Talking Points
History of Camp Bullis Regulatory GuidanceRFA Goals & ProcessMRS dataRFA ResultsConclusions
519000
519000
529000
529000
539000
539000
549000
549000
559000
559000
569000
569000
579000
579000
589000
589000
3243
000
3243
000
3253
000
3253
000
3263
000
3263
000
3273
000
3273
000
3283
000
3283
000
3293
000
3293
000
3303
000
3303
000
PROJECT LOCATION MAPCamp Bullis Military Reservation, Texas
1:500,000
Projection UTM, Zone 14Horizontal Datum NAD83Units MetersGrid 10,000 Meter
0 4 8 12Kilometers
0 2 4 6 8 10Miles
County BoundaryInstallation BoundaryRoadStreamWater
Area StatusOperational Range
TexasInstallation Location
RCRA FACILITY ASSESSMENT REPORTCAMP BULLIS MILITARY RESERVATION, TX
Source: Produced for the U.S. Army Corps of Engineersby engineering-environmental Management Inc. (e²M).
Date: August 2005Edition: Final
Figure 1
Camp Bullis
10
410
35 37
281
90
87
LacklandAFB
KellyAFB
BrooksAFB
Fort SamHouston
RandolphAFB
San AntonioInternational Airport
Camp BullisMilitary
Reservation
San Antonio
10 35
KENDALL
BANDERA
MEDINA
BEXAR
COMAL
GUADALUPE
WILSON
540000
540000
541000
541000
542000
542000
3278
000
3278
000
3279
000
3279
000
3280
000
3280
000
LOCATIONS of MR SITESCamp Bullis Military Reservation, Texas
1:22,000
Projection UTM, Zone 14Horizontal Datum NAD83Units MetersGrid 1,000 Meter
0 200 400 600Meters
0 500 1,000 1,500 2,000 2,500Feet
Installation BoundaryRoadCreekWater
Area StatusOperational RangeMR SiteRange Area, Firing Line to Target Butt
TexasInstallation Location
RCRA FACILITY ASSESSMENT REPORTCAMP BULLIS MILITARY RESERVATION, TX
Source: Produced for the U.S. Army Corps of Engineersby engineering-environmental Management Inc. (e²M).
Date: August 2005Edition: Final
Figure 2
Camp Bullis10 35
75 mm Munitions Site2.22 ac.
Stokes Mortar Munitions Site114.48ac.
Machine Gun Range0.25 ac.
100 Target Range7.95 ac.
Salado Creek
Regulatory Guidance
CERCLA preferred MMRP regulatory guidance
However, state may exercise authority under RCRA
Camp Bullis has RCRA permit
TCEQ requested Camp Bullis be evaluated under RCRA
Army agreed, TCEQ is the lead regulatory agency
MMRP RFA Goals
Primary GoalTo support one of the following recommendations
No Further ActionImmediate Response;Further Characterization
Secondary GoalTo apply the information to:
Refine the MMRP CTC estimates by ArmyUpload RFA analytical data into ERISPopulate the MRS-PP & calculate draftscores for each MRS
MMRP RFA Process
Establish and involve stakeholders throughoutDevelop/accomplish DQOsPerform historic records reviewDevelop CSM and determine data gapsDesign Work Plan and perform field workRFA
540500
540500
541000
541000
541500
541500
3279
500
3279
500
3280
000
3280
000
STOKES MORTAR MUNITIONS MR SITE SAMPLE LOCATIONCamp Bullis Military Reservation, Texas
1:8,000
Projection UTM, Zone 14Horizontal Datum NAD83Units MetersGrid 500 Meter
0 100 200 300Meters
0 150 300 450 600 750Feet
CreekGrab Sample Location, Biased
Area StatusOperational RangeMR Site, Revised Boundary
TexasInstallation Location
RCRA FACILITY ASSESSMENT REPORTCAMP BULLIS MILITARY RESERVATION, TX
Source: Produced for the U.S. Army Corps of Engineersby engineering-environmental Management Inc. (e²M).
Date: August 2005Edition: Final
Figure 10
Camp Bullis10 35
Salado Creek
STK-B01
540300
540300
540400
540400
540500
540500
3278
700
3278
700
3278
800
3278
800
75 mm MUNITIONS MR SITE SAMPLE LOCATIONSCamp Bullis Military Reservation, Texas
1:2,000
Projection UTM, Zone 14Horizontal Datum NAD83Units MetersGrid 100 Meter
0 10 20 30Meters
0 40 80 120 160 200Feet
Sample Location
Prior UXO FindingArea Status
Operational RangeMR Site, Revised Boundary
TexasInstallation Location
RCRA FACILITY ASSESSMENT REPORTCAMP BULLIS MILITARY RESERVATION, TX
Source: Produced for the U.S. Army Corps of Engineersby engineering-environmental Management Inc. (e²M).
Date: August 2005Edition: Final
Figure 7
Camp Bullis10 35
R1R
R04
R25
R19
R55
R15R12R10
541700
541700
541800
541800
541900
541900
542000
542000
542100
542100
3278
100
3278
100
3278
200
3278
200
3278
300
3278
300
3278
400
3278
400
3278
500
3278
500
100 TARGET RANGE MR SITE SAMPLE LOCATIONSCamp Bullis Military Reservation, Texas
1:3,270
Projection UTM, Zone 14Horizontal Datum NAD83Units MetersGrid 500 Meter
0 40 80 120Meters
0 50 100 150 200 250Feet
Stream
Random Sample Location
Biased Sample Location
Surface Water Sample
5-Point Composite Sample
Area StatusOperational RangeMR Site
TexasInstallation Location
RCRA FACILITY ASSESSMENT REPORTCAMP BULLIS MILITARY RESERVATION, TX
Source: Produced for the U.S. Army Corps of Engineersby engineering-environmental Management Inc. (e²M).
Date: August 2005Edition: Final
Figure 8
Camp Bullis10 35
R2R15
R10
R18R24
R38
R35R33
R29
B10
B01
B03B04
B05B06
B07B08
B09
B11B12
R46
600 yd. Firing Line
500 yd. Firing Line
Salado Creek
B02BULL-100T-R39
BULL-100T-R39SW
541500
541500
541550
541550
3278
550
3278
550
MACHINE GUN RANGE MR SITE SAMPLE LOCATIONSCamp Bullis Military Reservation, Texas
1:500
Projection UTM, Zone 14Horizontal Datum NAD83Units MetersGrid 50 Meter
0 5 10 15Meters
0 10 20 30 40 50Feet
Road
Random Sample Location
Biased Sample Location
Area StatusOperational RangeMR Site
TexasInstallation Location
RCRA FACILITY ASSESSMENT REPORTCAMP BULLIS MILITARY RESERVATION, TX
Source: Produced for the U.S. Army Corps of Engineersby engineering-environmental Management Inc. (e²M).
Date: August 2005Edition: Final
Figure 9
Camp Bullis10 35
R07R09
R22
R12
R02
R30
R27R31B01
B02B03
B04 B05B06
B07B08
1200 yd. Firing Line
Wilderness Trail R
d
RFA Results - MCAs TCEQ is lead agency, stakeholders agreed
Use TRRP PCLs for residential levels in soil for comparison
Explosives (EPA Method 8330) assessed at two MRSs.
No explosive compounds detectedTAL Metals (EPA Method 6010B) assessed at all four MRSs.
Metals detected at 2 MRSs
RFA Results - MC
thallium 6.3 mg/kgthallium 8.07-12.0 mg/kg75 mm Munitions SiteTRRP Tier 1 PCLsMC DetectedMRS
All 8 samples collected showed slightly elevated levels of thallium.Thallium is associated with the potassium minerals in clay soils.Camp Bullis IRP is investigating thallium throughout the installation.Stakeholders felt thallium issue notrelated to munitions.
RFA Results - MEC
Stokes Mortar RangeMEC confirmed during HRR
75 mm Munitions SiteDGM – performed to refine MRS boundary and support historic evidence of site as DMM site.Covered 76 % of the MRS.
RFA Results - MC
Copper Conclusion: “ Due to the very low detections of copper from the samples analyzed on 3 June 2005 and 14 July 2005, there does notappear to be a concern with high levels of copper at the site.”*
copper 550 mg/kgcopper 6.2 – 10.5 mg/kg
FSH resample
TRRP Tier 1 PCLsMC Detected100 Target Range
copper 10.8 mg/kg
copper 3390 mg/kgthallium 6.4 & 7.24 mg/kg
copper 550 mg/kge2M resample – 5-point composite
copper 550 mg/kgthallium 6.3 mg/kg
RFA Field Work
•Memorandum, to TCEQ, Region 13, RE: Copper sampling Results from MMRP Site, 100 Target Range, US Army Camp Bullis, Texas, from Director, Environmental and Natural Resources Office.
RFA Conclusion – Stokes Mortar Munitions Site
Further Characterization:
MEC: Documentation indicates MEC has been found throughout the MRS.
MC: Metals and explosives were not detected
RFA Conclusion – 75 mm Munitions Site
Further Characterization
MEC: MEC has historically been discovered at this MRS and DGM detected 160 anomalies supporting reasonable cause for further investigation.MC: Thallium detected in all 8 surface soil samples.
RFA Conclusion - 100 Target Range
No Further Action
MEC: MEC is not associated with the MRS.MC: Copper and thallium exceeded PCLs.
Copper was determined to be an outlier by follow up samplingThallium determined not a contaminant of concern by stakeholders.
RFA Conclusion – Machine Gun Range
No Further Action
MEC: MEC is not associated with the MRS.
MC: MC was not detected in levels which exceed TRRP Tier 1 PCLs at the MRS.