1

Agenda for 23rd Meeting of WR Constituents regarding Connectivity

& Long-Term Access applications in Western Region

----------------------------------------------------------------------------------------------------------------

1. Confirmation of the minutes of 22nd Meeting of WR Constituents regarding

Connectivity & Long-Term Access applications in Western Region held on 30-

11-2015 at NRPC, New Delhi

Members may confirm the minutes of the 22nd Meeting of WR Constituents regarding

Connectivity & Long-term Access applications in Western Region. No comments on

the MoM have been received.

2. Amendment in Detailed Procedure

CERC has issued directions by amending the Detailed Procedure for treating long

pending applications vide letter dated 17.02.2016 and requested CTU to give wide

publicity to the amendment for the information of all concerned (also available at

CTU website also). The amended provision states that:

“23.16 CTU shall not hold any LTA application in abeyance and process the

applications within the timeline prescribed in Regulation 7 of the Connectivity

Regulations. If any LTA applicant requests CTU in writing for deferment of

consideration of its applications or does not participate in the LTA meetings despite

being invited by CTU, the application shall not be further processed. CTU shall in

such cases close the applications and return the bank guarantee.

In respect of applications which are already pending with CTU on request of the

applicants or for their non-participation in the LTA meetings, CTU may give a notice

of 15 days in writing to the concerned LTA applicants about the closure of the

application. If any applicant is willing to pursue his application the same shall be

processed in the next LTA meeting. If the applicant seeks further deferment of

extension of application or does not respond to the notice, CTU may proceed to

close the applications and return the bank guarantee”

Members may kindly note the above.

3. AGENDA FOR INTER - REGIONAL (IR) LTA APPLICATIONS SEEKING POWER

TRANSFER FROM WR TO NR

The LTA to various customers with generation projects located in WR / ER / SR

having beneficiaries in NR had been granted progressively with different

transmission corridors which are presently under implementation and slated for

commissioning progressively.

Presently following major inter-regional links are in pipeline for commissioning :

2

Table-1

Sl.

No.

Name of the link Expected time

frame

1. Present IR links April, 2016

2. Champa – Kurukshetra phase – I November, 2016

3. Champa – Kurukshetra phase – II March, 2018

4. Jabalpur – Orai 765 kV D/c line April, 2018

Corresponding to time frame of April, 2018, LTAs have been granted for transfer of

about 17500 MW from generation projects in WR, ER & SR to NR through WR-NR

Corridors and the anticipated ATC with above links is of the same order.

Recently, there have been number of cases where LTA customers have approached

CERC for relinquishment of LTA on account of various reasons including force

majeure events. The Hon’ble CERC has observed that pending decision on the

various issues involved, the quantum of LTA proposed to be relinquished can be

utilised for grant of LTA to other LTA applicants. The details of the relinquished

capacity (as on date) involving transfer of LTA power from WR, ER & SR to NR

through WR- NR Corridor are as below:

Table-2

Sl.

No

Name of LTA

Customer

Quantum of

LTA

relinquished

Quantum of

NR portion

relinquished

Remarks

1

Bina Power Supply

Company Ltd.(2x250

MW)

265.35 132.67

Petition for relinquishment

before CERC (98/MP/2015).

Final order awaited.

2 Jaiprakash Power

Ventures 775 387.3

Petition for abeyance before

CERC (293/MP/2015). Final

order awaited.

3 Sterlite Energy Ltd 1400

480*

[160 (Ph-I)+

320 (Ph-2)]

Capacity relinquished in

principle as per ROPs in

Petition Nos. 003/MP/2016

and 303/MP/2015.

4 Jindal India Thermal Power Ltd

1044 667.2* Capacity relinquished in principle as per ROPs in Petition No. 55/MP/2015.

5 Ind Barath Energy

(Utkal) Ltd 116 92.8* Change in Region

6 BALCO(4x300) 100 100 Change in Region

7 GMR Kamalanga 60 48* Change in Region

Total 3760.35 MW 1907.97 MW

*Through sensitivity analysis, it is seen that about 80% of despatch from Odisha projects (Sl. No.

3,4,5&7 above) takes WR – NR path and about 20% of despatch directly flows to NR through ER –

3

NR inter-regional links. Accordingly, 80% of NR LTA quantum from these generation projects in

Odisha has been considered for power transfer over WR-NR corridor.

Further, it is to mention that there are LTA applications from generation projects

located in ER/WR/SR seeking transfer of power to NR which are presently under

process. An exercise has been carried out to assess the reallocation of transmission

capacity relinquished in WR-NR corridor by above LTA customers to applications

under process and seeking power transfer through WR-NR. Details of the same are

as follows:

Table-3

Sl.

No Name of the Applicant

Injecting

Region

Quantum of

LTA sought

for NR (MW)

Application Month LTA sought

from

1 Satviki Energy Pvt. Ltd. SR 75 29-Nov-2013 Apr-2015

2 Noida Power Co. Ltd.* WR 400 10-Dec-2013 1-Dec-2017

3 MB Power (Madhya

Pradesh) Limited

WR 169 11-Feb-2014 1-Jun-2015

4 MB Power (Madhya

Pradesh) Limited

WR 31 11-Feb-2014 1-Jun-2015

5 KSK Mahanadi Power

Company Ltd

WR 1000 27-Feb-2014 30-Oct-2016

6 MB Power (Madhya

Pradesh) Limited

WR 144 29-Dec-2014 1-Aug-2015

7 Barethi STPS WR 870.87 29-Jan-2015 1-July-2021

8 Suzlon SR 40 30-Apr-2015 1-Apr-2018

9 Suzlon SR 40 30-Apr-2015 1-Oct-2018

10 Suzlon SR 40 30-Apr-2015 1-Apr-2019

11 SEI Sunshine Power Pvt.

Ltd.

WR 180 31-Jul-2015 30-Sep-2016

12 TRN Energy Ltd WR 240 27-Aug-2015** 30-Oct-2016

13 DB Power Chhattisgarh

Ltd.

WR 75 20-Oct-2015 30-Nov-16

14 Rewa Ultra Mega Solar

Ltd.

WR 300 6-Nov-2015 30-Jun-2017

15 Maruti Clean Coal &

Power Ltd

WR 205 1-Mar-2016 30-Nov-2016

16 Srijan Energy System

Private Limited

WR 150 6-May-2016 31-03- 2018

Total 3959.87 MW

* Noida Power Company has applied LTA on Target Source Basis from WR (400 MW) and ER (100

MW).

**TRN Energy was asked to file fresh application on account of non submission of NoC by UP with

application dated 27-Aug-2015. Based on direction of CERC, old application is being considered for

grant of LTA.

4

Additionally, M/s RKM Powergen Ltd. has signed PPA of 350 MW with UP against

their LTA of 200 MW on target basis to NR granted earlier. It is expected that RKM

may apply for balance quantum.

Thus, the relinquished capacity of about 1900MW available with the commissioning

of Jabalpur PS – Orai 765kV corridor and Champa – Kurukshetra phase II can be

allotted to pending LTA applications. Accordingly, based on priority of new LTA

applications, it is proposed to grant LTA to the following LTA Applicants with

commissioning of Jabalpur PS – Orai 765 kV corridor and Champa – Kurukshetra

HVDC Phase II :

Table-4

Sl. No

Name of the Applicant Injecting Region

Quantum of LTA sought for NR (MW)

Application Month LTA sought

from

1 Satviki Energy Pvt. Ltd. SR 75 29-Nov-2013 Apr-2015

2 Noida Power Co. Ltd. WR 400 10-Dec-2013 1-Dec-2017

3 MB Power (Madhya Pradesh) Limited

WR 169 11-Feb-2014 1-Jun-2015

4 MB Power (Madhya

Pradesh) Limited WR

31 11-Feb-2014 1-Jun-2015

5 KSK Mahanadi Power Company Ltd

WR 1000 27-Feb-2014 30-Oct-2016

6 MB Power (Madhya Pradesh) Limited

WR 144 29-Dec-2014 1-Aug-2015

1819 MW

System Studies have been carried out considering projects mentioned above at

Table-4 and, it has been observed that power from these projects can be dispatched

from Western region to Northern region and all the line loadings are within limits. The

results of the load flow studies are tabulated below:

Sl. No. Case Exhibit No.

1 Base case (April’2018 conditions) 1

2 With proposed power transfer from WR to NR 2

In view of the above, it is proposed that LTA to the applicants listed in Table-4 be

granted for the desired time period with commissioning of Jabalpur - Orai 765 kV

corridor under implementation as “Inter-Regional System Strengthening Scheme in

WR and NR Part-B” and Champa – Kurukshetra HVDC Phase II under

5

implementation as “Transmission System Strengthening in WR-NR Transmission

Corridor For IPPs in Chhattisgarh”. Details of both the schemes are as given below:

Inter-Regional System Strengthening Scheme in WR and NR Part-B

Jabalpur PS - Orai 765kV D/C line

Orai - Aligarh 765kV D/C line

Orai - Orai 400kV D/C (Quad) line

LILO of one ckt of Satna - Gwalior 765kV 2xS/C line at Orai

LILO of Agra - Meerut 765kV S/C at Aligarh

LILO of Kanpur - Jhatikara 765kV S/C at Aligarh

Transmission System Strengthening in WR-NR Transmission Corridor For

IPPs in Chhattisgarh

Up-gradation of ± 800kV, 3000MW HVDC bipole between Champa PS –

Kurukshetra (NR) to 6000MW

Kurukshetra (NR) – Jind 400kV D/c (Quad)

Regarding LTA application of Barethi STPS of NTPC Ltd. at Sl. 7 of table 3, it may

be mentioned that Barethi STPS is proposed to be connected directly with ISTS

system of NR & WR and the LTA of the project is proposed to be granted along with

its evacuation system.

Regarding remaining applications listed in Table-3 (Sl. 8 to 15) above, following may

be mentioned:

In the 22nd LTA / Connectivity meeting of WR constituents held on 30.11.2015, it

was decided to grant LTA to new LTA applications in WR with NR as target

region on Vindhyachal – Allahabad 765kV corridor subject to approval of the

same in meeting of NR constituents.

The scheme was discussed in 37th Standing Committee Meeting of Power

System Planning in Northern Region held on 20-01-2016 wherein it was decided

to review the scheme after considering concerns raised by UPPTCL.

After further discussions with CEA & UPPTCL, it has been proposed to

strengthen the WR - NR corridor by constructing Vindhyachal – Varanasi 765 kV

D/c line (along-with suitable reactive compensation) instead of earlier proposed

Vindhyachal – Allahabad 765kV corridor. Same has been proposed in the

forthcoming Standing Committee Meeting of NR for concurrence of the

constituents.

In view of the above, it is proposed to grant LTA to following applicants with

commissioning of Vindhyachal – Varanasi 765 kV D/c line subsequent to approval

of the link in standing committee meeting.

6

Upon approval of above link in standing committee meeting, the same shall be put to

Emowered Committee. After recommendation from Empowered Committee, the link

is expected to be commissioned in 49 months {40 months (CERC time schedule) + 9

months (time required for bidding process)}.

Table-5

Sl. No

Name of the Applicant

Quantum of LTA sought for NR (MW)

Application Month LTA sought from

1 Suzlon 40 30-Apr-2015 1-Apr-2018

2 Suzlon 40 30-Apr-2015 1-Oct-2018

3 Suzlon 40 30-Apr-2015 1-Apr-2019

4 SEI Sunshine Power Pvt. Ltd.

180 31-Jul-2015 30-Sep-2016

5 TRN Energy Ltd 240 27-Aug-2015 30-Oct-2016

6 DB Power Chhattisgarh Ltd.

75 20-Oct-2015 30-Nov-16

7 Rewa Ultra Mega Solar Ltd.

300 6-Nov-2015 30-Jun-2017

8 Maruti Clean Coal & Power Ltd

205 1-Mar-2016 30-Nov-2016

Total 1120 MW

As mentioned earlier, fresh application from RKM Powergen Ltd. for additional

150MW to NR is yet to be received. However, the same has been considered in

studies in anticipation.

System Studies have been carried out for above mentioned generation projects and

it has been observed that all line loadings are within limits for power transfer from

above generation projects in Western region to NR.

Sl. No. Case Exhibit No.

1 Base case 3

2 With proposed power transfer from WR to NR 4

7

Regarding LTA application of Srijan Energy System Private Ltd. at Sl. 16 of table 3, it

may be mentioned that the high capacity Green energy corridor starting from Bhuj

PS (WR) to Moga(NR) is under implementation for evacuation and dispersal of

power from renewable generations coming up in Gujarat (especially Kutch complex)

and Rajasthan. Accordingly, as the proposed project is a wind generation in Kutch

area of Gujarat, LTA for power transfer to NR may be granted on the under

implementation Bhuj Pool – Banaskantha PS– Chittorgarh 765kV D/c corridor.

4. Connectivity (6x660 MW) and LTA (4x660MW) Application of Barethi STPS of

NTPC

The subject application was discussed in the 22nd LTA & Connectivity meeting of WR

constituents held on 30-11-2015 wherein it was decided that in view of uncertainty

due to pending environment clearance and observation / suggestion of MPPTCL, the

transmission system for connectivity and LTA for Barethi STPS shall be finalised in

the next meeting after submission of proposal in this regard by MPPTCL. After

considering proposals of MPPTCL received vide letter dated 12.02.2016, revised

system studies were conducted. As suggested by MPPTCL, a new substation in

Chhatarpur area is being proposed in 40th WR SCM as a system strengthening

scheme in WR which shall also take care of power evacuation from Bijawar (500

MW) solar park. Regarding transmission system for connectivity and LTA for Barethi

STPS, following system is proposed (Study results attached at Exhibit – 5) subject to

approval of the same in standing committee meetings of WR and NR:

Transmission System for Connectivity:

LILO of one ckt of Satna - Gwalior 765kV 2x S/c line at Barethi STPS (Approx.

LILO length -30KM)* *One ckt of Satna - Gwalior 765kV 2x S/c line is already getting LILOed at Orai S/s. The proposal

is to LILO other 765kV S/c line at Barethi STPS.

Reactive Compensation:

240 MVAR Switchable Line Reactors at Barethi STPS end of Gwalior –

Barethi STPS 765kV S/c line (Approx Length: 225km.) (formed after LILO of

one ckt of Satna - Gwalior 765kV 2x S/c line at Barethi STPS)

765kV bus reactor at Barethi STPS Switchyard: 1x240 MVAR

Transmission System Strengthening for LTA:

Barethi STPS - Orai 765kV D/c line (Approx Length: 180 Kms.)

Orai – Bareilly 765kV D/c line (Approx Length: 300 Kms.)

Reactive Compensation:

2x240 MVAR switchable line reactor at Barethi end of Barethi STPS - Orai

765kV D/c

240 MVAR switchable line reactors at both ends of each circuit of Orai –

Bareilly 765kV D/c line (Approx Length: 300 Kms.)

8

765kV bus reactor at Barethi STPS Switchyard: 1x240 MVAR

Out of the above, following scope of work shall be implemented by NTPC Ltd at

Barethi STPS switchyard.

765kV line bays : 4 nos. ( 2 for LILO of one ckt of Satna – Gwalior 765kV 2xS/c line & 2 for

Barethi STPS – Orai 765kV D/c line)

765kV bus reactor: 2x240 MVAR

765kV switchable line reactor: 3x240 MVAR (2 nos for Barethi STPS – Orai 765kV D/c

line and 1 no for Barethi STPS – Gwalior 765kV S/c line formed after LILO of one ckt of Satna –

Gwalior 765kV 2xS/c at Barethi STPS)

Space for additional 4 nos. 765 kV line bays along with switchable line reactors

may be kept as future provision

Upon approval of above transmission system in standing committee meeting, the

same shall be put to Emowered Committee. After recommendation from Empowered

Committee, the transmission system is expected to be commissioned in 49 months

{40 months (CERC time schedule) + 9 months (time required for bidding process)}.

5. Connectivity & LTA application for 750 MW by REWA Ultra Mega Solar (RUMS)

Ltd. for development of Solar Park in Rewa, Madhya Pradesh

The subject application was discussed in the 22nd LTA & Connectivity meeting of WR

constituents held on 30-11-2015. The beneficiaries of the project are WR:450MW &

NR:300MW. Since, power is to be transferred to NR, it was decided that LTA shall

be granted to M/s RUMS Ltd. on the new proposed WR – NR corridor after approval

of the scheme in meeting of NR constituents.

Here, it may be mentioned that since Rewa PS is not an existing substation,

connectivity to the substation is possible only after commissioning of Rewa PS

along-with associated lines. Hence, Connectivity and LTA system is proposed as

follows:

Transmission System for Connectivity:

RUMS Ltd. switchyard – Rewa PS 220kV 3xD/c line alongwith associated bays at

Solar Park (to be implemented by generation developer)

Establishment of 400/220kV, 1x500 MVA Pooling station at Rewa

LILO of one circuit of Vindhyachal STPS-Jabalpur 400kV 2nd D/c line (ckt-3&4) at

Rewa PS

6 Nos. 220kV Line bays at Rewa PS (for RUMS-Rewa PS 220kV 3xD/c)

9

Transmission System for LTA:

For transfer of power from M/s RUMS Ltd. to WR under LTA, following additional

transmission system shall be required.

Addition of 400/220kV, 2x500 MVA ICT at Rewa PS

LILO of other circuit of Vindhyachal STPS-Jabalpur 400kV 2nd D/c line (ckt-3&4)

at Rewa PS

1x125 MVAr, 420 kV Bus Reactor at Rewa Pooling Station

For transfer of power from M/s RUMS Ltd to NR under LTA, the new proposed

Vindhyachal – Varanasi 765kV D/c line as described at Item No. 3 of the agenda is

required in addition to the above transmission system.

6. Agenda for Transmission system for Srijan Wind farm in Bhuj, distt. Kutch

Gujarat.

M/s Srijan Energy System Private Limited (SESPL), a wholly owned subsidiary of

M/s Continuum Wind Energy (India) Pvt. Ltd. is developing a Wind Power Project

around Bhuj, District Kutch, Gujarat. SESPL has applied for connectivity & LTA in

ISTS for 300 MW in this regard.

Details of Application is as under-

Table-6

Sl. Particulars Application Details

1 Capacity for which connectivity is

required

300 MW

2 Date from which connectivity is

required

31.03.2018

3 Quantum for which LTA required 300 MW

4 Date from which LTA is required Mar 31, 2018

5 Date upto which LTA is required Mar 30, 2043

6 Location of Generating station Bhuj, Distt. Kutch, Gujarat (WR)

7 Drawl of Power NR:150MW; WR:90MW; SR:60

MW

Commissioning schedule of the wind power project is indicated as under-

Table-7

10

S. No. Installed Capacity

(MW)

Commissioning

Schedule

1 20 Mar 31, 2018

2 120 Sep 30, 2018

3 120 Mar 31, 2019

4 40 May 31, 2019

Here, it may be mentioned that 765/400kV Bhuj and Banaskantha Pooling stations

along with Bhuj PS - Banaskantha PS 765kV D/c line is already under

implementation as part of Green Energy Corridor scheme. Further Banaskantha PS

is also being interconnected to 765 kV Chittorgarh and 400 kV Sankhari (GETCO)

S/s as part of above transmission scheme. However, 400/220kV transformation level

at Bhuj PS was not taken up due to no LTA application at 220KV Bhuj PS.

Transmission System for Connectivity:

In view of project capacity, proximity of generation, following transmission system is

proposed for connectivity:

SESPL switchyard – Bhuj PS 220kV D/c line along with line bays at both ends (to

be constructed by SESPL in view of the short time line)

Installation of 2x500 MVA, 400/220kV ICT at Bhuj PS (to be implemented by

POWERGRID under Green Energy Corridor)

The connectivity of SESPL with the grid shall be established after the commissioning

of above system and Bhuj PS – Banaskantha PS – Chittorgarh PS 765 kV D/c

corridor including Banaskantha PS – Sankhari (GETCO) & Chittorgarh PS –

Chittorgarh (RVPN) 400 kV interconnections being implemented by POWERGRID

under Green Energy Corridor-ISTS scheme and expected to be commissioned by

July’18.

Transmission System for LTA:

Regarding power transfer under LTA within WR, it may be mentioned that existing

and planned transmission infrastructure shall be sufficient to enable dispersal of

power within WR.

Further, LTA for transfer of power to beneficiaries in NR is proposed to be granted

with commissioning of following transmission system (under implementation as part

of Green Energy Corridors):

Bhuj PS - Banaskantha PS 765kV D/c line

Banaskantha PS - Chittorgarh PS 765kV D/c line

Chittorgarh PS – Chittorgarh (RVPN) 400kV D/c (quad) line

11

Regarding grant of LTA for 60 MW power transfer to SR, it may be mentioned that

new interconnections between NEW grid and SR are under implementation and

accordingly power transfer capacity towards SR is envisaged to increase

progressively. Keeping in view the LTA applications received till date, it is proposed

to grant LTA for transfer of 60 MW power from SESPL to SR with progressive

enhancement of ATC with progressive commissioning of following links:

Wardha – Nizamabad 765 kV D/c line along with Nizambad – Dichpally 400 kV

D/c Line (HTLS)

Nizamabad – Hyderabad (Maheshwaram) 765kV D/c line along with associated

400 kV Transmission System.

Same shall also be taken up for approval in Southern Region Standing Committee

Meeting.

7. Connectivity Application of M/s Renew Power Ventures Pvt. Ltd. (4x100MW)

M/s Renew Power Ventures Pvt. Ltd. (RPVPL) has applied for grant of connectivity

received in Apr’16. Details of the application are as follows :

Table-8

S.No Description Details as per

submitted application

1 Installed Capacity of the Generating

station (Wind Power Plant)

400 MW

2 Capacity for which connectivity

required

400 MW

3 Commissioning Schedule 15/12/2017 : 100 MW

15/03/2018 : 100 MW

15/09/2018 : 100 MW

15/03/2019 : 100 MW

4 Date from which connectivity

required

15/12/2017

5 Location of the Generating station Bhuvad, Gandhidham,

Distt.– Kutch, gujarat

6 Nearest substations 765/400/220 kV Bhuj

Pooling S/s – 65 Km

400/220 kV Bhimasar

(Bhachau) S/s -45 Km

M/s Renew Power Ventures Pvt. Ltd. has indicated that they will step up voltage upto

220kV at their generating plant. Since it is a renewale generation project in Kutch

area, it is proposed to connect it to Bhuj PS which is being developed as part of

12

Green Energy Corridor and expected to get commissioned by July’18. Accordingly,

following transmission system is proposed for connectivity :

RPVPL switchyard – Bhuj PS 220kV D/c line along with associated line bays at

both ends (to be constructed by RPVPL in view of the short time line)

Installation of 2x500 MVA, 400/220kV transformer at Bhuj PS (to be implemented

by POWERGRID under Green Energy Corridor)

The connectivity of RPVPL with the grid shall be established after the commissioning

of above system and Bhuj PS – Banaskantha PS – Chittorgarh PS 765 kV D/c

corridor including Banaskantha PS – Sankhari (GETCO) & Chittorgarh PS –

Chittorgarh (RVPN) 400 kV interconnections being implemented by POWERGRID

under Green Energy Corridor-ISTS scheme and expected to be commissioned by

July’18.

8. Connectivity Application of Ostro Kutch Wind Pvt. Ltd.

M/s Ostro Kutch Wind Pvt. Ltd. (OKWPL) has applied for connectivity to the ISTS

system. Details of the application, received in Apr’16, are as follows :

Table-9

S.No Description Details as per

submitted application

1 Installed Capacity of the Generating

station (Wind Power Plant)

300 MW

2 Capacity for which connectivity

required

300 MW

4 Date from which connectivity required 31/03/2018

5 Location of the Generating station Kutch, Gujarat

6 Nearest substation 400/220 kV Bhachau S/s

(at distance of 5 km from

Ostro Kutch Wind power

plant)

Ostro Kutch Wind Pvt. Ltd. has indicated that they will step up voltage upto 220kV at

their generating plant. The generation project is located near Bhachau sub-station of

POWERGRID. Accordingly, following transmission system is proposed for

connectivity :

OKWPL switchyard - Bhachau 220kV D/c line along with associated line bays at

both ends (to be constructed by OKWPL in view of the short time line)

9. Connectivity & LTA application by Gujarat Power Corporation Limited (GPCL)

Ltd. for Radhanesda Solar Park (700 MW) in Banaskantha, Gujarat

13

An ultra-mega solar Power park of 700 MW capacity is being developed by M/s

Gujarat Power Corporation Limited, a Solar Power Park Developer (SPPD), in

Banaskantha district of Gujarat.

In line with the CERC regulatory requirement, MNRE has issued authorization to M/s

GPCL, a Solar power Park Developer (SPPD), to apply for Connectivity/LTA for its

700 MW Banaskantha Solar Park in Gujarat. MNRE also authorized SPPD to

undertake infrastructural activities including arrangement for connectivity on behalf of

the solar power generators in the park.

M/s GPCL vide letter dated 18.02.16 in-principally agreed to step up power upto

400kV at pooling station to set up within solar park. Subsequently, Connectivity &

LTA application for 700 MW has been made by M/s Gujarat Power Corporation Ltd.

Salient features of the application are as under:

Table-10

Sl. Particulars Application Details

1 Capacity for which connectivity is

required

700 MW

2 Date from which connectivity is

required

31.12.2017

3 Quantum for which LTA required 700 MW

4 Date from which LTA is required Dec 31, 2017

5 Date upto which LTA is required Dec 31, 2042

6 Location of Generating station Radhanesda, distt.

Banaskantha, Gujarat(WR)

7 Drawl of Power Gujarat:140MW;

WR:560MW

As part of Green Energy Corridor-Interstate Transmission scheme, 765/400 kV

Banaskantha(PG) PS along with Banaskantha PS - Chittorgarh (POWERGRID)

765kV D/c line & Banaskantha PS - Sankhari (GETCO) 400kV D/c line is under

implementation. Therefore, in order to evacuate and transfer power from above ultra

mega solar power park (700 MW), a 400kV D/c interconnection between Solar

Power Park and Banaskantha(PG) substation is proposed.

Study Results with above proposed transmission system is enclosed at Exhibits-6-

8. From the studies, it is observed that under n-1 contingency, loading on 400kV

14

Banaskanta – Sankhari D/c is critical. However with bypassing of LILO for Vadavi

(Ranchodpura) - Zerda (Kansari) line (at 400/220kV Sankhari (GETCO) substation),

loading is in order. However, the issue is proposed to be deliberated in the Standing

committee meeting of WR constituents.

In view of the above, following interstate transmission system for connectivity & LTA

is proposed :

Transmission System for Connectivity:

Banaskantha (Radhanesda) PS – Banaskantha (PG) PS 400 kV D/c along with 2

nos. 400 kV line bays at Banaskantha (PG) PS (to be implemented by POWERGRID).

2 nos. 400 kV line bays at Banaskantha (Radhanesda) PS for Banaskantha

(Radhanesda) PS – Banaskantha (PG) PS 400 kV D/c line (to be constructed by

GPCL)

The connectivity of Banaskantha (Radhanesda) PS with the grid shall be established

after the commissioning of above system and Bhuj PS – Banaskantha PS –

Chittorgarh PS 765 kV D/c corridor including Banaskantha PS – Sankhari (GETCO)

& Chittorgarh PS – Chittorgarh (RVPN) 400 kV interconnections being implemented

by POWERGRID under Green Energy Corridor-ISTS scheme and expected to be

commissioned by July’18.

Transmission System for LTA:

Regarding power transfer within WR, it may be mentioned that existing and planned

transmission infrastructure shall be sufficient to enable dispersal of power within WR.

10. Long Term Access application of M/s Essel Saurya Urja Company of

Rajasthan Ltd.

M/s Essel Saurya Urja Company of Rajasthan Ltd. located at Phalodi & Pokharan in

Rajasthan has been granted LTA in Standing Committee meeting of NR for 750 MW

out of which 400 MW is to be consumed within NR and 350 MW is to be transferred

from NR to WR.

Regarding power transfer from NR to WR, it may be mentioned that existing and

planned transmission infrastructure shall be sufficient to enable power transfer from

the generation project to WR and power shall flow by displacement to WR.

Accordingly, it is proposed to grant LTA for transfer of 350 MW from NR to WR .

11. Connectivity Application of Adani Green Energy Ltd. (AGEL) : 300 MW

The subject application was discussed in the 22nd LTA & Connectivity meeting of WR

constituents held on 30-11-2015 wherein connectivity of M/s AGEL to Sami (Adani) /

15

Banaskantha(PG) was proposed. M/s AGEL informed that Sami substation is around

15km from the project site whereas Banaskantha substation is more than 90km from

the project. Accordingly, it would be preferable to connect to Sami (Adani) substation

which is further connected to Dehgam S/s. M/s AGEL was requested to confirm

about availability of land for development of 220kV level at Sami Switching Station.

Subsequently, AGEL vide its letter ref: AGEL/PG/02022016 dated 02.02.2016 has

informed that land is available at the Sami Switching Station for termination of 220kV

line and installation of one no. 400/220kV ICT.

As per extant planning criteria, The ‘N-1’ criteria may not be applied to the immediate

connectivity of wind/solar farms with the ISTS/Intra-STS grid. Hence, following

system is proposed for connectivity of the Solar power project with ISTS:

AGEL - Sami (Adani) 220 kV D/c line

1x500 MVA, 400/220 kV ICT at Sami (Adani) substation

In view of the short time line, it is proposed that AGEL shall construct the above

transmission system.

Members may discuss.

12. Request for enhancement in quantum of Connectivity granted to Surguja

Power Private Limited (SPPL) for 4x150 MW power plant from 490MW to

550MW

M/s Surguja Power Private Limited vide our letter no. C/CTU-

Plg/ConlW/2015/01/Surjuga dated 07-05-2015 has been granted connectivity for 490

MW through following transmission system to be implemented by generation

developer :

SPPL Switchyard - Dharamjaygarh 400kV D/c line

1x125 MVAR 420 kV bus reactor at SPPL switchyard

Subsequently, SPPL vide letter letter no. SPPUPG/161220 15/002 dated 16.12.2015

has requested for enhancement in quantum of connectivity from 490 MW granted

vide intimation letter dated 07.05.15 to 550 MW. Since the connectivity line has

adequate capacity to cater to the proposed connectivity quantum (550MW), it is

proposed to enhance the connectivity quantum from 490 MW to 550 MW with the

above mentioned system to be implemented by generation developer.

13. Revision in the LTA quantum of Chhattisgarh State Power Trading Company

Ltd. (CSPTrdCL).

16

The matter was discussed in the 21st and 22nd LTA meetings held on 17-07-2015

and 30-11-2015 wherein CTU stated that if CSPTrdCL reduces the quantum of

power availed from various generation projects, relinquishment charges in line with

CERC regulations will apply and the same shall be incident on CSPTrdCL. In this

regard, CSPTrdCL vide email dated 28-11-2015 has intimated that they have

decided to file a petition in CERC. However, it is understood that CSPTrdCL is yet to

file the petition in the CERC.

CSPTrdCL may update in this regard.

14. Closure of LTA Application of Heavy Water Board for 17 MW drawal from

440MW Kakrapar Atomic Power station (KAPS) in Gujarat

LTA was granted to Heavy Water Board (HWB) vide our letter dated 19-12-2012 for

transfer 17 MW from Kakrapar Atomic Power station in Gujarat to Heavy Water

Board’s load at Thal in Maharashtra. However, HWB is yet to sign the Long term

Access Agreement with POWERGRID and is also not attending Joint Coordination

Committee meetings of WR. In view of the above, it is proposed to close the subject

LTA application.

15. Closure of Connectivity and LTA Application of Pipavav Energy Pvt. Ltd.

Connectivity as well as LTA for 1200MW was granted to M/s Pipavav Energy Pvt.

Ltd. (PEPL) vide intimations dated 14th September, 2010. Connectivity was granted

with Pipavav TPS – Pirana 400kV D/c (triple) line. LTA was granted for 1200MW with

following target beneficiaries: WR: 550MW, NR: 290MW and ER: 360MW. However,

the PEPL is yet to sign requisite commercial agreements. PEPL is also not attending

the JCC meetings and no progress has been reported till date. Hence, it is proposed

to close the Connectivity and LTA applications of M/s Pipavav Energy Private Ltd.

60002754
Text Box
EXHIBIT - 1
60002754
Text Box
EXHIBIT-2
60002754
Text Box
EXHIBIT - 3
60002754
Text Box
EXHIBIT-4

NTPC BARETHI TRANSMISSION SYSTEM

Diagram created using'V:\CTU-Common\Year-wise files upto 2018\2018-19 File\UPDATED 2018-19 File\Barethi TPS Studies\All India 2018-19 Peak File_NR-27000MW_Low RE-with HVDC-With Chhatarpur.sav''V:\CTU-Common\Year-wise files upto 2018\2018-19 File\UPDATED 2018-19 File\Barethi TPS Studies\Barethi Trn Sys SLD.sld'

Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar

kV: >0.000 <=66.000 <=132.000 <=220.000 <=400.000 <=765.000

BASE-W/O BARETHI STPS & ASSOC SYSTEM

BARETHI

1.0765

ORAI

1.0796

1

2

3

4

ALIGARH

1.0794

JABALPR-POOL

1.0796

1116

89

1116

89

1229

50

1229

50

GWALIOR

1.0790

SATNA

1.0786

508

128

1382

120

10

253

1.0776

10

247

BINA-PG

1.0791

SASAN

1.0778

VIN-POOL

1.0779

820

124

814

126

1122

159

1136

166

995

162

995

162

1045

45

1045

45

876

37

1129

68

1129

68

1129

68

10

256

1333

716

1001

543

10

248

886

284

886

284

3776

990

GADARWARA ST

1.1804

BHOPAL_STER

1.0801

DHARAMJAIGAR

1.0766

DHRAM_SPL

1.0779

185

347

185

347

1212

107

1090

391

1090

391

877

343

877

343

1801

200L

2801

200L

10

331

20

331

10

342

SEONI7

1.0793

INDORE

1.0802

610

83

887

209

823

93

10

264

1433

87

BAREILLY

JAIPURR

1.1806

AGRA-PG

1.0781

970

117

1036

121

1182

261

1191

261

10

266

20

266

B10

225

B20

225

ORAI

1.0415

550

8

550

8

SATNA

1.0405

112

127

112

127

SASAN

1.0401

414

100

414

100

JABALPR-POOL

1.0410

320

204

320

204

BINA-PG

1.0411

455

33

455

33

GWALIOR4

1.0410

465

74

465

74

1

60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Text Box
EXHIBIT - 5(a) - BASE CASE

NTPC BARETHI TRANSMISSION SYSTEM

Diagram created using'V:\CTU-Common\Year-wise files upto 2018\2018-19 File\UPDATED 2018-19 File\Barethi TPS Studies\All India 2018-19 Peak File_NR-27000MW_Low RE-with HVDC-With Chhatarpur.sav''V:\CTU-Common\Year-wise files upto 2018\2018-19 File\UPDATED 2018-19 File\Barethi TPS Studies\Barethi Trn Sys SLD.sld'

Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar

kV: >0.000 <=66.000 <=132.000 <=220.000 <=400.000 <=765.000

BARETHI

1.0798

ORAI

1.0797

1254

216 1

254 216

1594

165L

2594

165L

3594

165L

4594

165L

ALIGARH

1.0798

JABALPR-POOL

1.0800

1063

117

1063

117

1097

3

1097

3

GWALIOR

1.0797

SATNA

1.0790

1370

183

1528

127

568

228

1264

72

10

256

1.0788

1103

132

1103 132

10

255

BINA-PG

1.0796

SASAN

1.0780

VIN-POOL

1.0782

811

140

805

142

1114

171

1128

177

987

155

987

155

995

35

995

35

835

28

1037

76

1037

76

1037

76

10

260

1343

718

1009

544

10

250

903

294

903

294

3776

990

GADARWARA ST

1.1807

BHOPAL_STER

1.1805

DHARAMJAIGAR

1.0767

DHRAM_SPL

1.0779

141

337

141

337

1203

113

1024

422

1024

422

761

376

761

376

1801

200L

2801

200L

10

332

20

332

10

342

SEONI7

1.0795

INDORE

1.1805

527

69

910

199

815

89

10

266

BAREILLY

JAIPURR

1.1810

AGRA-PG

1.0785

907

84

969

86

1104

335

1113

335

10

269

20

269

B10

227

B20

227

ORAI

1.0416

525

4

525

4

SATNA

1.0406

101

141

101

141

SASAN

1.0402

414

116

414

116

JABALPR-POOL

1.0411

316

217

316

217

BINA-PG

1.0414

464

41

464

41

GWALIOR4

1.0414

469

77

469

77

1

60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Highlight
60002754
Text Box
EXHIBIT - 5(b) WITH BARETHI STPS

826.9

392.3 388.3

826.9

392.3

783.6

388.3

To Pirana

To Nagda

To Wanakbori

To Limdi

To Sanand

To Halvad

783.6

To Chittorgarh

To Hadala

To Kankroli

To Bhinmal

To Gandhar

To Sami

To Sami

To Jetpur

To Jangral

To Deodhar

To Mohindergarh

EXHIBIT-

n-1:561 MW

Transmission System for Banaskanta Solar Park

(Without Banaskanta Solar Park)

154.1

55.7

154.5

5.1 279.7

43.7

77.7

24.2 312.5

100.6

109.0

3.0

207.3

60.3

159.2

9.5

1

313.0

43.6

313.0

53.111

354015MUNDRA4

236.5

96.6

3168.0

243.7

480.0

0.0

354003DEHGM4

341.2

91.4

337.3

0.3

507.1

27.9

118.5

41.9

546.3

63.4

549.6

65.5

30.6

31.6

30.6

31.6 20.2

453.3

20.2

252.3

84.0

354005SOJA4

31.5

4.3

37.0

78.8

301.6

66.2

301.6

66.2

349.8

40.5

346.6

18.3

17.5

90.1

17.5

90.1

31.5

4.3

36.9

56.4

415.0

38.9

415.0

38.9

370.8

34.1

1

238.3

61.7

169.7

70.0

178.2

71.2

238.0

64.4

16.6

38.1

137.9

250.8

121.5

533.6

116.0

188.2

22.2354137SANKHARI

349.8

6.7

356.3

109.7

43.9

354140CHARANKA SOL

208.2

354024BACHAU

354023CGPL

493.6

108.4

496.6

43.1

392.1

34.3

394.5

85.2

3200.0

228.9

377.2

10.5

377.2

10.5

135.9

33.5

11

390.4

28.3

390.4

43.111

331.7

24.4

330.4

70.3

354135BHUJ POOL

137.9

237.0

453.3

354017RANCHDP4

354136BANASKANTHA

354019ZERDA

354040BANASKANT PS

S

354025VERSANA

313.0

358136BANASKANTHA

76.4

98.8

76.3

86.2

12.7

390.3

358135BHUJ POOL

125.1

389.5

11

170.8

20.4

170.8

8.811

11

164.2

40.3

11

164.2

40.3

114.3

11

574.1

7.0

226.1

3.111

110.1

0.111

225.6

17.6

11

148.4

25.3

11

148.4

25.3

2.9

352141CHARANAKA

150.2

75.3

8.5

17.6

1

60002754
Text Box
6

826.9

392.3 388.1

826.9

392.3

783.6

388.1

To Pirana

To Nagda

To Wanakbori

To Limdi

To Sanand

To Halvad

783.6

To Chittorgarh

To Hadala

To Kankroli

To Bhinmal

To Gandhar

To Sami

To Sami

To Jetpur

To Jangral

To Deodhar

To Mohindergarh

Transmission System for Banaskanta Solar Park

(Solar Maximised Scenerio)

With proposed System

EXHIBIT-II

n-1:894 MW

107.1

57.4

107.3

4.0 384.8

46.1

167.6

22.3 496.3

89.5

90.2

3.9

227.8

59.4

184.0

7.3

1

149.6

59.0

149.6

61.411

354015MUNDRA4

216.1

99.6

3168.0

251.2

480.0

0.0

354003DEHGM4

345.7

90.4

341.7

0.3

510.8

28.6

139.2

41.1

592.2

70.5

596.1

66.2

45.5

31.5

45.5

31.5 17.4

466.7

17.4

255.8

82.1

354005SOJA4

46.4

7.1

64.8

78.5

329.0

68.9

329.0

68.9

359.8

41.2

356.4

15.3

41.2

93.2

41.2

93.2

46.4

7.1

64.7

56.4

434.7

39.4

434.7

39.4

405.8

36.3

1

210.2

66.3

168.0

68.2

176.4

69.3

245.1

63.3

16.2

34.7

136.3

250.8

121.5

492.6

105.1

155.8

23.9354137SANKHARI

359.8

8.3

366.7

107.2

40.4

354140CHARANKA SOL

228.9

354024BACHAU

354023CGPL

504.4

108.0

507.6

40.8

400.7

33.9

403.2

83.4

3200.0

234.1

383.5

8.0

383.5

8.0

142.0

33.2

11

364.5

23.8

364.5

36.511

305.7

15.1

304.5

64.0

354135BHUJ POOL

136.3

244.1

466.7

348.0

27.6

350.0

0.0

354017RANCHDP4

354136BANASKANTHA

700.0

0.0H

354019ZERDA

354040BANASKANT PS

S

354025VERSANA

497.6

358136BANASKANTHA

214.1

86.0

213.8

94.6

10.9

364.4

358135BHUJ POOL

130.3

363.8

11

170.3

19.6

170.3

8.111

11

161.9

39.5

11

161.9

39.5

115.1

11

651.4

19.9

225.2

3.611

110.1

0.111

230.8

17.7

11

138.1

23.9

11

138.1

23.9

3.1

352141CHARANAKA

154.8

76.1

8.4

17.7

1

60002754
Text Box
7

826.9

392.3 388.1

826.9

392.3

783.6

388.1

To Pirana

To Nagda

To Wanakbori

To Limdi

To Sanand

To Halvad

783.6

To Chittorgarh

To Hadala

To Kankroli

To Bhinmal

To Gandhar

To Sami

To Sami

To Jetpur

To Jangral

To Deodhar

To Mohindergarh

EXHIBIT-III

Transmission System for Banaskanta Solar Park

(Solar Maximised Scenerio)

Exhibit-II+Bypassing of ZERDA-Ranchodpura at Shankari

n-1:735 MW

7.8

77.5

7.7

22.5

401.0

67.7

73.0

7.5

316.0

37.9

171.8

6.7

171.8

6.7

1

53.9

43.7

53.9

44.111

354015MUNDRA4

198.2

96.0

3168.0

261.0

480.0

0.0

354003DEHGM4

362.4

90.3

358.0

6.0

536.6

37.6

110.2

35.8

559.4

64.0

562.9

64.3

24.2

27.4

24.2

27.4 17.3

476.6

17.3

262.4

81.0

354005SOJA4

41.5

6.2

64.9

78.3

321.7

67.5

321.7

67.5

365.2

42.5

361.6

12.9

35.0

92.2

35.0

92.2

41.5

6.2

64.8

56.2

429.8

38.9

429.8

38.9

380.3

31.8

1

184.9

61.6

167.9

66.1

176.3

67.2

255.6

63.8

17.7

33.7

136.8

250.8

121.5

523.6

115.1

183.0

24.4354137SANKHARI

365.2

10.1

372.2

106.7

39.4

354140CHARANKA SOL

318.0

354024BACHAU

354023CGPL

521.6

108.5

525.0

38.4

414.4

34.4

417.0

81.4

3200.0

220.5

389.4

6.3

389.4

6.3

146.9

33.8

11

327.8

30.3

327.8

40.711

268.6

15.8

267.8

68.1

354135BHUJ POOL

136.9

254.5

476.6

348.0

27.2

350.0

0.0

354017RANCHDP4

354136BANASKANTHA

700.0

0.0H

354019ZERDA

354040BANASKANT PS

S

354025VERSANA

401.8

358136BANASKANTHA

273.2

91.0

272.8

85.6

20.8

327.7

358135BHUJ POOL

123.6

327.2

11

155.9

20.7

155.9

11.011

11

157.9

39.9

11

157.9

39.9

115.2

11

786.4

19.7

202.6

9.011

110.1

0.111

240.1

17.6

11

125.3

26.0

11

125.3

26.0

2.0

352141CHARANAKA

164.9

75.2

8.0

17.6

1

60002754
Text Box
8