MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 1
MINING PLAN FOR QUARTZ & FELDSPAR
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 2
INCLUDING PROGRESSIVE MINE CLOSURE PLAN
(Under Amended Rule 7 A (1) of APMMC Rules, 1966 &
Rule 7 A (3) of APMMC Rules, 1966)
(FOR THE FIRST FIVE YEARS PLAN PERIOD)
(OTHER THAN FULLY MECHANISED OPENCAST ‘A’ CATEGORY)
Over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B (P), 2C, 2D & 3 of
Lakshmipuram (V), Tiruvuru (M), Krishna District
Andhra Pradesh State
APPLICANT
MM//ss BBAALLAAJJII AACCQQUUAA && AAGGRROO PPRROODDUUCCTTSS PPVVTT.. LLTTDD
CC && MMDD.. SSrrii GGaaddddee RRaammaa MMoohhaann
DDoooorr NNoo.. 77--1177
KKaannuurruu RRooaadd
KKaammaayyyyaatthhooppuu CCeennttrree
VViijjaayyaawwaaddaa –– 77
KKrriisshhnnaa DDiissttrriicctt
By
P.V. SATYANARAYANA
Consultant Geologist & RQP
INTRODUCTION
M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD, C & MD. Sri Gadde Rama
Mohan, of Vijayawada, filed an application for grant of quarry lease for Quartz & Feldspar
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 3
over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B (P), 2C, 2D & 3 of Lakshmipuram
Village, Tiruvuru Mandal, Krishna District Andhra Pradesh State.
The Asst. Director of Mines and Geology, Vijayawada, submitted proposals for grant of
quarry lease for Quartz & Feldspar over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B
(P), 2C, 2D & 3 of Lakshmipuram Village, Tiruvuru Mandal, Krishna District Andhra
Pradesh State, in favour of M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD, C
& MD. Sri Gadde Rama Mohan, for a period of (30) years.
After careful examination of the proposals of the Assistant Director of Mines and
Geology, Vijayawada, it is decided in principle to grant the quarry lease for Quartz &
Feldspar over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B (P), 2C, 2D & 3 of
Lakshmipuram Village, Tiruvuru Mandal, Krishna District Andhra Pradesh State, in favour
of M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD, C & MD. Sri Gadde Rama
Mohan, for a period of (30) years subject to submission of Approved Mining Plan, with a
condition that the Approved Mining Plan shall reflect the restrictions to be adopted by the
applicant while conducting quarry operations due to existence of any structures, railway
line, roads, water bodies such as river etc., and the stipulated distances as per the various
regulations prescribed under Mines and Metalliferrous Regulations ‘1961 alongwith
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 4
consent for Establishment from A. P. Pollution Control Board & Environmental
Clearance from Ministry of Environment & Forests as per Environment Impact
Assessment Notification through S.O. 1533, dated 14-09-2006 to consider grant of quarry
lease for Quartz & Feldspar and vide Department of Mines & Geology, Ibrahimpatnam,
Notice No. 22567 / R2-3 / 2017 dated 11-09-2017 (Annexure – I).
M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD, C & MD. Sri Gadde Rama Mohan, of
Vijayawada, approached P.V. SATYANARAYANA, Consultant Geologist and RQP (RQP / DMG / AP /
34 / 2017) for preparation of Mining Plan in the above mentioned area.
Accordingly this Mining Plan is prepared as per guidelines issued in Form-T in G.O.Ms.No.56, Industries & Commerce (M.II) Department.,
dated 30-04-2016 under Amended Rule 7 A (1) of APMMC Rules, 1966 and Progressive Mine Closure Plan under Rule 7 A (3) of APMMC
Rules, 1966 for the first five years period and submitted to the Deputy Director of Mines & Geology, Kakinada, for scrutiny.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 5
I GENERAL
1. Name and Address of the applicant
M/s BALAJI ACQUA & AGRO PRODUCTS PVT.
LTD
C & MD. Sri Gadde Rama Mohan,
Door No. 7-17,
Kanuru Road,
Kamayyathopu Centre,
Vijayawada – 7,
Krishna District.
2. Status of the applicant Private Firm
3. Mineral (s) which are included in the Letter of
Intent Quartz & Feldspar
4. Name and Details of person employed for
preparing Mining Plan
P.V. SATYANARAYANA
Lattice It,
Aarya Castle,
Door No: 8-5 / 2,
Cherukuri Krishna Rao Gari Street,
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 6
Sarakottu Center, Gollapudi,
Vijayawada- 521225
Ph No-8610692941
RQP Registration No. & Validity RQP/ DMG / AP / 34 / 2017
(Valid Upto 25th March ‘2027)
II. LOCATION AND ACCESSIBILITY
1. Applied Area / Lease Details
Sy. No’s 89 / 2A, 2B (P), 2C, 2D & 3
Village Lakshmipuram
Mandal Tiruvuru
District Krishna
State Andhra Pradesh
Extent 1.275 Hectares
Ownership of Occupancy Govt. Land
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 7
Geo Co-ordinates
The quarry lease applied area falls in the
Survey of India, Toposheet No. 65 C / 12 (Scale
1 : 50,000) and is bounded
B.P
No
LATITUDE LONGITUDE
A 17° 5'4.39"N 80°39'10.04"E
B 17° 5'3.35"N 80°39'11.70"E
C 17° 5'3.27"N 80°39'11.83"E
D 17° 5'1.83"N 80°39'11.56"E
E 17° 5'1.22"N 80°39'11.80"E
F 17° 5'3.09"N 80°39'12.15"E
G 17° 5'2.65"N 80°39'12.98"E
H 17° 5'2.44"N 80°39'13.72"E
I 17° 5'0.72"N 80°39'13.68"E
J 17° 4'59.81"N 80°39'12.66"E
K 17° 5'0.43"N 80°39'9.96"E
L 17° 5'1.12"N 80°39'7.74"E
M 17° 5'3.11"N 80°39'9.16"E
Total Extent Accessibility
The quarry lease applied area is located at the
distance of 3.25 Km due NE of Lakshmipuram
Village. The Mandal Head Quarters Tiruvuru is
located at the distance of 5.00 Km due SE of the
quarry lease applied area. The quarry lease applied
area can be approached from Tiruvuru – Putrela
road. The location of the area is indicated in Key
- Cum - Location Map (Plate - I).
2. Attach a general location map showing area and access routes
The location of the area is indicated in Key - Cum - Location Map (Plate - I).
3. Period of quarry lease required = 20 years.
4. Infrastructure and Communication
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 8
Availability of Water
The ground water is available 20 M BGL. The agricultural fields in the
surrounds of the quarry lease applied area are irrigated by ground water.
Availability of Electricity Electricity is available in all the villages and in the nearby agricultural lands
for borewells.
Communication Network
Tele Communications facility is available at the Lakshmipuram village.
Road Network
State Transport Bus Services ply from Tiruvuru frequently; Private
Transport is also available on this road network.
Nearest Rail Head Vijayawada Railway Station is 73 Km (via. NH - 30) from the Site
Port Facility Machilipatnam Port is about 125 Km (via. Gudivada road) from the Site.
School Primary School Education is available at Lakshmipuram village. Higher
Education are available at Jaggaiahpeta & Vijayawada Towns.
Medical Facility Registered Medical Practioner is available at Lakshmipuram village.
Jaggaiahpeta & Vijayawada Towns are well placed for Doctors, Nursing
Homes & Hospitals.
BOUNDARIES
North Agricultural Lands
South Agricultural Lands
East Agricultural Lands
West Agricultural Lands
PART – A
1. GENERAL DETAILS OF THE APPLIED AREA / QUARRY LEASE
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 9
1. Topography
The quarry lease applied area is situated on the mound.
The lowest contour is 99 M and highest contour is 100 M in topo
plan (Plate – III).
Edulla Vagu is passing at the distance of 2.25 Km due South. The
quarry lease applied area is surrounded by numerous water
bodies.
2. Drainage Sub-Dendritic Pattern in SW – NE direction
3. Vegetation Sparse with thorny bushes in the quarry leased applied area, areas
around the quarry leased applied area are cultivation lands
4. Climate
The area experience semi arid climatic condition. The area
experience 800 mm average annual rainfall during August -
November months. The day temperature varies 28oc in winter and
about 50oc in summer season. The general wind direction is SW to
NE & SE- NW.
5. Rainfall The average annual rainfall of the area is 1,000 mm
6. Soil Type Red lateritic soils
7. Land Use Pattern
The quarry lease applied area is part of undulating terrain area with
moderate to steeply sloping. The land is barren with bounders and
rocky exposures and not fit for cultivation
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 10
2. GEOLOGY AND EXPLORATION
a) Brief description of Regional Geology with reference to location of lease / applied area
Regional Geology
The district constitutes a part of the Indian Peninsular Shield. The district formed by Archeans include
Khondalite suite of rocks Charnockites, Schists, Granites and Anthrosites. The major rocks of this
group have a regional strike and foliation in the ENE – WSW direction with steep dips towards SSE.
The geological succession of the district is given below.
Geological Age Formation
Sub Recent to Recent River Gravel, Alluvium Kankar and Soil
Mio – Pliocene Rajahmundry Sandstones
-------------------------------------Unconformity-----------------------------------------------------
Eocene Deccan Traps
-------------------------------------Unconformity-----------------------------------------------------
Lower Jurassic Upper Gondwana Super Group Gollapalle Sandstones
Upper Permian Lower Gondwana Super Group Chintalapudi Sandstone
-------------------------------------Unconformity-----------------------------------------------------
Late Proterozoic Palnad Group Narji Limestone,Shales & Banaganapalli Quartzite
-------------------------------------Unconformity-----------------------------------------------------
Middle Proterozoic Cuddapah Super Group – Nallamalai Formation – Cumbum Shales & Quartzites
-------------------------------------Unconformity-----------------------------------------------------
Archean Quarzt Veins & Dolerites, Khondalites,
Granites, Aplites, Pegmatites, Peninsular
Gneiss, Charnokites & Dharwars
b) Detailed description of geology of lease area
The subject area falls on the northern part of the district consisting of Dharwars which belong to
the Archean age. The two distinct units consist the subject area. These two Litho units are (1)
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 11
Quartz Vein with Feldspar as Hangwall and (2) Muscovite Schists. The subject area is covered by
the soil and Feldspar in the lower altitudes i.e on either side of the Quartz body. But the Quartz
body has exposed as two veins in the center and north eastern part of the area. The Quartz veins
are seen in the excavated pits. The Quartz is massive, Fine grained and Glassy in nature. It is
colourless to translucent. T Quartz vein has a NW-SE strike and the dip is about 400 SW. Feldspar
occurs as a hangwall over the two exposed Quartz Bodies.
c) Details of Quarry Lease holder
M/s BALAJI ACQUA & AGRO PRODUCTS PVT. LTD
C & MD. Sri Gadde Rama Mohan,
Door No. 7-17,
Kanuru Road,
Kamayyathopu Centre,
Vijayawada – 7,
Krishna District.
d) Details of Prospecting / Mining Carried Out
1 old pit is existing in the quarry lease applied area.
Pit No. Grids Area
(M2)
Average Depth (M)
1 N 50 – 150 & E 100 – 150 527.00 5.00
e) Surface Geological Plan area on 1 : 1,000 Or 1 : 2,000 Scale
Topographical Survey
The baseline is considered from the GPS reading in co-relation with Toposheet contours, the levels were taken using total station of
LEICA with 5 Cm accuracy covering the total area.
The BM is taken on Boundary Pillar – C at East near the Boundary Pillar No. I of the quarry lease applied area with its value of 99.50 M
(Plate – III).
The geo co-ordinates were fixed using the 12 channel handheld GPS, GARMIN make with
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 12
MAP DATUM : WGS – 84
Position Format hddd – mm – ss.s
Map Datum WGS – 84
Units Metric
North Reference Magnetic
Variance 001o W
Angle Degrees
The features captured are drafted to prepare the Surface Geological Plan on 1 : 1,000 Or 1 :
2,000 Scale
f) Surface Cum Geological Plan prepared on a scale 1 : 2,000
The geological features captured are drafted to prepare the Surface Geological Plan on 1 :
1,000 Or 1 : 2,000 Scale (Plate – III)
g) Geological Sections on natural scale at suitable interval across the lease area or
applied area
Geological traverses in the mine and existing mining pits in the vicinity facilitated to access the shape and size of the deposit in the area. It
is a part of mound deposit rising 1 M above ground level within the quarry leased applied area (The lowest contour is 99 M and highest
contour is 100 M).
Method of Estimation of Reserves
The exposed reef with Quartz and Feldspar outcrops indicating fairly continuous deposition of the
pegmatite body with quartz as major component compare to feldspar. The volume of the deposit is
computed by Cross Sectional Area method by multiplying the Sectional Influence
The deposit is found to be irregular in shape. Hence cross sectional method adopted for Estimation of
Geological Reserves. 3 Sections A-A1 to C-C1 were drawn at equal distance perpendicular to the strike
direction of the formation to estimate the reserves (Plate – III).
The cross sections were drawn perpendicular to the strike direction, the cross sectional area of the
individual sections are calculated to arrive at sectional area, the area thus arrived is multiplied by the
sectional influence of 40 M (average) to arrive the volume of deposit.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 13
Since the Quartz and Feldspar are exposed to the nature are exhibiting minor contamination of Fe (Iron).
Hence, the recovery percentage for Quartz is considered at the rate of 60% and Feldspar at 30%.
Financial Analysis
The major components required to project the financial status of a project are:
Cost of the project
Means of financing
Cost of production
Tax burden and flows
Profitability
COST OF THE PROJECT
The cost of the project consists of the following major components:
Land and site development
Buildings and civil works
Machinery
Processing charges and Consultancy charges for preparation of mining plan, Environment
monitoring for generation of baseline data, REIA report, Public consultation, Pollution control
board clearance etc.
Provision for contingencies
Margin money for working capital
S.No Component of project cost Status Total cost in Rs.
01 Land and site development Working Pits 1,30,000/-
02 Buildings and civil works(Site services) 65 Sq.m 1,00,000/-
03 Machinery Hired Machinery 3,00,000/-
04 Processing and Consultancy charges 1,00,000/-
05 Provision for contingencies 1,00,000/-
06 Working capital 4,50,000/-
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 14
07 Financial assurance and purchase of NSS
bonds Furnished --
Total cost of project 11,80,000/-
The estimated total cost of the project is Rupees nineteen lakhs. The land is a private land. There are two
working pits in the area which are being worked. In total an amount of Rs. Twenty lakhs shall be incurred
for execution of mining lease.
COST OF PRODUCTION
The proposed production of mineral is 12,000 tonnes per annum and the proposed ROM to be excavated is
14,000 tonnes per annum.
The cost of production include the following components:
Excavation cost
o Drilling cost
o Blasting cost
o Loading and transportation
Utilities cost
o Cost of Power, Water and fuel
Overhead cost
o Administrative expenses
o Repairs and maintenance
o Taxes & Royalties of minerals
o Miscellaneous expenses
Cost of EMP implementation
EXCAVATION COST
Drilling cost: The annual production of the mineral is 12,000 tonnes per annum. The total ROM excavated
shall be 14,000 tonnes per annum.
The spacing and burden of a drill block shall be 2m x 2m with a depth of 1.6m.
The volume of rock broken per drill hole 6.4 Cu.m
The quantity of rock broken per hole in tonnes, 16 tonnes / drill hole
considering a specific gravity of 2.5 (Approx as it is ROM including waste)
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 15
Total drilling required for ROM of 14000 tonnes shall be 880 drill holes
The total cost of one drill hole in this area is Rs. 40/- per drill hole
Total cost of drilling Rs.35,200/-
Blasting cost: The average powder factor in this area is 4 tonnes per kilogram of explosive of medium
strength.
The total explosive required for an ROM of 14000 tonnes 3500 Kg
Total cost of explosives including accessories Rs.3,50,000/-
(Delays, Detonators, Safety fuse etc)
Loading & Transportation Cost: A hired excavator can excavate and load 50 tons per hour as the
excavation involves digging and selective mining. The excavation and transportation per hour shall cost Rs.
2200/-. The transportation and excavation cost of 14000 tons ROM amounts to 6,16,000/-.
Hence, the total excavation costs amounts to Rs. 10,01,200/-
UTILIITES COST
The project requires power only to operate the water pumps and for general lighting purpose.
The average power bill is estimated @ Rs.40,000/- per month
Total utilities cost per annum shall be Rs.4,80,000/-
OVERHEADS COST
Administrative costs: The administrative expenses include salaries of statutory employees, Postal and
telephone expenses, Stationary etc.
The salaries of the employees per annum shall be as follows:
Mines Manager II class Rs.4,20,000/-
Mine mate & Blaster Rs. 1,50,000/-
Supervisors – 1 @ 10,000/- per month Rs. 1,20,000/-
Watch & Ward – 2 @ 4000/- per month Rs. 96,000/-
The total salaries per annum amount to Rs.7,88,000/- say 8,00,000/-.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 16
The office expenses including Postal and telephone expenses and stationary @ Rs.5000/- per month shall
be Rs.60,000/- per annum
The total administrative expenses shall be Rs. 8,60,000/-
Taxes and Royalties to be paid the government are approximately @ Rs.102/- per ton.
Taxes and Royalties for 12,000 tonnes is Rs. 12,24,000/-
Hence total overhead cost shall be Rs. 20,84,000/-.
Cost of EMP implementation/ Year
S. No. Activity Amount proposed to
be spent Rs in Lakhs
1 Retention/toe walls 0.40
2 Plantation on Buffer zone & in the un-used areas. 0.70
3 Occupational health protective first-aid and other medical
aids. 0.60
4 Environmental pollution monitoring 1.00
5 Socio-economioc welfare measures in near by villages 1.00
6 Miscellaneous expenses for consultants celebration of safety
and environment week etc., 0.3
Total 4.00
Total excavation costs per annum shall be Rs. 10,01,200/-
Total utilities cost per annum shall be Rs. 4,80,000/-
Hence total overhead cost shall be Rs. 20,84,000/-
Cost of EMP implementation/ Year Rs. 4,00,000/-
The total production cost shall be Rs.39,65,200/-
Production cost including Miscellaneous Expenses Rs. 44,00,000/-
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 17
SALE PROCEEDS
The mine shall generate 6000 tons of Quartz and 6000 tons of feldspar per annum
The average sale proceeds of Quartz @ Rs750/- per ton Rs.45,00,000/-
The average sale proceeds of Feldspar @ Rs350/- per ton Rs.21,00,000/-
ESTIMATES OF WORKING RESULTS
S.No. Component Cost in Rs.
1. Cost of production 44,00,000
2. Expected Sale proceeds 66,00,000
3. Gross profit before interest 22,00,000
4. Interest on investment @12% per annum 2,40,000
5. Operating profit 19,60,000
6. Provision for taxation@30% 5,88,000
7. Surcharge @3% of tax 17,460
8. Net Profit after Tax 13,54,540
The recovery percentage of the minerals increases with depth. The project hence is economically viable
with good returns without much gestation period. The depth considered for estimation of Proved reserves
is 10m, i.e from the surface of the existing pit.
h) Broadly indicate the future program of exploration with due justification taking into
consideration the future tentative excavation programme planned in first five years
Year
No. of
Boreholes
(Core / RC /
DTH)
Grid
Interval
Total
meterage
No. of Pits,
Dimensions
and
Volume
No. of
Trenches,
Dimensions
and
Volume
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 18
1st N.A - - N.A N.A
2nd N.A - - N.A N.A
3rd N.A - - N.A N.A
4th N.A - - N.A N.A
5th N.A - - N.A N.A
i) Type of exploration used to confirm the deposit:
Exposed pit is in the orientaion of NE & SW direction is clearly visible & So the trend of the deposit is in same direction ,So we estimated the reserves with the data available at the site .
j) Reserves and Resources as per UNFC. Detailed calculation of reserves shall be stated
The reserves are estimated by multiplying the cross sectional area with the influence distance of
section, tonnage factor (T.F) and recovery factor (R.F). The tonnage factor of Quartz is considered
as 2.7 and Feldspar is considered as 2.6.
The intercalated waste from the joints in Quartz, which are rejects considered @ 15% of the ROM,
recovery factor saleable ore is taken as 85%.
The tonnage tonnage factor of Quartz is considered as 2.7 and Feldspar is considered as 2.6 and
recovery factor saleable ore is taken as 85%.
The reserves upto 15 M below the surface are considered under Proved Category of Reserves (Upto RL
70 M) (Plate – III).
Hence, only G1 (Proved) scale category as (111) code is calculated. No resources are considered under
G2 & G3 (Probable & Possible) scale of exploration.
Applicant didn't produce any chemical analysis certificate from the laboratory , Hence according
to RUTLYES ELEMENTSOF MINEROLOGY the specific gravity is mentioned as :
SPEECIFIC GRAVITY OF QUARTZ = 2.7
SPEECIFIC GRAVITY OF FELDSPAR = 2.6
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 19
a) TOTAL GEOLOGICAL RESERVES
(QUARTZ & FELDSPAR)
Sections
Category
&
UNFC Code
Sectional
Area
Sectional
Influence Volume
Quartz @ 55% Feldspar @ 30%
TONNES
Waste @ 15% Quartz * 2.7 Feldspar *2.6
(M2) (M) (M
3) (MT) (MT)
A – A1
Proved
(111)
Nil
B – B1 915.00 40.00 36,600.00 20,130 10,980.00
5,490.00
54351 28,548.00
C – C1 1148.00 52.00 59,696.00 32,832.8 17,908.8
8,954.4
88648.56 46,562.88
TOTAL 96,296.00 52,962.8 28,888.8
14,444.4
142999.56 75,110.88
B – B1
Possible
(121)
528.00 40.00 21,120.00 11,616 6,336
3,168 31363.2 16,473.6
C – C1
630.00 52.00 32,760.00 18,018 9,828
4,914
48648.6 25,552.8
TOTAL 53,880.00 29,634 16,164
8,082
80011.8 4,2026.4
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 20
SUB TOTAL 1,50,176.00 82,596.8 45,052.8
22,526.4
223011.36 1,17,137.28
b) RESERVES IN UNFC CODE
S.No. Category of Reserves
UNFC
Code
Quartz
Reserves in Million Tons
Feldspar
Reserves in Million Tons
11. Proved
111 0.143 0.075
2. Probable 121 0.119 0.042
3. Possible
333 Nil Nil
TOTAL 0.0.263 0.117
c) RESERVES BLOCKED UNDER 7.5 M BUFFER ZONE
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 21
Sections
Category
&
UNFC Code
Sectional
Area
Sectional
Influence Volume
Quartz @ 55% Feldspar @ 30%
TONNES
Waste @ 15% Quartz * 2.7 Feldspar *2.6
(M2) (M) (M
3) (MT) (MT)
A – A1
Proved
(111)
Nil
B – B1 197.00 40.00 7880 4334 2364
1182
11701.8 6146.4
C – C1 140.00 52.00 7280 4004 2184
1092
10810.8 5678.4
TOTAL 15160 8338 4548
2274
22512.6 11824.8
B – B1
Possible
(121)
129.00 40.00 5160 2838 1548
774
7662.6 4024.8
C – C1 76.00 52.00 3952 2173.60 1185.6
592.8
5868.72 3082.56
TOTAL 9112 5011.60 2733.6
1366.80
13531.32 7107.36
SUB TOTAL 24272 13349.60 7281.6
3640.8
36043.92 18932.16
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 22
d) RESERVES BLOCKED UNDER SAFETY SLOPES
Sections
Category
&
UNFC Code
Sectional
Area
Sectional
Influence Volume
Quartz @ 55% Feldspar @ 30%
TONNES
Waste @ 15% Quartz * 2.7 Feldspar *2.6
(M2) (M) (M
3) (MT) (MT)
A – A1
Proved
(111)
Nil
B – B1 95.00 40.00 3800 2090 1140
570
5643 2964
C – C1 175.00 52.00 9100 5005 2730
1365
13513.5 7098
TOTAL 12900 7095 3870
1935
19156.5 10062
B – B1
Possible
(121)
189.00 40.00 7560 4158 2268
1134
11226.6 5896.8
C – C1 233.00 52.00 12116 6663.8 3634.80
1817.4
17992.26 9450.48
TOTAL 19676 10821.8 5902.80
2951.4
29218.8 15347.28
SUB TOTAL 32576 17916.8 9772.8
4886.4
48375.3 25409.28
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 23
TOTAL MINEABLE RESERVES
RESERVES AVAILABLE FOR MINING
A. Total Geological Reserves 3,40,148.64 MT
B. Reserves Blocked under 7.5 M Buffer Zone 54,976.08 MT
C. Reserves Blocked under Safety Slopes 73784.58 MT
D. Total Reserves Blocked (B + C) 1,28,760.00 MT
E Reserves available for Quarrying
(A – (B + C)) 2,11,388.64 MT
@ 85% Recovery (Proved) 1,79,680.34 MT
Life of the Quarry =
Total Mineable Reserves / Average Annual Production
1,79,680.34 MT / 13,062.00 MT
= 13.75 OR SAY
14.00 YEARS
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 24
3. MINING
a) Open Cast Mining
i) Description of existing / proposed method for excavation with all design parameters
indicating on plans / sections
The method of mining shall be opencast and semi-mechanized on single shift basis. Excavations shall be carried out by Jack Hammer
drilling and blasting. Bench height and width will be maintained at 6 m and 6 m each respectively with overall slope at 60°. Excavation
and loading shall be carried out with simple excavators of capacity 0.9 to 1.1 cu.m bucket capacity. This shall be utilized for
developmental work, excavation and loading into the trucks. Tippers of 10 T capacity shall be utilized for all transportation purposes.
The firm intends to extract the Quartz and Feldspar production to the tune of 7,837.20 MT
of Quartz per annum and 3,918.60 MT of Feldspar per annum production to the tune of
during the first five years of the plan period.
Capacity of Quartz & Feldspar raising per annum = 18,724.50 MT
(Maximum Production)
No of Working Days considered = 300 of quarry operation
Total required quantity of excavation per Annum = 20,805.00 MT
Total required quantity per day = 69.35 MT per day
The opencast mine operations consist of four major operations viz. drilling, blasting, loading and transport
ii) Drilling and Blasting
DRILLING MACHINE :
Drilling Parameters for Quartz & Feldspar :
Burden (B) : 2.50 meter
Spacing (S) : 3.00 meter
Depth (Includes sub grade drilling) (D) : 6.0 meter
The angle of inclination should less than 78° to 82°. Sub grade Drilling + 8 % of the depth of the
bench. (6 meter + 0.48 =6.48 Or Say 6.5 meter)
In-situ density : 2.5
Yield per hole : B X S X D X 2.5
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 25
: 2.5 x 3.00 x 6.00 x 2.5 = 112.50 MT
Yield per meter : 112.50 / 6 = 18.75 Or Say 19 MT
Drilling required for planned ROM = 20,805.00 / 19 = 1,095 meters / annum
(Maximum ROM)
Technical Specification of diesel driven portable compressor :
Compressor capacity : 600 cfm
Compressor output capacity : 10 .5 kg/cm2
Wagon Drill : 54 mm Ø (Pneumatic)
Working pressure on hammer : 150 lbs
Average drilling output per hour : 12 meters
Total Hours required for planned production : 1,095 / 12 = 91.25 Hours / Annum
: 91.25 / 10 = 9.125 Hours / Month
Effective working hours per day from 8 am to 6 pm is 8 hours
Number of drilling days required per month = 9.125 / 8 = 1.14 Or Say 1 Day
By considering 80 % availability of men & machinery, One DTH drilling units, having 54 mm Ø is
adequate to meet out the targeted production during the plan period.
Note: As far as, the strata condition in the mined area was medium / low in situ density, the drilling
in the waste has to be performed in micro level.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 26
iii) Indicate year wise tentative excavation in cubic meters indicating development, ROM,
pit wise as in table.
Year Pit
No
Total
Tentative
Excavation
Top
Soil
OB / SB
/ IB
ROM from Mineralised Zone
Waste
ROM /
Waste
Ratio Clean Ore
Sub -
Grade
Ore
Mineral
Rejects
(M3 ) (M
3 ) (M
3 ) (M
3 ) (M
3 ) (M
3 )
1 2 3 4 5 6 7 9 8 9
1st 1
8,322.00 Nil 2,080.50
7,073.70 Nil Nil
601.26 1 : 0.1
2nd
3,468.00 Nil Nil
2,947.80 Nil Nil
250.56 1 : 0.1
3rd
7,266.00 Nil 1,816.50
6,176.10 Nil Nil
524.97 1 : 0.1
4th
2,850.00 Nil Nil
2,422.50 Nil Nil
205.91 1 : 0.1
5th
4,218.00 Nil 712.50
3,585.30 Nil Nil
304.75 1 : 0.1
TOTAL 26,124.00
4,609.50 22,205.40 1,887.46
AVERAGE 5,224.80
1,536.50 4,441.08 377.49
iv) Dump Management
Waste Dump
(Plate – V)
Dump Area
(M2)
Height
(M) Direction Grids
Mineral 1,674 6.00 NW N 50 – 150 & E 00 – 100
Soil Overburden 1,203 6.00 SW N 00 – 100 & E 00 – 100
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 27
Under Ground Mining
Not applicable
a) Production Proposed for the first five years
The applicant intends to extract the Quartz production to the tune of 39,186.00 MT and Feldspar
19,593.00 MT per annum during the first 5 years of the plan period.
During the plan period it is proposed to exploit the Quartz & Feldspar from the total area of
3,232.00 M2 to an average depth of 6 M from North of the quarry lease applied area covering
under Cross Sections B-B1 to C-C1 between the grids N 00 – 150 & E 50 – 200. The workings
advance Southwards (Plate – V).
Other than fully mechanized open cast ‘A’ category method of mining operations will be
deployed. Compressor with Jack hammers will be utilized for drilling the holes.
Excavation, haulage will be done by manually. Manual sorting and sizing of the mineral
will be done manually. The minerals will be transported by hired trucks.
b) Mining Program for the first five years
It is proposed to produce the Quartz & Feldspar from North of the quarry lease applied area
during the first five years.
The waste generated will be temporarily dumped in the NW of the quarry lease applied area (within the
quarry lease applied area) covering an area of 1,674 M2
with an average height of 6 M between the grids
N 50 – 150 & E 00 – 100. The dump will be re-handled for back filling the matured pits (Plate – V).
Soil Dump
The soil waste generated will be temporarily dumped in the SW of the quarry lease applied area (within
the mining applied lease area) covering an area of 1,203 M2
with an average height of 6 M between the
grids N 00 – 100 & E 00 – 100 (Plate – V).
Stock Yard
Quartz
The mineral generated will be stocked in the temporary stock yard over an area of
642.00 M2 in the SE of the mining lease applied area between the grids N 00 – 50 &
E 100 – 150 (Plate – V).
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 28
Feldspar
The mineral generated will be stocked in the temporary stock yard over an area of
457.00 M2 in the South of the quarry lease applied area between the grids N 00 – 50
& E 50 – 100 (Plate – V).
YEAR QUARTZ & FELDSPAR
1st
During 1st year the mining will be initiated from North of the quarry lease
applied area between the grids N 50 – 150 & E 50 – 150 and between the RL
100.85 – 95.30 M to RL 94.85 – 89.30 M over an area of 2,774.00 M2 to a depth
of 1.50 (Soil) & 6 M (Quartz & Feldspar).
A total volume 10,402.50 M3 of excavation will be made, generating 2,080.50
M3 of Soil Overburden.
A total 20,805.00 MT of ROM and will be obtained producing 12,358.17MT of
Quartz (55% recovery) & 6,491.16MT of Feldspar (30% recovery) and 1248.3M3
(15% of Soil & Mineral Waste) will be generated. The mining advances
Southwards.
2nd
In the second year the mining will continue below 1st year workings between
the grids N 50 – 150 & E 50 – 150 and between the RL 94.85 – 89.30 M to RL
88.85 – 83.50 M over an area of 578.00 M2 to a depth of 6 M (Quartz &
Feldspar). A total volume of 3,468.00 M3 of excavation will be made.
8,670.00 MT of ROM and will be obtained producing 5,149.98 MT of Quartz (55%
recovery) & 2,705.04 MT of Feldspar (30% recovery) and 520.2 M3 (15% of Soil &
Mineral Waste) will be generated. The mining advances Southwards.
3rd
During 3rd year the mining will continue due NE of the quarry lease applied area
between the grids N 00 – 100 & E 100 – 200 and between the Contour 99.50 M
to RL 93.50 M over an area of 1,789.00 M2 to a depth of 1.50 (Soil) & 6 M
(Quartz & Feldspar).
A total volume 5,284.50 M3 of excavation will be made, generating 1,816.50 M3
of Soil Overburden.
A total 1, 18,165.00 MT of ROM and will be obtained producing 10,790.01MT of
Quartz (55% recovery) & 5,667.48MT of Feldspar (30% recovery) and 1089.9 M3
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 29
(15% of Soil & Mineral Waste) will be generated. The mining advances
Southwards.
4th
In the 4th year the mining will continue below 3rd year workings between the
grids N 00 – 100 & E 100 – 200 and between the RL 93.50 – 87.50 M over an
area of 475.00 M2 to a depth of 6 M (Quartz & Feldspar). A total volume of
2,850.00 M3 of excavation will be made.
7,125.00 MT of ROM and will be obtained producing 4,232.25 MT of Quartz (55%
recovery) & 2,223.00MT of Feldspar (30% recovery) and 427.5M3 (10% of Soil &
Mineral Waste) will be generated. The mining advances Southwards.
5th
During 5th year the mining will continue due South of 3rd year workings between
the grids N 00 – 100 & E 100 – 150 and between the Contour 99.50 M – 99 M to
RL 93.50 – 93.00 M over an area of 1,178.00 M2 to a depth of 1.50 (Soil) & 6 M
(Quartz & Feldspar).
A total volume 4,930.50 M3 of excavation will be made, generating 712.50 M3 of
Soil Overburden.
A total 10,545.00 MT of ROM and will be obtained producing 6263.73 MT of
Quartz (55% recovery) 3,290.04 MT of Feldspar (30% recovery) and 632.70 M3 (15%
of Soil & Mineral Waste) will be generated. The mining advances Southwards.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 30
The year wise production proposed is shown in the following table.
YEAR WISE PRODUCTION FOR FIRST FIVE YEARS FOR QUARTZ & FELDSPAR
Year Litho-Unit
Area Bench
Height Volume
Quartz
@ 55%
Feldspar
@ 30%
Recovery @ 80%
Waste
@ 15%
(M3)
Quartz
*2.7
Feldspar
*2.6
(M2) (M) (M
3) (M
3) (M
3) (MT) (MT)
1st
Soil Overburden 1,387.00 1.50 2,080.50 2,080.50
Mineral 1,387.00 6.00 8,322.00 4577.1 2496.6 12,358.17 6,491.16 1248.3
2nd
Mineral 578.00 6.00 3,468.00 1907.4 1040.4 5,149.98 2,705.04 520.2
3rd
Soil Overburden 1,211.00 1.50 1,816.50 1,816.50
Mineral 1,211.00 6.00 7,266.00 3996.3 2179.8 10,790.01 5,667.48 1089.9
4th
Mineral 475.00 6.00 2,850.00 1567.5 855.00 4,232.25 2,223.00 427.5
5th
Soil Overburden 475.00 1.50 712.50 712.50
Mineral 703.00 6.00 4,218.00 2319.9 1265.4 6263.73 3,290.04 632.70
TOTAL 30,733.50 14,368.2 7,837.2 38,794.14 20,736.72 8,528.10
AVERAGE 6,146.70 2,873.64 1,567.44 7,758.83 4,075.344 1,705.62
Total Soil Overburden Waste : 4,609.50 M3
Total Mineral Waste : 3918.60 M3
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 31
c) Production Schedule
The production of Quartz & Feldspar continuous throughout year except during monsoon that is 10
working months, 25 working days per month are considered. The average production of Quartz &
Feldspar is 4,441.08 M3 / 11834.17 MT per year (250 days @ 17.76 M
3 / 47.33 MT per day) can be
easily achieved in a single shift with sufficient men and machinery.
d) Magazine Type and Capacity
Applicant will apply for the Explosive license for storing the explosives with 100 Kg Portable Magazine.
Alternatively engages a licensed blasting contractor for carrying out the drilling and blasting.
4. MINE DRAINAGE
A Minimum and Maximum depth of
water table
Shallow aquifers during monsoon period and
canal flows.
Depletion of water occurs during summer
Water table depth ranges from 10 – 35 m
B Indicate Maximum and minimum
depth of workings
RL 100.85 – 87.50 M to
RL 95.30 – 83.30 M
C Quantity and Quality of water Potable
D Regional Drainage Pattern Parallel
5. STOCKING OF MINERAL REJECT / SUB GRADE MATERIAL AND
DISPOSAL OF WASTE
During mining operations in first five years a total of 3918.16 M3 of Quartz & Feldspar waste
and 4,609.50 M3 of soil waste will be generated and dumped at the dumping yard, on an
average of 783.72 M3 of Quartz & Feldspar waste & 921.90 M3 of Soil waste per annum.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 32
Year
Waste @ 15 % (M3)
Mineral Soil
1st
1248.3 2,080.50
2nd
520.2
3rd
1089.9 1,816.50
4th
427.5
5th
632.70 712.50
TOTAL 3918.6 4,609.50
AVERAGE 783.72 921.90
Estimated Waste Quantity that will be generated in the Entire Lease Period
At the rate of 1,705.62 M3 of waste per year, the total of waste generated in entire lease
period i.e. 20 years is estimated to be 34,112.40 M3.
6. USE OF MINERAL AND MINERAL REJECT
The Quartz & Feldspar of this area is not meant of captive use. The mineral quartz will be sold to
the Ferro Alloy Industries, Foundries, Ceramics and to Glass Industries. Feldspar will be sold to
the ceramic industries.
Specifications stipulated by buyers
Industry SiO2
Fe2O3 Al2O3
I) Quartz
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 33
AGI (Glass) 98.5 0.05 0.40
HMT Bulb Industry 98.4 0.05 0.55
Hindustan Sanitary Ware 99.4 0.03 0.24
Sheet Fibre Glass 99.6 0.03 0.15
Industry Na2O K2O Fe2O3 Al2O3
II) Feldspar
Hindustan Sanitary Ware &
Regency Ceramic 4.5 11.0 0.6 20.50
AGI (Glass) 4.8 10.5 0.5-0.6 10.00
7. PROCESSING OF ROM AND MINERAL REJECT Beneficiation is limited to chipping and breaking to small pieces of 20-150mm size
8. OTHERS
a) SITE SERVICES
Temporary Office, Rest Shelter, Drinking Water Facilitates, Public Utilities, First Aid
will be provided by the applicant in the South of the mining lease area
covering an area of 131 M2 between the grids N 00 – 50 & E 50 – 100 (Plate – V).
b) Extent of Mechanisation
The following machinery is deployed by the company
S.NO. RATED CAPACITY REQUIREMENT OF
MACHINERY
01. Hitachi Bucket Capacity 0.9 M3 1 No.
02. Jack Hammers 4 No's.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 34
03. Tractor Mounted Compressor 1 No.
04. Water Tanker (Tractor Mounted) 5000 L 1 No.
05. Tractors with Trailers 4 No’s.
Employment Potential
S.NO. CATEGORY NO’S
Supervisory Cader
1. Mines Manager Cum Mining Engineer 1
2. Mine Mate 1
Work Persons
3. Excavator Operator 1
4. Drivers 5
5. Compressor Operator 4
6. Semi Skilled Workers 20
7 Un – Skilled Workers 20
TOTAL 52
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 35
PART – B
PROGRESSIVE MINE CLOSURE PLAN
1. ENVIRONMENT BASE LINE INFORMATION
i Existing Land Use Pattern
The quarry lease applied area is on part of the elevated
ridge with sparse vegetation small bushes from the
vegetal cover. The deposit is occupying part of the
lease area. The areas around are agricultural lands.
ii Water Regime
Edulla Vagu is passing at the distance of 2.25 Km due
South. The quarry lease applied area is surrounded by
numerous water bodies.
iii Flora and Fauna
The whole quarry lease applied area is occupied by
scattered sparse vegetation of thorny trees and small
bushes. In the quarry lease applied area, no wild
animals are witnessed as per the statements collected
from the local population, since 50 years
iv Quality of Air, Ambient
Noise Level and Water
Air quality is good but at quarries it is filled
with dust, due to haulage on the road,
blasting etc.
The noise generated mostly due to blasting,
drilling, vehicular traffic
v Climatic Conditions
The quarry leased applied area experience semi arid
climatic condition. The area experience 1000 mm
average annual rainfall during August - November
months. The day temperature varies 28c in winter and
about 50c in summer season. The general wind
direction is SW to NE & SE- NW.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 36
vi Human Settlement
The nearest village Shambhunigudem is situated 1.75
Km due NE of the quarry leased applied area, having a
population of 800 No’s. Agriculture and sheep breeding
are important profession of the people living in the
village besides involving themselves in mining activity.
S.No. Village Direction Distance
(Km)
Approx.
Population
(No’s)
01. Kotta
Lakshmipuram NW 2.50 1,200
02. Tiruvuru NW 5.00 5,000
03. Ganeshpadu NE 3.00 1,600
04. Chinna Mallela NE 4.25 1,500
05. Shambhunigudem NE 1.75 800
06. Gollagudem SE 2.00 500
07. Kotturu SE 3.50 1,200
08. Vellampatla SE 4.00 800
09. Kakarla SW 3.75 1,000
10. Anjaneyapuram SW 4.50 900
vii Public Buildings, Places
& Monuments
No public buildings, important places and monuments
are seen in and around the quarry lease applied area;
however, the applicant will adopt the safety measures
while conducting the mining operations as per the
Regulations 109 & 127 of Metalliferrous Mines
Regulation ‘1961.
viii Sanctuaries
No bird or animal sanctuaries are existing in 10 Km
radius
ix
Eco-Sensitive Areas
No Eco Sensitive are existing in 10 Km radius
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 37
x Afforestation
The applicant proposes for afforestation in the East of
the quarry leased applied area covering an area of 750
M2 within the 7.5 M buffer zone in phased manner
during the plan period with Neem / Mango plants (Plate
– V).
Year Area
(M2)
No. of
Plants Type of Plants
1st
150.00 30 Neem / Mango
2nd
150.00 30 Neem / Mango
3rd
150.00 30 Neem / Mango
4th
150.00 30 Neem / Mango
5th
150.00 30 Neem / Mango
TOTAL 750.00 150
2. ENVIRONMENTAL IMPACT ASSESSMENT
a Landscape Changes
A large pit of 3,759 M2 to an average depth of 12 M will be
formed in the quarry leased applied area. The mining will
alter the shape of the present mound slope with a large
sliced pit.
b Air Quality
Air quality is good but at quarries it is filled with dust, due to
haulage on the road, blasting etc. but it will be within the
permissible limits by sprinkling water on roads and covering
the drill rods with cloth. Air quality will not be disturbed, as
the Mining is very limited.
Base Level
Allowable Level
SPM = 140g/m3 360g/m
3
RSPM = 60g/m3 120g/m
3
SO2 = 40g/m3 80g/m
3
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 38
NO2 = 40g/m3 80g/m
3
CO = 1.0g/m3 5.0g/m
3
c Water Quality
The water environment will not be disturbed as the mine is
far off from the water courses.
The mining of Quartz & Feldspar has no adverse affect is
anticipated on the water regime in the area
d Noise Levels
The blasting and the haulage and the drilling of boreholes
generate noise. However, the probable noise level will be
within the permissible limits and will not cause harm. The
applicant will provide suitable protective gear to the workers
for minimizing the noise pollution and the machinery will be
well maintained.
e Vibration Levels
The vibrations that will be generated due to heavy machinery
will be meager
f Water Environment
The water environment will not be disturbed as the mine is
far off from the water courses.
g Acid Mine Drainage No acids will be generated from Quartz & Feldspar mines
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 39
h Surface Subsidence
No subsidence is anticipated in this regime as the basement
rock is massive and away from the seismic zone
i Socio economics
The main occupation of villagers is agriculture and sheep
raring. The commencement of mining activity in this area
improved the socio-economic status of the local people by
creation of employment and paying taxes to gram
panchayath.
The mining in this area does not involve any hazardous
methods. The applicant is providing First Aid facilities at
Mine site.
j Historical
Monuments
No historical monuments exist within 5 Km radius
k Bio-Diversity
No impact will happen to the Mankind, Flora and Fauna by
the mining operations, excepting minor vibrations due to
blasting, sound pollution and dust which will be under
control and within the permissible limits.
3. PROGRESSIVE RECLAMATION PLAN
The pits will be utilized for water storage and water harvesting structure.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 40
4. MINED OUT LAND
The mined out pit will be utilized for water recharge structure. The entire area leaving 7.5 M
buffer zone will be excavated to a depth of RL 70 M i.e. ultimate pit depth.
Land Use Pattern of the quarry area during the first 5 years will be as follows :
Area M2 Hectares
Active Quarry Area
Broken 527 0.053
To be broken 3,232 0.323
TOTAL 3,759 0.376
Waste Dumps
Existing Nil Nil
Soil 1,203 0.120
Proposed 1,674 0.167
TOTAL 2,877 0.288
7.5 M Wide Safety Zone 3,586 0.359
Roads (included in pits) (318) (0.032)
Infrastructure 131 0.013
Stock Yard
Quartz : 642
1,099 0.110
Feldspar : 457
QUARRY LEASE AREA UTILIZED 11,452 1.145
TOTAL QUARRY LEASE AREA 12,750 1.275
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 41
Area that will be broken during Conceptual Plan (Plate – VII)
Period
Mining Operations
Area
(M2)
Depth
(M)
Area / Plants
(M2)
During 2nd
5 year block period 1,549 18.00 2,072 M
2
(7.5 M buffer zone)
Reclamation (Plate – IX)
The matured pits will be backfilled by re-handing of waste as a reclamation measure and
balance of pits will be utilized as water harvesting structure
5. TOP SOIL MANAGEMENT
Not applicable
6. TAILING DAM MANAGEMENT
Not applicable
7. DISASTER MANAGEMENT AND RISK ASSESSMENT
To mitigate the emergency, planning is the first & four most thing, i.e. recognizing the
accident or possible, assessing the consequences of such possible accidents and deciding on
emergency planning / procedures in advance both on site & off site that would necessary to
be implemented in the event of emergency without any delay and confusion.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 42
Proper bench design in mines and observing safety measures for transportation, storage,
handling of explosives & fuels, etc, good maintenance of vehicles, roads, fire prevention
measures shall go in preventing disaster / accidents.
The applicant is committed to identify the possible causes for potential disaster and draw a
code of emergency measures and procedures to deal with such disasters, which is otherwise
also advised by DGMS through their circulars.
The mine is located at the distance of 5 Km from Tiruvuru town having good transport and
communication systems.
The mine is having good communication like telephone & mobile facility. In case of any
minor / major accidents within the mine, the same will be communicated to the Agent by
the Mines Manager and intern he will inform to the Revenue Authorities, Police, Fire
Department, DGMS etc for action.
A vehicle is kept all the time at the mine site for conveyance.
At mine level First Aid will provided and person(s) shall be shifted to nearby hospital at
Tiruvuru which is having all basic amenities.
8. CARE AND MAINTENANCE DURING TEMPORARY DISCONTINUANCE
The mine workers are taken on contract basis on need based orders, the workers always get
Employment / Contract in similar quarries existing around. During monsoon these labour are
busy with agricultural activities.
ITEM DETAILS PROPOSED ACTUAL
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 43
Dump Management
Area afforested (Ha)
1. No. of saplings planted
2. Cumulative no of plants
3. Cost including watch and care during the year
Nil Nil
Management of worked
out benches
1. Area available for rehabilitation (specify)
2. No of saplings planted in the year
3. Cumulative no of plants
4. Any other method of rehabilitation (specify)
5. Cost including watch and care during the year
Plantation is
proposed all
along the
7.5 M Buffer
Zone
-
Reclamation and
Rehabilitation by
backfilling
1. Void available for
backfilling (L x B x D) pit
wise / stope wise Void filled
by waste / tailings
afforestation on the
backfilled area
2. Rehabilitation by making
water reservoir
3. Any other means (specify)
The waste will
be re-handled
to backfill the
matured pits
-
Rehabilitation of waste
land within lease
1. Area available (Ha)
2. Area rehabilitated
3. Method of rehabilitation
No proposals
are made -
9. FINANCIAL ASSURANCE
Financial Assurance can be submitted in any encashable form preferable a Bank
Guarantee from a Scheduled Bank at the rates equivalent to rates prescribed in Rule
23 (F) (2) of Mineral Conservation Development Rules, 1988 for the first five years
period expiring at the end of validity of the document.
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 44
The proposed mining operations are by Other than Fully Mechanised Mining and
hence the cost of Reclamation & Rehabilitation is calculated as per the provisions of
APMMC Rules, 1966 @ Rs. 25,000/- per hectare or part thereof. This amount works
out to be Rs. 19,650/- for 0.786 Hectares area.
The minimum financial assurance in the form of Bank Guarantee for Rs. 2,00,000/-
will have be submitted to the Assistant Director of Mines & Geology, Vijayawada.
10. FINANCIAL ASSURANCE PROFORMA
The details of area put to use under various activities are calculated to arrive the Financial
Assurance, various land uses are indicated in the following tabular form.
TABLE INDICATING THE BREAKUP OF AREAS IN THE QUARRY LEASE
FOR CALCULATION OF FINANCIAL ASSURANCE
S.No. Head
Area put
on use at
the start
of plan
(in Ha.)
Additional
requirement
during the
plan period
(in Ha.)
Total
(in Ha.)
Area
considered as
fully
reclaimed
and
rehabilitated
(in Ha.)
Net area
considered
for
calculation
(in Ha.)
1 2 3 4 5 6 7
1 Area under Mining 0.053 0.323 0.376 - 0.376
2 Storage for Top Soil Nil 0.120 0.120 - 0.120
3 Overburden / Dump Nil 0.167 0.167 - 0.167
4
Mineral Storage
(Quart & Feldspar)
Nil 0.110 0.110 - 0.110
5 Infrastructure (Workshop,
Administrative Building
Nil 0.013 0.013 - 0.013
MINING PLAN FOR QUARTZ & FELDSPAR Extent : 1.275 Hectares 2017
Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / 2017 9 9 6 6 1 2 0 8 3 0
Page – 45
etc.,)
6 Roads (included in pits) Nil (0.032) (0.032) - (0.032)
7 Railways Nil N.A. N.A. - N.A.
8
Green Belt
(Within the 7.5 M BZ)
Nil (0.075) (0.075) - (0.075)
9 Tailing Pond Nil N.A. N.A. - N.A.
10 Effluent Treatment Plant Nil N.A. N.A. - N.A.
11 Mineral Separation Plant Nil N.A. N.A. - N.A.
12 Township Area Nil N.A. N.A. - N.A.
13 Others (To be Specified) Nil - - - -
GRAND TOTAL
A B
C =
(A + B)
D E = (C-D)
0.053 0.733 0.786 - 0.786
11. CERTIFICATE
Certified that the above mentioned will be taken care in the Progressive Mine Closure
Plan for Quartz & Feldspar over an extent of 1.275 Hectares in Sy. No’s 89 / 2A, 2B
(P), 2C, 2D & 3 of Lakshmipuram Village, Tiruvuru Mandal, Krishna District Andhra
Pradesh State.
All statutory organizations, courts etc. have been taken into consideration and wherever any specific permission is required,
the applicant will approach the concerned authorities.
All the measures proposed in this closure plan will be implemented in a time bound manner as proposed.
12. PLANS & SECTIONS