mini hydro power plant 7,5 mw in lubuk gadang, west sumatera, indonesia
DESCRIPTION
PT SELO KENCANA ENERGITRANSCRIPT
Mini Hydro Power Plant 7,5 MW in Lubuk Gadang, West Sumatera, Indonesia
PT SELO KENCANA ENERGIPh: +6221 722 8483 / 722 8480
Fax: +6221 720 8191email : [email protected]
Project Summary
Project : Mini Hydro Power PlantLocation : South Solok Regency, West Sumatera Province
Study Site
Catchment Area
DESIGN FACTOR FOR MHPP CAPACITY(based on daily water flow rate 1989-2005)
2,5 MW MHPP requires 6,47 m3/sec;
3x2,5 MW requires 19,43 m3/sec
Revenue Streams
A. Revenue from PLN. Contract 15 years Power Purchase Agreement with PT. PLN (Persero). Grid connected, total energy produced is purchased by PLN. Fixed contract price 770 IDR ( 7,7 cent USD) / kwh for 1st until 5th year 485 IDR ( 4,85 cent USD) / kWh / year for 6th year to 15th year
B. Revenue from Carbon Financing. 30.000 ton CO2 reduction. €7 ~ €23 (10 USD ~ 30 USD) / ton CO2
Project Summary
Total Investment - Capex (civil) : 8.285.000 USD - Capex (machinery) : 4.000.000 USD- Land : 200.000 USD- Working Capital : 125.000 USD- IDC : 1.095.000 USD Self finance:- Paid up equity : 400.000 USD - Additional equity : 848.500 USD
Senior debt : 8.739.500. USD with interest 10% paMezzanine loan : 2.497.000. USD
Project Feasibility
- IRR : 16,07%- R.O.E : 22,47%- NPV : 5.622.014 USD
(using discount rate 10%)
- Simple Pay back period: 4 years
- Exit strategy : buy out in 5 years
RiskDevelopment Cost
Remittances
Land Clearing
Construction
No
Yes (supervised by independent consultant)
Construction Damage
Operational & Maintenance
No (Covered by Insurance Co)
Yes (Small)
No
No
Prepared byPT. SKE
SKE & Investor
P.P.A
Management Team
1. Financial Team 2. Management Team
Rudy S. Sunggoro(Banking and Trading)
Eddy Sutedjo(CFO Olex Cable and PT. Diva)
Andi B. Salim(IBM, Sucaco, PT Antam Tbk)
Suwardi(Director PT Selo Kencana)
3. Technical Team 4. Legal
Imam Santoso(PLN, Mini Hydro)
Yani Kardono (Corporate Infrastructure)
THANK YOU