mining plan for quartz & feldspar...mining plan for quartz & feldspar extent : 1.275...

46
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017 Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / Page – 1 MINING PLAN FOR QUARTZ & FELDSPAR

Upload: others

Post on 20-Mar-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 1

MINING PLAN FOR QUARTZ & FELDSPAR

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 2

INCLUDING PROGRESSIVE MINE CLOSURE PLAN

(Under Amended Rule 7 A (1) of APMMC Rules, 1966 &

Rule 7 A (3) of APMMC Rules, 1966)

(FOR THE FIRST FIVE YEARS PLAN PERIOD)

(OTHER THAN FULLY MECHANISED OPENCAST ‘A’ CATEGORY)

Over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B (P), 2C, 2D & 3 of

Lakshmipuram (V), Tiruvuru (M), Krishna District

Andhra Pradesh State

APPLICANT

MM//ss BBAALLAAJJII AACCQQUUAA && AAGGRROO PPRROODDUUCCTTSS PPVVTT.. LLTTDD

CC && MMDD.. SSrrii GGaaddddee RRaammaa MMoohhaann

DDoooorr NNoo.. 77--1177

KKaannuurruu RRooaadd

KKaammaayyyyaatthhooppuu CCeennttrree

VViijjaayyaawwaaddaa –– 77

KKrriisshhnnaa DDiissttrriicctt

By

P.V. SATYANARAYANA

Consultant Geologist & RQP

INTRODUCTION

M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD, C & MD. Sri Gadde Rama

Mohan, of Vijayawada, filed an application for grant of quarry lease for Quartz & Feldspar

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 3

over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B (P), 2C, 2D & 3 of Lakshmipuram

Village, Tiruvuru Mandal, Krishna District Andhra Pradesh State.

The Asst. Director of Mines and Geology, Vijayawada, submitted proposals for grant of

quarry lease for Quartz & Feldspar over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B

(P), 2C, 2D & 3 of Lakshmipuram Village, Tiruvuru Mandal, Krishna District Andhra

Pradesh State, in favour of M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD, C

& MD. Sri Gadde Rama Mohan, for a period of (30) years.

After careful examination of the proposals of the Assistant Director of Mines and

Geology, Vijayawada, it is decided in principle to grant the quarry lease for Quartz &

Feldspar over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B (P), 2C, 2D & 3 of

Lakshmipuram Village, Tiruvuru Mandal, Krishna District Andhra Pradesh State, in favour

of M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD, C & MD. Sri Gadde Rama

Mohan, for a period of (30) years subject to submission of Approved Mining Plan, with a

condition that the Approved Mining Plan shall reflect the restrictions to be adopted by the

applicant while conducting quarry operations due to existence of any structures, railway

line, roads, water bodies such as river etc., and the stipulated distances as per the various

regulations prescribed under Mines and Metalliferrous Regulations ‘1961 alongwith

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 4

consent for Establishment from A. P. Pollution Control Board & Environmental

Clearance from Ministry of Environment & Forests as per Environment Impact

Assessment Notification through S.O. 1533, dated 14-09-2006 to consider grant of quarry

lease for Quartz & Feldspar and vide Department of Mines & Geology, Ibrahimpatnam,

Notice No. 22567 / R2-3 / 2017 dated 11-09-2017 (Annexure – I).

M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD, C & MD. Sri Gadde Rama Mohan, of

Vijayawada, approached P.V. SATYANARAYANA, Consultant Geologist and RQP (RQP / DMG / AP /

34 / 2017) for preparation of Mining Plan in the above mentioned area.

Accordingly this Mining Plan is prepared as per guidelines issued in Form-T in G.O.Ms.No.56, Industries & Commerce (M.II) Department.,

dated 30-04-2016 under Amended Rule 7 A (1) of APMMC Rules, 1966 and Progressive Mine Closure Plan under Rule 7 A (3) of APMMC

Rules, 1966 for the first five years period and submitted to the Deputy Director of Mines & Geology, Kakinada, for scrutiny.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 5

I GENERAL

1. Name and Address of the applicant

M/s BALAJI ACQUA & AGRO PRODUCTS PVT.

LTD

C & MD. Sri Gadde Rama Mohan,

Door No. 7-17,

Kanuru Road,

Kamayyathopu Centre,

Vijayawada – 7,

Krishna District.

2. Status of the applicant Private Firm

3. Mineral (s) which are included in the Letter of

Intent Quartz & Feldspar

4. Name and Details of person employed for

preparing Mining Plan

P.V. SATYANARAYANA

Lattice It,

Aarya Castle,

Door No: 8-5 / 2,

Cherukuri Krishna Rao Gari Street,

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 6

Sarakottu Center, Gollapudi,

Vijayawada- 521225

Ph No-8610692941

RQP Registration No. & Validity RQP/ DMG / AP / 34 / 2017

(Valid Upto 25th March ‘2027)

II. LOCATION AND ACCESSIBILITY

1. Applied Area / Lease Details

Sy. No’s 89 / 2A, 2B (P), 2C, 2D & 3

Village Lakshmipuram

Mandal Tiruvuru

District Krishna

State Andhra Pradesh

Extent 1.275 Hectares

Ownership of Occupancy Govt. Land

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 7

Geo Co-ordinates

The quarry lease applied area falls in the

Survey of India, Toposheet No. 65 C / 12 (Scale

1 : 50,000) and is bounded

B.P

No

LATITUDE LONGITUDE

A 17° 5'4.39"N 80°39'10.04"E

B 17° 5'3.35"N 80°39'11.70"E

C 17° 5'3.27"N 80°39'11.83"E

D 17° 5'1.83"N 80°39'11.56"E

E 17° 5'1.22"N 80°39'11.80"E

F 17° 5'3.09"N 80°39'12.15"E

G 17° 5'2.65"N 80°39'12.98"E

H 17° 5'2.44"N 80°39'13.72"E

I 17° 5'0.72"N 80°39'13.68"E

J 17° 4'59.81"N 80°39'12.66"E

K 17° 5'0.43"N 80°39'9.96"E

L 17° 5'1.12"N 80°39'7.74"E

M 17° 5'3.11"N 80°39'9.16"E

Total Extent Accessibility

The quarry lease applied area is located at the

distance of 3.25 Km due NE of Lakshmipuram

Village. The Mandal Head Quarters Tiruvuru is

located at the distance of 5.00 Km due SE of the

quarry lease applied area. The quarry lease applied

area can be approached from Tiruvuru – Putrela

road. The location of the area is indicated in Key

- Cum - Location Map (Plate - I).

2. Attach a general location map showing area and access routes

The location of the area is indicated in Key - Cum - Location Map (Plate - I).

3. Period of quarry lease required = 20 years.

4. Infrastructure and Communication

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 8

Availability of Water

The ground water is available 20 M BGL. The agricultural fields in the

surrounds of the quarry lease applied area are irrigated by ground water.

Availability of Electricity Electricity is available in all the villages and in the nearby agricultural lands

for borewells.

Communication Network

Tele Communications facility is available at the Lakshmipuram village.

Road Network

State Transport Bus Services ply from Tiruvuru frequently; Private

Transport is also available on this road network.

Nearest Rail Head Vijayawada Railway Station is 73 Km (via. NH - 30) from the Site

Port Facility Machilipatnam Port is about 125 Km (via. Gudivada road) from the Site.

School Primary School Education is available at Lakshmipuram village. Higher

Education are available at Jaggaiahpeta & Vijayawada Towns.

Medical Facility Registered Medical Practioner is available at Lakshmipuram village.

Jaggaiahpeta & Vijayawada Towns are well placed for Doctors, Nursing

Homes & Hospitals.

BOUNDARIES

North Agricultural Lands

South Agricultural Lands

East Agricultural Lands

West Agricultural Lands

PART – A

1. GENERAL DETAILS OF THE APPLIED AREA / QUARRY LEASE

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 9

1. Topography

The quarry lease applied area is situated on the mound.

The lowest contour is 99 M and highest contour is 100 M in topo

plan (Plate – III).

Edulla Vagu is passing at the distance of 2.25 Km due South. The

quarry lease applied area is surrounded by numerous water

bodies.

2. Drainage Sub-Dendritic Pattern in SW – NE direction

3. Vegetation Sparse with thorny bushes in the quarry leased applied area, areas

around the quarry leased applied area are cultivation lands

4. Climate

The area experience semi arid climatic condition. The area

experience 800 mm average annual rainfall during August -

November months. The day temperature varies 28oc in winter and

about 50oc in summer season. The general wind direction is SW to

NE & SE- NW.

5. Rainfall The average annual rainfall of the area is 1,000 mm

6. Soil Type Red lateritic soils

7. Land Use Pattern

The quarry lease applied area is part of undulating terrain area with

moderate to steeply sloping. The land is barren with bounders and

rocky exposures and not fit for cultivation

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 10

2. GEOLOGY AND EXPLORATION

a) Brief description of Regional Geology with reference to location of lease / applied area

Regional Geology

The district constitutes a part of the Indian Peninsular Shield. The district formed by Archeans include

Khondalite suite of rocks Charnockites, Schists, Granites and Anthrosites. The major rocks of this

group have a regional strike and foliation in the ENE – WSW direction with steep dips towards SSE.

The geological succession of the district is given below.

Geological Age Formation

Sub Recent to Recent River Gravel, Alluvium Kankar and Soil

Mio – Pliocene Rajahmundry Sandstones

-------------------------------------Unconformity-----------------------------------------------------

Eocene Deccan Traps

-------------------------------------Unconformity-----------------------------------------------------

Lower Jurassic Upper Gondwana Super Group Gollapalle Sandstones

Upper Permian Lower Gondwana Super Group Chintalapudi Sandstone

-------------------------------------Unconformity-----------------------------------------------------

Late Proterozoic Palnad Group Narji Limestone,Shales & Banaganapalli Quartzite

-------------------------------------Unconformity-----------------------------------------------------

Middle Proterozoic Cuddapah Super Group – Nallamalai Formation – Cumbum Shales & Quartzites

-------------------------------------Unconformity-----------------------------------------------------

Archean Quarzt Veins & Dolerites, Khondalites,

Granites, Aplites, Pegmatites, Peninsular

Gneiss, Charnokites & Dharwars

b) Detailed description of geology of lease area

The subject area falls on the northern part of the district consisting of Dharwars which belong to

the Archean age. The two distinct units consist the subject area. These two Litho units are (1)

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 11

Quartz Vein with Feldspar as Hangwall and (2) Muscovite Schists. The subject area is covered by

the soil and Feldspar in the lower altitudes i.e on either side of the Quartz body. But the Quartz

body has exposed as two veins in the center and north eastern part of the area. The Quartz veins

are seen in the excavated pits. The Quartz is massive, Fine grained and Glassy in nature. It is

colourless to translucent. T Quartz vein has a NW-SE strike and the dip is about 400 SW. Feldspar

occurs as a hangwall over the two exposed Quartz Bodies.

c) Details of Quarry Lease holder

M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD

C & MD. Sri Gadde Rama Mohan,

Door No. 7-17,

Kanuru Road,

Kamayyathopu Centre,

Vijayawada – 7,

Krishna District.

d) Details of Prospecting / Mining Carried Out

1 old pit is existing in the quarry lease applied area.

Pit No. Grids Area

(M2)

Average Depth (M)

1 N 50 – 150 & E 100 – 150 527.00 5.00

e) Surface Geological Plan area on 1 : 1,000 Or 1 : 2,000 Scale

Topographical Survey

The baseline is considered from the GPS reading in co-relation with Toposheet contours, the levels were taken using total station of

LEICA with 5 Cm accuracy covering the total area.

The BM is taken on Boundary Pillar – C at East near the Boundary Pillar No. I of the quarry lease applied area with its value of 99.50 M

(Plate – III).

The geo co-ordinates were fixed using the 12 channel handheld GPS, GARMIN make with

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 12

MAP DATUM : WGS – 84

Position Format hddd – mm – ss.s

Map Datum WGS – 84

Units Metric

North Reference Magnetic

Variance 001o W

Angle Degrees

The features captured are drafted to prepare the Surface Geological Plan on 1 : 1,000 Or 1 :

2,000 Scale

f) Surface Cum Geological Plan prepared on a scale 1 : 2,000

The geological features captured are drafted to prepare the Surface Geological Plan on 1 :

1,000 Or 1 : 2,000 Scale (Plate – III)

g) Geological Sections on natural scale at suitable interval across the lease area or

applied area

Geological traverses in the mine and existing mining pits in the vicinity facilitated to access the shape and size of the deposit in the area. It

is a part of mound deposit rising 1 M above ground level within the quarry leased applied area (The lowest contour is 99 M and highest

contour is 100 M).

Method of Estimation of Reserves

The exposed reef with Quartz and Feldspar outcrops indicating fairly continuous deposition of the

pegmatite body with quartz as major component compare to feldspar. The volume of the deposit is

computed by Cross Sectional Area method by multiplying the Sectional Influence

The deposit is found to be irregular in shape. Hence cross sectional method adopted for Estimation of

Geological Reserves. 3 Sections A-A1 to C-C1 were drawn at equal distance perpendicular to the strike

direction of the formation to estimate the reserves (Plate – III).

The cross sections were drawn perpendicular to the strike direction, the cross sectional area of the

individual sections are calculated to arrive at sectional area, the area thus arrived is multiplied by the

sectional influence of 40 M (average) to arrive the volume of deposit.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 13

Since the Quartz and Feldspar are exposed to the nature are exhibiting minor contamination of Fe (Iron).

Hence, the recovery percentage for Quartz is considered at the rate of 60% and Feldspar at 30%.

Financial Analysis

The major components required to project the financial status of a project are:

Cost of the project

Means of financing

Cost of production

Tax burden and flows

Profitability

COST OF THE PROJECT

The cost of the project consists of the following major components:

Land and site development

Buildings and civil works

Machinery

Processing charges and Consultancy charges for preparation of mining plan, Environment

monitoring for generation of baseline data, REIA report, Public consultation, Pollution control

board clearance etc.

Provision for contingencies

Margin money for working capital

S.No Component of project cost Status Total cost in Rs.

01 Land and site development Working Pits 1,30,000/-

02 Buildings and civil works(Site services) 65 Sq.m 1,00,000/-

03 Machinery Hired Machinery 3,00,000/-

04 Processing and Consultancy charges 1,00,000/-

05 Provision for contingencies 1,00,000/-

06 Working capital 4,50,000/-

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 14

07 Financial assurance and purchase of NSS

bonds Furnished --

Total cost of project 11,80,000/-

The estimated total cost of the project is Rupees nineteen lakhs. The land is a private land. There are two

working pits in the area which are being worked. In total an amount of Rs. Twenty lakhs shall be incurred

for execution of mining lease.

COST OF PRODUCTION

The proposed production of mineral is 12,000 tonnes per annum and the proposed ROM to be excavated is

14,000 tonnes per annum.

The cost of production include the following components:

Excavation cost

o Drilling cost

o Blasting cost

o Loading and transportation

Utilities cost

o Cost of Power, Water and fuel

Overhead cost

o Administrative expenses

o Repairs and maintenance

o Taxes & Royalties of minerals

o Miscellaneous expenses

Cost of EMP implementation

EXCAVATION COST

Drilling cost: The annual production of the mineral is 12,000 tonnes per annum. The total ROM excavated

shall be 14,000 tonnes per annum.

The spacing and burden of a drill block shall be 2m x 2m with a depth of 1.6m.

The volume of rock broken per drill hole 6.4 Cu.m

The quantity of rock broken per hole in tonnes, 16 tonnes / drill hole

considering a specific gravity of 2.5 (Approx as it is ROM including waste)

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 15

Total drilling required for ROM of 14000 tonnes shall be 880 drill holes

The total cost of one drill hole in this area is Rs. 40/- per drill hole

Total cost of drilling Rs.35,200/-

Blasting cost: The average powder factor in this area is 4 tonnes per kilogram of explosive of medium

strength.

The total explosive required for an ROM of 14000 tonnes 3500 Kg

Total cost of explosives including accessories Rs.3,50,000/-

(Delays, Detonators, Safety fuse etc)

Loading & Transportation Cost: A hired excavator can excavate and load 50 tons per hour as the

excavation involves digging and selective mining. The excavation and transportation per hour shall cost Rs.

2200/-. The transportation and excavation cost of 14000 tons ROM amounts to 6,16,000/-.

Hence, the total excavation costs amounts to Rs. 10,01,200/-

UTILIITES COST

The project requires power only to operate the water pumps and for general lighting purpose.

The average power bill is estimated @ Rs.40,000/- per month

Total utilities cost per annum shall be Rs.4,80,000/-

OVERHEADS COST

Administrative costs: The administrative expenses include salaries of statutory employees, Postal and

telephone expenses, Stationary etc.

The salaries of the employees per annum shall be as follows:

Mines Manager II class Rs.4,20,000/-

Mine mate & Blaster Rs. 1,50,000/-

Supervisors – 1 @ 10,000/- per month Rs. 1,20,000/-

Watch & Ward – 2 @ 4000/- per month Rs. 96,000/-

The total salaries per annum amount to Rs.7,88,000/- say 8,00,000/-.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 16

The office expenses including Postal and telephone expenses and stationary @ Rs.5000/- per month shall

be Rs.60,000/- per annum

The total administrative expenses shall be Rs. 8,60,000/-

Taxes and Royalties to be paid the government are approximately @ Rs.102/- per ton.

Taxes and Royalties for 12,000 tonnes is Rs. 12,24,000/-

Hence total overhead cost shall be Rs. 20,84,000/-.

Cost of EMP implementation/ Year

S. No. Activity Amount proposed to

be spent Rs in Lakhs

1 Retention/toe walls 0.40

2 Plantation on Buffer zone & in the un-used areas. 0.70

3 Occupational health protective first-aid and other medical

aids. 0.60

4 Environmental pollution monitoring 1.00

5 Socio-economioc welfare measures in near by villages 1.00

6 Miscellaneous expenses for consultants celebration of safety

and environment week etc., 0.3

Total 4.00

Total excavation costs per annum shall be Rs. 10,01,200/-

Total utilities cost per annum shall be Rs. 4,80,000/-

Hence total overhead cost shall be Rs. 20,84,000/-

Cost of EMP implementation/ Year Rs. 4,00,000/-

The total production cost shall be Rs.39,65,200/-

Production cost including Miscellaneous Expenses Rs. 44,00,000/-

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 17

SALE PROCEEDS

The mine shall generate 6000 tons of Quartz and 6000 tons of feldspar per annum

The average sale proceeds of Quartz @ Rs750/- per ton Rs.45,00,000/-

The average sale proceeds of Feldspar @ Rs350/- per ton Rs.21,00,000/-

ESTIMATES OF WORKING RESULTS

S.No. Component Cost in Rs.

1. Cost of production 44,00,000

2. Expected Sale proceeds 66,00,000

3. Gross profit before interest 22,00,000

4. Interest on investment @12% per annum 2,40,000

5. Operating profit 19,60,000

6. Provision for taxation@30% 5,88,000

7. Surcharge @3% of tax 17,460

8. Net Profit after Tax 13,54,540

The recovery percentage of the minerals increases with depth. The project hence is economically viable

with good returns without much gestation period. The depth considered for estimation of Proved reserves

is 10m, i.e from the surface of the existing pit.

h) Broadly indicate the future program of exploration with due justification taking into

consideration the future tentative excavation programme planned in first five years

Year

No. of

Boreholes

(Core / RC /

DTH)

Grid

Interval

Total

meterage

No. of Pits,

Dimensions

and

Volume

No. of

Trenches,

Dimensions

and

Volume

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 18

1st N.A - - N.A N.A

2nd N.A - - N.A N.A

3rd N.A - - N.A N.A

4th N.A - - N.A N.A

5th N.A - - N.A N.A

i) Type of exploration used to confirm the deposit:

Exposed pit is in the orientaion of NE & SW direction is clearly visible & So the trend of the deposit is in same direction ,So we estimated the reserves with the data available at the site .

j) Reserves and Resources as per UNFC. Detailed calculation of reserves shall be stated

The reserves are estimated by multiplying the cross sectional area with the influence distance of

section, tonnage factor (T.F) and recovery factor (R.F). The tonnage factor of Quartz is considered

as 2.7 and Feldspar is considered as 2.6.

The intercalated waste from the joints in Quartz, which are rejects considered @ 15% of the ROM,

recovery factor saleable ore is taken as 85%.

The tonnage tonnage factor of Quartz is considered as 2.7 and Feldspar is considered as 2.6 and

recovery factor saleable ore is taken as 85%.

The reserves upto 15 M below the surface are considered under Proved Category of Reserves (Upto RL

70 M) (Plate – III).

Hence, only G1 (Proved) scale category as (111) code is calculated. No resources are considered under

G2 & G3 (Probable & Possible) scale of exploration.

Applicant didn't produce any chemical analysis certificate from the laboratory , Hence according

to RUTLYES ELEMENTSOF MINEROLOGY the specific gravity is mentioned as :

SPEECIFIC GRAVITY OF QUARTZ = 2.7

SPEECIFIC GRAVITY OF FELDSPAR = 2.6

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 19

a) TOTAL GEOLOGICAL RESERVES

(QUARTZ & FELDSPAR)

Sections

Category

&

UNFC Code

Sectional

Area

Sectional

Influence Volume

Quartz @ 55% Feldspar @ 30%

TONNES

Waste @ 15% Quartz * 2.7 Feldspar *2.6

(M2) (M) (M

3) (MT) (MT)

A – A1

Proved

(111)

Nil

B – B1 915.00 40.00 36,600.00 20,130 10,980.00

5,490.00

54351 28,548.00

C – C1 1148.00 52.00 59,696.00 32,832.8 17,908.8

8,954.4

88648.56 46,562.88

TOTAL 96,296.00 52,962.8 28,888.8

14,444.4

142999.56 75,110.88

B – B1

Possible

(121)

528.00 40.00 21,120.00 11,616 6,336

3,168 31363.2 16,473.6

C – C1

630.00 52.00 32,760.00 18,018 9,828

4,914

48648.6 25,552.8

TOTAL 53,880.00 29,634 16,164

8,082

80011.8 4,2026.4

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 20

SUB TOTAL 1,50,176.00 82,596.8 45,052.8

22,526.4

223011.36 1,17,137.28

b) RESERVES IN UNFC CODE

S.No. Category of Reserves

UNFC

Code

Quartz

Reserves in Million Tons

Feldspar

Reserves in Million Tons

11. Proved

111 0.143 0.075

2. Probable 121 0.119 0.042

3. Possible

333 Nil Nil

TOTAL 0.0.263 0.117

c) RESERVES BLOCKED UNDER 7.5 M BUFFER ZONE

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 21

Sections

Category

&

UNFC Code

Sectional

Area

Sectional

Influence Volume

Quartz @ 55% Feldspar @ 30%

TONNES

Waste @ 15% Quartz * 2.7 Feldspar *2.6

(M2) (M) (M

3) (MT) (MT)

A – A1

Proved

(111)

Nil

B – B1 197.00 40.00 7880 4334 2364

1182

11701.8 6146.4

C – C1 140.00 52.00 7280 4004 2184

1092

10810.8 5678.4

TOTAL 15160 8338 4548

2274

22512.6 11824.8

B – B1

Possible

(121)

129.00 40.00 5160 2838 1548

774

7662.6 4024.8

C – C1 76.00 52.00 3952 2173.60 1185.6

592.8

5868.72 3082.56

TOTAL 9112 5011.60 2733.6

1366.80

13531.32 7107.36

SUB TOTAL 24272 13349.60 7281.6

3640.8

36043.92 18932.16

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 22

d) RESERVES BLOCKED UNDER SAFETY SLOPES

Sections

Category

&

UNFC Code

Sectional

Area

Sectional

Influence Volume

Quartz @ 55% Feldspar @ 30%

TONNES

Waste @ 15% Quartz * 2.7 Feldspar *2.6

(M2) (M) (M

3) (MT) (MT)

A – A1

Proved

(111)

Nil

B – B1 95.00 40.00 3800 2090 1140

570

5643 2964

C – C1 175.00 52.00 9100 5005 2730

1365

13513.5 7098

TOTAL 12900 7095 3870

1935

19156.5 10062

B – B1

Possible

(121)

189.00 40.00 7560 4158 2268

1134

11226.6 5896.8

C – C1 233.00 52.00 12116 6663.8 3634.80

1817.4

17992.26 9450.48

TOTAL 19676 10821.8 5902.80

2951.4

29218.8 15347.28

SUB TOTAL 32576 17916.8 9772.8

4886.4

48375.3 25409.28

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 23

TOTAL MINEABLE RESERVES

RESERVES AVAILABLE FOR MINING

A. Total Geological Reserves 3,40,148.64 MT

B. Reserves Blocked under 7.5 M Buffer Zone 54,976.08 MT

C. Reserves Blocked under Safety Slopes 73784.58 MT

D. Total Reserves Blocked (B + C) 1,28,760.00 MT

E Reserves available for Quarrying

(A – (B + C)) 2,11,388.64 MT

@ 85% Recovery (Proved) 1,79,680.34 MT

Life of the Quarry =

Total Mineable Reserves / Average Annual Production

1,79,680.34 MT / 13,062.00 MT

= 13.75 OR SAY

14.00 YEARS

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 24

3. MINING

a) Open Cast Mining

i) Description of existing / proposed method for excavation with all design parameters

indicating on plans / sections

The method of mining shall be opencast and semi-mechanized on single shift basis. Excavations shall be carried out by Jack Hammer

drilling and blasting. Bench height and width will be maintained at 6 m and 6 m each respectively with overall slope at 60°. Excavation

and loading shall be carried out with simple excavators of capacity 0.9 to 1.1 cu.m bucket capacity. This shall be utilized for

developmental work, excavation and loading into the trucks. Tippers of 10 T capacity shall be utilized for all transportation purposes.

The firm intends to extract the Quartz and Feldspar production to the tune of 7,837.20 MT

of Quartz per annum and 3,918.60 MT of Feldspar per annum production to the tune of

during the first five years of the plan period.

Capacity of Quartz & Feldspar raising per annum = 18,724.50 MT

(Maximum Production)

No of Working Days considered = 300 of quarry operation

Total required quantity of excavation per Annum = 20,805.00 MT

Total required quantity per day = 69.35 MT per day

The opencast mine operations consist of four major operations viz. drilling, blasting, loading and transport

ii) Drilling and Blasting

DRILLING MACHINE :

Drilling Parameters for Quartz & Feldspar :

Burden (B) : 2.50 meter

Spacing (S) : 3.00 meter

Depth (Includes sub grade drilling) (D) : 6.0 meter

The angle of inclination should less than 78° to 82°. Sub grade Drilling + 8 % of the depth of the

bench. (6 meter + 0.48 =6.48 Or Say 6.5 meter)

In-situ density : 2.5

Yield per hole : B X S X D X 2.5

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 25

: 2.5 x 3.00 x 6.00 x 2.5 = 112.50 MT

Yield per meter : 112.50 / 6 = 18.75 Or Say 19 MT

Drilling required for planned ROM = 20,805.00 / 19 = 1,095 meters / annum

(Maximum ROM)

Technical Specification of diesel driven portable compressor :

Compressor capacity : 600 cfm

Compressor output capacity : 10 .5 kg/cm2

Wagon Drill : 54 mm Ø (Pneumatic)

Working pressure on hammer : 150 lbs

Average drilling output per hour : 12 meters

Total Hours required for planned production : 1,095 / 12 = 91.25 Hours / Annum

: 91.25 / 10 = 9.125 Hours / Month

Effective working hours per day from 8 am to 6 pm is 8 hours

Number of drilling days required per month = 9.125 / 8 = 1.14 Or Say 1 Day

By considering 80 % availability of men & machinery, One DTH drilling units, having 54 mm Ø is

adequate to meet out the targeted production during the plan period.

Note: As far as, the strata condition in the mined area was medium / low in situ density, the drilling

in the waste has to be performed in micro level.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 26

iii) Indicate year wise tentative excavation in cubic meters indicating development, ROM,

pit wise as in table.

Year Pit

No

Total

Tentative

Excavation

Top

Soil

OB / SB

/ IB

ROM from Mineralised Zone

Waste

ROM /

Waste

Ratio Clean Ore

Sub -

Grade

Ore

Mineral

Rejects

(M3 ) (M

3 ) (M

3 ) (M

3 ) (M

3 ) (M

3 )

1 2 3 4 5 6 7 9 8 9

1st 1

8,322.00 Nil 2,080.50

7,073.70 Nil Nil

601.26 1 : 0.1

2nd

3,468.00 Nil Nil

2,947.80 Nil Nil

250.56 1 : 0.1

3rd

7,266.00 Nil 1,816.50

6,176.10 Nil Nil

524.97 1 : 0.1

4th

2,850.00 Nil Nil

2,422.50 Nil Nil

205.91 1 : 0.1

5th

4,218.00 Nil 712.50

3,585.30 Nil Nil

304.75 1 : 0.1

TOTAL 26,124.00

4,609.50 22,205.40 1,887.46

AVERAGE 5,224.80

1,536.50 4,441.08 377.49

iv) Dump Management

Waste Dump

(Plate – V)

Dump Area

(M2)

Height

(M) Direction Grids

Mineral 1,674 6.00 NW N 50 – 150 & E 00 – 100

Soil Overburden 1,203 6.00 SW N 00 – 100 & E 00 – 100

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 27

Under Ground Mining

Not applicable

a) Production Proposed for the first five years

The applicant intends to extract the Quartz production to the tune of 39,186.00 MT and Feldspar

19,593.00 MT per annum during the first 5 years of the plan period.

During the plan period it is proposed to exploit the Quartz & Feldspar from the total area of

3,232.00 M2 to an average depth of 6 M from North of the quarry lease applied area covering

under Cross Sections B-B1 to C-C1 between the grids N 00 – 150 & E 50 – 200. The workings

advance Southwards (Plate – V).

Other than fully mechanized open cast ‘A’ category method of mining operations will be

deployed. Compressor with Jack hammers will be utilized for drilling the holes.

Excavation, haulage will be done by manually. Manual sorting and sizing of the mineral

will be done manually. The minerals will be transported by hired trucks.

b) Mining Program for the first five years

It is proposed to produce the Quartz & Feldspar from North of the quarry lease applied area

during the first five years.

The waste generated will be temporarily dumped in the NW of the quarry lease applied area (within the

quarry lease applied area) covering an area of 1,674 M2

with an average height of 6 M between the grids

N 50 – 150 & E 00 – 100. The dump will be re-handled for back filling the matured pits (Plate – V).

Soil Dump

The soil waste generated will be temporarily dumped in the SW of the quarry lease applied area (within

the mining applied lease area) covering an area of 1,203 M2

with an average height of 6 M between the

grids N 00 – 100 & E 00 – 100 (Plate – V).

Stock Yard

Quartz

The mineral generated will be stocked in the temporary stock yard over an area of

642.00 M2 in the SE of the mining lease applied area between the grids N 00 – 50 &

E 100 – 150 (Plate – V).

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 28

Feldspar

The mineral generated will be stocked in the temporary stock yard over an area of

457.00 M2 in the South of the quarry lease applied area between the grids N 00 – 50

& E 50 – 100 (Plate – V).

YEAR QUARTZ & FELDSPAR

1st

During 1st year the mining will be initiated from North of the quarry lease

applied area between the grids N 50 – 150 & E 50 – 150 and between the RL

100.85 – 95.30 M to RL 94.85 – 89.30 M over an area of 2,774.00 M2 to a depth

of 1.50 (Soil) & 6 M (Quartz & Feldspar).

A total volume 10,402.50 M3 of excavation will be made, generating 2,080.50

M3 of Soil Overburden.

A total 20,805.00 MT of ROM and will be obtained producing 12,358.17MT of

Quartz (55% recovery) & 6,491.16MT of Feldspar (30% recovery) and 1248.3M3

(15% of Soil & Mineral Waste) will be generated. The mining advances

Southwards.

2nd

In the second year the mining will continue below 1st year workings between

the grids N 50 – 150 & E 50 – 150 and between the RL 94.85 – 89.30 M to RL

88.85 – 83.50 M over an area of 578.00 M2 to a depth of 6 M (Quartz &

Feldspar). A total volume of 3,468.00 M3 of excavation will be made.

8,670.00 MT of ROM and will be obtained producing 5,149.98 MT of Quartz (55%

recovery) & 2,705.04 MT of Feldspar (30% recovery) and 520.2 M3 (15% of Soil &

Mineral Waste) will be generated. The mining advances Southwards.

3rd

During 3rd year the mining will continue due NE of the quarry lease applied area

between the grids N 00 – 100 & E 100 – 200 and between the Contour 99.50 M

to RL 93.50 M over an area of 1,789.00 M2 to a depth of 1.50 (Soil) & 6 M

(Quartz & Feldspar).

A total volume 5,284.50 M3 of excavation will be made, generating 1,816.50 M3

of Soil Overburden.

A total 1, 18,165.00 MT of ROM and will be obtained producing 10,790.01MT of

Quartz (55% recovery) & 5,667.48MT of Feldspar (30% recovery) and 1089.9 M3

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 29

(15% of Soil & Mineral Waste) will be generated. The mining advances

Southwards.

4th

In the 4th year the mining will continue below 3rd year workings between the

grids N 00 – 100 & E 100 – 200 and between the RL 93.50 – 87.50 M over an

area of 475.00 M2 to a depth of 6 M (Quartz & Feldspar). A total volume of

2,850.00 M3 of excavation will be made.

7,125.00 MT of ROM and will be obtained producing 4,232.25 MT of Quartz (55%

recovery) & 2,223.00MT of Feldspar (30% recovery) and 427.5M3 (10% of Soil &

Mineral Waste) will be generated. The mining advances Southwards.

5th

During 5th year the mining will continue due South of 3rd year workings between

the grids N 00 – 100 & E 100 – 150 and between the Contour 99.50 M – 99 M to

RL 93.50 – 93.00 M over an area of 1,178.00 M2 to a depth of 1.50 (Soil) & 6 M

(Quartz & Feldspar).

A total volume 4,930.50 M3 of excavation will be made, generating 712.50 M3 of

Soil Overburden.

A total 10,545.00 MT of ROM and will be obtained producing 6263.73 MT of

Quartz (55% recovery) 3,290.04 MT of Feldspar (30% recovery) and 632.70 M3 (15%

of Soil & Mineral Waste) will be generated. The mining advances Southwards.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 30

The year wise production proposed is shown in the following table.

YEAR WISE PRODUCTION FOR FIRST FIVE YEARS FOR QUARTZ & FELDSPAR

Year Litho-Unit

Area Bench

Height Volume

Quartz

@ 55%

Feldspar

@ 30%

Recovery @ 80%

Waste

@ 15%

(M3)

Quartz

*2.7

Feldspar

*2.6

(M2) (M) (M

3) (M

3) (M

3) (MT) (MT)

1st

Soil Overburden 1,387.00 1.50 2,080.50 2,080.50

Mineral 1,387.00 6.00 8,322.00 4577.1 2496.6 12,358.17 6,491.16 1248.3

2nd

Mineral 578.00 6.00 3,468.00 1907.4 1040.4 5,149.98 2,705.04 520.2

3rd

Soil Overburden 1,211.00 1.50 1,816.50 1,816.50

Mineral 1,211.00 6.00 7,266.00 3996.3 2179.8 10,790.01 5,667.48 1089.9

4th

Mineral 475.00 6.00 2,850.00 1567.5 855.00 4,232.25 2,223.00 427.5

5th

Soil Overburden 475.00 1.50 712.50 712.50

Mineral 703.00 6.00 4,218.00 2319.9 1265.4 6263.73 3,290.04 632.70

TOTAL 30,733.50 14,368.2 7,837.2 38,794.14 20,736.72 8,528.10

AVERAGE 6,146.70 2,873.64 1,567.44 7,758.83 4,075.344 1,705.62

Total Soil Overburden Waste : 4,609.50 M3

Total Mineral Waste : 3918.60 M3

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 31

c) Production Schedule

The production of Quartz & Feldspar continuous throughout year except during monsoon that is 10

working months, 25 working days per month are considered. The average production of Quartz &

Feldspar is 4,441.08 M3 / 11834.17 MT per year (250 days @ 17.76 M

3 / 47.33 MT per day) can be

easily achieved in a single shift with sufficient men and machinery.

d) Magazine Type and Capacity

Applicant will apply for the Explosive license for storing the explosives with 100 Kg Portable Magazine.

Alternatively engages a licensed blasting contractor for carrying out the drilling and blasting.

4. MINE DRAINAGE

A Minimum and Maximum depth of

water table

Shallow aquifers during monsoon period and

canal flows.

Depletion of water occurs during summer

Water table depth ranges from 10 – 35 m

B Indicate Maximum and minimum

depth of workings

RL 100.85 – 87.50 M to

RL 95.30 – 83.30 M

C Quantity and Quality of water Potable

D Regional Drainage Pattern Parallel

5. STOCKING OF MINERAL REJECT / SUB GRADE MATERIAL AND

DISPOSAL OF WASTE

During mining operations in first five years a total of 3918.16 M3 of Quartz & Feldspar waste

and 4,609.50 M3 of soil waste will be generated and dumped at the dumping yard, on an

average of 783.72 M3 of Quartz & Feldspar waste & 921.90 M3 of Soil waste per annum.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 32

Year

Waste @ 15 % (M3)

Mineral Soil

1st

1248.3 2,080.50

2nd

520.2

3rd

1089.9 1,816.50

4th

427.5

5th

632.70 712.50

TOTAL 3918.6 4,609.50

AVERAGE 783.72 921.90

Estimated Waste Quantity that will be generated in the Entire Lease Period

At the rate of 1,705.62 M3 of waste per year, the total of waste generated in entire lease

period i.e. 20 years is estimated to be 34,112.40 M3.

6. USE OF MINERAL AND MINERAL REJECT

The Quartz & Feldspar of this area is not meant of captive use. The mineral quartz will be sold to

the Ferro Alloy Industries, Foundries, Ceramics and to Glass Industries. Feldspar will be sold to

the ceramic industries.

Specifications stipulated by buyers

Industry SiO2

Fe2O3 Al2O3

I) Quartz

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 33

AGI (Glass) 98.5 0.05 0.40

HMT Bulb Industry 98.4 0.05 0.55

Hindustan Sanitary Ware 99.4 0.03 0.24

Sheet Fibre Glass 99.6 0.03 0.15

Industry Na2O K2O Fe2O3 Al2O3

II) Feldspar

Hindustan Sanitary Ware &

Regency Ceramic 4.5 11.0 0.6 20.50

AGI (Glass) 4.8 10.5 0.5-0.6 10.00

7. PROCESSING OF ROM AND MINERAL REJECT Beneficiation is limited to chipping and breaking to small pieces of 20-150mm size

8. OTHERS

a) SITE SERVICES

Temporary Office, Rest Shelter, Drinking Water Facilitates, Public Utilities, First Aid

will be provided by the applicant in the South of the mining lease area

covering an area of 131 M2 between the grids N 00 – 50 & E 50 – 100 (Plate – V).

b) Extent of Mechanisation

The following machinery is deployed by the company

S.NO. RATED CAPACITY REQUIREMENT OF

MACHINERY

01. Hitachi Bucket Capacity 0.9 M3 1 No.

02. Jack Hammers 4 No's.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 34

03. Tractor Mounted Compressor 1 No.

04. Water Tanker (Tractor Mounted) 5000 L 1 No.

05. Tractors with Trailers 4 No’s.

Employment Potential

S.NO. CATEGORY NO’S

Supervisory Cader

1. Mines Manager Cum Mining Engineer 1

2. Mine Mate 1

Work Persons

3. Excavator Operator 1

4. Drivers 5

5. Compressor Operator 4

6. Semi Skilled Workers 20

7 Un – Skilled Workers 20

TOTAL 52

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 35

PART – B

PROGRESSIVE MINE CLOSURE PLAN

1. ENVIRONMENT BASE LINE INFORMATION

i Existing Land Use Pattern

The quarry lease applied area is on part of the elevated

ridge with sparse vegetation small bushes from the

vegetal cover. The deposit is occupying part of the

lease area. The areas around are agricultural lands.

ii Water Regime

Edulla Vagu is passing at the distance of 2.25 Km due

South. The quarry lease applied area is surrounded by

numerous water bodies.

iii Flora and Fauna

The whole quarry lease applied area is occupied by

scattered sparse vegetation of thorny trees and small

bushes. In the quarry lease applied area, no wild

animals are witnessed as per the statements collected

from the local population, since 50 years

iv Quality of Air, Ambient

Noise Level and Water

Air quality is good but at quarries it is filled

with dust, due to haulage on the road,

blasting etc.

The noise generated mostly due to blasting,

drilling, vehicular traffic

v Climatic Conditions

The quarry leased applied area experience semi arid

climatic condition. The area experience 1000 mm

average annual rainfall during August - November

months. The day temperature varies 28c in winter and

about 50c in summer season. The general wind

direction is SW to NE & SE- NW.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 36

vi Human Settlement

The nearest village Shambhunigudem is situated 1.75

Km due NE of the quarry leased applied area, having a

population of 800 No’s. Agriculture and sheep breeding

are important profession of the people living in the

village besides involving themselves in mining activity.

S.No. Village Direction Distance

(Km)

Approx.

Population

(No’s)

01. Kotta

Lakshmipuram NW 2.50 1,200

02. Tiruvuru NW 5.00 5,000

03. Ganeshpadu NE 3.00 1,600

04. Chinna Mallela NE 4.25 1,500

05. Shambhunigudem NE 1.75 800

06. Gollagudem SE 2.00 500

07. Kotturu SE 3.50 1,200

08. Vellampatla SE 4.00 800

09. Kakarla SW 3.75 1,000

10. Anjaneyapuram SW 4.50 900

vii Public Buildings, Places

& Monuments

No public buildings, important places and monuments

are seen in and around the quarry lease applied area;

however, the applicant will adopt the safety measures

while conducting the mining operations as per the

Regulations 109 & 127 of Metalliferrous Mines

Regulation ‘1961.

viii Sanctuaries

No bird or animal sanctuaries are existing in 10 Km

radius

ix

Eco-Sensitive Areas

No Eco Sensitive are existing in 10 Km radius

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 37

x Afforestation

The applicant proposes for afforestation in the East of

the quarry leased applied area covering an area of 750

M2 within the 7.5 M buffer zone in phased manner

during the plan period with Neem / Mango plants (Plate

– V).

Year Area

(M2)

No. of

Plants Type of Plants

1st

150.00 30 Neem / Mango

2nd

150.00 30 Neem / Mango

3rd

150.00 30 Neem / Mango

4th

150.00 30 Neem / Mango

5th

150.00 30 Neem / Mango

TOTAL 750.00 150

2. ENVIRONMENTAL IMPACT ASSESSMENT

a Landscape Changes

A large pit of 3,759 M2 to an average depth of 12 M will be

formed in the quarry leased applied area. The mining will

alter the shape of the present mound slope with a large

sliced pit.

b Air Quality

Air quality is good but at quarries it is filled with dust, due to

haulage on the road, blasting etc. but it will be within the

permissible limits by sprinkling water on roads and covering

the drill rods with cloth. Air quality will not be disturbed, as

the Mining is very limited.

Base Level

Allowable Level

SPM = 140g/m3 360g/m

3

RSPM = 60g/m3 120g/m

3

SO2 = 40g/m3 80g/m

3

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 38

NO2 = 40g/m3 80g/m

3

CO = 1.0g/m3 5.0g/m

3

c Water Quality

The water environment will not be disturbed as the mine is

far off from the water courses.

The mining of Quartz & Feldspar has no adverse affect is

anticipated on the water regime in the area

d Noise Levels

The blasting and the haulage and the drilling of boreholes

generate noise. However, the probable noise level will be

within the permissible limits and will not cause harm. The

applicant will provide suitable protective gear to the workers

for minimizing the noise pollution and the machinery will be

well maintained.

e Vibration Levels

The vibrations that will be generated due to heavy machinery

will be meager

f Water Environment

The water environment will not be disturbed as the mine is

far off from the water courses.

g Acid Mine Drainage No acids will be generated from Quartz & Feldspar mines

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 39

h Surface Subsidence

No subsidence is anticipated in this regime as the basement

rock is massive and away from the seismic zone

i Socio economics

The main occupation of villagers is agriculture and sheep

raring. The commencement of mining activity in this area

improved the socio-economic status of the local people by

creation of employment and paying taxes to gram

panchayath.

The mining in this area does not involve any hazardous

methods. The applicant is providing First Aid facilities at

Mine site.

j Historical

Monuments

No historical monuments exist within 5 Km radius

k Bio-Diversity

No impact will happen to the Mankind, Flora and Fauna by

the mining operations, excepting minor vibrations due to

blasting, sound pollution and dust which will be under

control and within the permissible limits.

3. PROGRESSIVE RECLAMATION PLAN

The pits will be utilized for water storage and water harvesting structure.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 40

4. MINED OUT LAND

The mined out pit will be utilized for water recharge structure. The entire area leaving 7.5 M

buffer zone will be excavated to a depth of RL 70 M i.e. ultimate pit depth.

Land Use Pattern of the quarry area during the first 5 years will be as follows :

Area M2 Hectares

Active Quarry Area

Broken 527 0.053

To be broken 3,232 0.323

TOTAL 3,759 0.376

Waste Dumps

Existing Nil Nil

Soil 1,203 0.120

Proposed 1,674 0.167

TOTAL 2,877 0.288

7.5 M Wide Safety Zone 3,586 0.359

Roads (included in pits) (318) (0.032)

Infrastructure 131 0.013

Stock Yard

Quartz : 642

1,099 0.110

Feldspar : 457

QUARRY LEASE AREA UTILIZED 11,452 1.145

TOTAL QUARRY LEASE AREA 12,750 1.275

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 41

Area that will be broken during Conceptual Plan (Plate – VII)

Period

Mining Operations

Area

(M2)

Depth

(M)

Area / Plants

(M2)

During 2nd

5 year block period 1,549 18.00 2,072 M

2

(7.5 M buffer zone)

Reclamation (Plate – IX)

The matured pits will be backfilled by re-handing of waste as a reclamation measure and

balance of pits will be utilized as water harvesting structure

5. TOP SOIL MANAGEMENT

Not applicable

6. TAILING DAM MANAGEMENT

Not applicable

7. DISASTER MANAGEMENT AND RISK ASSESSMENT

To mitigate the emergency, planning is the first & four most thing, i.e. recognizing the

accident or possible, assessing the consequences of such possible accidents and deciding on

emergency planning / procedures in advance both on site & off site that would necessary to

be implemented in the event of emergency without any delay and confusion.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 42

Proper bench design in mines and observing safety measures for transportation, storage,

handling of explosives & fuels, etc, good maintenance of vehicles, roads, fire prevention

measures shall go in preventing disaster / accidents.

The applicant is committed to identify the possible causes for potential disaster and draw a

code of emergency measures and procedures to deal with such disasters, which is otherwise

also advised by DGMS through their circulars.

The mine is located at the distance of 5 Km from Tiruvuru town having good transport and

communication systems.

The mine is having good communication like telephone & mobile facility. In case of any

minor / major accidents within the mine, the same will be communicated to the Agent by

the Mines Manager and intern he will inform to the Revenue Authorities, Police, Fire

Department, DGMS etc for action.

A vehicle is kept all the time at the mine site for conveyance.

At mine level First Aid will provided and person(s) shall be shifted to nearby hospital at

Tiruvuru which is having all basic amenities.

8. CARE AND MAINTENANCE DURING TEMPORARY DISCONTINUANCE

The mine workers are taken on contract basis on need based orders, the workers always get

Employment / Contract in similar quarries existing around. During monsoon these labour are

busy with agricultural activities.

ITEM DETAILS PROPOSED ACTUAL

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 43

Dump Management

Area afforested (Ha)

1. No. of saplings planted

2. Cumulative no of plants

3. Cost including watch and care during the year

Nil Nil

Management of worked

out benches

1. Area available for rehabilitation (specify)

2. No of saplings planted in the year

3. Cumulative no of plants

4. Any other method of rehabilitation (specify)

5. Cost including watch and care during the year

Plantation is

proposed all

along the

7.5 M Buffer

Zone

-

Reclamation and

Rehabilitation by

backfilling

1. Void available for

backfilling (L x B x D) pit

wise / stope wise Void filled

by waste / tailings

afforestation on the

backfilled area

2. Rehabilitation by making

water reservoir

3. Any other means (specify)

The waste will

be re-handled

to backfill the

matured pits

-

Rehabilitation of waste

land within lease

1. Area available (Ha)

2. Area rehabilitated

3. Method of rehabilitation

No proposals

are made -

9. FINANCIAL ASSURANCE

Financial Assurance can be submitted in any encashable form preferable a Bank

Guarantee from a Scheduled Bank at the rates equivalent to rates prescribed in Rule

23 (F) (2) of Mineral Conservation Development Rules, 1988 for the first five years

period expiring at the end of validity of the document.

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 44

The proposed mining operations are by Other than Fully Mechanised Mining and

hence the cost of Reclamation & Rehabilitation is calculated as per the provisions of

APMMC Rules, 1966 @ Rs. 25,000/- per hectare or part thereof. This amount works

out to be Rs. 19,650/- for 0.786 Hectares area.

The minimum financial assurance in the form of Bank Guarantee for Rs. 2,00,000/-

will have be submitted to the Assistant Director of Mines & Geology, Vijayawada.

10. FINANCIAL ASSURANCE PROFORMA

The details of area put to use under various activities are calculated to arrive the Financial

Assurance, various land uses are indicated in the following tabular form.

TABLE INDICATING THE BREAKUP OF AREAS IN THE QUARRY LEASE

FOR CALCULATION OF FINANCIAL ASSURANCE

S.No. Head

Area put

on use at

the start

of plan

(in Ha.)

Additional

requirement

during the

plan period

(in Ha.)

Total

(in Ha.)

Area

considered as

fully

reclaimed

and

rehabilitated

(in Ha.)

Net area

considered

for

calculation

(in Ha.)

1 2 3 4 5 6 7

1 Area under Mining 0.053 0.323 0.376 - 0.376

2 Storage for Top Soil Nil 0.120 0.120 - 0.120

3 Overburden / Dump Nil 0.167 0.167 - 0.167

4

Mineral Storage

(Quart & Feldspar)

Nil 0.110 0.110 - 0.110

5 Infrastructure (Workshop,

Administrative Building

Nil 0.013 0.013 - 0.013

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 45

etc.,)

6 Roads (included in pits) Nil (0.032) (0.032) - (0.032)

7 Railways Nil N.A. N.A. - N.A.

8

Green Belt

(Within the 7.5 M BZ)

Nil (0.075) (0.075) - (0.075)

9 Tailing Pond Nil N.A. N.A. - N.A.

10 Effluent Treatment Plant Nil N.A. N.A. - N.A.

11 Mineral Separation Plant Nil N.A. N.A. - N.A.

12 Township Area Nil N.A. N.A. - N.A.

13 Others (To be Specified) Nil - - - -

GRAND TOTAL

A B

C =

(A + B)

D E = (C-D)

0.053 0.733 0.786 - 0.786

11. CERTIFICATE

Certified that the above mentioned will be taken care in the Progressive Mine Closure

Plan for Quartz & Feldspar over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B

(P), 2C, 2D & 3 of Lakshmipuram Village, Tiruvuru Mandal, Krishna District Andhra

Pradesh State.

All statutory organizations, courts etc. have been taken into consideration and wherever any specific permission is required,

the applicant will approach the concerned authorities.

All the measures proposed in this closure plan will be implemented in a time bound manner as proposed.

12. PLANS & SECTIONS

MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017

Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0

Page – 46

The Pans and Sections are enclosed.