m&mnagpur

Upload: vivek338

Post on 05-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 M&MNagpur

    1/31

    Mahindra & Mahindra Ltd.

    Farm Division

    Nagpur Unit

  • 7/31/2019 M&MNagpur

    2/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    At Nagpur we produce 14 Models and 86 Variants on a single assembly line

    Our Product

    MAHINDRA & MAHINDRA, NAGPUR

  • 7/31/2019 M&MNagpur

    3/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    2001 - ISO 14001 Certification (Environment Management System)

    2003 Deming Application Prize for FES

    2004 ISO/TS 16949:2002 Certification

    2005 OHSAS 18001 Certification

    2007 Japan Quality Medal for FES

    2008 - Awards for Best Energy Management System from Government of

    Maharashtra

    2009 Golden Peacock Award in Safety & Health by world Environment Forum

    2009 Frost & Sullivan Golden Award

    2009 Award for Water Efficient Unit by CII

    MAHINDRA & MAHINDRA, NAGPUR

    Achievements

  • 7/31/2019 M&MNagpur

    4/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Our scope of operations

    Each Unit consist of Assembly, Testing and Raw material Stores

    Machining Activities in Hydraulics, Transmission and Engine

    Ware House for Material Storage

    Hydraulics Plant

    Hydraulics Plant Tractor Plant

    Tractor Plant

    Transmission Plant

    Transmission Plant Engine Plant

    Engine Plant

    Engine PlantWarehouse

  • 7/31/2019 M&MNagpur

    5/31

  • 7/31/2019 M&MNagpur

    6/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Control Valvecomponent

    cleaning

    Control valve

    componentmachining

    Control ValveAssembly &

    Testing

    VTU component

    cleaning

    VTUAssembly

    Transmission

    componentmachining

    Enginecomponentmachining

    Enginecomponent

    cleaning

    Tractor PrePainting

    operation

    Transmissioncomponent

    cleaning

    TransmissionAssembly & Testing

    EngineAssembly &

    Testing

    Tractor

    Testing

    TractorPainting

    operation

    Tractor PostPainting

    Operation

    VTUTesting

    Process Flow Diagram

  • 7/31/2019 M&MNagpur

    7/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

  • 7/31/2019 M&MNagpur

    8/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Leader

    S. W. Mahabal

    DGM Central Services

    Member

    D. K. Shrivastava

    Manager

    Tractor Maint.

    Member

    P. Wakankar

    Manager

    Transmission Maint.

    Member

    V. V. Deshpande

    Manager

    Engine Maint.

    Member

    S. R. Khedikar

    Manager

    Hydraulic Maint.

    Member

    M. N. Joshi

    Manager

    Central Services

    Functional Team for Energy Conservation

  • 7/31/2019 M&MNagpur

    9/31

  • 7/31/2019 M&MNagpur

    10/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Sr No Projects

    1 Incorporation of Energy efficient Pumps in Place of Conventional Pumps at 18

    Locations

    2 Use of Turbo ventilators' in place of exhaust Pumps

    3 Use of Natural Lighting by using Poly carbonate sheets on Roof

    4 Timers to Package Airconditionars

    5 Solar Heating for Kitchen

    6 Compressor Air Management

    7 Incorporation of Heat Pump

    8 Water siphon & Timer circuits for OH water Tanks9 Using Electrical Motors in Star connections as possible.

    10 Improving the design of the Hot air circulation on ovens

    11 Monitoring the Heat loss from all Hot air circulations fans & improving the Insulation

    12 Incorporation of VFDs for major induction motors13 Replacement of Conventional lamps with LED lamps

    Projects Implemented through Engineering Control

  • 7/31/2019 M&MNagpur

    11/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    BEFORE AFTER Optimizing power by Replacing Conventional Pump

    with Energy Efficient Pump

    Incorporation of Energy Efficient Pump

  • 7/31/2019 M&MNagpur

    12/31

  • 7/31/2019 M&MNagpur

    13/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    BEFORE AFTER

    Optimizing power by Replacing Conventional Pump

    with Energy Efficient Pump

    Incorporation of Energy Efficient Pump

  • 7/31/2019 M&MNagpur

    14/31

  • 7/31/2019 M&MNagpur

    15/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    BEFORE AFTER

    PACKAGED AC WITH NO TIMER PACKAGED AC WITH TIMER

    Timer on ACs

  • 7/31/2019 M&MNagpur

    16/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Solar Heating for Canteen

  • 7/31/2019 M&MNagpur

    17/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    BEFORE AFTER

    Earlier Two

    Compressors of900 CFM & oneCompress or of200 CFM was

    required.

    Now One Compressors of 900CFM & one Compress or of 200

    CFM is required

    Piping re-layout and Compressor Shifting

  • 7/31/2019 M&MNagpur

    18/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    BEFORE AFTER

    Heat Pump installed

    Heaters panel

    (6 x 4 =24KW)

    HeatersPower MCB

    ON

    New Heat

    Pump

    (6KW)Heaters Power MCB off

    High consumption Electrical Heater

    Optimization of Power by replacing Heaters with Heat Pump

  • 7/31/2019 M&MNagpur

    19/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    BEFORE AFTER

    Unnecessary Running Ofpump eliminated.

    Unnecessary Running OfWater pump while

    overflowing.

    Siphon system for OH water Tanks with Level sensors

  • 7/31/2019 M&MNagpur

    20/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    BEFORE AFTER

    Improvement in hot air circulation inside oven system for faster baking

  • 7/31/2019 M&MNagpur

    21/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Induced draft fan removing the heatfrom the combustion chamber

    Method of Testing:

    Checked the Flue gas temperature.

    It is observed that the temperature of Flue Gas

    is 220 degree centigrade which reduces below

    180 degree when ID fans is kept OFF.

    Recommended Flue Gas temperature

    is 190 degree C.

    CHIMNEY

    2200

    C

    Heat Recovery

  • 7/31/2019 M&MNagpur

    22/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Thermal Insulation of 4 has

    been

    provided on the Circulation FAN.

    Skin temperature is reduced

    from

    90 degree centigrade to

    40 degree centigrade.

    BEFORE

    AFTER

    950 C

    400 C

    Heat Loss Reduction

  • 7/31/2019 M&MNagpur

    23/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Induced draft fan removing

    the heat from

    the combustion chamber

    Induced draft of one Burner stopped

    and chimney directly connected so

    that Flue gas can move with

    Natural Draft.

  • 7/31/2019 M&MNagpur

    24/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Variable frequency

    Drive installed for

    blower motors

    Before After

    (1) Dampers with 40% throttle. (1) Dampers fully open & VFD installed.

    (2) Power consumption

    Units 2,20,000 Kwh / annum

    Cost - Rs. 10,56,000 / annum

    (2) Power consumption

    Units 1,80,000 Kwh / annum

    Cost Rs. 8,64,000 / annum

    (3) Air velocity 2.4 m / sec (3) Air velocity 2.4 m / sec

    VFD installation for exhaust blowers in paint booth

  • 7/31/2019 M&MNagpur

    25/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Sr No Projects

    1 Energy conservation Audits

    2 Training on Energy conservation to all Employees

    3 Awareness through Banners & Poster

    4 Idea Generation campaigns

    5 Implementation of all Feasible Energy saving Ideas

    6 Rewards & Recognitions for all participants contributing to Energyconservation drive.

    Energy Saving Through Administration control & People Involvement

  • 7/31/2019 M&MNagpur

    26/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Idea Generation Campaign

  • 7/31/2019 M&MNagpur

    27/31

  • 7/31/2019 M&MNagpur

    28/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Banner Display

  • 7/31/2019 M&MNagpur

    29/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    11

    2831

    38

    50

    0

    10

    20

    30

    40

    50

    60

    F07 F08 F09 F10-H1 F10-

    Total

    NumberofIdeas

    8.93

    7.89

    1.28

    4.57 4.99

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    F07 F08 F09 F10-H1 F10

    Total

    SavinginKwh/Yea

    r

    42.87

    37.87

    6.14

    21.93

    23.95

    0

    5

    10

    15

    2025

    30

    35

    40

    45

    50

    F07 F08 F09 F10-H1 F10

    Total

    SavinginRs

    .Lacs/Year

    Better Better

    Better

    Consistent Performance by the Team Since F07

  • 7/31/2019 M&MNagpur

    30/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    Stabilized supply to

    plant

    for saving Energy

    during

    Non Peak Hours

    Installation of 3.2 MW

    Wind Mill Projects for

    Power Generation

    Future plans

    & G

  • 7/31/2019 M&MNagpur

    31/31

    FD - NAGPUR

    MAHINDRA & MAHINDRA, NAGPUR

    THANKS