Introduction
MIR Engineering and Technology Management
Company was founded in 2004 as a fully owned
subsidiary of Monenco Iran Consulting Engineers in
response to a void in the Iranian energy market to
target
needs and opportunities that Monenco Iran could not
pursue on its own. Accordingly, it is vital for MIR Co. to
provide Monenco’s clients with the best quality of
services and keep them satisfied. Overtime though,
the company has evolved in a full-service solution
provider rendering services to many other companies
other than Monenco’s clients due to expansions of its
activities and capabilities.
Experienced qualified personnel and using modern
systems led Mir Co. to provide high quality services in
the field of energy. Moreover, by having well known
shareholders (such as Monenco), MIR was able to hold
professional training courses and seminars which
caused the company to grow widely in the field of
energy.
Monenco was successful to expand its services in
international market especially in Middle East, south
East Asia, Africa as well as CIS countries due to its
capabilities and Know How Transfer through its
representatives offices in Oman (Monenco Oman) and
Nigeria (Monenco Nigeria).
MIR Engineering Management and Technology
Company renders services in the following fields:
Information and Communication Technology
General and Professional Training Services
E-learning Services
Energy Consumption Management in the Buildings
Management Consultancy
3 Introduction to MIR Company
a) Information and Communication
Technology
In recent Years, ICT is an integral part of all
activities of organizations; especially many
projects that start in power generation industry.
Due to its experience in the field of information
and communication technology and with regard to
the full knowledge of the power industry, MIR
Company has entered to this market.
MIR has managed to provide services in
consultation, design and implementation of
several projects in this field as follows:
Document management system
Document control system
Document control dashboard
Software consultancy services
b) Training Services Teaching and learning are the most important
tools in any organizational development, MIR has
been sensitive to these subjects, so has provided
the following services :
Research & Development on new
teaching methods Creating training courses with E-learning
methods
Providing ICT-based training courses and
E-learning
Equipped with well-experienced teachers
Providing appropriate training space
Providing advanced equipment for
MIR uses the latest modern practices and
specialized training,
MIR uses its experiences in deploying software systems so that could
play a role in successful
conduct of various projects.
4 Introduction to MIR Company
Some of the courses held
scientific and practical courses
Providing valid training certificate
Some training courses held by the company in the different areas are as follows :
Instrumentation and Control
PLC – S7(300)
Win CC
Profibus, Modbus, Eternet)industrial networks)
PLC – S7(400)
PCS7
PLC400H
PLC400FH
PLC AllenBradley
Oil & Gas
PDMS
AVEVA P&ID
Building Energy Modeling
Design Builder software
Management
Management of meetings
Stress Management
Fainancial Management for non-Financial Managers
5 Introduction to MIR Company
eLearning
Energy Saving Consulting
Management of Organizational Behavior
Time Management
Effective writing emails (in English) Marketing Basics 5S Workplace Organization
Methodology
c) eLearning Services In view of potential of eLearning, it was
decided to hold training courses based on
eLearning methodology in MIR Company.
For this purpose ,in several training
courses eLearning technologies and
concepts were employed as follows:
Two Training courses for newly recruited in some organizations
An HSE course for supervisors in EPC projects
d) Energy Saving Consulting
Buildings are the largest energy consuming sector in any country. Iran is a country where about %40 percent of the total energy is consumed in buildings. MIR company provides building energy modeling and management consultancy services for Design, Implementation and Commissioning phase by taking advantage of Advance Techniques.
Energy Simulation in buildings
6 Introduction to MIR Company
Management Consultancy
MIR Clients
Examining and reporting of annual energy consumption reports of buildings
Analysis of energy simulation results and provide energy saving solutions
Building parametric optimization to reduce annual energy consumption
Energy audit of buildings under operation
Building management system (BMS) consultancy
e) Management Consultancy services
MIR Engineering and Technology Management has been successful to implement variety of projects by assistant of his executive team in the following area
Designing Strategic Plan
Designing ICT Master plans in various areas of industry
Designing Business Plan
MIR Clients
Monenco Iran Consulting Engineers Company
Tehran Construction Engineering Organization
Kharazmi Information Technology Development Company
Modje Niroo Company
Tavanir Company, Iran Power Generation,
7 Introduction to MIR Company
Transmission And Distribution Management Company
Tehran Milad Tower Company
Iran Power Development Center(IPDC)
Sistan & Balouchestan Electric Power Distribution Company
Ilam, Electrical Power Distribution Company
Ehia Frayand Company
Isfahan’s Mobarakeh Steel Company
Mapna Group Companies:
o Touga
o Meco
o Mapna Boiler
o Pars
Oil And Gas Companies:
o Iranian Offshore Oil Company (IOOC)
o Gachsaran Oil and Gas Production Company
o Parsian Gas Refining Company
o Iranian Gas Transmission Company
Power Plants:
o Kerman Power Generation Management Company
o Shahid Rajaee Power Plant
o Montazer Ghaem Power Plant
Agricultural Companies
o Dehkhoda Agro Industry. Inc
8 Introduction to MIR Company
General Agreement on Energy Saving in
Buildings
Title: General Agreement on Energy Saving in Buildings
Start Date: August 1, 2015
End Date: August 1, 2016
Client: Tehran Construction Engineering Organization
Location: Tehran Construction Engineering Organization and MIR
Company
Abstract:
The main purpose of cooperation between the Tehran Construction
Engineering Organization and MIR is reducing energy consumption
in largest energy consuming sectors specifically buildings. In order
to pursue such a goal, it is quite necessary to design and implement
a set of short and long term plans. Considering Realities and current
facilities is one of the main principles of designing any plan. The
design phase of control systems as the first phase of the project
should be started from Governmental building like most
commercials, complexes, educational, hospitals, hotels, etc. During
goal setting, levels of energy use intensity (kWh/m2) should be
considered. In order to achieve the aforementioned goal, practical
solutions should be designed; next, based on suggested solutions,
an executive program should be designed and implemented in
collaboration with Tehran Construction Engineering Organization.
Agreement Provisions:
Training
Research Based Projects
Design executive regulations of energy control and
management in buildings
Energy auditing of building
9 Introduction to MIR Company
Provide Engineering and Design Services for the National Training
Center of Building Energy Management in
Research and Educational Complex,
Khorasan
Title: Provide Engineering and Design Services for the National
Training Center of Building Energy Management in Research and
Educational Complex, Khorasan
Start Date: January 20, 2016
End Date: May 20, 2016
Clients: Central Office of Energy Efficiency and Monenco Iran
Consulting Engineers Company
Location: Laboratory Buildings of Research and Educational
Complex, Khorasan
Abstract:
Energy use management is one of the main concerns of the
Ministry of Energy of Iran. To this end, the Ministry aims to
design, build and equip a laboratory to train engineers and experts
in this field. MIR Co. in the current project seeks to conduct basic
and detail design and consulting services of the energy
management laboratory buildings.
Items of contract:
Apply standards and technical principles
Design and provide sustainability reports
Provide practical report
Provide preliminary list of all required documents
Analyze Data
Provide basic architectural plans
Provide technical specification for different parts of
project
Provide Maps and calculations
Provide cost analysis for each tender
Status: On-going
10 Introduction to MIR Company
Codification of Strategic Plan for Modje Niroo Company
Title: Design Strategic Plan Start Date: May 10, 2014 End Date: September 11, 2014 Client: Modje Niroo Company Location: Tehran
Abstract: This project started based on a contract between MIR and Modje Niroo The project scope involved defining and determining role of senior managers of Modje Niroo Company in organizational tasks. In this context, the main concerns of the employers have been discussed, next, a thorough analysis of current state and ideal state of company has been done.
The phases of Modje Niroo project are as follows: Phase 1:
Identify stakeholders Identify mission, vision, values and long-term goals of
company
Analysis of External factors affecting the company's activities
Analysis of Internal factors affecting the company's activities
Phase 2: Determine Company’s strategies based on consideration of
internal and external factors Prioritization of strategies Identify strategic actions
Phase 3: Strategic plan formulation(5 year) Deliver final reports
Phase 4: Presenting results
Revise of final Reports
Status: Completed
11 Introduction to MIR Company
Codification of Strategic Plan for Kharazmi Company
Title: Designing Strategic Plan
Start Date: August 23, 2015 End Date: December 22, 2015 Client: Kharazmi Information Technology Development Company
Location: Tehran
Abstract: The project started based on a contract between Kharazmi and MIR, The scope of Kharazmi’s activities includes Consultancy Services, Network Design, Bank Facilities, Software and Solutions like technical plan for optimum use of hardware facilities. Fast development of information technology and vast usage of it in all aspects, require organizations particularly Kharazmi Information Technology Development Company to make the best decisions and strategies in order to survive in today’s competitive environment.
Items of contract:
Designing Strategic Plan for Kharazmi Company
Determine and analyze the current state of the kharazmi - Identifying stakeholders - CSF matrix
- Analysis of external factors affecting the company's activities based on PESTEL model
- Analysis of internal factors affecting the company's activities based on PORTER model
- Strategic Positioning for Kharazmi - Determine and analyze the ideal state of Kharazmi Company
, Mission Statement - Vision
- Values
- Determine strategies based on BCG model - Determine Strategy map based on BSC(Balanced Score Card) - Setting main goals based on BSC (Balanced Score Card) - Determine Top Chart - Define KPI’s
- Define Strategic actions Deliver reports
Status: on going
12 Introduction to MIR Company
Strategic Plan Update
Behpak Industrial Co.
Title: Strategic Plan Update
Start Date: April 14, 2016
End Date: Sep 5, 2016
Client: Behpak Industrial Co.
Location: Tehran and Mazandaran Province
Abstract: This project started based on a contract between MIR and Behpak
Industrial Co.. According to article 2 of Statute, main activities of
of Behpak Industrial Co. lies in establishing textile factories, oil-
extracting and vegetable protein as well as production, trade,
investment, exports, imports and related deals.
Food industry propagation, diversity in taste, increasing number of
domestic and foreign competitors cause Behpack Co. to make the
right decisions and policies to survive in today's fast-paced
and competitive environments .
Items of contract:
Strategic plan Update includes the following items:
Determine and analyze the current state of Behpak Co.
‐ Identifying stakeholders
‐ Analysis of external factors affecting the company's activities
based on PESTEL model
‐ Analysis of internal factors affecting the company's activities
based on PORTER model
Strategic SWOT Update
‐ Determine and analyze the ideal state of Behpak Co.
‐Revise mission statement
‐ Revise vision
‐Revise values of Company
‐Determine strategies based on BCG model
‐Revise major strategies
‐Define Strategy map based on BSC (Balanced Score Card)
‐Setting major goals based on BSC(Balanced Score Card)
‐ Define Strategic actions
Deliver reports
Final revise of all documents
Status: Ongoing
13 Introduction to MIR Company
Strategic Plan Update Monenco Iran
Consulting Engineers Company
Title: Strategic Plan Update
Start Date: October 22, 2012 End Date: September 23, 2013
Client: Monenco Iran Consulting Engineers Company
Location: Tehran
Abstract: Due to the end of the strategic planning period for Monenco Company in
2011 ،this project aimed to revise and update the Strategic Plan of the
company. In this project we had a thorough study on the strategic plan of Co.
, next, analysis on the internal and external factors on all range of activities
of Co. has been done. Therefore, based upon Balance Score Cart (BSC), all
measurable values of company in terms of Key Performance Indicators
(KPI’s) along with strategic plan of Co. has been defined and documented.
It is notable that Monenco Company is activate in the fields of design,
engineering and consulting services in power generation, power transmission
and distribution , oil and gas industry, SCADA, Dispatching, communication
and telecommunication .
Items of contract: Strategic plan Update includes the following items:
Determine and analyze the current state of Monenco Co.
- Identifying stakeholders
- Competitors Analysis
- Analysis of external factors affecting the company's activities
based on PESTEL model
- Analysis of internal factors affecting the company's activities
based on PORTER model
Strategic Positioning for Monenco Co. - Determine and analyze the ideal state of Monenco Co.
Revise mission statement - Revise vision - Revise values of Company Determine and define major
strategies - Define Strategy map based on BSC (Balanced Score Card)
- Setting major goals based on BSC(Balanced Score Card)
- Define Strategic actions - Define KPI’s
Status: Completed Strategic Plan of Monenco Co. has been finalized in Oct 2013 and a roadmap
for its implementations has been adopted. In this regard, a coordinating
committee of the Strategic Plan is in charge of monitoring company’s
activities based on defined Startegic Plan.
14 Introduction to MIR Company
Design Strategic Road-Map for Dispatching
and Telecommunication
Deputy
Title: Design Strategic Road-Map for Dispatching and
Telecommunication Deputy
Start Date: September 6, 2015
End Date: December 6, 2015
Client: Dispatching and Telecommunication Deputy of Monenco Iran
Consulting Engineers Company
Location: Tehran
Abstract:
Dispatching and Telecommunication Deputy of Monenco Co., one of the
recently established Deputy in the company, considering the high
dependency of such industry on Information Technology and
Telecommunication planned to have strategic plan and road-map. In this
regard, MIR Co. is in charge of design and defining strategic documents for
this Deputy.
Items of contract:
Determine and analyze the current state of Dispatching and
Telecommunication Deputy
- Identifying stakeholders
- Competitors Analysis
- Analysis of external factors affecting the company's activities
based on PESTEL model
- Analysis of internal factors affecting the company's activities
based on PORTER model
- Strategic Positioning for the Deputy Determine and analyze the ideal state of of Dispatching and
Telecommunication Deputy
- Revise mission statement
- Revise vision
- Determine and define values of Deputy
- Determine and define major strategies
- Define Strategy map based on BSC (Balanced Score Card)
- Setting major goals based on BSC (Balanced Score Card)
- Define Strategic actions
- Define KPI’s
Status: Completed
15 Introduction to MIR Company
in Consultationconducting two-stages auction of contractor selection for Milad Telecommunication
Towers (+284 meters)
Title : Consultation in conducting two-stage auction of contractor selection for Milad Telecommunication Towers (+284 meters) Start Date : Tuesday, May 7, 2013
End Date : Saturday, March 8, 2014
Client: Milad Tower Company
Location: Tehran, Milad Tower
Abstract: The current project defined and started between Milad Tower Company, Monenco Co. and MIR Co. In order to gain interest of the Telecommunication Tower (+284 meters), the scope of project and business plan was determined and defined at the first. In this regard, the main needs based on the employer’s view are rendered as Follows:
Analyze status, telecommunication usage and data transmission of Milad Telecommunication Tower (plus 284 meters)
Draw a comparison between 5 world Telecommunication Towors at least and Milad Telecommunication Tower
Analyze market potential and demand for Milad Telecommunication Tower Providing different alternatives for economical and beneficial usage of Milad
Telecommunication Tower Presenting economic studies results about usage of Milad
Telecommunication Tower(+284 meters) Providing business plan and financial model of various usage alternatives to
Milad Telecommunication Tower Providing risk studies about various usage alternatives to Milad
Telecommunication Tower
After accomplishing economical studies of the project, the contract was signed.
Items of contract:
Providing auctions documents (qualitative and quantitative) to Milad Tower Co. Answering auction participants’ questions (orally or written) Qualitative analyze of auction documents and providing a list for second step of
call Delivering RFP (Request For Proposal) documents to considerable auction
participants Quantitative analyze of offered documents and selection of contractor Presenting legitimate auction documents along with written report to the
employer Status: Complete After accomplishing preliminary studies of the world Telecommuinication Towers and Milad Telecommunication Tower, the following actions were performed:
Providing business plan and financial model of various usage alternatives to Milad
Telecommunication Tower (+284 meters)
Providing auction RFP (Request for Proposal) documents Providing auction invitation call Qualitative analyze of the auction participantsProviding an invitation list for
second step of call Quantitative analyze of the offered auction documents Selection of contractor for Milad Tower Co. Defining Strategic actions Delivering reports Final revise of documents
16 Introduction to MIR Company
Document Archive System
Title: Document Archive System Start Date: May 26, 2013 End Date: February 19, 2014 Client: Iran Power Development Center (IPDC) Location: Tehran
Abstract:
Following interactions within Iran Power Development Center (IPDC) and MIR Company, the project has been defined and started between IPDC and MIR Company. Archive center of IPDC has millions of project documents in hard copy which have been produced during the past 40 years. For the first step, all those documents should be organized and converted into electronic version. In this regard, the main needs based on the employer’s view are rendered as follows:
Determine and analyze the current state of company Design and analyze of Document Archive System
After making contract and delivering feasibility studies, using Sharepoint Software in this project has been offered by the employer.
Items of contract
Determine and analyze the current state of company Scan hard copy documents(about 200,000 papers) Design and analyze of Document Archive System Produce the System
Status: Completed
Determine and analyze the current state of Co. and delivering related documents
Scan 200,000 hard copy documents Customize SharePoint Software Import all data into the System
17 Introduction to MIR Company
The feasibility studies of automating monitoring system of private power
plants in Iran Title: The feasibility studies of automating monitoring system of private power plants in Iran
Start Date: May 21, 2012 End Date: October 22, 2012 Client: Tavanir Company Location: Tehran
Items of contract:
Studying all documents including contracts, forms and regulations also the provisions dealing with energy under different conditions (including or excluding fuel price)
Visit the sample power plant and study current used methods in monitoring centers
Study similar projects in other countries and gather information about all used hardware and software equipment
Data acquisition and analysis Categorize and prioritize the data based on the
importance and accuracy level Study current methods of calculation and determination
of permissible error of each parameter according to contracts and regulations
Study encouragement and punishment methods according to contracts
Determine different types of data required for the power plant or monitoring center
Determine and identify different methods of data acquisition rather than electricity industry
Study flexibility of such a plan due to possible changes in the contracts or annexes.
Provide a comprehensive plan for automating monitoring system of power plants
Status: Completed
18 Introduction to MIR Company
Design, Analysis, Implementing and
Deployment Interoperability
infrastructure among Systems in the National
Smart Metering Program in Iran (Called Faham)
based on IEC61968
Iran Energy Efficiency Organization
(SABA)
Title: Design, Analysis, Implementing and Deployment
Interoperability infrastructure among Systems in the National Smart
Metering Program in Iran (Called Faham) based on IEC61968
Start Date: January 21, 2015
End Date : April 21, 2015
Client: Monenco Iran Consulting Engineers Company and Iran Energy Efficiency Organization (SABA) Location: Tehran
Abstract:
The National Smart Metering Program in Iran (Faham project) is one of the big infrastructure projects of Ministry of Energy. Loss reduction of power distribution network, both technical and non-technical are as the main feature and goal of the project. Management of the interoperability among different existing systems in Smart Grid sound necessary due to number of different systems from variety of venders.
The major reference which have been considered as the basis of Interoperability Management among different systems at the project is IEC61968 Standard. Another words, deploying Interoperability infrastructure provides an effective and efficient data exchange as well as stable and standard data portability among variety of systems in National Smart Metering Program.
Items of contract:
Provide consulting services on different methods of deploying interoperability strategies between systems
Provide consulting services on choosing the best method for implementing and deployment interoperability infrastructure
Provide consulting services on testing interoperability methods among variety of systems as well as implementation of it.
Status: Ongoing
19 Introduction to MIR Company
Assignment Name: Develop a Strategic plan for Behshahr
Zarrin Company
Start date:
End date:
Name of Client: Behshahr Zarrin Company
Location: Tehran, Mazandaran
Description of contract services:
Stakeholder analysis
Develop vision statement
Define External Factors Evaluation Matrix (EFE)
Define Competitive Profile Matrix (CPM)
Define Internal Factor Evaluation Matrix (IFE)
Define Threats, Opportunities, Weaknesses and Strengths
Matrix (SWOT)
Define Strategic Position and Action Evaluation Matrix
(SPACE)
Define Boston Consulting Group matrix ( BCG)
Define Internal and External Matrix (IE)
Define Core Strategy Matrix
Define Quantitative Strategic Planning Matrix (QSPM)
Identify the Balanced Score Card Model aspects and define
the causal relationship between them
Identify Key Success Factors (CSF) in each aspect of the
Balanced Score Card Model
Define the strategic objectives for each model aspect based
on the company's defined vision and strategies
Specify supervisor and responsible person for each of the
strategic goals of the company
Draw a strategic map
Define possible indicators for each of the defined strategic
objectives
Develop a Strategic plan
for Behshahr Zarrin
Company
20 Introduction to MIR Company
Define red (critical), yellow (normal) and green (ideal) areas
for all indicators
Participate in improvement plans of identified key indicators
in different areas
Determine the timetable and budget needed to implement
improvement projects
Determine monitoring levels and revision periods
Advice on selecting an appropriate software for the BSC
model
Measure the extent to which the organization goals are
realized
Measure the extent to which the deputies goals are
realized
Adaptation of ongoing activities to program standards
Quantitative Monitoring of activities with the Gantt
chart tool and controlling it
Adaptation of results to program objectives and , if
necessary, corrective actions in terms of structure
components
Adaptation of results to program objectives and , if
necessary, corrective actions in terms of system
components
Adaptation of results to program objectives and , if
necessary, corrective actions in terms of behavioral
components
Assignment Status: Ongoing
21 Introduction to MIR Company
Title: Design and implementation of E-learning course for newly hired staff of Monenco Co. Start Date: May 22, 2015
End Date: October 23, 2015 Client: Monenco Iran Consulting Engineers Company Location: Tehran
Abstract: Effective continuous training and learning is one of the main concerns of different types of managers in any organization. Many plans have been forming for training personnel. Lack of efficiency and effectiveness of such training courses makes a serious challenge in organization. Using modern technology tools in training guarantee to meet objectives and produce a final product which is pretty qualified and cost-effective.
Monenco Co. annually hires new employees in different sections and indeed cares all new recruited staff be aware of company’s rules and regulations, structure of organization, history of company, ethical principles, mission statement and vision, all work processes and used software and hardware in organization. To this end, a project has been defined to teach and train all the aforementioned concepts in terms of E-learning course. MIR Co. is in charge of design and implementing E-learning software including two main course: Introduction to Monenco Co. and rules and guidelines for Monenco Co..
MIR Company by using E-learning technology as well as a brilliant background in holding general and specific training courses is making its business grow by offering E-learning courses.
Items of contract:
Design and implementation of E-learning course in terms of Introduction to Monenco Co.(about 70 minutes )
Design and implementation of E-learning course in terms of rules and guidelines for Monenco Co. (about 70 minutes )
Current Status:
E-learning course about Introduction to Monenco Co. has been completed.
E-learning course about rules and guidelines for Monenco Co. is under processing.
Design and implementation of
learning courses newly hired staff Monenco
Iran
22 Introduction to MIR Company
Title: Design and implement E-learning HSE
Start Date: February 9, 2016
End Date: May 9, 2016
Client: Monenco Iran Consulting Engineers Company
Location: Tehran
Abstract:
Safety, occupational health and environmental requirements are
among highlighted topics in today’s commercial and industrial
activities. That’s why continuous trainings in the fields are at the
center of attention of most organizations and plenty of
investments are spent on them. Organizations of all kind are
increasingly concerned with the security issues and safety of
personnel. If the issues are neglected, legal consequences may
happen. The most important part of activities of the department of
management of health, safety and environment in any
organization is about effective and continuous training on the HSE
rules and requirements and proper use of equipment. MIR
company by using E-learning technology as well as a brilliant
background in holding general and specific training courses is
making its business grow by offering E-learning HSE software.
Items of contract:
Design and implement a course in terms of the
principles of occupational health and safety
Design and implement a course in terms of
environmental principles
Design and implement a course in terms of diagnostic
techniques of health and safety hazards
Design and implement a course in terms of
introduction to safety rules and regulations, health and
environment
Follow safety and health rules and protection of
environmental resources
Status: On-going
Design and implement E_learning HSE Monenco
Iran
23 Introduction to MIR Company
Holding 16 specialized programs for Oil Engineering and
Development Company Program Subject: Holding training program for beneficiaries of
Arvandan Oil and Gas Company in the field of instrumentation and
mechanical control (North Azadegan).
Start Date: 11.03.2017
End Date: 13.09.2017
Client Name: Iran Petroleum Engineering & Development Company +
CNPC China Company
Location: Arvandan Oil and Gas Company – Khorramshahr, Iran
Program Description: In order to update the mechanical and instrumentation experts in the
implementation of the project, It includes turbine, compressor control
and control of Siemens and Allen Plc plots trainings. These trainings
objectives are to learn how to use and operate, to prevent damage
caused by lack of personnel knowledge and to eliminate Probable and
instant problems.
Description of contract services:
Holding a training program for technical experts in various departments
of Arvandan Oil and Gas Company along with practical work with
complete laboratory equipment as follows:
Stabilized LP Gas Compressor
HP compressor
LV & MV boards
Yokogawa
PLCS7 (II)
Monitoring with SCADA
Heating Medium Heater
Safety and Shutdown System
RTU (Control Logix5000)
Industrial network relying on PRofibus
ETERNET industrial network
MOUDBUS Industrial Network
PLC400 H
PLC400 FH
PCS7 (I)
PCS7 (II)
Current status: 5 programs have been held.
24 Introduction to MIR Company
Holding “design and map employee
competency models”
Iran Petroleum Engineering and Development Company
Assignment Name: Holding “design and map employee
competency models” specialized workshop with an emphasis on oil
and gas industry.
Start date: 26.08.2017
End Date: 28.08.2017
Client: Iran Petroleum Engineering and Development Company
Location: Kish Island
Project Description:
This course was held with instructors and consultants from the
Netherlands to update and empower human resource experts and
managers of the Ministry of Petroleum Subsidiaries and to assess
their personnel competency indicators.
Description of contract service:
Holding a training course for human resource experts and
managers of the Ministry of Petroleum subsidiaries with the
following topics:
Talent development
Competency Development Plans
Competency Assessment Center Design and Management
Professional competency based interview
Feedback skills
Current status:
25 Introduction to MIR Company
Training 3D Course Engineerting, Mechanical &
Management Field
Monenco Iran
Title: Training 3D Modeling Course in Engineering,
Mechanical and Management Field
Start Date: June 23, 2014 End Date: April 26, 2015 Client: Monenco Iran Consulting Engineers Company
Location: Tehran, Monenco Company
Abstract:
Holding three PDMS courses
Holding four Aveva P&ID courses
Holding three Avea Engineering courses
Holding one Avea Electrical course
Holding one Avea Instrumentation course
Items of Contract:
Upgrade PDMS 11.6 to 12.1 in order to unify the process of
design and production of engineering documents in all
companies of Mapna group
Make smart P&ID maps
Introduction on new features of PDMS 12.1 namely
LEXICON module and its distinct graphical structure
Understanding the changes of PIPEWORK & EQUIPMENT
Introduction to PIPE router in PDMS12.1 to smart modeling
of pipes
Introduction to new features of EXPLANT & IMPLANT
software in order to transfer 3D models among PDMS, PDS,
TEKLA, MICROSTATION and AUTOCAD
Use PSI interface to transfer piping 3D models to CAESAR
software and vice versa
Introduction to new features PDMS 12.1 to produce
documents for instance Draft and Isodraft module
Introduction to new features of PDMS 12.1 modules such as
Admin, Paragon. Spcon and producing professional Spec
with new built-in capabilities of Paragon
Introduction to applications of AVEVA Multi-Discipline
Support (MDS) in Design Module
Introduction to new features of Structure, Open Steel
Interface and IMPLANT STL
Status: Completed in terms of 12 courses.
26 Introduction to MIR Company
Training 3D Modeling Course
Touga (Mapna Group Companies)
Title: Training 3D Modeling Course
Start Date: July 8, 2014
End Date: March,3,2016
Client: Touga (Mapna Group Companies)
Location: Touga (Mapna Group Companies) Abstract:
Holding two PDMS courses
Holding two Aveva P&ID courses
Holding two Avea Engineering courses
Holding one Avea Electrical course
Holding one Avea Instrumentation course
Items of Contract:
Upgrade PDMS 11.6 to 12.1 in order to unify the process of
design and production of engineering documents in all
companies of Mapna group
Make smart P&ID maps
Introduction on new features of PDMS 12.1 namely
LEXICON module and its distinct graphical structure
Understanding the changes of PIPEWORK &
EQUIPMENT
Introduction to PIPE router in PDMS12.1 to smart modeling
of pipes
Introduction to new features of EXPLANT & IMPLANT
software in order to transfer 3D models among PDMS, PDS,
TEKLA, MICROSTATION and AUTOCAD
Use PSI interface to transfer piping 3D models to CAESAR
software and vice versa
Introduction to new features PDMS 12.1 to produce
documents for instance Draft and Isodraft module
Introduction to new features of PDMS 12.1 modules such as
Admin, Paragon. Spcon and producing professional Spec
with new built-in capabilities of Paragon
Introduction to applications of AVEVA Multi-Discipline
Support (MDS) in Design Module
Introduction to new features of Structure, Open Steel
Interface and IMPLANT STL
27 Introduction to MIR Company
Title: Training 3D Modeling Course Start Date: January 21, 2015
End Date: April 1, 2016
Client: Mapna Boiler (Mapna Group Companies) Location: Mapna Boiler (Mapna Group Companies) and Monenco Iran Consulting Engineers Company Abstract:
Holding one PDMS course Holding one Aveva P&ID course Holding one Avea Engineering course Holding one Avea Electrical course Holding one Avea Instrumentation course
Items of Contract: Upgrade PDMS 11.6 to 12.1 in order to unify the process of
design and production of engineering documents in all companies of Mapna group
Make smart P&ID maps
Introduction on new features of PDMS 12.1 namely LEXICON module and its distinct graphical structure
Understanding the changes of PIPEWORK & EQUIPMENT
Introduction to PIPE router in PDMS12.1 to smart modeling of pipes
Introduction to new features of EXPLANT & IMPLANT software in order to transfer 3D models among PDMS, PDS, TEKLA, MICROSTATION and AUTOCAD
Use PSI interface to transfer piping 3D models to CAESAR software and vice versa
Introduction to new features PDMS 12.1 to produce documents for instance Draft and Isodraft module
Introduction to new features of PDMS 12.1 modules such as Admin, Paragon. Spcon and producing professional Spec with new built-in capabilities of Paragon
Introduction to applications of AVEVA Multi-Discipline Support (MDS) in Design Module
Introduction to new features of Structure, Open Steel Interface and IMPLANT STL
Status: Completed
Training 3D Modeling Course
Mapna Boiler
28 Introduction to MIR Company
Title: Training 3D Modeling Course
Start Date: January 21, 2014
End Date: may,25,2015
Client: Meco (Mapna Group Companies)
Location: Meco (Mapna Group Companies) and Monenco Iran
Consulting Engineers Company
Abstract:
Holding one PDMS course
Holding one Aveva P&ID course
Holding one Avea Engineering course
Holding one Avea Electrical course
Holding one Avea Instrumentation course
Items of Contract:
Upgrade PDMS 11.6 to 12.1 in order to unify the process
of design and production of engineering documents in all
companies of Mapna group
Make smart P&ID maps
Introduction on new features of PDMS 12.1 namely
LEXICON module and its distinct graphical structure
Understanding the changes of PIPEWORK &
EQUIPMENT
Introduction to PIPE router in PDMS12.1 to smart
modeling of pipes
Introduction to new features of EXPLANT & IMPLANT
software in order to transfer 3D models among PDMS,
PDS, TEKLA, MICROSTATION and AUTOCAD
Use PSI interface to transfer piping 3D models to
CAESAR software and vice versa
Introduction to new features PDMS 12.1 to produce
documents for instance Draft and Isodraft module
Introduction to new features of PDMS 12.1 modules such
as Admin, Paragon. Spcon and producing professional
Spec with new built-in capabilities of Paragon
Introduction to applications of AVEVA Multi-Discipline
Support (MDS) in Design Module
Introduction to new features of Structure, Open Steel
Interface and IMPLANT STL
Status: Completed
Training 3D Modeling Course
Mapna Group Company
Meco
29 Introduction to MIR Company
Training 3D Modeling
Mapna Generator Companies
Pars Title: Training 3D Modeling Course Start Date: July 20, 2015
End Date: December 10, 2016
Client: Pars (Mapna Group Companies)
Location: Pars (Mapna Group Companies)
Abstract:
Holding one PDMS course
Holding one Aveva P&ID course
Holding one Avea Engineering course
Holding one Avea Electrical course
Holding one Avea Instrumentation course
Items of Contract:
Upgrade PDMS 11.6 to 12.1 in order to unify the process
of design and production of engineering documents in all
companies of Mapna group
Make smart P&ID maps
Introduction on new features of PDMS 12.1 namely
LEXICON module and its distinct graphical structure
Understanding the changes of PIPEWORK &
EQUIPMENT
Introduction to PIPE router in PDMS12.1 to smart
modeling of pipes
Introduction to new features of EXPLANT & IMPLANT
software in order to transfer 3D models among PDMS,
PDS, TEKLA, MICROSTATION and AUTOCAD
Use PSI interface to transfer piping 3D models to
CAESAR software and vice versa
Introduction to new features PDMS 12.1 to produce
documents for instance Draft and Isodraft module
Introduction to new features of PDMS 12.1 modules such
as Admin, Paragon. Spcon and producing professional
Spec with new built-in capabilities of Paragon
Introduction to applications of AVEVA Multi-Discipline
Support (MDS) in Design Module
Introduction to new features of Structure, Open Steel
Interface and IMPLANT STL
Status: Completed
30 Introduction to MIR Company
Title: Industrial Automation Training Course Start Date: September 12, 2013
End Date: Ongoing
Client: Iranian Gas Transmission Company (IGTC) Location: Tehran (MIR Company)
Abstract:
This project has been defined to prevent occurring any kind of damage and to promote knowledge of experts in the field of instrumentation in all ten districts of Iranian Gas
Transmission Company.
Items of Contract:
Holding ten training course for each employee, along with the practical work with laboratory equipment as follows:
PLCS7(I) PLCS7(II) Wincc Monitoring PRofibus(Industrial Network) ETERNET(Industrial Network) MOUDBUS(Industrial Network) PLC400 H PLC400 FH PCS7(I) PCS7(II)
Current Status:
All phased have been successfully completed. Customer Service Training
Industrial Automation Training
Iranian Gas Transmission Company (IGTC)
31 Introduction to MIR Company
Title: Industrial Automation Training Course
Start Date: November 4, 2014
End Date: Ongoing
Client: National Iranian South Oilfields Company (NISOC)
Location: Ahvaz , National Iranian South Oilfields Company
Abstract: This project has been defined to prevent occurring any kind of
damage and to promote knowledge of experts in the field of
instrumentation in all ten districts of Iranian Gas
Transmission Company.
Items of contract:
PLCS7(I)
PLCS7(II)
Wincc Monitoring
PRofibus(Industrial Network)
ETERNET(Industrial Network)
MOUDBUS(Industrial Network)
PLC400 H
PLC400 FH
PCS7(I)
PCS7(II)
Current Status:
Ongoing
Industrial Automation Training Course
National Iranian South Oilfields Company
32 Introduction to MIR Company
Energy Management in Buildings
Title: Holding five workshops on building energy modeling, parametric design phase
Start Date: Saturday, August 23, 2014
End Date: Ongoing
Client: Various industries
Location: Tehran
Abstract: Design Builder provides advanced modeling tools in an easy-to-use interface. This enables the whole design team to use the same software to develop comfortable and energy-efficient building designs from concept through to completion, some of capabilities:
Calculate the energy consumption of buildings (heating, cooling, lighting…)
Modeling(Building physics, Climate, usage, lighting, air conditioning)
CFD Modeling calculation of gain and loose energy
Items of contract:
Basics of Building Physics and Climatology Modeling(Building physics, Climate, usage, lighting, air
conditioning) Simulating the energy behavior of buildings(Heating and
cooling loads calculation , Energy consumption for heating, cooling and lighting systems)
Functional analysis results and software outputs Practical modeling and building energy consumption optimization
Current Status: 4 workshop is completed 3 seminars is completed
33 Introduction to MIR Company
Title: Energy Efficiency solutions in buildings
Start Date: Monday, September 21, 2015
End Date: Tuesday, January 5, 2016
Client: Monenco Iran
Location: Monenco Iran - Building
Abstract: Calculation and reporting of amounts of annual energy
consumption of buildings Simulation of energy building Energy analysis and simulation results suggest solutions Parametric optimization of building based on reduction in
annual energy consumption
Items of contract: Reduce monthly (yearly) costs for energy consumption
Improve staff comfort zones , To enhance staff performance
Change the culture of energy consumption
Status: Ongoin
g
Calculation and solutions to optimize energy consumption
Monenco Iran