milwaukee’s best brew stand
DESCRIPTION
Milwaukee’s Best Brew Stand. 5th Update. Ben Caya Carl Czajka. Parts. Ordered and Received. Kettle – Ordered Valves – In Thermometers - In. Ordered and Received. Parts. Working on donation. Free and Received. Ordered. Frame. Frame. Frame. Frame Continued. To-Do. Gas piping - PowerPoint PPT PresentationTRANSCRIPT
Milwaukee’s Best Brew Stand
Ben CayaCarl Czajka
5th Update
Parts
Ordered and Received
Ordered and Received
Kettle – OrderedValves – InThermometers - In
Parts
Free and Received
Ordered
Working on donation
Frame
Frame
Frame
Frame Continued
To-Doo Gas pipingo Bolt on Pumps (bracket already welded in)o Pump wiring
• Central power• Wire switch
o Weld on castorso Weld on propane tank holdero Brew Beer
Gantt Chart
WBS TasksTaskLead Start End
Duration (Days)
% Complete
Working Days
Days Compl
ete
Days Remaining
23 - Jan - 12 30 - Jan - 12 06 - Feb - 12 13 - Feb - 12 20 - Feb - 12 27 - Feb - 12 05 - Mar - 12 12 - Mar - 12 19 - Mar - 12 26 - Mar - 12 02 - Apr - 12
1 Initialize Project 1/23/12 2/15/12 3 100% 18 3 0
1.1 Partner Assign 1/23/12 1/24/12 2 100% 2 2 0
1.2 Choose Project 1/23/12 1/25/12 3 100% 3 3 0
2 VOC and Design Requirments 2/16/12 2/29/12 14 100% 10 14 0
2.1 HBT Design Pole 2/16/12 2/22/12 7 100% 5 7 0
2.2 Design Requirments 2/16/12 2/18/12 3 100% 2 3 0
2.3 Bi-Weekly Report #1 2/25/12 2/29/12 5 100% 3 5 0
2.4 Oral Presentation #1 2/25/12 2/29/12 5 100% 3 5 0
3 VOC and Design Requirments 2/16/12 2/29/12 14 100% 10 14 0
3.1 HBT Design Pole 2/16/12 2/22/12 7 100% 5 7 0
3.2 Design Requirments 2/16/12 2/18/12 3 100% 2 3 0
3.3 Bi-Weekly Report #2 2/25/12 2/29/12 5 100% 3 5 0
3.4 Oral Presentation #2 2/25/12 2/29/12 5 100% 3 5 0
4 Design Selection 3/01/12 3/14/12 14 77% 10 10 4
4.1 Select Design 3/01/12 3/04/12 4 100% 2 4 0
4.2 CAD Models 3/04/12 3/10/12 7 100% 5 7 0
4.3 FEA Analysis 3/10/12 3/14/12 5 0% 3 0 5
4.4 Bi-Weekly Report #3 3/12/12 3/14/12 3 100% 3 3 0
4.5 Oral Presentation #3 3/12/12 3/14/12 3 100% 3 3 0
5 Manufacturing Design 3/15/12 4/04/12 21 36% 15 7 14
5.1 Parts List 3/15/12 3/19/12 5 90% 3 4 1
5.2 Order Parts 3/19/12 3/21/12 3 30% 3 0 3
5.2.1 Steel for Frame 3/19/12 3/25/12 7 100% 5 7 0
5.2.2 Heating 3/19/12 3/25/12 7 0% 5 0 7
5.2.2.1 Burners 3/19/12 3/25/12 7 0% 5 0 7
5.2.2.2 Piping 3/19/12 3/25/12 7 0% 5 0 7
5.2.2.3 Pilot Lighting 3/19/12 3/25/12 7 0% 5 0 7
5.2.3 Pumps (2) 2/27/12 3/27/12 30 25% 22 7 23
5.2.4 Hoses for Pumps 3/19/12 3/25/12 7 0% 5 0 7
5.2.5 Valves 3/19/12 3/25/12 7 100% 5 7 0
5.2.6 Kettles 3/19/12 3/25/12 7 100% 5 7 0
5.2.7 Thermometers 3/19/12 3/25/12 7 100% 5 7 0
5.2.8 Heat Exhanger 3/19/12 3/25/12 7 0% 5 0 7
5.2.9 Castors 3/19/12 3/25/12 7 0% 5 0 7
5.3 Frame and Accessory Assembly 4/01/12 4/04/12 4 30% 3 1 3
5.4 Bi-Weekly Report #4 4/02/12 4/04/12 3 100% 3 3 0
5.5 Oral Presentation #4 4/02/12 4/04/12 3 100% 3 3 0