Minutes of the 71 st meeting of the Committee Constituted for Deciding the Consent under Orange Category, held on 06.08.2008 in the Conference Room of Chairman, DPCC. The following persons attended the meeting: 1. Sh. J. K Dadoo, Chairman DPCC 2. Sh. K. Mahesh, Member Secretary, DPCC 3.Sh. S.K.Gupta, Head Chemical Engineering Deptt. ,IIT Delhi 4. Sh. B. Kumar, SEE, DPCC 5. Sh. M. Dwarakanth, SSO, Dept. of Env,. GNCTD. 6.EEs of CMC – I, II & III. 7. AEEs and JEE of CMC – I, II & III. Following decisions were taken in the said meeting:- Agenda Item No.1- ATR of previous meetings This item could not be taken up by the Committee due to paucity of time. Agenda Item No.2 - Personal hearing of Construction of commercial building at Plot No 2, City Centre, Sector-13, Dwarka by M/s Nettles Farms Pvt. Ltd. The unit came for personal hearing today and assured that it will file the documents asked vide letter dated 06.06.2008 within a week. Call for personal hearing on 20.08.2008, at 6.45 PM. Agenda Item No.3- Special Reference cases Decisions taken with respect to this agenda are tabulated and annexed as Annexure – 1. Agenda Item No.4- Shopping Mall cases This agenda could not be discussed due to paucity of time and it was decided to take up the same in the next CMC meeting to be held on 12.8.2008.

Upload: hoangmien

Post on 26-Apr-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

Minutes of the 71st meeting of the Committee Constituted for Deciding the Consent under Orange Category, held on 06.08.2008 in the

Conference Room of Chairman, DPCC.

   The following persons attended the meeting:

1. Sh. J. K Dadoo, Chairman DPCC2. Sh. K. Mahesh, Member Secretary, DPCC3. Sh. S.K.Gupta, Head Chemical Engineering Deptt. ,IIT Delhi 4. Sh. B. Kumar, SEE, DPCC5. Sh. M. Dwarakanth, SSO, Dept. of Env,. GNCTD.6. EEs of CMC – I, II & III.7. AEEs and JEE of CMC – I, II & III.

Following decisions were taken in the said meeting:-

Agenda Item No.1- ATR of previous meetings

This item could not be taken up by the Committee due to paucity of time.

Agenda Item No.2 - Personal hearing of Construction of commercial building at Plot No 2, City Centre, Sector-13, Dwarka by M/s Nettles Farms Pvt. Ltd.

The unit came for personal hearing today and assured that it will file the documents asked vide letter dated 06.06.2008 within a week. Call for personal hearing on 20.08.2008, at 6.45 PM.

Agenda Item No.3- Special Reference cases

Decisions taken with respect to this agenda are tabulated and annexed as Annexure – 1.

Agenda Item No.4- Shopping Mall cases

This agenda could not be discussed due to paucity of time and it was decided to take up the same in the next CMC meeting to be held on 12.8.2008.

Agenda Item No.5- Construction Projects cases

This agenda could not be discussed due to paucity of time and it was decided to take up the same in the next CMC meeting to be held on 12.8.2008.

Agenda Item No.6- Cases of Wazirpur Industrial Area

Only 73 cases of this agenda were discussed and the decisions taken with respect to these cases are tabulated and annexed as Annexure – 2. It was decided to take up the remaining cases of this agenda in the CMC meeting to be held on 29.8.2008.

Agenda Item No.7- Cases of Friends Colony Industrial Area

This agenda could not be discussed due to paucity of time and it was decided to take up the same in the next CMC meeting to be held on 29.8.2008.

Agenda Item No.8- Letter from DSIIDC regarding low pH levels of the waste water being received at pumping            stations and in the conveyance system

This agenda could not be discussed due to paucity of time and it was decided to take up the same in the next CMC meeting to be held on 29.8.2008.

Table Agenda Item No 1: Aditya Mall, CBD Ground, Near Karkardooma Court, Delhi-92

The unit appeared before Committee during the CMC meeting. He has filed a representation before Hon’ble Chief Minister, which was received and shown to all the Committee members today. The Committee deliberated on the lenient view representation of the unit and decided that since it was a small unit and was running only one mall, the damages could be readjusted to 1 % of the total project cost and Bank Guarantee would be decided only after the damages of Rs. 20 Lakhs is paid before 12.08.2008. Call on 12.08.2008 for a final decision.

Table Agenda Item No 2 : Complaint against the pollution caused by construction at premises R-41, Greater Kailash Part-I from Shri R.P. Joneja through L.G. office.

The file of this unit was submitted to the Chairman administratively and it was decided to take up this as a table agenda. As the unit has not filed reply, notice for closure may be issued immediately without waiting for the minutes.

Table Agenda Item No 3 : Two units namely Sh. Rajesh Singhal, B – 22, Group, WIA engaged in pickling and Sh. Naresh Jain, B – 72/4, Eastern side engaged in pickling were taken up by the Committee as table agenda as they were found by the SIT, during their inspection, that both the units are in operation without any consent of DPCC and pollution control measures. Looking at the blatant violation by the units, closure directions may be issued, invoking the rules 34 (6) and 20 A (6) of Water Rules and Air Rules, for disconnection of power/water supply.

Meeting ended with thanks to the Chair.

Sl.No Name of the unit Activity Earlier Decision, if any ATR/Remarks Decision on 06.08.2008

1 AM Automobiles (A unit of Blue Bird Enterprise Pvt. Ltd.), Plot No 189-91, Lawrence Road Industrial Area

Automobiles Service Centre with washifng, denting & painting & repairing

03.4.2008Ask him to apply for authorization under HWM Rules. 17.04.2008The unit may be asked to file a Bank Guarantee of Rupees One Lakh under HWM Rules to ensure that he is not understating the production of hazardous waste in the unit where he claims to be servicing 40-42 cars per day. 29.05.2008Ask the unit to file permission from Central Ground Water Authority for ground water drawl. 17.07.2008Insist on CGWA permission. Call on 20.08.2008.

Unit has applied for Consent to Establish on 17.12.2007 vide I.D. No. 24514.Bank is seeking a copy of CTE for sanctioning the loan.Unit applied for authorisation under HW Rules.As per CMC decision dated 18.06.2008, letter isued 18.06.2008.Reply along with affidavit & test report of ETP on 07.07.2008 and informed that the unit will use MCD water for washing activity and will not use ground water. They have a valid MCD connection for bulk water. As per CMC decision dated 17.07.2008, letter issued.Represented again on 05.08.2008.

Based on the affidavit, Consent to Establish can be issued with the clear condition that if the unit violates the norm of drawing ground water without CGWA clearance, unit will be closed down.

2 NCR Vehicles Pvt. Ltd., J-3, B-1, Extension, Mohan

Cooperative Industrial Area

Servicing, Repairing & Washing of Vehilces (Car)

_ Applied for CTE on 28.04.2008 vide I.D. No. 25591.Applied for authorization under HWM Rules on 28.04.2008 vide I.D. No. 4558.Unit has submitted a letter on 04.08.2008 & requested to issue CTE.

The unit can be granted Consent to Establish if it has started the operation only with installation of ETP. Let the unit confirm it through an affidavit. Call on 29.08.2008.

3 Café Coffee Day, E-12, Ground Flor,

DDA Market, Maszid Modh,

Greater Kailsh-II, Delhi

Food Procesing (Restaurant)

18.06.2008Call on 25.06.2008 with SIT report.

25.06.2008The unit claims that it has corrected all the deficiencies and SIT also tends to agree

with the same. Unit may be asked to file Bank Guarantee of Rs. 1 Lakh under each of the three acts. Call on 31.07.2008.

Applied for CTE on 02.05.2008 vide I.D. No. 25636.Unit has submitted a representation on 06.06.2008 & requested to restore the electricity supply.CMC decision dated 25.06.2008 to be reviewed.

Unit may be directed to file Bank Guarantee of Rs. 1 Lakh each under Air Act & Water Act and if it does so water & power supply may be restored and Consent to Establish be issued. MS is authorized to restore the electricity / water supply and to issue CTE without coming back to the Committee.

4 SAVERA ENTERPRISES,PLOT NO 417, SECTOR-5, POCKET-E, DSIDC INDUSTRIAL COMPLEX, Bawana

MFG. OF ALLUMINIUM PRODUCTS (SHEETS, SLUGS & CIRCLE)

27.9.2007Disconnection of electricity & water supply and cancellation of MCD license in the name of the unit.. 18.02.2008Let the unit apply for Consent to Establish. 10.3.2008Restore power / water supply and grant Consent to Establish. 01.5.2008Inform unit that as per the Consent to Establish application, test report should not be more than 03 months old. Call on 03.06.2008. 11.06.2008Issue reminder without waiting for minutes. Call on 25.06.2008. 25.06.2008Call on 31.07.2008 with test report.

As decided by CMC on 10.3.08, CTE was granted and power/water supply restored on 14.3.08Unit submitted a letter dated 07.4.08, requesting for consideration of the test reports of Sep 2007 for submission of CTO application now.Reminder letter issued 13.06.2008.Reply received.Applied for CTO on 24.07.2008 vide I.D. No. 26688.

Ask the unit to file a copy of CGWA clearance for ground water drawl. Call on 29.08.2008.

5 Shalini Arora, A-13, DSIDC

Rohtak Road

Mfg. of Plastic goods (moulded items) and Service Station (Service, repair & maintenance)

25.06.2008Ask the unit to apply for authorization under HWM Rules. Call on 31.07.2008.

Applied for CTE on29.08.2007 vide I.D. No. 23319.Letter issued. Unit has applied for authorization under HWM Rules.

Wait for High Court order on Justice Chopra Committee's report.

6 7 Star Banquets, 20, Najafgarh

Road Industrial Area, Delhi

Banquet Hall 27.09.2007the unit has applied for CTE on 21.08.2007 while it is operating since 25.01.2007 when the unit was inspected. Let the unit file an affidavit stating why he was operating without consent to establish. 25.06.2008Ask the unit to do following :-(i) Solar Water Heating.(ii) Rain Water Harvesting.(iii) Composting of Bio-degradable Waste.(iv) Large Scale Plantation.(v) Use of CFL and other energy efficient devices.(vi) File up to date water cess amount.Call on 31.07.2008.

Applied for CTO on 13.07.2007 vide I.D. No. 22391.Applied for authorization under HWM Rules jon 13.07.2007.Applied for CTE on 21.08.2007 vide I.D.No 23209.As per decision of CMC dated 25.06.2008, letter issued.Reply awaited.

Issue reminder. Call in CMC on 29.08.2008.

7 Delhi Gymkana Club Ltd2. Safdarjung Road, New Delhi

Sports and recreation club

25.01.2008Case to be taken up in next month CMC. 17.3.2008Case to be taken up in last CMC of April, 2008. 01.5.2008Call on 03.06.2008. 03.06.2008Col. Malhotra may be asked to send a copy of the reply he files to NDMC in response to their letter dated 03.06.2008 to DPCC also. Call on 11.07.2008 11.06.2008Call on 11.07.2008. 11.07.2008Call on 31.07.2008.

Consent o Establish was issued to the unit on 02.11.2007.Consent to operate dt 26.4.2007 to be decided.

Issue Consent to Operate.

8 Jhankar Banquet & Restaurant, Asiad Tower,

Khelgaon, New Delhi-110049

Banquet Halls 01.5.2008The file is not complete and without the note sheet. Concerned CMC to ensure file to be complete in all respects and put up on 14.05.2008. 13.5.2008Since an adverse inspection report of 24.10.2007 is on record, it will be in the fitness of things, the concerned CMC inspect the unit and submit the report in CMC on 10.06.2008. 11.06.2008The unit has to install hood & suction arrangement along with ducting on all LPG Chullas and provide a stack of minimum height of 30 feet. Ask the unit to file Consent to Establish application. Call on 11.07.2008. 11.07.2008Final Reminder be issued. Call on 06.08.2008.

Unit has obtained CTO on 08.10.2001 (valid upto 30.09.2004).CTE applied on 28.12.2007 vide I.D. No. 24608CTO applied on 26.02.2008 vide I.D. No. 25029Inspection carried out by CMC.Reminder issued.No reply received.

Consent to Establish granted. Call on 03.09.2008.

9 Samara AutoMax Pvt. Ltd.A-17, Mayapuri Ind Area, Phase - I, New Delhi - 64

Automobile Service Station

Reference letter of the unit dated 03.04.2008. The unit may be clearly indicated to file an application for authorization under HWM Rules before his consent application can be considered. Take up on 14.05.2008. 13.5.2008Ask the unit to confirm by when the ETP will be installed and how the waste water is being discharged now. Concerned EE may also inspect the unit and report on 10.06.2008. Call on 10.06.2008. 11.06.2008Unit may be asked to file CGWA clearance for 9 KLD of ground water drawl. Unit may also be asked to complete the ETP and report. Call on 11.07.2008. 11.07.2008The unit has filed an affidavit saying it will not use the ground water. Let him shut the borewell , show proof of drawing municipal water and file adequacy report of ETP. Call on 06.08.2008.

Unit applied for Consent to Establish.Not applied for authorisation under HWM Rules.Letter issued on 30.04.2008. The unit as submitted an application for authorization under HWM Rules 0n 07.05.2008Inspection carried out by CMC.Letter issued on 20.06.2008Unit has submitted its reply on 02.07.2008 along with affidavit.As per CMC decision dated 11.07.2008, letter issued on 22.07.2008.Reply along with affidavitreceived.

Let us wait for adequacy report to be filed. If there is any ground water drawl that must be closed down and confirmed to CMC Call on 03.09.2008.

10 Jagadish Prasad Triloki Nath & Co.(Indra Cold Storage)42, Rama Road, New Delhi - 15

Cold storage 01.5.2008SIT to inspect and report by 03.06.2008. 11.07.2008Ask the unit to file an affidavit for correction of deficiencies observed during the inspection and submit a Bank Guarantee of Rupees One Lakh under Air Act. Call on 11.07.2008. 11.07.2008Let the unit file Bank Guarantee. Call on 06.08.2008.

Unit applied for renewal of Consent on 18.1.2006Unit was earlier issued consent renewal on 19.3.04 valid up to 19.01.2006As per CMC decision dated 11.07.2008, letter issued.No reply received.

Issue reminder. Call in CMC on 29.08.2008.

11 Tosy Auto Products, Plot No

46, Pocket-I, Sector-4, DSIDC, Bawan Industrial

Area, Delhi

Mfg. of auto parts (fuel pipes, brake hoses, fuel injection pipes, stel brake tubes, oil hoses, power sterring hoses, etc.)

11.06.2008CMC to inspect and report. Call on 11.07.2008. 11.07.2008CTE to be refused since business activity changed. Ask unit to file fresh CTE.Call on 06.08.08

Applied for Consent to Establish on 27.12.2006 vide I.D. No. 20292.Unit has submitted its representation along with new affidavit & project report on 05.05.2008 for correct activity. Inspection done as per the decision of CMC dated 11.06.2008.As per CMC decision dated 11.07.2008, refusal of CTE issued on 22.07.2008Unit has applied for CTE under Green category on 16.07.2008.As per CMC(Green) decision dated 18.07.2008, CTE granted.

Shift to Green Committee.

12 Mansfield Conveyors P LtdS - 77, Badli Indl estate, Delhi - 42

Safety/toughned glass 01.05.2008The unit must clarify the capacity of the oven. Call on 03.06.2008. 29.05.2008Consent to Establish will be granted if he files permission from Central Ground Water Authority for ground water drawl. Call on 03.07.2008 for documentary proof. 17.07.2008Insist on CGWA permission. Call on 06.08.2008.

Unit was issued CTO on 20.8.04 valid up to 31.8.07.Applied for CTO (Renewal) on 27.8.07.Applied for CTE in March 2008 vide ID No. 25104Letter issued on 18.06.2008 regarding permission from CGWA for ground water drawl.Reply received on 01.07.2008 Ground water consumption indicated in the consent form is 1000 lt/day.As per CMC decision dated 17.07.2008, letter issued on 24.07.2008No reply received.

Wait for reply. Call on 03.09.2008.

13 Chime Elctronics, E-17, Sector-3, DSIDC, Bawana Industrial Area

Mfg. of Electronics & Electrical Goods

07.12.2008Inpsection by CMC and report. 29.05.2008Consent to Operate will be granted if the unit submits the permission for ground water drawl from Central Ground Water Authority 17.07.2008Insist on CGWA permission. Call on 06.08.2008.

Applied for CTO on 30.11.2006 vide I.D. No. 20021.CTE obtained on 11.09.2006 (valid upto 07.09.2007).Inspected by CMC officials on 01.02.2008.As per CMC decision dated 29.05.2008, letter issued on 18.06.2008.Reply along with affidavit recevied on 04.07.2008 stating that they are not using the ground water and using the water supply by DSIDC.Ground water consumption indicated in the consent form is 200 lt/day.As per CMC decision dated 17.07.2008, letter issued on 24.07.2008Reply received on 04.08.2008.

Consent to Operate granted.

14 Vinayak International, A-115, Wazirpur Industrial Area

Mfg. of S.S. Utensils with buffing and polishing

17.07.2008Ask the unit to file Bank Guarantee of Rs. 1 Lakh under Air Act. Call on 06.08.2008.

Appied for CTE on 16.11.2007 vide I.D. No. 24218.Production capacity : 4000 Pc/day (as per affidavit)Unit has submitted a representation on 10.06.2008 & requested to issue CTE.As per CMC decision dated 17.07.2008, letter issued.Returned back undelievered.

Copy of the letter be pasted on the premises.Call on 03.09.2008.

15 Dev Steels, A-19, Wazirpur Industrial Area

Pickling of SS sheets 05.07.2007Authorization Granted under HW Rules. 11.6.08Issue letter for correction of minor deficiencies observed during the inspection. Also ask the unit to file Bank Guarantee of Rupees One Lakh each under Air Act, Water Act & HWM Rules. Issue notice for closure to M/s Durga Enterprises for not applying for Consent to Establish. Call on 03.07.2008. 17.07.2008In view of his own admission in the Consent to Establish for production of 1 tonne/day, Bank Guarantee cannot be reduced. Issue fresh letter for filing Bank Guarantee of Rs. 1 Lakh. Call on 06.08.2008. Check if M/s Durga Enterprises has filed the Consent to Establish. Call on 06.08.2008.

CTO(R) issued on 20.07.2006 (valid upto 13.06.2009)Authorization issued on 20.08.2007 as decided by CMC on 05.07.2007.Inspection carried out by SIT on 09.05.2008.Letter along with affidavit received on 12.05.2008Letter as decided by CMC on 11.6.08 issued to the unit.Unit has submitted its reply on 30.06.2008 & requested to withdrawal of BG as production capacity is very low i.e. 25 tonne / month. As per applicaiton submitted by unit production capacity is 1 tonne/day, however, SIT inspection report not mentioned about the production capacity.Letter issued.Unit has submitted a letter along with affidavit on 06.08.2008 & informed that they have rectified all the deficiencies found during the inspection on 09.05.2008 and the same was also verified by SIT during the inspection on 04.08.2008 and requested to withdraw the amount of BG.M/s Durga Enterprises has applied for CTEBeing considered along with the 85 units of WIA.

Since the unit production is one tonne / day, it will have to file the Bank Guarantee immediately. Call on 20.08.2008.If M/s Durga Enterprises files an affidavit that it will not undertake any pollution activity, Committee will consider its application for Consent to Establish. Call on 03.09.2008.

COMPLETE S.No. Sl. No

Sl. No

Name of Industry / Unit

Address Activity Production figure

BG Submitted

CTE status Consent Status Status of authorization

Decision on 29.05.2007

ATR for 06.08.2008 Decision on 06.08.2008

Y 9 1 1 Arihant Industries A-101/1 A Re-rolling & Pickling

800-900 Kg/day (as per inspection report)

BG of Rs. 3 Lakhs submitted on 28.09.2007.

CTE on 01.01.2008 vide I.D. No. 24631.

CTO on 06.08.2007.

06.08.2007. 24.04.2008SIT to inspect in June, 2008. 29.05.2008Call on 03.07.2008

SIT inspection report to be discussed.

Consent to Establish granted.

Y 184 2 2 Gupta Enterprises B-47/2, Group

Annealing, Re-Rolling & Pickling of SS Sheets.

01 tonne (as per inspection report)

BG submitted on 21.11.2007

CTE on 21.11.2007 vide I.D. No. 24275.

CTO was valid up to 30.9.2005.CTO(R) 28.09.2007.

Applied for authorization on 26.07.2006 vide I.D. No. 2948.

Ask the unit to file new adequacy report, permission from Central Ground Water Authority for ground water drawl and affidavit for

Letter issued.Replies received on 30.06.2008 & 01.07.2008AR not submitted.Unit has informed that they

Call on 03.09.2008.

correction of deficiencies noted during the inspection by SIT.

have submitted the fee to GGS Univesity. As soon as they get the AR, the same will be submitted.Permission from CGWA not submitted. Unit has informed that they have filed the application for permission to CGWA. As soon as they get the permission, same will be submitted.Affidavit submitted.

Y 195 3 3 Rana Motors Pvt. Ltd.

A-3 Service Station 25-30 cars (as per inspection report)

BG of Rs. Three Lakh submitted on 22.11.2007

CTE on 15.01.2008 vide I.D. No. 24752.

CTO refused on 09.10.2007. CTO on 24.08.2006 vide I.D. No. 19123.

Refused on 09.10.2007. Applied on 23.01.2008 vide I.D. No. 4469.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl and affidavit for correction of deficiencies noted during the inspection by SIT.

Letter issued.Reply received on 27.06.2008Affidavit along with photographs submitted.Permission from CGWA not submitted. Unit has informed that they have approched to CGWA fro permission of ground water drawl.

Call on 03.09.2008.

Y 6 4 4 Sahil Mohit & Co.

B-85 Re-rolling & Pickling

10 tonnes / month (as per inspection report)

BG of Rs. Three Lakh submitted on 24.12.2007

CTE on 13.2.2008 with ID No. 24929

CTO on 09.11.2004 vide I.D. No. 12091.

Applied for renewal of authorization on 18.08.2006 vide I.D. No. 3365.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 01.07.2008Permssion from CGWA not submitted. Unit has submitted a copy of application which has filed to CGWA for permission for ground water drawl.

Call on 03.09.2008.

Y 33 5 5 Scorpion Iron Steel Pvt. Ltd.

A- 135 Manufacturing of utensils involving Buffing

2 tonnes / day (as per affidavit)

BG submitted on 26.09.2007.

CTE on 17.09.2007 vide I.D. No. 23528.

CTO revoked on 09.08.2007

Not applicable Ask the unit to file affidavit for correction of deficiencies noted

Letter issued.Reply along with photographs received on 01.07.2008

Consent to Establish granted.

during the inspection by SIT, failing which Bank Guarantee will be forfeited.

Affidavit submitted.

Y 64 6 6 Shiv Shakti Industries

A-84/1 Re-Rolling & Pickling of S.S.Sheets

1 T/Day as per affidavit.

BG of Rs. Three Lakh submitted on 23.10.2007.

CTE issued as decided in CMC meeting dated 26.02.2008.

CTO(R) applied on 12.10.2006

Authorization issued as decided in CMC meeting dated 26.02.2008.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl and affidavit for correction of deficiencies noted during the inspection by SIT, failing which Bank Guarantee will be forfeited.

Letter issued.Reply received on 30.06.2008Permission from CGWA submitted. Affidavit submitted.

SIT to inspect on pH and report. Call on 03.09.2008.

Y 182 7 7(a) Shri Sai Enterprises

B-27/2, Group

  1 Tonne/day as per affidavit.

BG of Rs. Three Lakh submitted on 31.12.2007.

CTE issued as decided in CMC meeting dated 26.02.2008.

CTO (Re) applied on 05.10.2007 vide ID No. 23785

Revocation of authorization on 01.10.2007

Ask the unit to file permission from Central Ground Water Authority for ground water drawl and affidavit for correction of deficiencies noted during the inspection by SIT, failing which Bank Guarantee will be forfeited. Notice for closure to Ankit for Consent to Establish.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have filed the application for permission to CGWA. As soon as they get the permission, they will subit the same.Affidavit submitted.

Call on 03.09.2008.

      7(b) Ankit Exim Pvt. Ltd.,

B-27/2, Group

Re-rolling and annealing of S.S. Sheets at ground floor & utensils cutting at 1st floor

    CTE on 05.06.2008 vide I.D. No. 25985.

      Notice for closure issued.Reply received on 03.07.2008. Unit has informed that they have applied for CTE on 05.06.2008 vide I.D. No. 25985.

Ask the unit to file clearcut details about stack height and acosutic enclosure of D.G. Set. Call on 03.09.2008

Y 67 8 8(a) Avtar Refrigeraton Industries

C-57/1 Re-Rolling & Pickling of S.S.Sheets

2-3 tonne (as per inspection report)

BG of Rs. Three Lakh submitted on 03.01.2008

CTE obtained on 05.01.2004. Valid upto 05.01.2005. CTO refused on 07.08.2007 vide refusal no. 1646..

CTE obtained on 05.01.2004. Valid upto 05.01.2005. CTO refused on 07.08.2007 vide refusal no. 1646..

Refused on 07.08.2007.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl. Issue notice for closure to three units found by SIT

Letter issued.Reply received on 29.07.2008.No permission from CGWA submitted. Unit has informed that they have applied for permission to CGWA. As and when the permission will come the same will be submitted.

Call on 03.09.2008.

      8(b) New Goel Steel C-57/1, 1st Floor

Circle cutting       CTO on 07.08.2007 vide I.D. No. 23029 under Green category

    Notice for closure issued.Reply received on 03.07.2008. Unit has informed that they have applied for CTO, under green category on 07.08.2007 vide I.D. No. 23029.

Shift to Green Committee.

      8(c) Hans International

C-57/1, 2nd Floor

Bearing Trading             Notice for closure issued.Reply received on 03.07.2008. Unit has informed that they are engaged in activity of trading only. No mfg. activity take place. They have only office at the second floor like banks, or shops and donot have any D.G. Set. Being a trader, they are not covered under pollution type activity and requested to withdraw the notice.

Call on 03.09.2008

      8(d) Neeraj KumarNeeraj Enterprises

C-57/1, 2nd Floor

Assembling of washbasin part

    CTE on 19.06.2008 vide I.D. No. 26115 under Green category.

      Notice for closure issued.Reply received on 03.07.2008. Unit has informed that they have applied for CTE on 19.06.2008 vide I.D. No. 26115 under Green category.As per CMC (Green) decision dated 18.07.2008, CTE granted.

Shift to Green Committee.

Y 58 9 9 Parmod Steel C-54, GateNo.5

Pickling and Cold Re Rolling of S.S.Sheets

1 tons (as per inspection report)

Submitted on 25.02.2008

Obtained CTE on 21.9.2005 valid up to 20.9.06

CTO applied on 20.12.2006

Applied for auth on 20.12.06 with ID No. 4178.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have filed the application for permission to CGWA. As soon as they get the permission, they will subit the same.

Call on 03.09.2008

Y 93 10 10 Brij Mohan Ram Mohan

A-86/2 Pickling & Re- Rolling of SS sheet

1 tonne/day (as per inspection report)

Submitted valid up to 06.02.2010 for 3 lakhs

CTE on 27.09.2007 vide I.D. No. 23668.

CTO obtained. Valid upto 30.09.2008.Revoked on 09.2.07

Refused on 09.02.2007

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 27.06.2008Permission from CGWA not submitted. Unit has informed that they have applied to CGWA, as soon as they get the permission, the same will be submitted to DPCC.

Call on 03.09.2008

Y 106 11 11 Dham Dyeing & Bleaching Mills

B-63/2 Dyeing , Bleaching and processing of hosiery fabrics

400 Kg (as per inspection report)

Submitted valid up to 06.02.2010 for 3 lakhs BG forfeited

CTE on 18.09.2007 vide I.D. No. 23543.

CTO refused on 13.9.07

Auth refused on 13.9.07

Call on 03.07.2008 with reply of notice issued to the unit earlier.

Notice issued.Reply received on 03.06.2008.

BG forfeiture decision will not be revoked. Unit to ensure pH within norms and ETP

as decided by CMC on 24.4.08.

fully functional & operational. Inform the unit accordingly. Call on 03.09.2008.

Y 140 12 12 R.J. Enterprises A-112 Pickling and Cold Re-Rolling of S.S Sheets

750 kg/day as per affidavit.

Submitted on 25.02.2008

CTE on 14.12.2007 vide I.D. No 24493

CTO dt 03.10.06 refused on 18.08.2007 vide refusal no. 1667.

Refused on 18.08.2007.

As SIT observed that pH as 2, forfeit Bank Guarantee under all the three acts. Inform unit accordingly.

Bank forfeited under all three acts.Unit has submtted its reply and case was taken up CMC on 25.06.2008 and decided to reinspect the unit by SIT.Unit submitted letter requesting for revival of BGs forfeited earlier.

SIT report has been checked. The unit needs to construct fresh flooring and slope of the floor should be towards effluent collection tank. Let the unit do this and confirm it through an affidavit. Call on 03.09.2008.

Y 188 13 13(a) Rishabh Steel C-59/2 Pickling of SS Sheets

2.0-2.5 tonnes (as per inspection report)

Submitted valid up to 06.02.2010 for 3 lakhs

CTE on 22.10.2007 vide I.D. No. 23992.

  Applied on 08.11.2007 vide I.D. No. 4416.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl. Issue notice for closure to M/s Jai Chand for not applying for Consent to Establish.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have filed the application for permission to CGWA. As soon as they get the permission, they will subit the same.A complaint received from Sinter Kings Virmani (P) Ltd. against the unit on 13.06.2008 and requested to the instruct the unit to take proper corrective measures to stop the acid leakage into its premises.Also, a complaint received from

Ask the unit to file adequacy report of ETP. Call on 03.09.2008

Samajwati Andoolan Suraksha against the unit (listed at Sl. No 16 out of 26 cases).

      13(b) Jai Chand C-59/2, 1st & 2nd Floor

Mfg of S.S. Utensils             Notice for closure issued.No reply received.

Confirm closure. Call on 03.09.2008

Y 15 14 14(a) S. K. Steels B-58, Group

Pickling 30 tonnes / month (as per inspection report)

Submitted on 25.02.2008

CTE on 31.12.2007 vide I.D. No. 24612.

CTO applied on 16.3.2005 vide ID No. 13018.

Applied on 29.8.06 for renewal.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl. Issue notice for closure to two new units found by SIT during their inspection.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have filed the application for permission to CGWA. As soon as they get the permission, they will submit the same.

Call on 03.09.2008

      14(b) R.K. Steel Ground Floor, B-58, Group

Re-rolling             Notice for closure issued on 20.06.2008.No reply received.

Confirm closure. Call on 03.09.2008 for ATR.

      14(c) P.K. Steel 1st Floor, B-58, Group

Trading of S.S. Utensils

    CTE on 09.07.2008 vide I.D. No. 26374 under Green category.

CTO(R) on 25.07.2007 vide I.D. No. 22803 under Green category.

    Notice for closure issued on 20.06.2008.Applied for CTE on 09.07.2008 vide I.D. No. 26374 under Green category.As per CMC (Green) decision dated 18.07.2008, CTE granted.

Shift to Green Committee.

Y 138 15 15 Swaroop Industries

B-9, Group

Pickling of S.S.Sheets

  BG of Rs. 50000 each under Air & Water Act only instead of Rs. 1 Lakh under each of the three acts.

CTE on 21.09.2007 vide I.D. No. 23597.

_

Applied on 04.02.2005 vide I.D. No. 2306.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 02.07.2008Permission from CGWA not submitted. Unit has informed that they have filed an application to CGWA.Unit has submitted

Ask the unit to file full Bank Guarantee and confirm. Call on 03.09.2008

BG of Rs. 50000 under Air Act & Water Act instead of Rs. One Lakh under Air Act, Water Act and HWM Rules asked vide letter dated 18.12.2007

Y 126 16 16 A.V. Metal A-72/2 Re-rolling and pickling of SS sheets

8 MT/month Not sought CTE on 13.11.2007 vide ID No. 24193

_

_

24.04.2008SIT to inspect & report by 28.05.2008. 29.05.2008Call on 03.07.2008

Unit has suubmitted a letter on 22.05.2008 & informed that they are facing critical problems and closed down its activity last one year. They have rectified all the deficiencies found during the inspection and requested to allow to operating its unit.SIT inspected the unit.SLP filed by DPCC dismissed by Hon'ble SC.

Based on SIT report, issue fresh notice for closure. Call on 03.09.2008

Y 75 17 17 Ajit Nath Alloys (P) Ltd.

C- 60/1 Manufacturing of SS utensils (including buffing)

250-300 Kg (as per inspection report)

BG of Rs. 50000 under

Air Act submitted.

CTE on 13.08.2007 vide I.D.No. 23112 under Orange category.CTE under Green category on 21.9.07

  Not applicable Call on 03.06.2008 CTE under Green category issued and as per decision of CMC meeting dated 03.06.2008, decision of CMC was intimated to Legal Cell for filing the application to High Court.Application filed before Hon'ble HC

Shift to Green Committee.

Y 100 18 18 Baba Steels A- 14 (Backside)

Pickling (unit found closed &locked from outside .Unit non operational)

Not Mentioned

BG not submitted.

CTE on 28.11.07 vide ID No. 24342

CTO refused on 18.08.2007 vide refusal no. 1659.

Applied for renewal on 18.08.2006 vide I.D. No. 3351.

Issue closure directions u/s 31(A) of the Air Act, 1981 and u/s 33(A) of the Water Act, 1974, as the unit has not submitted Bank Guarantee inspite of issuing SCN for the same.

Closure direcitons issued.Replies received on 19.06.2008 & 30.06.2008BG not submitted. Unit has informed that they have stopped pickling activity and removed all the equipments related to pickling activity and requested to withdraw the notice.Unit has also informed on 30.06.2008 that they are not operating unit for the last 15 months and requested to withdraw the notice.NDPL has informed that no industry exists at site.

Ask the unit to file an affidavit that it has actually closed down the unit. Call on 03.09.2008.

Y 57 19 19 Bhalla Hosiery Factory

B-40, Group

Re-rolling & Pickling

S.S Sheet (as per inspection report)

BG not submitted.

CTE on 18.09.2007 vide I.D. No. 23542.

CTO refused on 09.08.2007 vide refusal no. 1655. CTO on 21.08.2007 vide I.D. No. 23212.

_ Issue notice for clousre based on SIT inspection.

As per approval on file, unit was directed to file BG of Rs. One Lakh each under three acts.Letter issued.Reply along with affidavit received on 16.07.2008 & stated that we are not enagaged in polluting activity and the same was verified by SIT, therefore, does not require to submit BG.

SIT to inspect after 02 months. Call in CMC of WIA in October, 2008

Y 210 20 20 Gee Aar Industries

A-9/3 Mfg A cotton thread, Mercerizing, and Bleaching.

400-450 Kg (as per inspection report)

Not sought CTE on 28.12.2007 vide I.D. No. 24606.

CTO refused on 30.11.2007

Refused on 30.11.2007

Reminder for compliance.

Reminder issued.No compliance report received.

Issue reminder.Call on 03.09.2008

Y 193 21 21 Hari Ram C-40/3 Pickling of SS Sheets

500-600 Kg / day (as per affidavit)

BG of Rs. 75000 under Air, Water

Acts & HWM Rules

CTE on 31.12.2007 vide I.D. No. 24620.

CTO refused on 09.12.2005.

Applied for renewal on 18.08.2006 vide I.D. No. 3367.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Replies issued on 27.06.2008 & 29.07.2008.No permission from CGWA submitted. Unit has informed that they have applied for permission to CGWA. As and when the permission will come the same will be submitted.

Call on 03.09.2008

Y 72 22 22 Hariom Industries C- 60/3 Manufacturing of SS utensils (involving buffing)

200 Pcs per day as per affidavit

BG submitted.

CTE on 20.9.2007 vide ID No. 23580

Only CTE applied

Not applicable Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have approched to CGWA. As soon as they get the permission, they will subit the same.Noise moniotirng report of D.G. Set submitted.

Call on 03.09.2008

Y 54 23 23 Parasmani Steel Job Works

B-33/3, Group

Re-rolling & Pickling

1 tonne/day (as per inspection report) BG not

submitted.

CTE on 11.09.2007 vide I.D. No. 23462.

    Issue notice for clsoure.

Notice for closure issued.Reply received. Unit has requested to allow more time to submit BG.

Issue final reminder for filling Bank Guarantee by 03.09.2008, failing which closure order will be issued.

Y 161 24 24 Shakti Industries C-9/4 Re-Rolling and Pickling of SS Sheets.

300 Kg (as per inspection report)

BG not submitted.

CTE on 14.12.07

CTO valid up to 01.8.05.Applied for CTO(R) on 08.10.2007 vide I.D. No. 23808.

_ Issue notice for clsoure.

Notice for closure issued.Reply received on 07.07.2008. Unit has informed that there is no hazardous waste generation as the activity of the unit is cold re-rolling of S.S.Sheet (dry unit). Unit has also informed that unit is closed since 1st November, 2007.Unit has also informed that to allow the time upto 31.12.2008 to submit BG as unit is not operating since 1st November, 2007.

Issue final notice for Bank Guarantee of Rs. 50,000 under Air Act to be filed by 03.09.2008, failing which closure order will be confirmed.

Y 61 25 25 Vishal Industries C-55/1 Re-Rolling & Pickling of S.S.Sheets

2.5 Tonnes per month

BG of Rs. 1.5 Lakhs

submitted.

CTE on 10.09.2007 vide I.D. No. 23442.

CTO refused on 20.07.2007 vide I.D. No. 22638.

  Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply submitted on 04.08.2008.Permission from CGWA not submitted.Unit has informed that they have submitted an application for permission to CGWA (copy enclosed).

Call on 03.09.2008

Y 87 26 26 Goyal Enterprises B-7, Group

Pickling & Re- Rolling of SS sheet

1 tonne (as per inspection report)

BG of Rs. Three Lakh submitted on 24.10.2007.

CTO(R) obtained. Valid upto 11.08.2008.

CTO(R) obtained. Valid upto 11.08.2008.

Applied for renewal of authorization on 26.07.2006 vide I.D No. 2943

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 25.06.2008Permission from CGWA submitted.

Authorization under HWM Rules granted.

Y 88 27 27(a) Hari Ram Babu Lal

B-63 Pickling , Annealing & Re- Rolling of SS sheet

20 tonnes (as per inspection report)

BG of Rupees Two Lakh submitted on 29.10.2007

CTE on 14.03.2008 vide I.D. No. 25202

CTO(R) obtained. Valid upto 01.08.2008. CTO on 04.10.2006 vide I.D. No. 19489.

Applied on 04.10.2006 vide I.D. No. 3759

Ask the unit to file permission from Central Ground Water Authority for ground water drawl. Issue notice for closure to two new units found by SIT for not applying for Consent to Establish.

Letter issued.Reply received on 29.07.2008.No permission from CGWA submitted. Unit has informed that they have applied for permission to CGWA. As and when the permission will come the same will be submitted.

SIT to inspect and report. Call on 03.09.2008

      27(b) Ashish Industries B-63, Ground Floor

R-rolling of S.S. Sheets

    CTE on 07.07.2008 vide I.D. No. 26320.

      Notice for closure issued.Reply received. Unit has informed that they have obtained valid consent and also applied for CTE on 07.07.2008 vide I.D. No. 26320.

SIT to inspect and report. Call on 03.09.2008

      27(c) Saurabh Industries

B-63, Ground Floor

Re-rolling of S.S. Sheets

    CTE on 07.07.2008 vide I.D. No. 26321.

      Notice for closure issued.Reply received. Unit has informed that they have obtained valid consent and also applied for CTE on 07.07.2008 vide I.D. No. 26321.

SIT to inspect and report. Call on 03.09.2008

Y 86 28 28 S.K. Enterprises A-126/1 Pickling, Annealing & Re- Rolling of SS sheet

2.5 tonnes (as per inspection report)

BG submitted on 08.10.2007

Not applied/obtained

CTO ( Renewal) obtained. Valid upto 26.7.2008.

Applied for renewal of authorization on 03.08.2006 vide I.D. No. 3110.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Replies issued on 27.06.2008 & 29.07.2008.No permission from CGWA submitted. Unit has informed that they have applied for permission to CGWA. As and when the permission will come the same will be submitted.

Call on 03.09.2008

Y 117 29 29 Parkash Re-Rolling Works

A-131, Group

Re-rolling and pickling of SS sheets

2.5 tonnes (as per inspection

BG of Rs. 3 Lakhs submitted.

CTE on 26.05.2008 vide I.D. No. 25838.

CTO refused on 18.08.2007 vide refusal no.

Applied for authorization on 25.06.2008

Ask the unit to file permission from Central Ground Water

Letter issued.Reply issued on 27.06.2008.

SIT to inspect and report. Call on 03.09.2008

report) 1661.. vide I.D No. 4606.

Authority for ground water drawl.

No permission from CGWA submitted. Unit has requested to allow 30 to 45 days time to file the permission from CGWA.

Y 98 30 30 Prem Dyeing A- 13 Dyeing (Premises found closed, unit not operating)

Not Mentioned

unit closed Not applied/obtained

CTO(R) on 09.04.2007 vide I.D. No. 21011.

  Reminder for compliance.

Reminder issued .No compliance report received.

Issue reminder for compliance report. Call on 03.09.2008

Y 81 31 31 (a)

Bhagwati Steels B-28/4 Pickling, Annealing & Re-Rolling of SS sheet

500 Kg/day (as per inspection report)

Revalidated BG of Rs. Three Lakh submitted on 19.03.2007

Applied for CTE on 20.03.2008 vide I.D. No. 25278.

CTO on 25.07.2005.

Renewal of authorization on 12.07.2006 vide I.D. No. 2758.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl. Issue notice for closure to new unit found by SIT for not applying for Consent to Establish.

Letter issued.Reply received on 03.07.2008.Permission from CGWA submitted.

SIT to inspect and report. Call on 03.09.2008

      31 (b)

Anil HandaRaj Industries

B-28/4, 1st Floor

Mfg. of S.S. Utensils

    CTE on 07.07.2008 vide I.D. No. 26333 under Green category.

      Notice for closure issued.Reply received on 08.07.2008. Unit has informed that the unit name is M/s Raj Industries in lieu of Anil Hand and they have applied for CTE on 07.07.2008 vide I.D. No. 26333.As per CMC (Green) decision dated 18.07.2008, SIT to Iinspect and report.

Shift to Green Committee.

Y 97 32 32 Ganpati Rolling Mill

A-98/6 Pickling & Re- Rolling of SS sheet

2-3 tonne (as per inspection report)

Revalidated BG of Rs. Three Lakh submitted on 29.10.2007

CTE on 11.03.2008 vide I.D. No. 25151.

CTO(R) on 16.05.2007 vide I.D. No. 21335

Applied for renewal of authorization on 18.08.2006 vide I.D No. 3353

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have filed the application for permission to CGWA. As soon as they get the permission, they will submit the same.

SIT to inspect and report. Call on 03.09.2008

Y 18 33 33(a) Kusum Steel Co. C-57 Re-rolling & Pickling

4-5 tonne (as per inspection)

BG of Rs. Three Lakh submitted on 23.08.2007

CTE on 11.04.2008 vide I.D. No. 25487.

CTO on 11.01.2005 vide I.D. No. 12421.

Applied for renewal of authorization on 11.01.2005 vide I.D. No. 2265.

Bank Guarantee forfeited, under all the three acts, on account of SIT inspection.Issue notice for cloure to new unit for not applying for Consent to Establish

Bank Guarantee forfeited under each of the three Acts. Unit has submitted its replies along with photographs on 03.06.2008 & 06.06.2008 & informed that they have rectified all the deficiencies and requested to send SIT for reinspection.

Decision of forfeiture of Bank Guarantees will not be revoked. SIT to inspect and report. Call on 03.09.2008.

      33(b) Shyam Steel C-57, 1st Floor

Circle cutting             Notice for closure issued on 20.06.2008.Notice for closure returned back undelievered.

Notice be pasted on the premises. Call on 03.09.2008

Y 92 34 34 Metal Fabricators A-85/3 Pickling, Annealing & Re- Rolling of SS sheet

30 tonnes / month (as per inspection report)

Revalidated BG submitted on 29.10.2007

Applied for CTE on 20.03.2008 vide I.D. No. 25279.

CTO on 24.01.2005 vide I.D. No. 12494

Applied on 20.09.2006 vide I.D. No. 3637

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have approched to CGWA. As soon as they get the permission, they will subit the same.

Call on 03.09.2008

Y 79 35 35 Mitul Industries A-124 Pickling, Annealing 1.5 tonnes Extension CTE granted CTO(R) on Applied for Ask the unit to file Letter issued. Call on 03.09.2008

& Re-Rolling of SS sheet

(as per affidavit)

letter for BG submitted on 01.10.2007.BG revalidated up to 06.02.2010.

vide CMC decision dated 24.04.2008

01.08.2005 vide I.D. No. 15868.

renewal of authorization on 09.12.2006 vide I.D. No. 3248.

permission from Central Ground Water Authority for ground water drawl.

Reply received on 27.06.2008Permission from CGWA not submitted. Unit has informed that they have applied to CGWA, as soon as they get the permission, the same will be submitted to DPCC.

Y 84 36 36 Pooja Rolling Mills

A-90/1, Group

Pickling & Re- Rolling of SS sheet

1-1.25 tonne (as per inspection report)

Revalided BG of Rs. Three Lakh submitted on 29.10.2007

Applied for CTE on 18.03.2008 vide I.D. No. 25220.

CTO(R) on 30.01.2006 vide I.D. No. 17616.

Applied for renewal of authorization on 01.08.2006 vide I.D. No. 3030.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 23.06.2008Permission from CGWA submitted.

SIT to inspect and report. Call on 03.09.2008

Y 51 37 37 Rahul Udyog A- 96 / 1A Annealing, Re-Rolling & Pickling of S.S.Sheets

2-2.5 tonnes (as per inspection report)

BG of Rs. Three Lakh submitted on 15.10.2007.

CTE on 01.01.2008 vide I.D. No. 24632.

CTO applied on 29.3.2005 vide ID No. 13253

Applied on 28.03.2005 vide I.D. No. 2367.

Ask the unit to file adequacy report and permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have approched to CGWA. As soon as they get the permission, they will subit the same.

Forfeit Bank Guarantees under three Acts/Rules submitted by the unit. Call on 03.09.2008

Y 73 38 38 Raj Overseas C- 60/1 Annealing , re-rolling and pickling of SS sheets and manufacturing of utensils ( including buffing)

3 tonnes/day (as per affidavit)

BG of Rs. Three Lakh submitted on 31.12.2007.

CTE granted vide CMC decision dated 24.04.2008

CTO on 01.06.2007.

Applied on 01.06.2007

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply submitted on 04.08.2008.Permission from CGWA not submitted.Unit has informed that they have submitted an application for permission to CGWA (copy enclosed).

SIT to inspect and report. Call on 03.09.2008

Y 95 39 39 Satish Kumar B-70/2 Annealing of SS sheet

150 tonnes / month (as per raw

Revalidated BG of Rs. 50,000

CTE on 25.04.2008 vide I.D. No. 25583

CTO on 31.01.2006 vide I.D. No. 17629.

Not applicable Ask the unit to file permission from Central Ground Water

Letter issued.Reply received on 27.06.2008

SIT to inspect and report. Call on 03.09.2008

material list) 60 sqm(plot area)

submitted.BG of Rs. 50000 under Air Act submitted on 22.05.2008.

Authority for ground water drawl.

Permission from CGWA not submitted. Unit has informed that the activity of the unit is annealing which is dry activity so does not require to take permisson from CGWA.

Y 83 40 40 Shriram Rolling Mill

A-93/14 Pickling & Re- Rolling of SS sheet

2-3 tonne (as per inspection report)

Revalidated BG of Rs. Three Lakh submitted on 29.10.2007

Applied for CTE on 25.03.2008 vide I.D. No. 25299.

CTO on 01.06.2006 vide I.D. No. 18355

Applied on 01.06.2007 vide I.D. No. 2655.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have filed the application for permission to CGWA. As soon as they get the permission, they will submit the same.

Call on 03.09.2008

Y 80 41 41(a) Vinayak Industires

C-36/1 Re- Rolling & Pickling of SS sheet

375 - 500 kg/day

BG of Rs. Three Lakh subitted 29.10.2007.

CTE on 18.03.2008 vide I.D. No. 25226

CTO applied on 02.8.02 and 25.6.04CTO valid up to 24.6.07.CTO(R) on 11.06.2007 vide I.D. No. 21775.

Applied on 23.12.2003 & 25.04.2005 vide I.D. No. 192 & 2387 respectively.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl. Issue notice for closure to two new units found by SIT for not applying for Consent to Establish.

Letter issued.Reply on 29.07.2008.No permission from CGWA submitted. Unit has informed that they have applied for permission to CGWA. As and when the permission will come the same will be submitted.

Call on 03.09.2008

      41(b) Jaina Steel C-36/1, Basement

Mfg. of S.S. Utnsils without buffing

            Notice for closure issued on 20.06.2008.Notice for closure returned back undelievered.

Notice to be pasted on the premises. Call on 03.09.2008

      41(c) Auto Plast C-36/1, Ground Floor

        CTO obtained on 27.10.2007(valid upto 07.10.2007)

    Notice for closure issued on 20.06.2008.Notice for closure returned back undelievered.

Notice to be pasted on the premises. Call on 03.09.2008

Y 118 42 42 Rajkumar Hosiery

A-128, Group

Dyeing , Bleaching and processing of hosiery clothes

300 Kg (as per inspection report)

BG not submitted.

Not applied/obtained

CTO applied on 26.7.02CTO renewal applied on 30.9.05

Applied for renewal on 02.8.06 vide Id No.3077

SIT to inspect again at correct address & report. Call on 03.7.08

Findings of SIT inspection to be discussed

Since unit is closed, issue letter for disconnection of power/water supply & cancellation of MCD licence to the unit.File be closed.SIT found four other units, details of which are as follows:-(i) J.P. Steel engaged in S.S. Sheet pressing job.(ii) Somdutt engaged in lathe machine works.(iii) Suresh Kumar engaged in plastic footwear.(iv) Sushil Kumar Goel engaged in circle cutting.Issue notice for closure to all the four units for not applying for for Consent to Establish.

Y 59 43 43 Sh. Gaurav(Proprietor of pickling unit )

C-55/1 (back side portion )

Pickling of S.S.Sheets

Not Mentioned

BG of Rs. 3 Lakhs submitted.

CTE on 21.05.2008 vide I.D.No. 25789.

CTO applied. Not applied. Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have filed the application for permission to CGWA. As soon as they get the permission, they will subit the same.

Call on 03.09.2008

Y 122 44 44 A.N. Steel Industries

A-95 Re-Rolling of S.S.Sheets(Pickling stopped)

15 tonnes / month (as per inspection report)

Not sought

Not applied/obtained

Refused on 31.07.2006

  Reminder for compliance.

Reminder for compliance issued.No reply received.

Issue reminder for compliance report. Call on 03.09.2008

Y 40 45 45(a) Abhinandan Steel A-124, II & III Floor,

Manufacturing of steel utensils (involving buffing)

200-300 kg/day (as per inspection report)

  Not applied/obtained

CTO revoked on 09.08.2007 vide revocation no. 1651.

Not applicable Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

  Since unit is closed, issue letter for disconnection of power/water supply & cancellation of MCD licence to the unit.File be closed.

      45(b) Adhinath Works A-124, 2nd & 3rd Floor

    Bank Guarantee of Rs 01 Lakh under Air Act submitted

        Letter issued.Reply received on 01.07.2008Permssion from CGWA not submitted. Unit has informed that they do not have any bore well connection and requested to withdraw the notice.

Ask the unit to file Consent to Establish application.Call on 03.09.2008

Y 55 46 46 Jain Udyog B-41, Group

Re-rolling & Pickling

Not Mentioned

Not sought CTE refused on 29.11.07

CTE refused on 29.11.07

Not applied. No pickling observed. Call on 03.07.2008 for final decision.

Unit has submitted a letter on 03.06.2008 & informed that they have closed down the pickling activity and rquested to treat old consent application or any other such doucments as null and void.A complaint received from Samajwati Andoolan Suraksha against the unit (listed at Sl. No 17 out of 26 cases).

SIT to inspect and report. Call on 03.09.2008

Y 52 47 47 Laxmi Chand Hosiery Factory

A-97 / 2 Buffing on S.S.Utensils(knitting of socks is also being carried out)

_ BG of Rs. 50000 under Air Act.

CTE on 28.05.2008 vide I.D. No. 25870

CTO on 25.07.2007 vide I.D. No. 22799 under Green

_ BG and CTE submitted. Call on 03.07.2008 for final decision.

Letter issued. Reply received on 28.05.2008.Bank Guarantee

Ask the unit to file permission from CGWA for ground water drawl.

Category. submitted on 27.05.2008.Applied for CTE on 28.05.2008 vide I.D. No. 25870

Y 85 48 48(a) Laxmi Rolling Mills

A-90/3, Group

Pickling & Re- Rolling of SS sheet

2-3 tonne (as per inspection report)

Revalided BG submitted on 29.10.2007

CTE on 18.03.2008 vide I.D. No. 25233

CTO on 12.03.2003 vide I.D. No. 7956. Unit depsited the fee for further three years on 17.08.2006 as sought by DPCC.

Applied for renewal of authorization on 07.08.2006 vide I.D. No. 3179.

unit found closed. Issue notice for closure to new two units for not applying for Consent to Establish.

  Since unit is closed, issue letter for disconnection of power/water supply & cancellation of MCD licence to the unit.File be closed.SIT to inspect new unit namely M/s Laxmi Rolling Industries.

      48(b) Chawla Polymer A-90/3, Ground Foor

Mfg. of safety boot     CTE on 11.03.2008 vide I.D. No. 25150.

      Notice for closure issued.Applied for CTE on 11.03.2008 vide I.D. No. 25150.

Call on 03.09.2008

      48(c) Acme Safety A-90/3, 1st & 2nd Foor

Mfg. of safety belt, torch, jacket

            Notice for closure issued.Notice returned back undelievered.

SIT to inspect and report. Call on 03.09.2008

Y 121 49 49 Mittal Dyeing and Processing Mills

A-94/1 Dyeing , Bleaching and processing of hosiery clothes

1000 Kg (as per inspection report)

BG not submitted

CTE on 26.03.2008 vide I.D. No. 25319 under Green Category

CTO valid up to 28.11.2003CTO(R) applied on 22.3.2005

Applied for renewal on 01.08.2006 vide I.D. No. 3027.

SIT to inspect & report. Call on 03.7.08

SIT report to be discussed.

Final reminder for submission of Bank Guarantee, failing which unit will be closed down. Call on 03.09.2008.

Y 76 50 50 Rafiq Electroplating

C- 59/2 Unit shifted.(Premises found vacant.)

Not Mentioned

Not sought Not applied/obtained

CTO refused on 07.08.2007 vide refusal no. 1643.

Refused on 07.08.2007.

Reminder for compliance.

Reminder issued.No compliance report received.

Issue reminder for compliance report. Call on 03.09.2008

Y 253 51 51 Sh. Paras and Sh. Mohd. Latif & (M/s Krishna Metal Industries)

A-40 Steel Rolling Annealing Re -Rolling & Pickling

10-15 Kg/month (as per inspection report)

BG of Rs. 3 Lakhs submitted on 06.08.2008

Applied for CTE on 24.03.2008 vide I.D. No. 25290.

CTO obained. Expired on 02.12.2007.CTO(R) on 04.04.2008 vide

Applied for renewal of authorization on 18.08.2006 vide I.D. No.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl, affidavit

Letter issued.Replies received on 30.06.2008, 01.07.2008 & 06.08.2008

Call on 03.09.2008

I.D. No. 25417. 3355. for correction of deficiencies observed by SIT and to submit Bank Guarantee for Rs. 1 lakh each under Water Act, Air Act and HWM Rules.

Permission from CGWA not submitted. Unit has informed that they have applied to CGWA for permission (copy enclosed).Affidavit submitted.BG submitted on 06.08.2008.

Y 152 52 52 Shiv Industires B-7 (Back side), Group

Re-Rolling & Pickling of S.S.Sheets (Presently unit is not in operation)

1 tonne (as per affidavit)

Not Sought Not applied/obtained

CTO was valid up to 06.6.07.CTO(R) on 11.07.2007 vide I.D. No. 22316.

Applied for renewal of authorization on 09.08.2006 vide I.D. No. 3245.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl, affidavit for correction of deficiencies observed by SIT and to submit Bank Guarantee for Rs. 1 lakh each under Water Act, Air Act and HWM Rules.

Letter issued.Reply received on 27.06.2008Permission from CGWA not submitted. Unit has informed that they have approached to concerned to file permission.Affidavit submitted.BG not submitted. Unit has requested to reduce the amount of BG as the production capacity was very small i.e. 500 Kg/day which was also verified by the Inspecting Officer during the inspection.

No reduction in Bank Guarantee amount. Final reminder for Bank Guarantee & permission from CGWA, failing which unit be closed down.

Y 24 53 53 Shree Krishna Enterprises

Shed no. 75 (DSIDC Sheds)

Rolling. Pickling proposed.

15-20 tonnes / month (as per affidavit)

BG of Rs. 75000 each under Air, Water Acts & HWM Rules

CTE on 28.05.2008 vide I.D. No. 25859

Refused on 09.08.2007 vide refusal no. 1659.

Refused on 09.08.2007.

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply issued on 27.06.2008.No permission from CGWA submitted. Unit has requested to allow 30 to 45 days time to file the permission from CGWA.

Call on 03.09.2008

Y 116 54 54 Vardhman Impex A-38 Re-rolling and pickling of SS sheets

3 tonnes (as per inspection report)

BG not submitted.

CTE on 18.03.2008 vide I.D. No. 25217.CTE on

CTO refused on 18.08.2007 vide refusal no. 1660.

_ Call on 03.7.2008 for final decision.

Letter issued. Reply received on 22.05.2008.BG not submitted.

No reduction in Bank Guarantee amount. Final reminder for Bank

21.05.2008 vide I.D.No. 25791 (M/s Saurabh Steel Udyog).

Unit has stated its reply that they have stopped the pickling activity and informed to DPCC vide letter dated 23.08.2007 and the same was observed during the inspection on 24.04.2008 and they have applied for consent for the activity of cold re-rolling and requested to waive off the order of submission of BG and withdraw the notice.M/s Saurabh Steel Udyog : Unit has submitted a letter on 21.05.2008 & informed that there is no unit in the name of M/s Rakesh Kumar at the said premises.Unit has again submitted a letter on 28.05.2008 & informed that they have placed order for canopy. As soon as canopy install, they will submit the noise monitoring report.Applied for CTE on 21.05.2008 vide I.D.No. 25791.M/s Rakesh Kumar : Unit has neither applied for CTE and nor submitted any reply.

Guarantee , failing which unit will be closed down.

SIT to inspect both units and report. Call on 03.09.2008

Y 183 55 55(a) Vardhman Metal B-50, Group

Pickling 4 T/day as per adequacy report

Not Sought CTE on 28.02.2008 vide I.D. No. 25059.

CTO on 21.07.2004 vide I.D. No. 11088.

Applied on 29.08.2007 vide I.D. No. 3426.

Unit found closed. Call on 03.07.2008.Issue notice for closure to Ramanand Gupta & Swagat Steel for not applying for Consent to Establish .

  Since unit is closed, issue letter for disconnection of power/water supply & cancellation of MCD licence to the unit.File be closed.

      55(b) Swagat Steel Ground Floor, B-50, Group

Annealing     CTE on 01.07.2008 vide I.D. No. 26235

      Notice for closure issued.Applied for CTE on 01.07.2008 vide I.D. No. 26235.

SIT to inspect and report. Call on 03.09.2008

      55(c) Ramanand Gupta B-50, Group, 2nd Floor

Acid Battery Recyling

    CTE on 03.06.2008 vide I.D. No. 25960.

      Notice for closure issued.Applied for CTE on 03.06.2008 vide I.D. No. 25960.

SIT to inspect and report. Call on 03.09.2008

Y 7 56 56 Vijay Industries B-71 Annealing & Pickling

_ BG of Rs. 3 Lakhs submitted.

CTE on 15.04.2008 vide I.D. No. 25519

CTO applied on 02.5.2005.

Applied on 27.4.05 vide ID No. 2390

Ask the unit to file permission from Central Ground Water Authority for ground water drawl.

Letter issued.Reply received on 30.06.2008Permission from CGWA not submitted. Unit has informed that they have filed the application for permission to CGWA. As soon as they get the permission, they will submit the same.

Call on 03.09.2008

Y 89 57 57 W.C. Steel B-70/2 Pickling of SS sheet 1.5 Tonnes per ady as per List of raw materials

Not Sought Not applied/obtained

CTO refused on 19.09.2007

Refused on 19.09.2007

Reminder for compliance.

Reminder issued.No compliance report received.

Issue reminder for compliance report. Call on 03.09.2008

Y 39 58 58 R. K. HosieryA-69

A-69, Group

Dyeing and bleaching of cotton hosiery fabric.

Not Mentioned

Not sought CTE under Green Category on 14.12.2007 vide I.D. No.

24494.

CTO (R) obtained. Valid upto 29.11.2007

Applied for renewal of authorization on 02.08.2006 vide I.D. No. 3067.

Let Green Committee decide.

Case was taken up by CMC(Green) on 06.06.2008 & it was decided to again resubmit in CMC(Orange) to take decision for storage of

SIT to inspect and report. Call on 03.09.2008

hazardous waste.    59 59 R.N. Gupta & Co. A-125 Pickling &

Annealing of SS sheet

30 tonnes / month (as per inspection report)

Not sought CTE under Green category on 17.1.08 vide ID No. 24773.

CTO refused on 08.01.2007 vide refusal no. 1578.

Refused on 05.01.2007.

29.05.2008SIT to inspect and report. Call on 11.06.2008.

04.07.2008 In view of the order of Finance Commissioner, the case was taken up as a table agenda today. Since the file is with SIT, case may be taken up 11.07.2008. 11.07.2008Since Finance Commissioner order says de-seal and inspect, SIT will coordinate with SDM, de-seal, inspect and reseal and submit report by 06.08.2008.

SIT inspection report to be discussed.

SIT to inspect and report. Call on 29.08.2008

Y 159 60 60(a) Bhagwati Industries

A-101/5 unit closed Not Mentioned

unit closed unit closed _ _ M/s Bhagwati Industries was found closed by SIT. Issue notice for closure to other units found by SIT.

  Since unit is closed, issue letter for disconnection of power/water supply & cancellation of MCD licence to the unit.File be closed.

      60(b) Kanwar Sina A-101/5, Ground Foor

Mf.g of Iron Base             Notice for closure issued.No reply received.

Notice to be pasted on the premises. Call on 03.09.2008

      60(c) S.K. Polymers A-101/5, Ground Foor

Mfg. of Pet Bottles             Notice for closure issued.No reply received.

Notice to be pasted on the premises. Call on 03.09.2008

Y 158 61 61 Durga Industries A-100/2 unit closed Not Mentioned

unit closed unit closed _ _ Call on 03.07.2008   SIT to inpect and report. Call on 03.09.2008

Y 133 62 62(a) Ganesh A-79, Group

Unit Closed Unit closed. unit closed unit closed _ _ Issue notice for closure to all six units. Call on 03.07.2008.

  Call on 03.09.2008

      62(b) Vardhman S. Industries

A-79, Basement, Group

Mfg. of S.S. Utensils

    CTE on 04.07.2008 vide I.D .No 26288 under Green category.

      Notice for closure issued.Unit has applied for CTE under Green category on 04.07.2008 vide I.D. No. 26288.As per CMC (Green) decision dated 18.07.2008, CTE granted without buffing.

Shift to Green Committee.

      62(c) Jain Enterprises A-79, Ground Floor, Group

Mfg. of motorcycle brake parts

    CTE on 04.07.2008 vide I.D .No 26289 under Green category.

      Notice for closure issued.Unit has applied for CTE under Green category on 04.07.2008 vide I.D. No. 26289.As per CMC (Green) decision dated 18.07.2008, CTE granted.

Shift to Green Committee.

      62(d) Mishra Hosiery A-79, 1st Floor, Group

Mfg. of Socks     CTE on 04.07.2008 vide I.D. No. 26301 under Green category.

      Notice for closure issued.Applied for CTE on 04.07.2008 vide I.D. No. 26301 under Green category.As per CMC (Green) decision dated 18.07.2008, CTE granted.

Shift to Green Committee.

      62(e) Anju Impex A-79, 2nd Floor, Group

Mfg. of S.S. Modular Kitchen Set (wire basket)

    CTE on 04.07.2008 vide I.D .No 26291 under Green category.

      Notice for closure issued.Unit has applied for CTE under Green category on

Shift to Green Committee.

04.07.2008 vide I.D. No. 26291.As per CMC (Green) decision dated 18.07.2008, CTE granted.

      62(f) Dhatu Spectro A-79, 3rd Floor, Group

Metal Checking (analysis work)

    CTE on 04.07.2008 vide I.D .No 26290 under Green category.

      Notice for closure issued.Unit has applied for CTE under Green category on 04.07.2008 vide I.D. No. 26290.As per CMC (Green) decision dated 18.07.2008, "Shift to Orange Committee".

SIT to inspect and report. Call on 03.09.2008

      62(g) ETS Engineering A-79, Ground Floor, Group

Zinc Casting (Pressure Die Casting)

    CTE on 04.07.2008 vide I.D .No 26287

      Notice for closure issued.Applied for CTE on 04.07.2008 vide I.D .No 26287

SIT to inspect and report. Call on 03.09.2008

Y 181 63 63 Ganpati Industries

B-27/2, Group

Unit does not exist. Unit does not exist.

Not sought Unit does not exist.

Unit does not exist.

Unit does not exist.

No action. No action. No action.

Y 56 64 64 K.C. Steel B-31, Group

Buffing on S.S. Utensils.

200 Kg (as per inspection report)

Not sought Premises vacant.

Revocation of consent on 09.08.2007.

Not applicable Reminder for compliance.

Reminder issued.No compliance report received.

Issue reminder for compliance report. Call on 03.09.2008

Y 156 65 65 Kirti Industries A-100/1 unit closed Not Mentioned

unit closed Unit found closed by SIT

Unit found closed by SIT

_ Call on 03.07.2008Shift King Steel to Green Committee.

  No action by this committee.

Y 139 66 66 Manoj Steel Industries

B-5, Group

unit closed and shifted.

Not Mentioned

unit closed unit closed and shifted.

_ _ No action. No action. No action.

Y 124 67 67 Om Steel Rolling Works

A-96/10 No Indl Activity observed(Premises is being used for godown & One Transport Company exists)

Activity Obsersved (as per Inspection Report)

_   CTO refused on 18.08.2007 vide refusal no. 16640.

  No industrial activity found by SIT. Call on 03.07.2008.

  Since unit is closed, issue letter for disconnection of power/water supply & cancellation of MCD licence to the unit.File be closed.

Y 74 68 68 Rajinder C- 60/2 (Backside portion)

Manufacturing of Hinges (including pickling activity)

Unit does not exist.

Unit does not exist.

Unit does not exist.

Unit does not exist.

Unit does not exist.

Shift (i) & (ii) to Green Category. Other units i.e. (iii) & (iv) call on 03.07.2008. Issue notice for closure to (v) unit who have not applied for CTE.

Notice for closure issued to (v) Rattan Singh & Sons.Applied for CTE on 30.05.2008 vide I.D. No. 25903

SIT to inspect all five units. Call on 03.09.2008

Y 1 69 69(a) Sobti Associates B-78 Pickling (unit found closed / site found vacant)

Unit closed. Not sought Unit closed. CTO refused on 06.08.2007 vide I.D. No. 1638

Unit closed. Sobti closed.Issue notice for closure to Vidya Inds , Cellco India & Dinesh.

  SIT to inspect and report. Call on 03.09.2008

      69(b) Vidya Inds B-78     Applied CTE on 20.09.2007 vide I.D. No. 23573

    Applied for authorization on 07.07.2008 vide I.D. No. 4616.

  Notice for closure issued.Reply received on 07.07.2008. Unit has applied for authorization under HWM Rules.Unit has applied CTE on 20.09.2007 vide I.D. No. 23573

SIT to inspect and report. Call on 03.09.2008

      69(c) Cellco India B-78               Notice for closure issued.Reply received on 07.07.2008. Unit has informed that they are engaged in trading of synthetic leather and no need to apply CTE as informed by Enquiry Coutner.

SIT to inspect and report. Call on 03.09.2008

      69(d) Dinesh B-78               Notice for closure issued.No reply received.

SIT to inspect and report. Call on 03.09.2008

Y 128 70 70 Sun Flower Steel Industries

A-81/1 Unit closed & shifted.No Indl Activity observed. Premises found vacant

Not Mentioned

unit closed Unit closed _ _ Call on 03.07.2008   Since unit is closed, issue letter for disconnection of power/water supply & cancellation of MCD licence to the unit.File be closed.

Y 105 71 71 Swastik Enterprises

B-63 Pickling of SS sheets (Unit found closed, Pickling not found at site)

Not Mentioned

unit closed Unit closed _ _ SIT to inspect & report.

SIT report to be discussed.

Since unit is closed, issue letter for disconnection of power/water supply & cancellation of MCD licence to the unit.File be closed.

Issue notice for closure to (i) Ashiksh Industries (ii) Surabh Industries for not applying for Consent to Establish.

Y 60 72 72(a) Sh. Charat / Sadanand (Proprietor of

C-55/1 (front portion )

Pickling of S.S.Sheets

  BG not submitted.

  _   Issue final reminder for submission of BG to first two units for

  Since unit is closed, issue letter for disconnection

pickling unit ) considering their CTE applications. Issue notice for closure for Shriram Inds.

of power/water supply & cancellation of MCD licence to the unit.File be closed.

      72(b) Shree Metal C-55/1, 1st Floor

Circle cutting   BG of Rs. One Lakh under Air Act submitted.

CTE on 27.05.2008 vide I.D. NO. 25831 under Green category

      Letter issued.Bank Guarantee of Rs. One Lakh under Air Act submitted.

Ask the unit to file CGWA permission.Call on 03.09.2008

      72(c) Suraj Industries C-55/1 Pickling of S.S. Sheets

  Rs. 75000 under each of three acts

CTE on 26.05.2008 vide I.D. No. 25839

      Letter issued.Bank Guarantee of Rs. 75000 under each of three acts submitted.

Ask the unit to file CGWA permission.Call on 03.09.2008

      72(d) Shriram Inds Ground Floor (front portion)

Steel Rerolling             Notice for closure issued.No reply received.

Notice to be pasted on the premises. Call on 03.09.2008

  111 73 73 Sterling Auto Engineering

B-69/1 Manufacturing of piston rings (involving electroplating, grinding and buffing)

Pistion Rings (as per Inspection Report)

Not Sought _ _   Reminder for compliance from MCD & DJB.

Reminder issued.No compliance report received.Unit has filed a write before High Court.

Issue reminder for compliance report. Call on 03.09.2008