  • 8/10/2019 MixStrategy MRP RUN

    1/18

    ollowing materials are involved.

    IN112 = Main configurable material

    FIN107 = Component of FIN112 but itself configurable material& declared as phantom assembly

    RMQ106, RMQ109 & RMQ111 = Component of FIN112

    FIN113 = Component of FIN107

    RMQ114 = Component of FIN113

    BOM is as follows

    Details of dependency in BOM

  • 8/10/2019 MixStrategy MRP RUN

    2/18

  • 8/10/2019 MixStrategy MRP RUN

    3/18

    Also for final material FIN112 , maintain all characteristic for FIN112 without assign the characteristic value. We will assign

    haracteristic value for FIN112 in sales order as per customer demand.

    Material Master maintenance :- FIN112

  • 8/10/2019 MixStrategy MRP RUN

    4/18

  • 8/10/2019 MixStrategy MRP RUN

    5/18

    Material Master for FIN107

  • 8/10/2019 MixStrategy MRP RUN

    6/18

  • 8/10/2019 MixStrategy MRP RUN

    7/18

  • 8/10/2019 MixStrategy MRP RUN

    8/18

    Material Master for FIN113 (Not a configurable & class is not assign)

  • 8/10/2019 MixStrategy MRP RUN

    9/18

    Material Master RMQ106, RMQ109 & RMQ111

  • 8/10/2019 MixStrategy MRP RUN

    10/18

    Material Master for RMQ114

  • 8/10/2019 MixStrategy MRP RUN

    11/18

  • 8/10/2019 MixStrategy MRP RUN

    12/18

    lan Independent Requirement entry in MD61

  • 8/10/2019 MixStrategy MRP RUN

    13/18

    Run MRP through MD02 either with Material or Product group

    his MRP is on Assembly level with strategy 70

    Result of MRP

  • 8/10/2019 MixStrategy MRP RUN

    14/18

    Run MRP though MD01 for final product. Customer requirement capture from sales order

    ales order quantity is 50

    Result of MRP

  • 8/10/2019 MixStrategy MRP RUN

    15/18

    2nd

    Pointlanning independent requirement maintain for assembly level. Run the MRP and confirm the production order quantity.

    After confirmation of partial or full assembly quantity check the result what happen after run the MRP for final material.

    lanning Independent requirement for assemblybeforeconvert plan order to production order, and confirm production ord

    uantity.

  • 8/10/2019 MixStrategy MRP RUN

    16/18

  • 8/10/2019 MixStrategy MRP RUN

    17/18

  • 8/10/2019 MixStrategy MRP RUN

    18/18