1M. Popovic
MuCool Collaboration Meeting
Milorad Popovichttp://www-bdnew.fnal.gov/proton_source/popovic/index.html
6-Feb-2002
2M. Popovic
3M. Popovic
View from the top of Wilson Hall, 2001
Access
4M. Popovic
Close Up, 2001
5M. Popovic
WarningAny usage of the facility should be completely parasitic to Linac Operations and maintenance. Construction will/should require only modest, ~ three weeks of invasive interaction with Linac, which will/should be schedule as part of regular shutdowns.
1. Liquid Hydrogen Absorber test facilitya. Engineering Tests no Beam----Jun-2001
b. Beam Related Hydrogen Absorber test ------Jun-2002
c. Short Fully Integrated Cooling Section, H-Abs., Be-Window RF Cavity, SC Solenoid----Sep-2002
2. High Power RF Test Bed, 200MHz and 805MHza. Be Window RF Cavity, High Power RF Test---Sep-2002
b. Grid Based RF Cavity, High Power Test—Sep-2002
c. Cryo Cold Copper Cavity
Near Future Activities
6M. Popovic
People&Groups• Universities&FNAL
D.Kaplan, M.A.Cummings, E.Black, J.Norem, D.Summers S.Geer,….
• FESSJ.Sims-Structural Eng. R. Alber-G.VanZandbergen-Architect
• Cryo B.Norris, A. Klebaner, A. MartinezC. Darve
• RFA. Moretti
• Beam LineC. Johnstone
• InstrumentationD. Errede, M. Shea
• SafetyJ. Priest-ES&HM.Gerardi-RadiationM.Ferguson-Linac AreaB.Fritz-Environment
• LH2-Safety?J.Kilmer, AllspachW.Smart
• ProtonSourceB.Webber-G.LeaderJ. Lackey
7M. Popovic
Target Dates• 1-May-01 End of Civil Construction for Phase I
Start LH2 Target InstallationStart Helium Plant Installation
• 20-April-01 Start Helium Plant Removal from PS4• 1-April-01 Cryo Moving/Assembly Contracts Awarded• 15-March-01 Cryo Related Bids Out• 1-March-01 Cryo Design Ready/Start of Civil Const. • 15-Feb-01 Civil Const. Contracts Awarded• 1-Feb-01 Const., LH2, He,.. Safety Issues Defined • 15-Jan-01 Enclose&Cryo Building Bids Ready/Out• 20-Dec-00 Enclose&Cryo Building Design Ready• 15-Dec-00 Architectural Design Review by Lab B.C.
8M. Popovic
History
9M. Popovic
Jan-30-2001
10M. Popovic
View from the top of Linac Berm
11M. Popovic
30-Aug-2001
12M. Popovic
1500kVA Transformer Piping
13M. Popovic
1500kVA Transformer, Oct-2001
14M. Popovic
MuCool Site Plan as Jan-02
15M. Popovic
Schedule page 1
16M. Popovic
Schedule, page 2
17M. Popovic
Spending Profile
MuCool Spending ProfileW/ OHP
$142,000
$0 $0
$70,840
$175,120
$292,160
$15,000
$344,160$298,640
$44,000
050000
100000150000200000250000300000350000400000
Jan-02
Feb-02
Mar-02
Apr-02
May-02
Jun-02
Jul-02
Aug-02
Sep-02
Oct-02
Nov-02
Dec-02
Amount Earned by Month
Dol
lars
18M. Popovic
Future
Looking North
Looking South