    FACILITY

    May 10, 2011

    StateBuildiSaint Pau

    BackgYear built

    Building Sq

    Replaceme

    Date Asses

    ExistinThe State

    75 Reveren

    St. Paul, Mfive (5) stor1905 and hsince. The

    The facilityChambers,and SupreOffices, legirooms, legicontrol spaelectrical, tequipment

    Minnesota

    The buildinVarious moBehind, a bfront othersroadway oflines. Set nsteps a panpresented.

    The buildinis classifiedconstructioPartially SpoccupancieA-3, AssemCourt Chaconference

    ONDITION

    f Minngl, Minneso

    ound I

    uare Feet

    nt Value:

    sed

    g Asseapitol Buildi

    d Dr. Martin

    55155. Thibuilding was been parti

    facility has a

    houses cereHouse of Ree Court Chaslative officelative cafetee, building slecommunicpaces for el

    tate Legisla

    is set in a lanuments areridge spanswere later aInterstate 94ar the crest

    oramic view

    s primary oas Group B,type per the

    rinklered. Ts per the 200bly - Senate,bers, large hrooms.

    XECUTIVE

    esota

    a

    fo1905

    374,984 S

    $271,753,0

    November

    Summng is locateduther King, J

    approximats originally cally renovateT-shaped fo

    onial spacepresentativesmbers, Exec, hearing ania and diningpport spacetions and Hcted officials

    ure.

    ndscaped cato its sides aniversity Avded over the

    , thus preserof a hill, fromof downtown

    cupancy perBusiness an2009 IBC isere are seco9 IBC classifiHouse andearing rooms

    SUMMARY

    Capito

    00

    2010

    ryatr. Drive,

    ly 374,984 Snstructed inseveral tim

    tprint.

    , SenateChamberstive Branch

    d conferenceroom, medi

    s plusACof the

    mpus.d front.nue, and insunkening the sightthe CapitolSt. Paul is

    the 2009 IBits primary

    Type 1Bndaryed as Groupupremeand large

    EPORT

    page 1 of 7

    F,

    s

    MThSe

    likegropreshewinine

    Neratreptot

    Morisk

    EmratemThfollin t

    Stat

    jor Issexterior she

    eral areas a

    ly separate fund. Near tevent non-recll integrity andows are weficient.

    rly all mechd useful life,

    air costs andl system fail

    st plumbing sfunctional s

    ergency powd life and m

    ergency.

    state has cwing specialis report:

    ! Roof!sy! Exterior!! Dome!! Rain!lea!

    Hot!Wa

    ! French!! Orname

    ! West!st! East!an

    e Capital Buildi

    esll stone requie noted whe

    rm the buildim repairs wilverable dam

    d cosmetics.ll beyond rat

    nical systemcausing highrisking shutre.

    ystems are but down if pi

    er and light sy be inadeq

    ntracted withlty studies, w

    tems!Stone!

    der!and!storer!system!oors!

    ntal!plaster/ir!and!plaza!!North!stair!

    g

    State Ca

    res major stae segments

    ng and fall tol be requriedage to the eMany of thed lifeand en

    s are beyonder operatingown in the e

    eyond ratede systems f

    ystems are aate in the ev

    other vendoich are not i

    !sewer!syst

    aintings!nd!plaza!

    ital Building

    bilization.could

    thetoterior

    exteriorrgy

    theirandvent of

    life andil.

    ll beyondent of

    rs for thecluded

    m!

  • 8/3/2019 MN Capitol - Facility Condition Executive Summary Report - May 2011[1]

    2/7

    FACILITY

    May 10, 2011

    Table 1.

    Capital AsseHighlighted st

    ONDITION

    ive Year N

    Managementeps are complet

    XECUTIVE

    eds

    rocesse.

    SUMMARY EPORT

    page 2 of 7

    Tab

    State Ca

    le continued on

    ital Building

    next page.

  • 8/3/2019 MN Capitol - Facility Condition Executive Summary Report - May 2011[1]

    3/7

    FACILITY

    May 10, 2011

    Table 1.

    ONDITION

    ive Year Ne

    XECUTIVE

    eds (cont.)

    SUMMARY EPORT

    page 3 of 7

    T

    State Ca

    able continued

    ital Building

    n next page.

  • 8/3/2019 MN Capitol - Facility Condition Executive Summary Report - May 2011[1]

    4/7

    FACILITY

    May 10, 2011

    Table 1. F

    ONDITION

    ive Year Ne

    XECUTIVE

    ds (cont.)

    SUMMARY EPORT

    page 4 of 7

    T

    State Ca

    able continued o

    ital Building

    n next page.

  • 8/3/2019 MN Capitol - Facility Condition Executive Summary Report - May 2011[1]

    5/7

    FACILITY

    May 10, 2011

    Table 1. F

    ONDITION

    ive Year Ne

    XECUTIVE

    ds (cont.)

    SUMMARY EPORT

    page 5 of 7

    T

    State Ca

    ble continued o

    ital Building

    n next page.

  • 8/3/2019 MN Capitol - Facility Condition Executive Summary Report - May 2011[1]

    6/7

    FACILITY

    May 10, 2011

    Table 1. F

    ONDITION

    ive Year Ne

    XECUTIVE

    ds (cont.)

    SUMMARY EPORT

    page 6 of 7

    State Ca

    able continued

    ital Building

    n next page.

  • 8/3/2019 MN Capitol - Facility Condition Executive Summary Report - May 2011[1]

    7/7

    FACILITY

    May 10, 2011

    Table 1. F

    ONDITION

    ive Year Ne

    XECUTIVE

    ds (cont.)

    SUMMARY EPORT

    page 7 of 7

    State Ca ital Building