The 5 th working group meeting of Asian Highway Investment forum on Bangkok Participants from Azerbaijan: Ministry of Transport of Azerbaijan Republic “AZERROADSERVICE” OJSC Mrs Gojulu Shafiga (Head of department of international relations and translation of “Azerroadservice” OJSC, expert of UNESCAP, Doctor of transport sciense Academician and active member of International Transport academy of Russian Federation,

Upload: others

Post on 07-Nov-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

The 5th working group meeting of Asian Highway Investment forum on Bangkok

Participants from Azerbaijan:

Ministry of Transport of Azerbaijan Republic“AZERROADSERVICE” OJSC

Mrs Gojulu Shafiga(Head of department of international relations and

translation of “Azerroadservice” OJSC, expert of UNESCAP, Doctor of transport sciense Academician and active member of International Transport academy of Russian Federation,

Page 2: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Highways of the Azerbaijan Republic(under the symbol "AH“)

International AH-roads – 1504 km. Republican network has codes M1, M2, M3, M4, M5, M6, M7, M8.

The main roads in the Republic 1. Baku - Alat - Kurdamir - Ganja - Gazakh - border of the

Republic of Georgia, stretching 503km (M2 AH-5 and E-60) 2. Guba - Baku - Salyan - Lenkaran - Astara - border Islamic

Republic of Iran, stretching 521 km (M1, M3, AH-8, E-119)3. Baku-Shirvan - Goradiz - Mindzhevan - Megry - Ordubad -

Nakhchivan - Sederek - the border of Turkey, stretching 631 km (M2, M6, M7, M8, AH-81 and E-002), There is accupation 20% (97 km) area.

Page 3: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Pictures of Road signs of AH

Page 4: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Main road indexes of Azerbaijan

Page 5: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Financial sources of roads

Financial Sources of Transportation sector of Azerbaijan Republic - State budget, including:

a) The miscellaneous type of taxes, b) Including road tax paid by owners of

vehicles of the Republic and foreign countries;

Page 6: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Financial sources of roads• Budget Fund "Avtomobil Yollari " (highways Fund)

including:

a) Road Tax,b) Simplified tax paid by persons engaged in passenger

and freight vehiclesc) Excise taxes apply to imported passenger cars,d) The customs duties applicable to imported motor

vehicles,e) The state fee charged for the granting of the

authorization governing international road transport in the territory of Azerbaijan Republic,

f) The state fee charged for an annual technical inspection of motor vehicles, trailers and semi-trailers

Page 7: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Construction of roads and road infrastructures

• Construction of roads and road infrastructures perform specialized organizations, companies and joint stock companies, including foreign companies, conducted under the competitive bidding - international tenders.

• For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis”OJSC of Ministry of Transport successfully negotiated with foreign investors, financial institutions and banks, imcluding WDB, Kuwait Faundation of Arabian economic development, Abu-Dhabi Faundation, European Devolepment Fund, Islamic Developing Bank, Asian Devoloping Bank and etc.

Page 8: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Foreign investment projects

Page 9: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

THE 2014 PROJECT ROAD CONSTRUCTION

Page 10: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Prediction ProjectsNr Names of projects Duration of

construction

1 Ganja-Georgian state border highway 2014-2017

2 Minghacevir st – Mingachevir – Bahramtapa highway 2014-2016

3 Bahramtapa – Horadiz 2015-2017

4 Bahramtapa – Bilasuvar hw 2014-2017

5 Yevlakh – Zagatala –Georgia state border hw 2015-2018

6 Ujar – Zardab – Aghjabady hw 2014-2017

7 Ismailli – Mususlu highway 2014-2017

8 Ismailli – Shaki part of Garamaryam – Ismailli highway 2015-2017

9 Ganja – Toghana part of Ganja Kalbajar – Lachin hw 2014-2017

10 Shirvan – Salyan – Neftchala highway 2017-2017

11 R-56 (M-5) – Karimli highway 2015-2017

12 Minghachevir dolama – Ganja – Yenikand Gibchag hw 2016-2018

Page 11: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Constant attention to road workers in Azerbaijan pays road safety. Work in the development of transport infrastructure and increase traffic safety in Azerbaijan continues.“Azerroadservice” OJSC does environmental requirements pre projects, constructions and exploitation during the work.

Page 12: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Information about average intensity of movement8 months of 2013

Title and name of road

Trucks from 3 ton to 5 

ton

Heavy trucks more 5 ton

TrailersHalf trailersTractor

VehicleAuthomobiles,

Bus

Total transport units

M1 Baku-Guba-Russian border

2173 2363 929 16933 22398

M2 Baku-Alat-Gazakh-Georgia

1912 1729 1051 4591 9283

M3 Alat-Astara-Iran border 1410 1432 758 4638 8237

M4 Hajigabul-Bahramtapa

-Mingach757 753 439 2274 4228

Page 13: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Information about road accidentsJuly 2013

Months Total numer of road accidents

Information about injured By reason of road

Perishes Injured Total number of RA

Information of about injured

Perishes injured

January 25 27 21 0 0 0

February 42 24 45 0 0 0

March 46 42 50 0 0 01st quarter 113 93 116 1 0 1

April 50 32 56 1 0 1May 29 34 27 0 0 0June 40 28 29 0 0 0

2nd quarter 119 94 112 1 0 1

For 6 months 232 187 228 1 0 1

July 35 18 44 0 0 0

Page 14: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Information about road safety and road equipmentJanuary – August - 2013

1 Installation and restoration of road signs (unit) 754

2 Installation and restoration signal posts (unit) 6448

3 Installation of curvilinear bars (m) 40741

4 Installation and restoration of a handrail of the bridge (pm) -

5 Fastening of roadsides (m2) 1903995

6 Marking of roads ( m2) 97186

7 Cancellation of illegal exits and entrances (unit) 305

8 Hole’s repair (m2) 2212094

Page 15: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Information about road safety and road equipmentJanuary – August - 2013

9 Laying of borders (pm) 8756

10 Coloring of road elements (m2) 203441

11 Cleaning of ditches (pm) 3016676

12 Adding sand against sliding (m2) 19384

13 Adding salt against sliding (m2) 1431

14 Marking of roads – Road advertisement LTD (m2) 2010898

15 3 AAA LTD – Lining of roads (marking) (m2) 533566

Total lining (Azerroadservice, Road and advertisement, 3A LTD 2641650

Page 16: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

INTERNATIONAL SEA TRADE PORT

Currently, work is underway on the construction of the new Baku International Sea Trade Port complex, which will cover the territory with an area of 490 hectares. In the center of the port and logistics facilities provided for the use of the latest technology. In 2015 it is planned to put into operation the first phase of the project - the construction of two ferries, three cargo berths for receiving containers, vessels "ro-ro" and conventional bulk carriers.

Page 17: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

INTERNATIONAL SEA TRADE PORT IN ALYAT SETTLEMENT

After commissioning of the planned processing of up to 8 tons of cargo and 50,000 containers a year and after commissioning is the construction of three cargo berthsPhase 2 is planned to port processing 15 million tons of cargo, 150,000 containers a year after commissioningAfter the launch of the third stage is planned processing up to 25 million tons of cargo and 1 million containers a year.

Page 18: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Present status on AH AHnumber

Route Length Classification Note

Main Class I Class II Class III

Inferior to Class III

Will be completed under the 2nd category till 2015

AH-5 “East-West” Europe-caucasus-Asia

Baku-Alyat-Gazakh-Georgian RepublicBorder (M-2)

513 km 175.0 km 338.0 km

AH-8

“North-South’”Russian Federation(Dagestan) state borderBaku (M-1)- Alyat-Astara-IIR state border (M-3, M-6)

509 km 235 km 162.7 km 111.3 km

Baku-Alat section is considered in AH5 and H.Z.Tagiyev-Sahil (R6) (Baku city bypass).Will be completed in

Page 19: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Present status on AH

AH-81

Baku-Alat- Hajıgabul--Horadiz-Minjivan—Armenian Republic.state border-Ordubad-Nakhchivan-Sadarak-Turkey Republic state border (M-6.7,8)

473km - 87,0 km is completed in 2013

138,0 151,0

97,0 km Horadiz –Armenian Republic state border is not under exploitation as this area was occupied by Armenia.

AH-83 Gazakh-Uzuntala-Armenian Republic state border (R-23)

14 - - 14,0 -

Page 20: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

AH router under constructionRoute Highway Length Progress of work Price, US$

1 2 3 4 5

AH-5“East-West”Baku-Alat-Qazakh-Georgia Republic state border (M-2)

502.0 km

a) Finished projects

Baku bypass

21,5(12,3/9,2)

Reconstruction (12,3) / new construction (9,2) -I class, 6 lane

153,97

Baku-Alat (km 22-49) 27,0+42(unfinished)

Reconstruction -1 class 6 lane98,0

Alat-Hajigabul 45,6Reconstruction -1 class, 4 lane 35,31

Hajigabul-Kurdamir

Kürdəmir by pass

85,0 (5,7/79,3)

Rehabilitation –I class.4Lane (5,7)/ II class. 2 lane (69,3)New construction –II class,2 lane

103,50

Kurdamir-Ujar 42,1 Rehabilitation - II class. 2 lane 88,83

Ujar-Yevlakh53,0 (8,5/44,9) Rehabilitation –I class 4 lane

(8,5) /II class 2 lane (44,9)

68,52

Yevlakh-Ganja50,0

Rehabilitation - II class. 2 lane 86.70

Page 21: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

AH router under construction

AH-5

Ganja by pass 37.5Rehabilitation -II class 2

lane 73.9

Ganja-Gazakh 94.0 Rehabilitation -II class 2 lane

47.1

Tavuz by pass 10.5 New consrt. II class 2 lane

25.5

Gazakh –state border of Georgia 35.8 Rehabilitation -II class 2 lane

50.70

b)Design in progress

Baku-Alat (km 49-69)20,0

Reconstruction –I class 6 lane

46,9

Page 22: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

AH router under construction

AH-8

295.8 km

Hajigabul-Kurdamir construction of 2 lane

80.0 Reconstruction – II class, 4 lane

416,5

Kurdamir-Yevlakh construction of 2 lane 87,0 Reconstruction –

Iclass, 4 lane682,2

a) Finished projects

Baku-Russian Federation state border (M-l)

North-South

Section km 6-1610.0 km

Rehabilitation-II class, 2 lane 68,29

Section km 89-109 20,0

Rehabilitation-II class, 2 lane 33,28

Section km 121-125,5 4,5

Rehabilitation-II class, 2 lane

51,82

Page 23: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

AH router under construction

AH-8

Section km-28-45 (Sumgait circular road)

17,0 Rehabilitation -I class, 4 lane

104,7

Section km-16-134 (Khirdalan-Gandob) 118,0 (cement-concrete)

Reconstruction and new construction -I cl. 4 lane, and: new construction -I cl.., 4 lane -23,6 km (Siyazan and Shabran circular) Reconstruction -92,4km

875,10

Information on projects on Baku-Alat section (Baku circular, Baku-Alat (km 22-49 and 49-69)) is indicated in AH5

AH -81

Alat-Astara-Iran Islam Republic state border (M-3)

Section km 9-31Section 0-9 km

22,09,0

Reconstruction -I cl. 4 lane,New construction (on the present highway exploitation)-

48,1257,4

Bilasuvar roundable 10,0construction finishedII class, 2 lane 13.8

Section Hajigabul-Bahramtapa

50.0 Is completed in 2013 127.18

Page 24: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Project under progress

AH-8

“North-South”

Baku-Russian Federation state border (M-l)

Section km-132-192 60,0 (asphalt-concrete)

New construction and reconstruction I cl, 4 laneand:new construction -50,0 kmReconstruction -10,0km

229

Section km 31,0-54,4 23,4 New constructionI class, 4 lane

134,14

Section km 54,4-55,8 1,4 New constr. class, 4 lane(Kur bridge)

50,74

Section km 55,8-80,6 24,8 New constructionI class, 4 lane

148,19

R-6 Tagiyev-Sahil (Baku circular)

42,0 Rehabilitation-II class, 2 lane 107,41

Page 25: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Project under progress

Route Highway Length Progress of work Price, US$

1 2 3 4 5

AH-8 North-South

Alat-Astara-Iran Islam Republic state border (M-3) masalli Lenkoran “A”-”B”

46.0New construction-I class 4 lane

379.5

Page 26: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Project under progress

AH-81Hajigabul-Bahramtapa-Horadiz-Minjivan-Armenian Rep.state border-Ordubad-Nakhchivan-Sadarak-Turkeyrepublic state border

Hajigabul-Bahramtapa-Horadiz-Minjivan-Armenian Rep.state border (M-6) Bahramtapa-Horadiz

63,0 Rehabilitation, II class, 2 lane

148.82

Page 27: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Further priority projects on AH Highways

Route Highway Length Progress of work Price, US$

AH-5EAST -WEST

Ganja-Georgian state borderConstruction of additional 2 lanes

130 Reconstruction I class4 lane

637.20

AH-8

Alat-Astara-Iran Islam Republic state border (M-3) 80.6-142.9 km 39.3

New construction-I class 4 lane 270.2

Masalli-Astara

Section C,km 46,15-61,74

16,74 New construction-I class 4 lane 138,24

AH-81 Hajigabul-Bahramtapa-Horadiz-Minjivan-Armenian Rep.state border (M-6) Bahramtapa-Horadiz

69,0 Rehabilitation, II class, 2 lane 176,40

Page 28: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Further priority projects on AH Highways

AH-81 Baku-Alat- Hajıgabul-Horadiz-Minjivan-Armenian Republic.state border-Ordubad-Nakhchivan-Sadarak-Turkey Republic state border (There is 97 km part of occupational area)

a) Finished projectsBaku-Alat-Gazakh-Georgian Republic state

border Baku by pass

21.5Reconstruction (12.3 km) New construction (9.2 km)- I class, 6 lane

153.97

Baku-Alat (km22-49 ) 27.0 km Reconstruction- I class, 6 lane

99.33

Alat-Hajigabul is indicated in 45.6 Reconstruction- I class, 4 lane

35.31

Nakhchivan-Sadarak-Turkey Republic state border (M-7)

87,0Reconstruction- I class, 4 lane

Hajigabul-Bulagli (0-40.5 km) 50.0 Reabilitation II class, 2 lanes

94.11

b) Projects in progressBaku-Alat-Gazakh-georgian Republic state

border (M-2)Baku-Alat (km 49-69)

20,0Reconstruction- I class, 6 lane

46,9

Hajigabul-Bahramtapa-Horadiz-Minjivan-Armenian republic state border (M-6)

Section km 40,5-113,1Kur bridge (Shirvan)

72,6 0,43

Rehabilitation, II class, 2laneRehabilitation, II class, 2lane

134,31 21,97

Page 29: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Report on the road sector

The territory of the country, thousands of square km 86.6

The population, in thousands 9356.5The density of public roadsOn 1000 sq km, area 219.3Per 1000 inhabitants 2.03

Page 30: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

The length of the road network, km

Automobile roads – total

Including:Public

18993.6

Of which:state roads

4640.0

Local roads 14353.6

Department and private -

Toll roads -

International roads “E”, E60, E119, E002 1490.0

International roads CIS (Protocol 11.09.98)

Page 31: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

The length of public road on technical categories

Title of indices Public roadsKm

Including

State roads, km Local roads, km

Surfaced roads 18824.6 4634 14190.6

Including on technical roads:

Motorways

I 333.0 326.0 7.0

II 1379.3 1349.0 30.3

III 5264.7 2858.0 2406.7

IV 10466.6 101.0 10365.6

V 1381.0 1381.0

Page 32: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

The length of public roads according of the types of road pavement, km

Title of indices Public roadsKm

Including

State roads, km Local roads, km

Public automobile roads – total 18993.6 4640 14353.6

Including:

With surfaced pavement-total 18824.6 4634.0 14190.6

Or which:With asphalt-concrete pavement 8025.6 4345.0 3630.6

With cement-concrete pavement 129.0 125.0 4.0

Created translation (grit, gravel, etc)

10670.0 164.0 10506.0

Ground water 169.0 6.0 163.0

Page 33: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

The presence and extent of man-made structures on public roads

Title of indices In units ofPublic roadsKm

Including

State roads, km Local roads, km

Bridges (over asses) – total Pieces 1455 620 835

R.M 50121.8 27674.5 22447.3

Including:

ferroconcretePieces 1274 600 674

R.M 44004.2 25904.3 18099.9

MetallicPieces 178 20 158

R.M 6102.6 1770.2 4332.4

WoodenPieces 3 3

R.M 15.0 15.0

Page 34: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

The presence of transport vehicles

The total number of fleet vehicles 1237

Including:

Trucks 196

Cars 1009

buses 32

Page 35: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Financial resources, designed in 2013 in the road sectorTitle of Incides Total vehicle Including on sources

Road fund

Public roads-total 2136698.3 247133.8 906285.2 983279.3

Including:

-Maintenance of roads and man-made structures on them

97923.6 96815.3 1108.3

Repair of roads and man-made structures on them 278367.1 150318.5 128048.6

Reconstruction (rehabilitation) of roads and man-made structures on them

1084590.5 123048.6 657439.3

Construction of a new roads and man –made structures on them

675817.1 427151.2 325840.0

The level of financial security (for 1 km of road) 112.5 13.01 47.72 51.77

State highways of the state (national) values all 1758086.2 147770.7 646765.5 963550

Including:

-Maintenance of roads and man-made structures on them

40331.2 39490.4 840.8

Repair of roads and man-made structures on them 163288.6 108280.3 55008.3 637710.0

Reconstruction (rehabilitation) of roads and man-made structures on them

979304.0 341594.0 637710.0

Page 36: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Financial resources, designed in 2013 in the road sector

Construction of a new roads and man –made structures on them

575162.4 249322.4 325840.0

The level of financial security (for 1 km of road)

378.9 3185 139.39 207.66

Local roads, total 378612.1 99363.1 259519.7 19729.3

Including:

-Maintenance of roads and man-made structures on them

57605.2 57324.9 280.3

Repair of roads and man-made structures on them

115040.2 42038.2 73002.0

Reconstruction (rehabilitation) of roads and man-made structures on them

105312.0 85582.7 19729.3

Construction of a new roads and man –made structures on them

100654.7 100654.7

The level of financial security (for 1 km of road)

26.37 6.92 18.08 1.37

Page 37: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Major accident rates on public roads (for 2013) 6 month and July

Title of accidents Public roadsThe total number of road accidents - all 267

İncluding due to road accidents - all 1

İncluding to road road conditions for 1000 vehicles 0.02

The number of died/because of road conditions 205/0

The number of injured/due to road conditions 272/1

The shared of road serviced in overload mode %

The length of roads providing a pass vehicles vvith an axle load. •thousands of km /% of the total length including::

18993.6

10 tons 19986/90.3

Also 11,5

Also 12 tons

Also 13 tons

Page 38: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Road management

1. Full and short name of the body of state road management: "Azerroadservice"OJSC

2. Last name. fırst name, middle ııame and official title of the head:

Javid Gurbanov Ganbar oglu, Chairman of "Azerroadservice" OJSC

Page 39: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Information about the existence and condition of road infrastructure in the CIS interstate roads, on 01.01.2013

The presence of road infrastructure

1 Petrol stations, units 130

2 Hotels, units / seats 30

3 Power points (cafes, canteens. etc.), units / seats 221

4 Parking facilities, units / car place 19

5 Vehicle maintenance items, units 135

6 The introduction of intelligent transport systems - total length, km

7 The presence of items weighing units 9

Page 40: Ministry of Transport of Azerbaijan Republic · • For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis” OJSC of Ministry

Thank you for your kind attention