Test Set-Up at ANKA Task 4.6 Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Upload: hector-berry

Post on 20-Jan-2018

222 views

Category:

Documents


0 download

DESCRIPTION

Vacuum, Surfaces & Coatings Group Technology Department 3 M. GIL COSTA position ANKA Facility ANKA FacilityCurrent StatusNext StepsScheduleConclusion ANKA Facility EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

TRANSCRIPT

Page 1: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Test Set-Up at ANKATask 4.6

Miguel GIL COSTACIEMATCERN TE-VSC

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 2: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 2

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

M. GIL COSTA

Test Set-Up at ANKA

Outline:

• ANKA Facility

• Current Status/Next Steps

• FCC Beam Screen Prototype

• Test Bench

• Next Steps

• ANKA Test Line full definition

• Schedule

• Conclusion

Page 3: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 3

M. GIL COSTA

position

ANKA Facility Current Status Next Steps Schedule Conclusion

ANKA Facility

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 4: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 4

Existing Beam Line

slit

Valve Absorber Pump

Distance source to set up center: 5.5 m

Set up

M. GIL COSTA

Information summary:• Free space

• Length from the source to the wall: ~ 7 m

• “Useful” length? (~ up to 2-3 m ?)• Beam height: 1.4 m• Incidence angle: 6.4 mrad• Operating ANKA at 2.2 GeV• Horizontal slit opening at 4m: 6.2 mrad• SR load : ~ 110 W• Flux: ~ 4 1020 ph/s

ANKA Facility Current Status Next Steps Schedule Conclusion

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 5: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 5

M. GIL COSTA

• Some components are available on site• Proposition Sketch beam line + set up (thanks to E. Huttel)

Vertical scrapper with fixed horizontal mask

ANKA Facility Current Status Next Steps Schedule Conclusion

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 6: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 6

Information to be defined:

• Design of absorbers needed or they are existent elements?

• Dimensions of existent elements to integrate on CATIA model?

• Alignment and survey system?

• Control and acquisition system ?

• Definition of the set up functionalities

• Finalisation of the instrumentation needs

M. GIL COSTA

ANKA Facility Current Status Next Steps Schedule Conclusion

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 7: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 7

Current Status / Next StepsBeam Screen Prototype

ANKA FCC Test Bench

ANKA FCC Test Line

M. GIL COSTA

ANKA Facility Current Status Next Steps Schedule Conclusion

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 8: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 8

Beam Screen (15m long)

Beam Screen Prototype (≈2m)

M. GIL COSTA

ANKA Facility Current Status Next Steps Schedule Conclusion

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 9: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 9

ANKA FCC Test Bench

• Supports adaptation from an existent

design

• Vacuum Chamber

• FCC Beam Screen Prototype Centring

System

M. GIL COSTA

ANKA Facility Current Status Next Steps Schedule Conclusion

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 10: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 10

M. GIL COSTA

• FCC Beam Screen Prototype Centring

System

• Supports adaptation from an existent

design

ANKA FCC Test Bench

ANKA Facility Current Status Next Steps Schedule Conclusion

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 11: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 11

Next Steps

ANKA FCC Test Line

• Complete definition of the line with

the inputs taken in the last days

• Check integration with ANKA

• Listing components and costs

• Start of production and material

orders

M. GIL COSTA

ANKA Facility Current Status Next Steps Schedule Conclusion

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 12: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 12

Schedule

• Design phase end expected by end

of November 2015

• Fully definition of the line is not yet

defined

M. GIL COSTA

ANKA Facility Current Status Next Steps Schedule Conclusion

Seems difficult to be finished in one week

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 13: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 13

Conclusions

• Beam Screen prototype production definition and 3D model is well advanced.

• Test Bench design proposition is presented and need to be discussed for further development and future design versions.

• ANKA Test Line for FCC prototypes has to be defined on the following weeks with priority based on the gathered information after discussion during Orsay meeting.

• Design Schedule might have to be reconsidered, trying to maintain the same deadline for the next step (procurement/tests in lab)

M. GIL COSTA

ANKA Facility Current Status Next Steps Schedule Conclusion

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 14: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 14

M. GIL COSTAEuroCirCol WP4, Annual meeting 3

Orsay, 19 November 2015

Page 15: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 15

M. GIL COSTA

Thanks for your attention

EuroCirCol WP4, Annual meeting 3Orsay, 19 November 2015

Page 16: Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

Vacuum, Surfaces & Coatings GroupTechnology Department 16

M. GIL COSTAEuroCirCol WP4, Annual meeting 3

Orsay, 19 November 2015