Love Your Vendor! A portion of every dollar you spend at the campus retail vendors helps support Arts & Events at UCSF.
UCSF Mission Bay – Space for Lease Mission Hall Café Q&A June 13, 2014 Lease, Rent, & Other Costs 1. What is the cost of rent, % rent, and Common Area Maintenance (CAM)?
Answer: Rent is $48 per square foot per year industrial gross. Percentage rent or commission rent will be negotiated. Tenant pays for utilities, taxes, insurance and a % share of CAM charges over the base year. Rent includes the cost of heating and cooling in the space. 2. Is the “Market rent/commission” described on page 7, section 4.c. of the document provided a
biddable component of the prospective provider’s financial proposal? Answer: Rent is approximately $48 per square foot per year. Commission will be negotiated; therefore a biddable component. 3. On the top of page 11 of the provided document, there is a “grid” with “Details required” of Total
Gross Revenue (US$MM), Total Income (US $MM). Please confirm that the figures to provide for this grid are to be for the bidder’s company, and not projections for the Mission Hall location.
Answer: Please provide this for the bidder’s company. 4. Please describe and/or outline the format the University wishes to see with regards to projected
capital investment, commissions, fees, etc. Answer: The University is only looking for basic information to determine if the investment versus sales or expenses versus revenues are reasonable projections. Ideally a budget should be prepared, something similar to a submittal to a bank for a loan to support your business. 5. How big is the space? Answer: 3,019 square feet. 6. What is the population of the building? Answer: There will be approximately 1,500 people working in the building with a current population of 4,000+ at the Mission Bay Campus, and that number is expected to double by 2015 to 9,600+. This does not include transient population such as Conference Center occupants, Fitness Center users, and hospital patients.
7. Does UCSF do leases longer than 10 years?
Answer: No. 8. Is it a strict lease or commission based?
Answer: The lease is commission based.
Love Your Vendor! A portion of every dollar you spend at the campus retail vendors helps support Arts & Events at UCSF.
9. What is rent for the kiosk? Is the kiosk stationary or to be stored? Will there be any improvements other than the utility stub?
Answer: Kiosk sales will be commissionable as outlined in base lease. There will be no additional improvements other than the utility stubbed to kiosk location. The kiosk design will need to be approved by the Campus Architect. 10. What is the average cost per square foot at Mission Bay? Answer: There is not an average cost per square foot available for food service space. Retail tenants pay for own tenant improvements. 11. Is there an estimated projection of Annual Revenues? Answer: No. However, Mission Hall will be a densely populated building with nearly 1,500 occupants; additionally, when the new Medical Center opens in February 2015, the population at the Mission Bay campus is expected to more than double to 9,600+. 12. Would the lessee be required to pay any rent or usage charge for outdoor space? Answer: Kiosk sales will be commissionable as outlined in base lease. At this time there is no additional “usage charge.” We will ask the vendor to keep the area clean of food/beverage debris from their customers who utilize the space. 13. What is the role of the UCSF assigned Project Manager? How much will that cost the vendor? Answer: Retail Services will pay for a UCSF Project Manager to oversee logistics and compliancy associated with the design review and construction build out of the space. This includes but is not limited to the following: State Fire Marshal plan review, Fire Life Safety drawings, utility shut downs, UCSF permits/inspection. Note: The vendor is responsible for SFDPH inspection(s) and permit(s) as it relates to food service. Landlord/Tenant Relations 14. What is the role of UCSF Retail Services and Real Estate Services? Is there a difference? Answer: Real Estate Services (RES) is responsible for all UCSF campus real estate development and support service activities; RES develops the leases and terms. Retail Services manages vendor relations at UCSF campus locations and will serve as your landlord/property manager; this includes but is not subject to the following: collecting rent, generating invoices, ensuring applicable permits are current, handling requests for facilities repairs/upgrades, marketing and promotions, retail promotions (Smart Choice, FastPay, BYOC, Going Greener, Bear Hugs.) Facilities/Construction 15. Are there common toilet facilities that the restaurant can share, or is it a requirement that the
operator provide facilities within the premises? Answer: Yes, there are restrooms adjacent to the café space. Additionally, the cafe space has stubouts (water and sewer) for restrooms to be built. Tenant should confirm code requirements for locations of restroom with SFDPH.
Love Your Vendor! A portion of every dollar you spend at the campus retail vendors helps support Arts & Events at UCSF.
16. Is outdoor seating permitted? If so, would such outdoor dining space be exclusive to the use of the restaurant?
Answer: There will be a garden pavilion with benches and outdoor seating in the courtyard next to the café space, but this will NOT be exclusive to just the café. 17. Will outside bistro tables be provided by the University or the vendor? Answer: All exterior furniture will be provided. In addition, no additional furniture may be added without prior written consent from UCSF. 18. Will exterior lighting be allowed for overhang on the front windows of the café? Answer: Lighting is already installed. 19. Will UCSF provide any tenant improvement allowance?
Answer: No. 20. Are there classrooms/meeting rooms on other floors of the building for catering purposes? Answer: There will be a Teaching and Learning Center on the 1st floor. In addition, there are conference rooms on all floors that may request catering for large meetings. Please see attached floor plans. 21. Is there storage?
Answer: No, however, any storage should be built within the space requirements. 22. How does gas and power work? Answer: Stubbed to the premises, there are separate meters for both gas and power. 23. What is the floor made of? What types of pipes and ducts will be run underneath the floors? Answer: The floor is a raised floor panel made of steel filled with lightweight concrete. There is not much underneath, but whatever is needed, is made to be accessible (i.e. the water line feeding the coffee cart runs under the raised floor). The vendor would need to install a flooring material that allows easy access or install access doors in strategic locations. 24. How will weight of the equipment affect the 2 ft. raised floor? What is the weight capacity? Answer: The access floor is made up of cantilever pedestals that are capable of resisting seismic loads for its own self-weight plus 50 psf of equipment provided the equipment is not fastened to the floor. If equipment needs to be fastened to the floor or if the weight of the equipment over a reasonable tributary area exceeds 50 psf, an independent lateral bracing system should be used for that equipment. For gravity loads, it was designed for 100 psf live load or a 2000 lb concentrated load spread over 2.5'x2.5'. That area has a ConCore CC1000 panel, which is capable of supporting a concentrated load of 1000 lbs over a one square inch at any location on the panel.
Love Your Vendor! A portion of every dollar you spend at the campus retail vendors helps support Arts & Events at UCSF.
25. Are the floors laterally braced? Answer: Yes. 26. How does security for the building work? What are their hours of operation? Answer: There is a guard on duty 24/7. The door between the Café and the Building has card readers and can be locked with card access only. Since the general public could access the Café and then into the building, we will need to work with the vendor to see what works the best. All UC employees have key cards and can access the door when it is programmed to require a card. Operations 27. Are alcoholic beverages permitted?
Answer: Vendor may apply for a license through the State of California Department of Alcohol Beverage Control for a beer and wine license. 28. How can the definition of Sustainability for UCSF be found? Answer: For the overall UCSF Campus Sustainability awareness program, please visit: http://sustainability.ucsf.edu/. For food sustainability, please visit: http://sustainability.ucsf.edu/what_ucsf_is_doing_2#food 29. Regarding Attachment C. UCSF Smoke-Free Workplace: are vendors required to follow this
policy or just UCSF employees? Answer: Vendors, UCSF employees, and customers are subject to adhere to the University’s Tobacco-Free and Smoke-Free policies. 30. How does signage work for both outdoor and indoor? Answer: All signage should be included in your design package and is subject to approval by UCSF. 31. Is the café accessible to everyone or just the building occupants? Answer: The café will be accessible to building occupants and the general public during its operating hours. 32. Is there a loading dock? What size truck can be accommodated at the loading dock? Answer: There is not a loading dock but a loading area with a door height of 8’-10’. It would be best to unload at the curb and wheel in your items. 33. Are compost, recycling, and garbage close by? Answer: Tenant will be required to have our “Going Greener” compost, recycling, and garbage receptacles with signage. Tenant will bring compost, recycling, and garbage to the building bins in the loading area for disposal.
Love Your Vendor! A portion of every dollar you spend at the campus retail vendors helps support Arts & Events at UCSF.
34. Is parking available?
Answer: There are two existing parking garages at Mission Bay, both charging hourly rates. The Owens St. garage is connected to the Rutter Center, and the 3rd street parking garage is around the corner from the Mission Hall building. Once the hospital opens, all street parking will be converted to meter parking. For more information about parking on campus visit the Transportation Services website: http://campuslifeservices.ucsf.edu/transportation/services/parking/public_parking
35. Are hours flexible/what are the preferred operating hours? What are the hours of the building?
Answer: At this time, the building will be unlocked from 7 am – 7 pm. Required operating hours are Monday to Friday 8am to 5pm. Considering the close proximity to the hospital, the Mission Hall building hours may change.
36. Are there any financial overhead costs or fees to the America to Go program?
Answer: Yes, and costs are to be negotiated between the vendor and America to Go. For more information, please contact Audrey Emmer with America to Go ([email protected], (617) 314-6618). 37. In the event that your company uses an outside catering service or has its own program, can it
be used in conjunction with America To Go? Answer: Tenant will be required to join America to Go. Miscellaneous 38. How many employees does UCSF have? Answer: UCSF is currently San Francisco’s second-largest employer with 21,900 employees. 39. Are the results of the neighborhood survey available for viewing? Answer: Yes, the results are available on our website: http://www.campuslifeservices.ucsf.edu/retail/services/lease 40. When is the rest of the construction at Mission Bay going to be completed?
Answer: The hospital will open in February 2015, and additional buildings will be built. However, there is no official timeline at this point. 41. How many total UCSF buildings are there at UCSF, and how many will be there be after all of
the construction is completed? Answer: There are 3 main locations that contribute to education, research, and patient care at UCSF: Parnassus, Mission Bay and Mt. Zion. Parnassus is the site for the main Medical Center and holds four schools—dentistry, medicine, nursing, and pharmacy—and the Graduate Division. The Mission Bay campus has 9 remarkable facilities and programs on 43 acres with the addition of the new UCSF Medical Center opening in February 2015. Total existing square footage at Mission Bay is 1.95M sf, and the total planned is 2.65M sf. Various major programs and departments are located at 19 other UCSF-owned or UCSF-leased sites across the city including affiliations with other hospitals such as San Francisco General Hospital and J. David Gladstone Institutes.
Love Your Vendor! A portion of every dollar you spend at the campus retail vendors helps support Arts & Events at UCSF.
42. What will occupy the adjacent space next to the building on the corner of 16th and 3rd St.? Answer: To be determined. 43. How does housing work at UCSF? Is there low-income housing?
Answer: Only UCSF students, post-docs, residents, clinical fellows, and faculty are eligible for on campus housing. If you would like more information, please see Housing Services at Mission Bay or visit: http://campuslifeservices.ucsf.edu/housing/ 44. Is there a grocery store on campus and/or are there plans to do so?
Answer: Mission Bay does not have a grocery store, but at this time, we are looking into having a convenience store or a self-service kiosk placed on campus. 45. As a medical sciences institution, do you vet healthy food choice vendors? Answer: UCSF is entirely dedicated to advancing health worldwide with the belief that a healthy environment leads to a sustainable future. Retail Services is committed to working with our vendors to establish best practices related to sustainability, including but not limited to participation in our Smart Choice program, which are in direct alignment with the UC Sustainable Food Service Practice Guidelines.
Love Your Vendor! A portion of every dollar you spend at the campus retail vendors helps support Arts & Events at UCSF.
Mission Hall Café Room 1600 Future Retail 2 (café – approx. 3019 sq. ft.) Design Considerations and Requirements Mechanical and Plumbing:
-‐ two taps off the SS5 UF supply plenum for future duct sox distribution (3000cfm cooling /ventilation air per area; future transfer may be required depending on café design)
-‐ grease duct connection to EF-5, max 3200cfm (Type I Hood) -‐ 2-1/2” DCW connection, with separate water meter -‐ 3/4" DCW; courtyard coffee cart -‐ 2” NG connection (low pressure, max 750 CFH), separate gas meter -‐ 1” HHWS/R connection (50 BTU per sq. ft. heating) -‐ three 4” grease waste connections -‐ two 4” SS connections -‐ stubouts (water and sewer) for the two future restrooms -‐ exhaust shaft connection to EF-6, 480cfm; future retail restroom exhaust
Electrical:
-‐ Lighting. We are providing egress lighting and exit signs. -‐ Power. We are providing a metered circuit breaker in the main switchboard with a 200A
277/480V feed to the space terminating at a fused disconnect located on the wall near gridline D.5 & 7.5.
-‐ Telephone. We have a 25 pair copper cable under the floor coiled up, terminated & tested. Raised Floor System:
-‐ The raised floor system allows for distribution of utilities and air distribution throughout the space. Special consideration is required for cleanliness and dryness of plenum space.
-‐ Kitchen area floor surface material should be impervious to water intrusion, and all air outlets into space should be extended above floor level.
-‐ Examples include quarry tile above a waterproof barrier and cement board underlayment. Building Information Model (BIM):
-‐ Architectural and structural building model will be provided in Autodesk Revit 2013 (.rvt) format. Full building model including M/E/P/FP systems will be provided in Autodesk Navisworks (.nwd) format.
Air Balance and HVAC system commissioning requirements:
-‐ BMS Control commissioning – Local HVAC Control (thermostats) leak detection for UFT’s and valve control on UFT’s. Pharmacy has a BMS panel located in the space. Café is adjacent to the BMS room and would need to be wired back to this room.
-‐ Testing and commissioning of the electrical system -‐ Lighting Control commissioning -‐ Fire Life Safety – Any added horn strobes or pull stations -‐ Fire Life Safety of Grease Hood and Fire Suppression System
UP
UP
UP
Y DH
1
A
2 3 4 5 6 7 8 9
B
C
D
E
F
G
H
BDF ROOM1F2
MAINELECTRICAL
ROOM1M3
FIRE PUMPROOM
1M2
PUMP ROOM1M1
FUTURERETAIL 1
1200
ELECTRICALCLOSET
1L2
BREAK-OUTSPACE
1103
CONTROLDESK1101
STORAGE1102
ENTRANCEHALL1C2
LOADINGAREA1503
FUTURERETAIL 2
1600
GENERATOR1L3
1.5
WOMENTOILET
1T1
MEN TOILET1T2
ELECTRICALCLOSET
1L1
ELEVATORLOBBY
1C1
JANITORCLOSET
1J1
IDF CL.1F1
OVERHEAD COILING DOOR
FUTURE RESTROOMBY TENANT
BLIND EXIT DOOR
BLIND SERVICE DOOR
STAIR 41S4
MEDCLASSROOM
1407
MEDCLASSROOM
1406
SMALLCLASSROOM
1405A/V RACK
1404
LARGECLASSROOM
1400
MEDCLASSROOM
1401
CENTRALSUPPLY
1505
ETS SUPPORT1500
FF +103
.81'
FF +103
.77'
VENDING1504
SMALLCLASSROOM
1105
LC STUDENTRESOURCE
CENTER1300
LC STUDYAREA1302
SMALLCLASSROOM
1107
SMALLCLASSROOM
1106
LC QUIETSTUDY AREA
1303
SMALLCLASSROOM
1108
STORAGE1301
FACILITIESMANAGEMENT
STORAGE1506
GAS1M5
WATER1M4
SMALLCLASSROOM
1109
MENS TOILET1T3
WOMENSTOILET
1T4
MEDCLASSROOM
1402
STAIR 11S1
STAIR 21S2
BREAK-OUTSPACE
1110
PRE-FUNCTIONSPACE
1403
FURNITURESTORAGE
1502
MECHANICALRISER1SS1
ELEVATOR 41E4
ELEVATOR 31E3
ELEVATOR 11E1
ELEVATOR 21E2
MECHANICALRISER1SS3
MECHANICALRISER1SS5
MECHANICALRISER1SS2
STAIR 51S5
F.1
4.6
E.6
E.8
CENTRAL MAIL1501
F.3
ROOM TYPES
BREAK-OUT SPACE
CENTRAL MAIL
CENTRAL SUPPLY
ETS SUPPORT
FURNITURE STORAGE
FUTURE RETAIL 1
FUTURE RETAIL 2
LARGE CLASSROOM
LC QUIET STUDY AREA
LC STUDENT RESOURCECENTER
LC STUDY AREA
LOADING AREA
MED CLASSROOM
PRE-FUNCTION SPACE
SMALL CLASSROOM
STORAGE
VENDING
PRE-FUNCTIONSPACE
7314
PRE-FUNCTIONSPACE
7315
BREAK-OUTSPACE
1104
SCALE:PROJECT #: 3/32" = 1'-0"
UCSF BLOCK 25A 11/08/11
101 - LEVEL 112000.00
DNUP
DN
UP
DN
UP
1
A
2 3 4 5 6 7 8 9
B
C
D
E
F
G
H
1.5
FOCUS2712
FOCUS2711
FOCUS2710
HUDDLE2709
FOCUS2610
HUDDLE2609
FOCUS2516
FOCUS2517
FOCUS2518
FOCUS2519
FOCUS2703
FOCUS2702
FOCUS2701
HUDDLE2814
FOCUS2815
FOCUS2816
FOCUS2801
FOCUS2802
FOCUS2803
FOCUS2508
FOCUS2506
FOCUS2505
FOCUS2515
HUDDLE2514
FOCUS2513
FOCUS2512
BREAK-OUTSPACE
2511
HUDDLE2510
FOCUS2509
FOCUS2509
HUDDLE2501
CONFERENCEC
2500
HUDDLE2404
FOCUS2403
FOCUS2402
FOCUS2401
FOCUS2804
FOCUS2805
CONFERENCED
2800
FOCUS2604
FOCUS2603
FOCUS2602
FOCUS2601
P/C/S/F2607
CONFERENCED
2600ELECTRICAL
ROOM2L2B
IDF ROOM A2F2
BREAK-OUTSPACE
2807
PANTRY2806
BREAK-OUTSPACE
2812
HUDDLE2810
HUDDLE2809
CONFERENCEB
2700
CONFERENCEA
2100
FLOORRECEPTION
2101
BREAK-OUTSPACE
2102
CONFERENCEA
2103
BREAK-OUTSPACE
2104
CONFERENCEC
2106
CONFERENCEC
2105
CONFERENCEC
2107
CONFERENCEC
2108
CONFERENCEC
2109
CONFERENCEC
2110
IDF ROOM B2F1
ELEVATORLOBBY
2C1
STORAGE2611
MAIL2113
ELECTRICALCLOSET
2L1
OPEN TO BELOW
FOCUS2502
FOCUS2503
EOS2'-3"
JANITORCLOSET
2J1
MEN TOILET2T2
WOMENTOILET
2T1
FOCUS2605
STORAGE2606
BALCONY2U2
STAIR 52S5
STAIR 22S2
MECHANICALRISER2SS2
ELEVATOR 12E1
ELEVATOR 22E2
ELEVATOR 42E4
ELEVATOR 32E3
MECHANICALRISER2SS1
MECHANICALRISER2SS3
PLUMBINGRISER2SS4
STAIR 42S4MECHANICAL
RISER2SS5
PANTRY2811
STAIR 32S3
STAIR12S1
4.6
E.6
E.8
TOILET2112
TOILET2111
F.3
ASF CIRCULATION
AV SUPPORT
BREAK-OUT SPACE
CONFERENCE A
CONFERENCE B
CONFERENCE C
CONFERENCE D
FOCUS
HUDDLE
P/C/S/F
PANTRY
STORAGE
WS2-1
WS2-2
WS2-3
WS2-6
WS2-5
CIRCULATION2-8
VESTIBULE2L2A
p:p:p:p:p:
1686
4496
a:a:a:a:a:
1686
4596
FOCUS2807
FOCUS2704
FOCUS2705
FOCUS2706
BREAK-OUTSPACE
2707
FOCUS5615
P/C/S/F2204
AV SUPPORT2201
FOCUS2203
FOCUS2202
FOCUS2405
STORAGE5620
ASFCIRCULATION
5628
WORKSTATIONSHOTELFOCUSHUDDLEBREAKOUT
ROOM COUNTS
FOCUS2713
SCALE:PROJECT #: 3/32" = 1'-0"
UCSF BLOCK 25A 05/16/12
102 - LEVEL 212000.00