth education into the entire development process, with their father and uncle focusing on engineering and architecture.
When James and Robert emerged from college in the late 90’s, they immediately moved into the construction arena and began the hands-on process of learning the industry. Drawing on the lessons instilled in them by their father and grandfather, they focused on analyzing every aspect of a potential project, most importantly the long-term effect each development had on the community that surrounds it.
Today, James and Robert continue the legacy set before them, looking to constantly find ways to build better ad smarter. They believe strongly in the mission that Katerra has laid out: “Transforming through technology – every process and every product.” James and Robert continue to give Katerra East guidance and leadership, bringing engineering, architecture and GC expertise to our team.
Head of Construction, EastHead of Construction, East
Jim Caulfield Rob CaulfieldHead of Construction, Southeast
Brett Fortune, LEED AP
Brett brings over 30 years of experience to Katerra’s construction leadership team. As co-founder and CEO of Fortune-Johnson, Brett has supervised the construction of more than 22,000 multifamily units since the company’s inception in 1991. His experience encompasses all phases of construction operations including estimating, scheduling, site development, building construction and business development. Brett is a LEED Accredited Professional and a licensed general contractor in Georgia, Florida, Alabama, North Carolina, South Carolina, Kentucky and Tennessee. He is Chairman Emeritus for the Associated Builders & Contractors of Georgia and sits on the Construction Management Advisory Board for Clemson University, as well as Kennesaw State University’s Construction Management Advisory Board, of which he is a past Chairman.
Greg is the Head of Construction in the Pacific Northwest Region. He began his career in the construction industry in 1985 and has worked as a tradesman, concrete specialty subcontractor and design build GC/Developer. He is experienced in the commercial, industrial, retail, institutional and residential market segments. His focus has always been constructing the most efficient structures for Owners while honoring the Designer’s intent. He is dedicated to a collaborative and integrated project delivery process with a commitment to both sustainable materials and construction processes.
Head of Construction, Northwest
Greg Smith
3534 katerra.com/construction-services
Chris is currently overseeing two roles with Katerra, one as the Head of Construction, Central Region and the other as Managing Director for North American Renovations.
Previously, Chris had a career spanning 25 years with Schlumberger holding roles across the US, as well as internationally. Most recently he was a Product Line President with a focus on North America. Chris brings a strong background on improving profitability and cash flow through process and efficiency enhancement. Earlier in his career, Chris held a variety of leadership roles heading up Geographies, Business Lines, and Sales Organizations. Chris holds a Professional Engineer designation, and also volunteers to enrich and enhance the quality of education by sitting on the Ft. Bend Education Foundation Legacy Board.
Head of Construction, Central Head of Construction, Rky. Mtns.
Chris Barton
Eric brings 35 years of experience in development and construction management to Katerra. He has held senior level positions with national development and construction firms. During this time, he has developed a very versatile skill set as his career path has included positions as jobsite laborer, concrete testing technician, project engineer, project manager, estimator, business developer, operations manager, development manager and various director and vice president positions. His past even includes a summer working as a roughneck on an oil rig in western Oklahoma.
In addition to the various positions he’s held, Eric’s project experience boasts an equally diverse range including mixed use, multi-family/student housing, office, retail, health care, institutional, distribution, sports/recreation and hospitality developments.
Head of Construction, Southwest
Eric Jeagers
Kevin is responsible for the leadership and direction of operations in the Rocky Mountain Region for Katerra West and vertical integration of Katerra’s manufacturing, design, and construction services.
Most recently Kevin has assisted Katerra in establishing regional operations teams and best practices across the Western United States.
Kevin has been in the construction industry for 17 years, working on projects ranging in scope from $3 million to over $300 million. His responsibilities have ranged from field supervision to operational strategy and execution. He has worked on design-build projects across the United States with some of the most stringent safety and quality requirements in the industry.
Kevin Strahley
Rick is a Regional Director for Katerra with over 24 years of experience in the construction industry, spanning a wide array of multifamily construction types, including more than 3000 Type I units, over 2000 Type III/V units, and 2M square feet of commercial construction, as well as an extensive portfolio of historic renovation projects in the Washington, DC, metropolitan area.
At Katerra Rick provides executive leadership and is responsible for the growth of the entire Mid-Atlantic Region, overseeing all aspects of business development, preconstruction and construction. He utilizes his depth of experiences and deep-rooted understanding of the industry, particularly in the Mid-Atlantic market.
Head of Construction, Mid Atlantic Head of Business Development
Rick Felice
Cotton McNutt is a dual degreed engineer and Certified Safety Professional with almost 20 years of international oil and gas, residential and commercial project experience. She has been with Katerra 3 years, and has served as the Head of Health, Safety, Environment & Quality for over 2 years and was General Manager at three of our factories for almost a year. Prior to Katerra she worked for ExxonMobil in over 20 countries building offshore oil platforms, chemical plants, and refineries in a varying technical and operational roles.
Health & Safety
Cotton McNutt
As the Head of Business Development Alvaro takes an intuitive approach to partnering with developers and communities. Beginning his career in Banking and Investments in 1998, Alvaro went on to lead development for an international company were he (among other things) developed condominiums, conducted numerous land transactions and started a real estate website. Drawing on his South American upbringing, Alvaro understands that true “development” means immersing himself within the community to understand the needs of both businesses and individuals. As a passionate advocate for the City of Phoenix he presently sits on the boards of the Phoenix Center of the Arts, the Evans Churchill Community Association and the Hance Park Conservancy. Alvaro has a proven track record in creating successful long-lasting relationships with cities, customers, investors, and communities.
Alvaro Sande
katerra.com/construction-services
Let’s break new ground.Together.
katerra.com
katerra.com/construction-services
Thank you.
For more information, please contact
NationalAlvaro SandeHead of Business [email protected](602) 380-3663
SeattleAdam KurtenbachBusiness Development – PNW [email protected](206) 379-4392
ScottsdaleMichelle SchwartzBusiness Development – Southwest [email protected](480) 540-1545
AtlantaJason MciIvainSenior VP – Southeast [email protected](404) 328-8574
Jersey CitySarah MoranBusiness Development – Northeast [email protected](219) 775-2155
DenverAnna SchmidtBusiness Development – Rocky Mtn. [email protected](303) 519-6376
VirginiaKristopher CarDirector of Preconstruction – Mid Atlantic [email protected](703) 405-4261
DallasSimon HarrisBusiness Development Central [email protected](405) 613-1361