mnt en file 1.3.1 process for safety valves to repair lgs 4111

3
LESER Global Standard Process for Safety Valves to Repair LGS 4111 Page 1/3 disclosure cat.: II proofread: OR published date: 9/14/11 effect. date: 18.11.201 0 author: Nieh released by: KUW replaces: initial status: published resp. depart.: PP date of release: 11/8/11 revision No.: 0 doc. type: LGS change rep. No.: 651A retention period: 10 protected Content 1 Purpose ............................................................................................................... 1 2 Scope .................................................................................................................. 1 3 Introduction .......................................................................................................... 1 4 Safety valve to repair ........................................................................................... 2 1 Purpose This LESER Global Standard (LGS) shows the process for safety valves to repair. 2 Scope This LGS applies to all members of the LESER Quality Cluster. 3 Introduction The following flow chart shows the process steps, which are necessary for valve repair. The right side give references to forms of inspection documentation, LESER standards, instructions and spare part lists.

Upload: amigdal

Post on 09-Feb-2016

1 views

Category:

Documents


0 download

DESCRIPTION

Safety valves

TRANSCRIPT

Page 1: MNT en File 1.3.1 Process for Safety Valves to Repair LGS 4111

LESER Global Standard Process for Safety Valves to Repair

LGS 4111

Page 1/3

disclosure cat.: II proofread: OR published date: 9/14/11 effect. date: 18.11.201

0 author: Nieh released by: KUW replaces: initial status: published

resp. depart.: PP date of release: 11/8/11 revision No.: 0

doc. type: LGS change rep. No.: 651A retention period: 10

pro

tecte

d

Content

1 Purpose ............................................................................................................... 1

2 Scope .................................................................................................................. 1 3 Introduction .......................................................................................................... 1 4 Safety valve to repair ........................................................................................... 2

1 Purpose

This LESER Global Standard (LGS) shows the process for safety valves to repair.

2 Scope

This LGS applies to all members of the LESER Quality Cluster. 3 Introduction

The following flow chart shows the process steps, which are necessary for valve repair. The right side give references to forms of inspection documentation, LESER standards, instructions and spare part lists.

Page 2: MNT en File 1.3.1 Process for Safety Valves to Repair LGS 4111

LESER Global Standard Process for Safety Valves to Repair

LGS 4111

Page 2/3

disclosure cat.: II proofread: OR published date: 9/14/11 effect. date: 18.11.201

0 author: Nieh released by: KUW replaces: initial status: published

resp. depart.: PP date of release: 11/8/11 revision No.: 0

doc. type: LGS change rep. No.: 651A retention period: 10

pro

tecte

d

4 Safety valve to repair

valve forwarded

visually inspection

disassembling

report 1.1

visually inspection inside parts

assembling instruction (LLS...)

report 1.2

cleaning good parts

original spare parts

finishing (if necessary)

Assembling instruction

catalogue

assembling the valve setting of the valve

tighness test

assembling instruction (LLS…) AA-EF and LWN 220-01-0-EN

type test approval plate / or customer identfication

plate assembling (if

necessary)

assembling instruction (LLS…) AA-EF-080 and

LWN 201-01-EN

paint finish

visually inspection

delivery to customer

assembling instruction (LLS…)

material safety data sheets LWN 001-80-EN

assembling instruction

(LLS...)

report 1.4

assembling instruction to cleaning good parts (LLS…)

assembling instruction to finishing (LLS…)

report 1.3

Page 3: MNT en File 1.3.1 Process for Safety Valves to Repair LGS 4111

LESER Global Standard Process for Safety Valves to Repair

LGS 4111

Page 3/3

disclosure cat.: II proofread: OR published date: 9/14/11 effect. date: 18.11.201

0 author: Nieh released by: KUW replaces: initial status: published

resp. depart.: PP date of release: 11/8/11 revision No.: 0

doc. type: LGS change rep. No.: 651A retention period: 10

pro

tecte

d