minimum fall 15 (inc roof) maximum fall 75 (inc roof) · 1 pinfold road , thurmaston leicester, le4...

3
Roof tiles to overlap apron lip by 20mm minimum Internal sizes taken from here (size ordered = size of timber structural opening) Tile Battens to be ran upto the side of the flashing tray Roofing underfelt to be fitted onto roof, flush to the edge of the structural opening prior to fitting rooflight White powder coated internal trim (factory applied) Plywood Deck Max 12mm Plasterboard Minimum fall 15 (inc roof) Maximum fall 75 (inc roof) Screw fix timber kerb to fix luxlite to roof using brackets and screws provided - refer to step by step guide used Do not lift by glass Lift from here (apron lip) Plasterboard to be finished as illustrated. Run into dedicated white internal trim, this will also act as your stop bead to ensure a neat finish Approx. 1:10 @A4 LUXLITE DOUBLE GLAZED (FIXED) SKYLIGHT - TYPICAL FITTING GUIDELINES - WARM DECK ROOF CS 07/12/2017 SM ROOF-maker 1 Pinfold Road , Thurmaston Leicester, LE4 8AS Tel: 0116 269 6297 Fax: 0116 269 6291 Email: [email protected] Title: THIS DRAWING IS FOR REFERENCE ONLY. PLEASE REPORTANY DISCREPANCIES TO THE DESIGNER BEFORE ANY WORKSCOMMENCE. ALL DIMENSIONS ARE IN mm. ALL DIMENSIONS TO BE CHECKED ON SITE BEFORE ANY WORKS COMMENCE. Date: Drawn: Checked: Scale:

Upload: phungdien

Post on 28-May-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Roof tiles to overlap apron lip by 20mm minimum

Internal sizestaken from here

(size ordered = size of timber structural opening)

Tile Battens to be ran upto the side of the flashing tray

Roofing underfelt to be fitted onto roof, flush to the edge of the structural opening prior to fitting rooflight

White powder coatedinternal trim (factory applied)

Plywood Deck

Max 12mmPlasterboard

Minimum fall 15 (inc roof) Maximum fall 75 (inc roof)

Screw fix timber kerb to fix luxlite to roof using brackets and screws provided - refer to step by step guide used Do not lift by glass

Lift from here (apron lip)

Plasterboard to be finished as illustrated. Run into dedicated white internal trim, this will also act as your stop bead to ensure a neat finish

Approx. 1:10 @A4

LUXLITE DOUBLE GLAZED (FIXED) SKYLIGHT - TYPICAL FITTING GUIDELINES - WARM DECK ROOF

CS

07/12/2017

SM

ROOF-maker1 Pinfold Road , ThurmastonLeicester, LE4 8ASTel: 0116 269 6297Fax: 0116 269 6291Email: [email protected]

Title:

THIS DRAWING IS FOR REFERENCE ONLY. PLEASE REPORTANY DISCREPANCIES TO THE DESIGNER BEFORE ANY WORKSCOMMENCE. ALL DIMENSIONS ARE IN mm. ALL DIMENSIONS TO BE CHECKED ON SITE BEFORE ANY WORKS COMMENCE.

Date:

Drawn: Checked:

Scale:

Roof tiles to overlap apron lip by 20mm minimum

Internal sizestaken from here

(size ordered = size of timber structural opening)

Roof Tiles

Tile Battens to be ran upto the side of the flashing tray

Roofing underfelt to be fitted onto roof, flush to the edge of the structural opening prior to fitting rooflight

White powder coatedinternal trim (factory applied)

Plywood Deck

Max 12mmPlasterboard

Minimum fall 15 (inc roof) Maximum fall 75 (inc roof)

Do not lift by glass

Lift from here (apron lip)

Screw fix timber kerb to fix luxlite to roof using brackets and screws provided - refer to step by step guide used

Plasterboard to be finished as illustrated. Run into dedicated white internal trim, this will also act as your stop bead to ensure a neat finish

Approx. 1:10 @A4

LUXLITE TRIPLE GLAZED (FIXED) SKYLIGHT - TYPICAL FITTING GUIDELINES - WARM DECK ROOF

CS

07/12/2017

SM

ROOF-maker1 Pinfold Road , ThurmastonLeicester, LE4 8ASTel: 0116 269 6297Fax: 0116 269 6291Email: [email protected]

Title:

THIS DRAWING IS FOR REFERENCE ONLY. PLEASE REPORTANY DISCREPANCIES TO THE DESIGNER BEFORE ANY WORKSCOMMENCE. ALL DIMENSIONS ARE IN mm. ALL DIMENSIONS TO BE CHECKED ON SITE BEFORE ANY WORKS COMMENCE.

Date:

Drawn: Checked:

Scale:

Roof tiles to overlap apron lip by 20mm minimum

Plywood deck

Do not lift from glass

Roofing underfelt to be fitted ontoroof, flush to the edge of thestructural opening prior to fittingrooflight

Plasterboard to be finished asillustrated. Run into dedicated whiteinternal trim, this will also act as yourstop bead to ensure a neat finish

Tile Battens to be ran upto theside of the flashing tray

White powder coated internal trim (factory applied)

Max 12mmplasterboard

Screw fix timber kerb to fix luxlite to roof using screws provided - refer to step by step guide used

Lift from here (apron lip)

Internal sizestaken from here

(size ordered = size of timber structural opening)

Minimum fall 15 (inc roof)Maximum fall 75 (inc roof)

LUXLITE TRIPLE GLAZED (HINGED OPENING) SKYLIGHT - FITTING GUIDELINES - WARM DECK ROOF

31/01/2018CS SM

ROOF-maker1 Pinfold Road , ThurmastonLeicester, LE4 8ASTel: 0116 269 6297Fax: 0116 269 6291Email: [email protected]

Title:

THIS DRAWING IS FOR REFERENCE ONLY. PLEASE REPORTANY DISCREPANCIES TO THE DESIGNER BEFORE ANY WORKSCOMMENCE. ALL DIMENSIONS ARE IN mm. ALL DIMENSIONS TO BE CHECKED ON SITE BEFORE ANY WORKS COMMENCE.

Date:

Drawn: Checked:

Scale:

Approx 1:3 @A4