Midway Technology Centre Chicago, IL 40 East Garfield | 2-Buildings - 230,000 SF | Phase I - 120,000 SF | 26 MW Midway Technology Centre (“MTC”), Chicago’s historic Schulze Baking Company building is a 230,000 SF hardened warehouse with 26 MW of available utility feed, will address the strong demand in the Chicago data center market. Currently under development, Phase I will comprise 120,000 SF of DC and 30,000 SF of office upon completion, which is expected early 2020. » 5 miles from The Loop » Connectivity to 350 E. Cermak via multiple adjacent long-haul & metro fiber routes » Enterprize Zone cost savings: No sales tax on capex of affixed equipment; no sales tax on utility bills » Away from natural disasters and flight paths » Out of the 100- and 500-year flood plains Located in one of the top data center markets in the United States 0 Elsdon o 64 So ut h B r anc h Ch Ri v e r 90 90 94 290 41 Brighton Park Pilsen Hyde Park Bridgeport Kenwood Near North Side Chicago N Pulas kiR 0 velt Rd W 26th St 47th St Lake St st St St go Ave S Pulaski Rd N Pulaski Rd S Central Park Ave ort Elsdon o 41 W Di vision St W 55th St W Cermak Rd 41 41 41 41 90 90 90 55 W 59th St W Jackson Blvd W Grand Ave W Chicago Ave S Racine A ve S State St W Pershing Rd W 47th St E 63rd St S Hal sted St W Roosevelt Rd W 43rd S t W 51st St W 26th St N Kedzie Ave E 43rd St S Canal St W 63rd St E 60th St W Lake St S Homan Ave Brighton Park Pilsen Hyde Park Bridgeport Kenwood Near North Side Chicago ort Connectivity to 350 E. Cermak Midway Technology Centre 350 E. Cermak Highlights

Upload: others

Post on 29-Oct-2021

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Midway Technology Centre - CIM Group

Midway Technology Centre Chicago, IL40 East Garf ield | 2-Buildings - 230,000 SF | Phase I - 120,000 SF | 26 MW

Midway Technology Centre (“MTC”),

Chicago’s historic Schulze Baking

Company building is a 230,000 SF

hardened warehouse with 26 MW of

available utility feed, will address the

strong demand in the Chicago data center

market.

Currently under development, Phase I will

comprise 120,000 SF of DC and 30,000 SF of

office upon completion, which is expected

early 2020.

» 5 miles from The Loop

» Connectivity to 350 E. Cermak via multiple

adjacent long-haul & metro fiber routes

» Enterprize Zone cost savings: No sales tax on

capex of affixed equipment; no sales tax on

utility bills

» Away from natural disasters and flight paths

» Out of the 100- and 500-year flood plains

Located in one of the top data center markets in the United States

Hermosa

Cragin

50

Chicago -MidwayAirport

Elsdon

Cicero

90

64

LincolnPark

South B r

anc h

Chicag

oRiver

90

90

94

290

41

BrightonPark

Pilsen

ChicagoLawn

Hyde Park

Bridgeport

Kenwood

Near NorthSide

Chicago

Park Manor

NLaram

ieAve

NPulas

kiRd

Hermosa

Cragin

50

W Roosevelt Rd

W 26th St W 26th St

W 47th St

W Lake St

W 31st St

W 16th St

W 39th St

W Chicago Ave

SPulaski R

dNPulaski R

d

SCentral P

arkAve

Chicago -Midway Airport

Elsdon

Cicero

41

NLin coln Ave

NCalifornia

Ave

NElston Ave

W Division St

Lincoln Park

W 55th St

W Cermak Rd

41

41

41

41

90

90

90

55

W 59th St

W Jackson Blvd

W Grand Ave

W Chicago Ave

SRacine

Ave

SState

St

W Pershing Rd

W 47th St

E 67th St

E 63rd St

SHalsted

St

W Roosevelt Rd

W 43rd St

W 51st St

W 26th St

NKedzie

Ave

E 43rd St

SCanal S

t

W 63rd St

E 60th St

W Lake St

W Marquette Rd

SHom

anAve

Br ighton Park

Pilsen

Chicago Lawn

Hyde Park

Bridgeport

Kenwood

Near NorthSide

Chicago

W 71st St

Park Manor © OpenStreetMap (and) contributors, CC-BY-SA

Hermosa

Cragin

50

Chicago -MidwayAirport

Elsdon

Cicero

90

64

LincolnPark

South B r

anc h

Chicag

oRiver

90

90

94

290

41

BrightonPark

Pilsen

ChicagoLawn

Hyde Park

Bridgeport

Kenwood

Near NorthSide

Chicago

Park Manor

NLaram

ieAve

NPulas

kiRd

Hermosa

Cragin

50

W Roosevelt Rd

W 26th St W 26th St

W 47th St

W Lake St

W 31st St

W 16th St

W 39th St

W Chicago Ave

SPulaski R

dNPulaski R

d

SCentral P

arkAve

Chicago -Midway Airport

Elsdon

Cicero

41

NLin coln Ave

NCalifornia

Ave

NElston Ave

W Division St

Lincoln Park

W 55th St

W Cermak Rd

41

41

41

41

90

90

90

55

W 59th St

W Jackson Blvd

W Grand Ave

W Chicago Ave

SRacine

Ave

SState

St

W Pershing Rd

W 47th St

E 67th St

E 63rd St

SHalsted

St

W Roosevelt Rd

W 43rd St

W 51st St

W 26th St

NKedzie

Ave

E 43rd St

SCanal S

t

W 63rd St

E 60th St

W Lake St

W Marquette Rd

SHom

anAve

Br ighton Park

Pilsen

Chicago Lawn

Hyde Park

Bridgeport

Kenwood

Near NorthSide

Chicago

W 71st St

Park Manor © OpenStreetMap (and) contributors, CC-BY-SA

Hermosa

Cragin

50

Chicago -MidwayAirport

Elsdon

Cicero

90

64

LincolnPark

South B r

anc h

Chicag

oRiver

90

90

94

290

41

BrightonPark

Pilsen

ChicagoLawn

Hyde Park

Bridgeport

Kenwood

Near NorthSide

Chicago

Park Manor

NLaram

ieAve

NPulas

kiRd

Hermosa

Cragin

50

W Roosevelt Rd

W 26th St W 26th St

W 47th St

W Lake St

W 31st St

W 16th St

W 39th St

W Chicago Ave

SPulaski R

dNPulaski R

d

SCentral P

arkAve

Chicago -Midway Airport

Elsdon

Cicero

41

NLin coln Ave

NCalifornia

Ave

NElston Ave

W Division St

Lincoln Park

W 55th St

W Cermak Rd

41

41

41

41

90

90

90

55

W 59th St

W Jackson Blvd

W Grand Ave

W Chicago Ave

SRacine

Ave

SState

St

W Pershing Rd

W 47th St

E 67th St

E 63rd St

SHalsted

St

W Roosevelt Rd

W 43rd St

W 51st St

W 26th St

NKedzie

Ave

E 43rd St

SCanal S

t

W 63rd St

E 60th St

W Lake St

W Marquette Rd

SHom

anAve

Br ighton Park

Pilsen

Chicago Lawn

Hyde Park

Bridgeport

Kenwood

Near NorthSide

Chicago

W 71st St

Park Manor © OpenStreetMap (and) contributors, CC-BY-SA

Connectivity to 350 E. Cermak

Midway Technology Centre

350 E. Cermak

Highlights

Page 2: Midway Technology Centre - CIM Group

Located in an enterprise zone, offering extensive tax incentives

Total Size of Building

» 230,000 SF

» Phase I: 120,000 SF DC Office Space: 30,000 SF

» 250+ lbs/SF floorloads allow high density cabinets

» 18-22 foot ceiling heights

Connectivity

» Access to 350 E. Cermak, 427 S. LaSalle, 600 S. Federal

» Latency to 350 E. Cermak is

.075 microseconds

Power

» Provider: Commonwealth

Edison

» 10 MW planned for Phase I with total of 26 MW reserved

Infrastructure

» N+1 UPS and diesel generators with capability for 2N expansion

» Fuel storage capacity at full load achieves minimum of 72 hours backup run time

Carriers on Site

AT&T

360 Networks

Allied Fiber

AT&T

City of Chicago

Comcast

Fibertek

Legacy Qwest

Level3

Legacy Worldcom

RCN

Starlight

Zayo

source: connect media

Property Details

John Bonczek |646.387.5151 [email protected]

Jason Dill | 323.860.4944 [email protected]

CIM is a community-focused real estate and infrastructure owner, operator and lender. Utilizing our in-house expertise, we strive to create value through each project, ultimately benefiting communities across the Americas. Learn more at www.cimgroup.com.

CIM Group is not affiliated with, associated with, or a sponsor of any of the tenants pictured or mentioned. The names, logos and all related product and service names, design marks and slogans are the trademarks or service marks of their respective companies.

Creating Value. Enhancing Communities.

Leasing Contacts

IN JOINT VENTURE PARTNERSHIP: