mo 370 interchange ramp at salt river road - phase 2

22
MO 370 Interchange Ramp at Salt River Road - Phase 2 Sponsor St Peters Project No. RB19-000021 Project Type New Road TOTAL FUNDING Total County Sponsor Federal Other $14,050,642.00 $1,300,257.00 $325,064.00 $5,400,000.00 $7,025,321.00 Project Description The City of St. Peters is seeking funds to construct the expansion of the Salt River Road/MO 370 Interchange to provide access to westbound/southbound MO 370 and I-70 from eastbound Salt River Rd and access to westbound Salt River Rd from eastbound/northbound MO 370 and I-70. The proposed interchange improvements will: Reduce reliance on the existing I-70 interchanges at Mid Rivers Mall Dr and Cave Springs Rd for commuter and freight traffic. Provide direct commuter and freight access to MO 370 and I-70 for the Premier 370 Business Park, a designated Mega Freight Center. Allow Salt River Rd to be used as a diversion route during incidents on I-70 that occur between MO 370 and MO 79. Currently it is difficult to access Salt River Rd from westbound I-70 and it is difficult to access eastbound I-70 from Salt River Rd. While direct ramps are provided at the MO370/I-70 interchange for these traffic movements these ramps are not currently provided at the MO370/Salt River Road interchange. This project will provide this missing connection. The City of St. Peters is working closely with MoDOT and FHWA to prepare an Access Justification Report (AJR) for the project. Phase 2/Ramps 2 and 3 of this project (submitted under this application) will construct ramps to connect eastbound/northbound MO 370 and I-70 with westbound Salt River Rd. Ramp 2 will consist of a 14 ft wide concrete ramp, with an 8 ft outside and 4 ft inside shoulder, extending from eastbound MO 370 to the westbound exit ramp from MO 370/Salt River Rd ramp to Spencer Rd. The ramp will have a 40 mph design speed and connect to MO 370 utilizing the existing shoulder. An auxiliary lane will be built to connect Ramp 2 to the MO 370 entrance ramp from westbound I-70. Three new bridges will be constructed with Ramp 2 over Premier Pkwy, over MO 370, and over the MO 370/Salt River Rd interchange ramps. A new westbound exit ramp (Ramp 3) to Spencer Rd will be constructed with Ramp 2. Ramp 3 will consist of a 12 ft wide concrete ramp, with an 8 ft outside and 4 ft inside shoulder. Ramp 3 will have a 40 mph design speed. Part of the westbound entrance ramp at the Salt River Rd/Spencer Rd interchange will be widened to accommodate the westbound through traffic movement from Ramp 2. Phase 1/Ramp 1 of this project (submitted under a separate application) will construct ramps to connect eastbound Salt River Rd with westbound/southbound MO 370 and I-70. Ramp 1 will consist of a 14 ft wide concrete ramp, with an 8 ft outside and 4 foot inside shoulder, extending from the Spencer Rd to Salt River Rd entrance ramp to westbound MO 370. The ramp will have a 40 mph design speed and connect to the existing three lane section of MO 370 utilizing the existing shoulder. An auxiliary lane will be built to connect the ramp to the MO 370 ramp to Eastbound I-70. The bridge over Premier Pkwy will be widened.

Upload: others

Post on 15-Oct-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MO 370 Interchange Ramp at Salt River Road - Phase 2

MO 370 Interchange Ramp at Salt

River Road - Phase 2

Sponsor St Peters Project No. RB19-000021

Project Type New Road

TOTAL FUNDING

Total County Sponsor Federal Other

$14,050,642.00 $1,300,257.00 $325,064.00 $5,400,000.00 $7,025,321.00

Project Description The City of St. Peters is seeking funds to construct the expansion of the Salt River Road/MO 370 Interchange to provide access to

westbound/southbound MO 370 and I-70 from eastbound Salt River Rd and access to westbound Salt River Rd from

eastbound/northbound MO 370 and I-70.

The proposed interchange improvements will:

Reduce reliance on the existing I-70 interchanges at Mid Rivers Mall Dr and Cave Springs Rd for commuter and freight

traffic.

Provide direct commuter and freight access to MO 370 and I-70 for the Premier 370 Business Park, a designated Mega

Freight Center.

Allow Salt River Rd to be used as a diversion route during incidents on I-70 that occur between MO 370 and MO 79.

Currently it is difficult to access Salt River Rd from westbound I-70 and it is difficult to access eastbound I-70 from Salt

River Rd. While direct ramps are provided at the MO370/I-70 interchange for these traffic movements these ramps are not

currently provided at the MO370/Salt River Road interchange. This project will provide this missing connection.

The City of St. Peters is working closely with MoDOT and FHWA to prepare an Access Justification Report (AJR) for the

project.

Phase 2/Ramps 2 and 3 of this project (submitted under this application) will construct ramps to connect eastbound/northbound

MO 370 and I-70 with westbound Salt River Rd. Ramp 2 will consist of a 14 ft wide concrete ramp, with an 8 ft outside and 4 ft

inside shoulder, extending from eastbound MO 370 to the westbound exit ramp from MO 370/Salt River Rd ramp to Spencer Rd.

The ramp will have a 40 mph design speed and connect to MO 370 utilizing the existing shoulder. An auxiliary lane will be built

to connect Ramp 2 to the MO 370 entrance ramp from westbound I-70. Three new bridges will be constructed with Ramp 2 over

Premier Pkwy, over MO 370, and over the MO 370/Salt River Rd interchange ramps. A new westbound exit ramp (Ramp 3) to

Spencer Rd will be constructed with Ramp 2. Ramp 3 will consist of a 12 ft wide concrete ramp, with an 8 ft outside and 4 ft

inside shoulder. Ramp 3 will have a 40 mph design speed. Part of the westbound entrance ramp at the Salt River Rd/Spencer Rd

interchange will be widened to accommodate the westbound through traffic movement from Ramp 2.

Phase 1/Ramp 1 of this project (submitted under a separate application) will construct ramps to connect eastbound Salt River Rd

with westbound/southbound MO 370 and I-70. Ramp 1 will consist of a 14 ft wide concrete ramp, with an 8 ft outside and 4 foot

inside shoulder, extending from the Spencer Rd to Salt River Rd entrance ramp to westbound MO 370. The ramp will have a 40

mph design speed and connect to the existing three lane section of MO 370 utilizing the existing shoulder. An auxiliary lane will

be built to connect the ramp to the MO 370 ramp to Eastbound I-70. The bridge over Premier Pkwy will be widened.

Page 2: MO 370 Interchange Ramp at Salt River Road - Phase 2
Page 3: MO 370 Interchange Ramp at Salt River Road - Phase 2
npatel
Text Box
Project Location Map
npatel
Polygon
Page 4: MO 370 Interchange Ramp at Salt River Road - Phase 2

County Sponsor Federal Other Total

Design $80,000.00 $20,000.00 $400,000.00 $500,000.00 $1,000,000.00

Utility Relocations $0.00 $0.00 $0.00 $0.00 $0.00

Right-of-Way $17,600.00 $4,400.00 $88,000.00 $110,000.00 $220,000.00

Construction $1,202,657.00 $300,664.00 $4,912,000.00 $6,415,321.00 $12,830,642.00

TOTAL $1,300,257.00 $325,064.00 $5,400,000.00 $7,025,321.00 $14,050,642.00

PERCENT (%) 9.25% 2.31% 38.43% 50.00% 100.00%

Design County Sponsor Federal Other Total

2020 $0.00

2021 $80,000.00 $20,000.00 $400,000.00 $500,000.00 $1,000,000.00

2022 $0.00

Utility Relocations County Sponsor Federal Other Total

2020 $0.00

2021 $0.00

2022 $0.00

Right-of-Way County Sponsor Federal Other Total

2020 $0.00

2021 $0.00

2022 $17,600.00 $4,400.00 $88,000.00 $110,000.00 $220,000.00

Construction County Sponsor Federal Other Total

2020 $0.00

2021 $0.00

2022 $1,202,657.00 $300,664.00 $4,912,000.00 $6,415,321.00 $12,830,642.00

FUNDING FOR IMPROVEMENTS

FINANCIAL PLAN

ST. CHARLES COUNTY ROAD BOARD

2020 TIP FINANCIAL WORKSHEET

MO 370 INTERCHANGE RAMP @ SALT RIVER PHASE 2

Page 5: MO 370 Interchange Ramp at Salt River Road - Phase 2

ESTIMATE OF PROJECT COSTS

Project Sponsor: City of St. Peters

Project Title: Route 370 Ramp to Westbound Salt River Road (Ramp 2)

Date: February 6, 2019

Description UnitEstimated

Quantity Unit Price Total

ROADWAY ITEMS:

CLEARING AND GRUBBING ACRE 14.2 $3,000 $42,600

REMOVAL OF IMPROVEMENTS LS 1 $45,000 $45,000

CLASS A EXCAVATION CY 1300 $15.00 $19,500

EMBANKMENT IN PLACE CY 316400 $10.00 $3,164,000

COMPACTING EMBANKMENT CY 1300 $5.00 $6,500

CLASS 3 EXCAVATION CY 7700 $15.00 $115,500

TYPE 5 AGGREGATE BASE (6" THICK) SY 14000 $7.00 $98,000

CONCRETE PAVEMENT (9" NON-REINFORCED) SY 14000 $50.00 $700,000

CONCRETE APPROACH PAVEMENT SY 560 $100.00 $56,000

MGS GUARDRAIL LF 4550 $30.00 $136,500

MGS BRIDGE APPROACH TRANSITION SECTION (REGULAR/NO CURB) EA 11 $3,000 $33,000

TYPE C CRASHWORTHY END TERMINAL EA 2 $16,000 $32,000

6" CONCRETE MEDIAN STRIP SY 70 $65 $4,550

CONCRETE GUTTER TYPE B LF 370 $30.00 $11,100

ROCK LINING CY 10 $100 $1,000

GRATE AND BEARING PLATE (5 FT. X 2 FT. OR 1524 MM X 610 MM) EA 8 $1,400 $11,200

CONCRETE TRAFFIC BARRIER, TYPE D LF 1090 $60.00 $65,400

MOBILIZATION LS 1 $776,000 $776,000

CONTRACTOR FURNISHED SURVEYING AND STAKING LS 1 $100,000 $100,000

MECHANICALLY STABILIZED EARTH WALL SYSTEMS SF 15380 $60.00 $922,800

12 IN. PIPE GROUP A LF 430 $75.00 $32,250

18 IN. PIPE GROUP A LF 1230 $80.00 $98,400

PRECAST DROP INLET 5 FT X 2 FT LF 135 $600 $81,000

18 IN. OR ALLOWED SUBSTITUTE GROUP A FLARED END SECTION EA 6 $1,050 $6,300

SEEDING - COOL SEASON MIXTURES ACRE 12.1 $3,000 $36,300

TRAFFIC CONTROL LS 1 $160,000 $160,000

EROSION CONTROL LS 1 $40,000 $40,000

SUBTOTAL: $6,794,900

BRIDGE ITEMS:

CLASS 1 EXCAVATION CY 290 $55.00 $15,950

BRIDGE APPROACH SLAB (MAJOR ROAD) SY 360 $235 $84,600

GALVANIZED STRUCTURAL STEEL PILES (12 IN.) LF 7250 $60.00 $435,000

PRE-BORE FOR PILING LF 440 $100 $44,000

PILE POINT REINFORCEMENT EACH 95 $125 $11,875

CLASS B CONCRETE (SUBSTRUCTURE) CY 330 $700 $231,000

SLAB ON STEEL SY 2020 $270 $545,400

SLAB ON CONCRETE I-GIRDER SY 905 $280 $253,400

BARRIER CURB (TYPE D) LF 1710 $105 $179,550

TYPE 4 (45 IN.) PRESTRESSED CONCRETE I-GIRDER LF 815 $190 $154,850

REINFORCING STEEL (BRIDGES) LB 36500 $1.20 $43,800

EXPANSION DEVICE (FLAT PLATE) LF 140 $800 $112,000

FABRICATED STRUCTURAL LOW ALLOY STEEL (I-BEAM) A709, GRADE 50 LB 663000 $1.60 $1,060,800

STEEL INTERMEDIATE DIAPHRAGM FOR P/S CONCRETE GIRDERS EACH 9 $700 $6,300

SLAB DRAIN EACH 38 $340 $12,920

DRAINAGE SYSTEM (ON STRUCTURE) LS 1 $6,000 $6,000

INTERMEDIATE FIELD COAT (SYSTEM G) SF 25000 $2.00 $50,000

FINISH FIELD COAT (SYSTEM G) SF 8000 $2.00 $16,000

VERTICAL DRAIN AT END BENTS EACH 4 $2,400 $9,600

LAMINATED NEOPRENE BEARING PAD (TAPERED) EACH 24 $325 $7,800

LAMINATED NEOPRENE BEARING PAD ASSEMBLY EACH 28 $1,800 $50,400

PIPE PILE SPACER EACH 12 $900 $10,800

SUBTOTAL: $3,342,045

SIGNAL, STRIPING, LIGHTING, AND ITS ITEMS:

PREFORMED THERMOPLASTIC PAVEMENT MARKING, LEFT/RIGHT ARROW EA 4 $300.00 $1,200

PREFORMED THERMOPLASTIC PAVEMENT MARKING, COMBINATION STR/LT/RT EA 2 $550.00 $1,100

4 IN. WHITE STANDARD WATERBORNE PAVEMENT MARKING PAINT, TYPE P BEADS LF 8560 $0.50 $4,280

4 IN. YELLOW STANDARD WATERBORNE PAVEMENT MARKING PAINT, TYPE P BEADS LF 3900 $0.50 $1,950

PreliminaryCostEstimate.xls 2/6/2019

Page 6: MO 370 Interchange Ramp at Salt River Road - Phase 2

ESTIMATE OF PROJECT COSTS

Project Sponsor: City of St. Peters

Project Title: Route 370 Ramp to Westbound Salt River Road (Ramp 2)

Date: February 6, 2019

LIGHTING POLE, 45 FT., TYPE AT DESIGN 2 EACH 6 $4,500 $27,000

LUMINAIRE, LED-C EACH 6 $800 $4,800

CONDUIT, 2 IN. RIGID, IN TRENCH LF 1500 $10.00 $15,000

CABLE, 6 AWG 1 CONDUCTOR LF 3000 $2.00 $6,000

CABLE, 10 AWG 1 CONDUCTOR, POLE AND BRACKET LF 625 $2.00 $1,250

CABLE, 6 AWG BARE NEUTRAL LF 1500 $1.50 $2,250

POLE FOUNDATION (45 FT. MOUNTING HEIGHT) EACH 6 $1,100 $6,600

SIGNAL HEAD, TYPE 4B EACH 1 $2,500 $2,500

CABLE, 16 AWG 7 CONDUCTOR LF 1000 $2.00 $2,000

REMOVAL OF EXISTING SIGNAL, LIGHTING & ITS EQUIPMENT LS 1 $10,000 $10,000

REPROGRAM VIDEO DETECTION ZONES LS 1 $4,500 $4,500

SIGNAL CONTROLLER & CABINET MODIFICATIONS EACH 1 $5,000 $5,000

REINSTALL CONDUIT & FIBER (INCLUDING TERMINATIONS) LS 1 $3,000 $3,000

RELOCATE RTMS EACH 1 $5,500 $5,500

SUBTOTAL: $103,930

SIGNING ITEMS:

CONCRETE FOOTING, EMBEDDED CY 15 $1,200 $18,000

CONCRETE FOOTING, BOLT DOWN CY 25 $1,000 $25,000

STRUCTURAL STEEL POSTS LB 830 $3.00 $2,490

PIPE POSTS LB 3240 $2.75 $8,910

BREAKAWAY ASSEMBLY EACH 20 $100 $2,000

SIGN, TYPE SHR2L-1 SF 320 $20.00 $6,400

SIGN, TYPE SHR2L-3 SF 490 $25.00 $12,250

TUBULAR SUPPORT, TYPE C-2018-28 EACH 3 $35,000.00 $105,000

76 FT SPAN TUBULAR TRUSS, 2 TUBE EACH 1 $55,000 $55,000

SUBTOTAL: $235,050

$10,475,925

$1,047,593

INFLATION (1.5% for 4 Years) $707,124

$1,000,000

$220,000

$600,000

$14,050,642PROJECT TOTAL

CONSTRUCTION COST TOTAL

CONTINGENCY (10%)

PRELIMINARY ENGINEERING

RIGHT-OF-WAY

CONSTRUCTION ENGINEERING

PreliminaryCostEstimate.xls 2/6/2019

Page 7: MO 370 Interchange Ramp at Salt River Road - Phase 2

SCALE

0 500 1000 1500

PREMIER PKWY S

SPENCER ROAD

SALT RIVER ROAD

RO

UTE 370

EX

EC

UTIV

E C

EN

TR

E P

KW

Y

RA

MP 2

RAMP 3

ROUTE 370 - SALT RIVER ROAD RAMPS 2 & 3

ENTRANCE RAMP WIDENING'

Page 8: MO 370 Interchange Ramp at Salt River Road - Phase 2

MEMORANDUM Date: December 26, 2018

To: Jarret Jasper, P.E. From: Shawn Leight, P.E., PTOE

Nirav Patel, E.I.T.

CBB Job Number: Traffic Forecast Memorandum Salt River Road & Missouri Route 370 Interchange Modifications Access Justification Report

Project 108-2018 CBB has prepared traffic forecasts for the Salt River Road & Missouri Route 370 (MO 370) Interchange Access Justification Report (AJR). The purpose of this memorandum is to provide a brief description of the procedures used to forecast traffic volumes to be used in the evaluation of the proposed modifications to the Salt River Road & MO 370 interchange in Saint Peters, MO. The study corridor includes Interstate 70 (I-70) between Mid Rivers Mall Drive interchange (to the west) and Cave Springs Road interchange (to the east) and MO 370 between Truman Boulevard interchange and I-70 interchange. The objective of this work was to develop traffic volume forecasts for future scenarios for use in evaluating the proposed improvements at the Salt River Road & MO 370 interchange. As an initial step in the process, manual turning movement counts were collected on a typical weekday from 7:00 AM to 9:00 AM and 4:00 PM to 6:00 PM at the following intersections and ramps in 2018:

• Mid Rivers Mall Drive at Eastbound I-70 Ramps (November 2018) • Mid Rivers Mall Drive at Westbound I-70 Ramps (November 2018) • Mid Rivers Mall Drive at Main Street/I-70 North Outer Road (November 2018) • Cave Springs at Road Mexico Road (November 2018) • Cave Springs at Veterans Memorial Parkway (November 2018) • Cave Springs at Eastbound I-70 Ramps (November 2018) • Cave Springs at Westbound I-70 Ramps (November 2018) • Cave Springs at West Clay Street (November 2018) • Westbound MO 370 to Eastbound I-70 Ramp (November 2018) • Westbound MO 370 to Westbound I-70 Ramp (November 2018)

Page 9: MO 370 Interchange Ramp at Salt River Road - Phase 2

Traffic Forecast Memorandum – Salt River Road AJR

December 26, 2018 Page 2

CBB utilized turning movement counts completed in 2017 for the Salt River Road and MO 370 Interchange Study for the following intersections and ramps:

• Spencer Road at Westbound Salt River Road Ramps (November 2017) • Spencer Road at Eastbound Salt River Road Ramps (November 2017) • Westbound MO 370 to Westbound Salt River Road Ramp (November 2017) • Eastbound Salt River Road to Eastbound MO 370 (November 2017) • Harry S. Truman Boulevard at Westbound MO 370 Ramps (September 2017) • Harry S. Truman Boulevard at Eastbound MO 370 Ramps (September 2017) • Harry S. Truman Boulevard at Premier Parkway (September 2017) • Eastbound I-70 to Eastbound MO 370 Ramp (November 2017) • Westbound I-70 to Eastbound MO 370 Ramp (November 2017)

CBB also utilized peak period and daily 2018 traffic volume data for I-70 obtained from MoDOT's ATMS Data Portal. After obtaining existing traffic volume counts, the traffic growth for the roadways was determined by evaluating historical growth trends, utilizing the St. Charles Count Travel Demand Model, and accounting for future land use plans within the study area. In particular, the Premier 370 Business Park in particular is an 850-acre business community positioned near the MO 370 and I-70 interchange. The primary source of traffic growth on the local roadway network in the immediate study area will be attributed to the trips generated by the developments within the Premier 370 Business Park. CBB utilized the projected traffic volumes from the Traffic Impact Study for the Proposed Project LOU Development, dated February 2018, for the area between Spencer Road to the west and Truman Boulevard to the east as well as MO 370. The estimated traffic volumes were based on currently approved developments within Premier 370 Business Park as well as a full development of the entire Premier 370 Business Park. The study area for this AJR expands from the Project Lou study area to include I-70 and interchanges with Mid Rivers Mall Drive, and Cave Springs Road as well as operations along MO 370. Figure 1 illustrates the locations where traffic volumes were distributed from the Project Lou study area. The anticipated directional distribution during the AM and PM peak hours for the projected traffic volumes for each individual location would be as follows:

• Location 1 o 40% to/from the west on I-70 via Mid Rivers Mall Drive Interchange; o 40% to/from the east on I-70 via Mid Rivers Mall Drive Interchange; o 10% to/from the west on Salt River Road; o 10% to/from the south on Mid Rivers Mall Drive;

• Location 2 o 40% to/from the west on I-70 via Mid Rivers Mall Drive Interchange; o 40% to/from the east on I-70 via Mid Rivers Mall Drive Interchange; o 10% to/from the south on Spencer Road;

Page 10: MO 370 Interchange Ramp at Salt River Road - Phase 2

Traffic Forecast Memorandum – Salt River Road AJR

December 26, 2018 Page 3

Figure 1: Locations where Traffic Volumes were Distributed from the Project Lou Study Area

• Location 3 o 90% to/from the west on I-70 via MO 370 Interchange; o 10% to/from the east on I-70 via MO 370 Interchange;

• Location 4 o 40% to/from the west on I-70 via Cave Springs Road Interchange; o 40% to/from the east on I-70 via Cave Springs Road Interchange; o 10% to/from the south on Muegge Road;

• Location 5 o 50% to/from the west on I-70 via Cave Springs Road Interchange; and o 50% to/from the east on I-70 via Cave Springs Road Interchange.

Future traffic volumes along I-70 were estimated based on historic growth trends as well as output from the St. Charles County travel demand model. Figure 2 illustrates the historic counts supplied by MoDOT AADT maps. As can be seen, the I-70 corridor has experienced steady annual traffic growth since the mid-1970s. Going forward, the growth rate is expected to continue. The project growth rate for I-70 between 2018 and 2040 is approximately 35%. Additionally, traffic volume on Mid Rivers Mall Drive and Cave Springs Road is expected to grow between 10-15%. The proposed traffic volumes are provided in the Appendix.

Page 11: MO 370 Interchange Ramp at Salt River Road - Phase 2

Traffic Forecast Memorandum – Salt River Road AJR

December 26, 2018 Page 4

Figure 2: Historical and Projected I-70 Traffic Volumes Finally, the MoDOT yearly count map was utilized to determine the existing daily truck volumes along I-70 near the MO 370 interchange, which is 12%. Additionally, the ramp counts completed by CBB obtained the truck percentages along MO 370 during the peak hours was on average 12%. CBB will utilize a truck percentage of 12% along I-70 and MO 370 for the 2020 traffic volume scenario. It should be noted that CBB reviewed the I-70 Planning and Environmental Linkages (PEL) Study Conditions Assessment Report, dated May 2017, for the I-70 corridor between Interstate 64 (I-64) IN St. Charles County, Missouri to the end of the express lanes in the City of St. Louis. CBB compared the I-70 peak hour traffic volumes in the PEL study to the peak hour traffic volumes obtained by the MoDOT's ATMS Data Portal. The comparison showed that the MoDOT's ATMS Data Portal peak hour traffic volumes are comparable to the I-70 PEL Study peak hour traffic volumes for I-70. St. Charles County has included a freight component in their travel demand model. This model shows increasing truck volumes in the future. The anticipated truck percentage along I-70 and MO 370 is 13% and 15%, respectively, for the 2040 traffic volume scenario. We appreciate your review of the above technical assumptions for the Salt River Road and MO 370 AJR. Very truly yours, Shawn Leight, PE, PTOE, PTP Vice President

0

50000

100000

150000

200000

250000

300000

1970 1980 1990 2000 2010 2020 2030 2040 2050Aver

age

Daily

Tra

ffic (

ADT)

Year

Interstate 70 Historical and Forecasted Traffic Counts

Historical Traffic Counts EWG Proposed ADTs

CBB Proposed ADTs Linear (Historical Traffic Counts)

Page 12: MO 370 Interchange Ramp at Salt River Road - Phase 2

Traffic Forecast Memorandum – Salt River Road AJR

December 26, 2018 Page 5

APPENDIX

Page 13: MO 370 Interchange Ramp at Salt River Road - Phase 2

Mid

Riv

ers

Ma

ll D

rive

Veterans Memorial Pkwy

Mid

Riv

ers

Ma

ll D

rive

210 (

505)

270 (

525)

500 (1,025)

160 (125)

355 (

450)

400 (

740)

390 (555)

180 (135)

775 (

555)

575 (

1,0

55)

Job# 108-18

12/18/18Exhibit 1A: Existing Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

7,205 (4,060)

560 (

1,1

10)

210 (

440)

610 (1,245) 660 (1,150)

570 (690)

70

20 (90)

30 (90)

140 (525)

45 (

50)

105 (

195)

45 (

20)

30 (15)

55 (50)

235 (310)

205 (

215)

145 (

100)

165 (

260)

Main Street

I-70 North Outer Road

670 (560)

985 (995) 1,615 (1,410)

40 (145)

80 (

155)

Mid

Riv

ers

Ma

ll C

ircl

e

925 (865)

370

6,535 (3,500)

2,6

80 (915)

35 (2

0)

870 (2,760)

15 (90)

3,265 (7,800) 2,655 (6,555)

870 (

2,7

60)

2,7

15 (

935)

WCla

ySt

reet

Ha

rry

S.

Tru

ma

n B

ou

leva

rd

30 (45)

55 (195)

85 (290)

35 (

40)

445 (

715)

15 (

35)

50 (35)65 (125)

195 (240)

265 (

290)

645 (

505)

190 (

185)

775 (835)

285 (180)490 (655)

315 (

425)

815 (

800)

140 (

270)

585 (

975)

905 (

1,3

95)

170 (

235)

905 (

1,0

70)

625 (

620)

225 (155)

455 (495)

115 (180)

230 (

350)

1,0

05 (

1,3

95)

125 (

145)

125 (315)50 (100)30 (85)

1,2

90 (

1,1

95)

20 (

30)

Veterans Memorial Pkwy

4,795 (3,540)

100 (105)

140 (405)

20 (35)

420 (

575)

455 (

720)

160 (

185)

595 (550)210 (255)310 (490)

285 (

560)

615 (

570)

25 (

40)

Mexico Road Mexico Road

Mu

eg

ge

Ro

ad

Ca

ve S

pri

ng

s

Ro

ad

455 (695)

795 (855)680 (650)

4,910 (3,745)

2,025 (4,270)2,445 (4,945)

4,780 (3,450)

70

570 (690)

660 (1,150)

2,680 (915)

35 (20) 775 (835)

770 (700)

15 (

90)

4,115 (2,890)680 (650)

2,480 (4,965)3,315 (7,705)

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

n.t.s.

Page 14: MO 370 Interchange Ramp at Salt River Road - Phase 2

Job# 108-18

12/18/18Exhibit 1B: Existing Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

Veterans Memorial Pkwy

7070

370

Harry S. Truman Boulevard

3,865 (1,320)1,125 (3,990)

4,150 (1,565)1,065 (3,885)

5 (5)

275 (390)

280 (395)

15 (1

5)

55 (1

00)

15 (1

0)

5 (5

)

60 (105)

110 (80)

395 (325)

5 (15)

105 (65)

390 (3

20)

65 (1

00)

5 (5

)

285 (3

95)

95 (505)

30 (

105)

95 (

505)

80 (60)

30 (

105)

445 (

205)

Sp

en

cer

Ro

ad

Salt River Road

2,7

15 (

935)

885 (

2,8

50)

370

80 (60)

445 (205)

705 (180)

1,150 (3

85)

95 (505) 240 (1,140)

145 (635)

175

(740

)

30 (105)

Premier Parkway

Spen

cer

Ro

ad

155 (560)

20 (5)

5 (25)10 (25)

470 (

285)

30 (

20)

115

(110

)

35 (3

0)

340 (310)

25 (35)

270 (330)

120 (130)

Premier Parkway

280 (395)

3,755 (1,240)

110 (80)

885

(2,8

50)

240

(1,1

40)

705 (180)

80 (60)

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

= Existing All-Way Stop Control

n.t.s.

Page 15: MO 370 Interchange Ramp at Salt River Road - Phase 2

Mid

Riv

ers

Ma

ll D

rive

Veterans Memorial Pkwy

Mid

Riv

ers

Ma

ll D

rive

275 (

760)

340 (

790)

500 (1,025)

405 (375)

610 (

710)

400 (

740)

390 (555)

425 (385)

775 (

555)

585 (

1,0

65)

Job# 108-18

12/18/18Exhibit 2A: 2020 No-Build Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

7,430 (4,280)

565 (

1,1

20)

275 (

695)

675 (1,500) 905 (1,400)

815 (940)

70

20 (90)

30 (90)

200 (905)

45 (

50)

180 (

335)

45 (

20)

30 (15)

55 (50)

235 (310)

205 (

215)

285 (

250)

525 (

620)

Main Street

I-70 North Outer Road

670 (560)

1,050 (1,250) 1,680 (1,665)

40 (145)

80 (

155)

Mid

Riv

ers

Ma

ll C

ircl

e

990 (1,120)

370

6,760 (3,720)

2,7

50 (980)

40 (2

5)

870 (2,830)

15 (95)

3,330 (8,295) 2,655 (6,795)

870 (

2,8

30)

2,7

90 (

1,0

05)

WCla

ySt

reet

Ha

rry

S.

Tru

ma

n B

ou

leva

rd

30 (45)

55 (195)

85 (290)

35 (

40)

450 (

1,0

35)

15 (

35)

50 (35)65 (125)

195 (315)

335 (

360)

945 (

800)

190 (

185)

930 (990)

440 (335)490 (655)

315 (

425)

1,0

30 (

1,0

10)

140 (

440)

590 (

1,2

00)

910 (

1,4

55)

170 (

400)

965 (

1,1

25)

625 (

620)

380 (310)

455 (495)

115 (180)

230 (

350)

1,0

10 (

1,4

55)

125 (

145)

125 (315)50 (100)30 (85)

1,3

50 (

1,2

50)

20 (

30)

Veterans Memorial Pkwy

5,015 (3,955)

100 (105)

140 (405)

20 (35)

420 (

575)

460 (

780)

160 (

185)

595 (550)210 (255)310 (490)

285 (

560)

675 (

625)

25 (

40)

Mexico Road Mexico Road

Mu

eg

ge

Ro

ad

Ca

ve S

pri

ng

s

Ro

ad

455 (865)

795 (1,020)835 (805)

4,975 (4,170)

2,275 (4,525)2,690 (5,365)

5,000 (3,860)

70

815 (940)

905 (1,400)

2,750 (980)

40 (25) 930 (990)

770 (700)

15 (

95)

4,180 (3,150)835 (805)

3,560 (8,195) 2,730 (5,390)

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

n.t.s.

Page 16: MO 370 Interchange Ramp at Salt River Road - Phase 2

Job# 108-18

12/18/18Exhibit 2B: 2020 No-Build Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

Veterans Memorial Pkwy

7070

370

Harry S. Truman Boulevard

4,060 (1,825)1,540 (4,485)

4,275 (2,325)1,480 (4,305)

5 (5)

580 (685)

585 (690)

15 (1

5)

55 (1

75)

15 (1

0)

5 (5

)

60 (180)

185 (150)

400 (650)

5 (15)

180 (135)

395 (6

45)

65 (1

75)

5 (5

)

590 (6

90)

510 (925)

125 (

280)

510 (

925)

250 (240)

125 (

280)

565 (

640)

Sp

en

cer

Ro

ad

Salt River Road

2,7

90 (

1,0

05)

885 (

2,9

25)

370

250 (240)

565 (640)

705 (180)

1,270 (8

20)

510 (925) 655 (1,560)

145 (635)

270

(915

)

125 (280)

Premier Parkway

Spen

cer

Ro

ad

155 (560)

605 (605)

220 (635)90 (500)

470 (

285)

480 (

470)

120

(510

)

40 (3

55)

340 (310)

325 (330)

270 (330)

500 (495)

Premier Parkway

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

n.t.s.

585 (690)

3,875 (1,675)

185 (150)

885

(2,9

25)

655

(1,5

60)

705 (180)

250 (240)

Page 17: MO 370 Interchange Ramp at Salt River Road - Phase 2

Mid

Riv

ers

Ma

ll D

rive

Veterans Memorial Pkwy

Mid

Riv

ers

Ma

ll D

rive

210 (

505)

275 (

535)

500 (1,025)

160 (125)

365 (

460)

400 (

740)

390 (555)

180 (135)

775 (

555)

585 (

1,0

65)

Job# 108-18

12/18/18Exhibit 3A: 2020 Build Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

7,575 (4,480)

565 (

1,1

20)

210 (

440)

610 (1,245) 660 (1,150)

570 (690)

70

20 (90)

30 (90)

140 (525)

45 (

50)

110 (

205)

45 (

20)

30 (15)

55 (50)

235 (310)

205 (

215)

155 (

110)

165 (

260)

Main Street

I-70 North Outer Road

670 (560)

985 (995) 1,615 (1,410)

40 (145)

80 (

155)

Mid

Riv

ers

Ma

ll C

ircl

e

925 (865)

370

6,905 (3,920)

3,0

70 (1,3

05)

420 (4

55)

935 (3,170)

180 (480)

3,270 (8,190) 2,660 (6,945)

935 (

3,1

70)

3,4

90 (

1,7

60)

WCla

ySt

reet

Ha

rry

S.

Tru

ma

n B

ou

leva

rd

30 (45)

55 (195)

85 (290)

35 (

40)

450 (

905)

15 (

35)

50 (35)65 (125)

195 (280)

305 (

330)

825 (

680)

190 (

185)

855 (915)

365 (260)490 (655)

315 (

425)

955 (

935)

140 (

355)

590 (

1,1

20)

910 (

1,4

55)

170 (

320)

965 (

1,1

25)

625 (

620)

305 (235)

455 (495)

115 (180)

230 (

350)

1,0

10 (

1,4

55)

125 (

145)

125 (315)50 (100)30 (85)

1,3

50 (

1,2

50)

20 (

30)

Veterans Memorial Pkwy

4,940 (3,960)

100 (105)

140 (405)

20 (35)

420 (

575)

460 (

780)

160 (

185)

595 (550)210 (255)310 (490)

285 (

560)

675 (

625)

25 (

40)

Mexico Road Mexico Road

Mu

eg

ge

Ro

ad

Ca

ve S

pri

ng

s

Ro

ad

455 (780)

795 (940)760 (730)

4,975 (4,170)

2,350 (4,600)2,385 (4,925)

4,760 (3,480)

70

570 (690)

660 (1,150)

3,070 (1,305)

420 (455) 855 (915)

770 (700)

180 (

480)

4,180 (3,230)760 (730)

3,320 (8,095) 2,805 (5,380)

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

n.t.s.

Page 18: MO 370 Interchange Ramp at Salt River Road - Phase 2

Job# 108-18

12/18/18Exhibit 3B: 2020 Build Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

Veterans Memorial Pkwy

7070

370

Harry S. Truman Boulevard

4,060 (1,825)1,540 (4,485)

4,275 (2,325)1,480 (4,305)

5 (5)

580 (685)

585 (690)

15 (1

5)

55 (1

75)

15 (1

0)

5 (5

)

60 (180)

185 (150)

400 (650)

5 (15)

180 (135)

395 (6

45)

65 (1

75)

5 (5

)

590 (6

90)

1,150 (1,575)

55 (

150)

1,1

50 (

1,5

75)

100 (50)

55 (

150)

695 (

1,3

15)

Sp

en

cer

Ro

ad

Salt River Road

2,7

90 (

1,0

05)

1,0

15 (

3,6

00)

370

220 (150)

565 (640)

705 (180)

1,270 (8

20)

1,210 (1,680)

655 (1,560)

145 (635)

260

(890

)

115 (255)

Premier Parkway

Spen

cer

Ro

ad

155 (560)

1,1

15 (1,1

15)

280 (1,180)30 (120)

470 (

285)

120 (

110)

120

(510

)

40 (2

25)

340 (310)

205 (210)

270 (330)

500 (495)

Premier Parkway

585 (690)

3,875 (1,675)

185 (150)

885

(2,9

25)

655

(1,5

60)

705 (180)

220 (150)

60 (105)

705 (

180)

120 (100)

700 (

755)

1,270 (820)

230 (725)

145 (635)1,210 (1,680)

230 (725)

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

n.t.s.

= Proposed Improvements

Page 19: MO 370 Interchange Ramp at Salt River Road - Phase 2

Mid

Riv

ers

Ma

ll D

rive

Veterans Memorial Pkwy

Mid

Riv

ers

Ma

ll D

rive

335 (

930)

410 (

975)

550 (1,130)

535 (445)

765 (

805)

440 (

815)

430 (610)

555 (450)

855 (

610)

650 (

1,1

70)

Job# 108-18

12/18/18Exhibit 4A: 2040 No-Build Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

9,510 (5,350)

625 (

1,2

40)

335 (

865)

775 (1,745) 1,085 (1,575)

985 (1,060)

70

20 (100)

35 (100)

275 (1,150)

50 (

55)

210 (

415)

50 (

20)

35 (15)

60 (55)

260 (340)

225 (

235)

355 (

290)

720 (

725)

Main Street

I-70 North Outer Road

735 (615)

1,190 (1,475) 1,880 (1,930)

45 (160)

90 (

170)

Mid

Riv

ers

Ma

ll C

ircl

e

1,125 (1,330)

370

8,775 (4,735)

3,4

70 (1,3

70)

95 (5

0)

1,410 (3,675)

30 (150)

4,410 (10,530) 3,653 (8,785)

1,4

10 (

3,6

75)

3,5

65 (

1,4

20)

WCla

ySt

reet

Ha

rry

S.

Tru

ma

n B

ou

leva

rd

35 (50)

60 (215)

95 (320)

40 (

45)

570 (

1,3

70)

15 (

40)

55 (40)70 (140)

240 (440)

465 (

430)

1,2

70 (

965)

210 (

205)

1,165 (1,150)

625 (430)540 (720)

345 (

465)

1,3

20 (

1,1

70)

205 (

625)

700 (

1,5

05)

1,0

10 (

1,6

50)

230 (

575)

1,1

10 (

1,2

45)

690 (

680)

555 (380)

500 (545)

125 (200)

255 (

385)

1,1

15 (

1,6

50)

140 (

160)

140 (345)55 (110)35 (95)

1,5

35 (

1,3

80)

20 (

35)

Veterans Memorial Pkwy

6,460 (4,845)

110 (115)

155 (445)

20 (40)

460 (

630)

515 (

910)

175 (

205)

655 (605)230 (280)340 (540)

315 (

615)

790 (

695)

25 (

45)

Mexico Road Mexico Road

Mu

eg

ge

Ro

ad

Ca

ve S

pri

ng

s

Ro

ad

550 (1,090)

920 (1,255)

1,055 (935)

6,325 (5,165)

2,855 (5,645)3,310 (6,685)

6,430 (4,695)

70

985 (1,060)

1,085 (1,575)

3,470 (1,370)

95 (50) 1,165 (1,150)

845 (770)

30 (

150)

5,405 (3,910)1,055 (935)

4,720 (10,360) 3,405 (6,735)

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

n.t.s.

Page 20: MO 370 Interchange Ramp at Salt River Road - Phase 2

Job# 108-18

12/18/18Exhibit 4B: 2040 No-Build Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

Veterans Memorial Pkwy

7070

370

Harry S. Truman Boulevard

5,000 (2,585)2,425 (5,595)

4,790 (3,360)2,210 (4,840)

480 (200)

610 (705)

1,090 (905)

815 (3

45)

60 (1

80)

200 (7

15)

155 (5

75)

215 (755)

760 (390)

550 (1,1

65)

575 (250)

185 (140)

420 (6

85)

300 (2

75)

130 (4

80)

680 (9

40)

Sp

en

cer

Ro

ad

Salt River Road

3,5

65 (

1,4

20)

1,4

40 (

3,8

25)

370

310 (270)

660 (965)

775 (200)

1,435 (1

,165)

820 (1,060) 985 (1,770)

165 (710)

310

(1,0

55)

145 (345)

Premier Parkway

Spen

cer

Ro

ad

205 (750)

655 (725)

345 (720)115 (550)

660 (

365)

515 (

495)

150

(555

)

60 (3

95)

570 (405)

355 (350)

330 (560)

535 (520)

Premier Parkway

1,090 (905)

4,240 (2,195)

760 (390)

1,44

0 (3

,825

)

985

(1,7

70)

775 (200)

310 (270)

285 (115)

535 (945)

15 (

55)

145 (

570)

130 (

290)

345 (

140)

605 (

1,2

30)

75 (

285)

55 (25)

255 (245)

420 (

405)

585 (

680)

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

n.t.s.

= Proposed Improvements

Page 21: MO 370 Interchange Ramp at Salt River Road - Phase 2

Mid

Riv

ers

Ma

ll D

rive

Veterans Memorial Pkwy

Mid

Riv

ers

Ma

ll D

rive

230 (

55)

310 (

600)

550 (1,130)

175 (140)

410 (

505)

440 (

815)

430 (610)

200 (150)

855 (

610)

650 (

1,1

70)

Job# 108-18

12/18/18Exhibit 5A: 2040 Build Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

9,675 (5,550)

625 (

1,2

40)

235 (

490)

670 (1,370) 725 (1,270)

630 (760)

70

20 (100)

35 (100)

155 (580)

50 (

55)

125 (

235)

50 (

20)

35 (15)

60 (55)

260 (340)

225 (

235)

180 (

125)

180 (

285)

Main Street

I-70 North Outer Road

735 (615)

1,090 (1,100) 1,780 (1,555)

45 (160)

90 (

170)

Mid

Riv

ers

Ma

ll C

ircl

e

1,025 (955)

370

8,940 (4,935)

3,9

70 (1,7

70)

710 (6

55)

1,530 (4,205)

335 (765)

4,300 (10,335) 3,630 (8,965)

1,5

30 (

4,2

05)

4,6

80 (

2,4

25)

WCla

ySt

reet

Ha

rry

S.

Tru

ma

n B

ou

leva

rd

35 (50)

60 (215)

95 (320)

40 (

45)

550 (

1,1

50)

15 (

40)

55 (40)70 (140)

230 (365)

385 (

385)

1,0

60 (

805)

210 (

205)

1,020 (1,045)

480 (325)540 (720)

345 (

465)

1,1

75 (

1,0

70)

190 (

470)

685 (

1,3

65)

1,0

10 (

1,6

50)

215 (

435)

1,1

10 (

1,2

45)

690 (

680)

410 (290)

500 (545)

125 (200)

255 (

385)

1,1

15 (

1,6

50)

140 (

160)

140 (345)55 (110)35 (95)

1,5

35 (

1,3

80)

20 (

35)

Veterans Memorial Pkwy

6,330 (4,885)

110 (115)

155 (445)

20 (40)

460 (

630)

515 (

910)

175 (

205)

655 (605)230 (280)340 (540)

315 (

615)

790 (

695)

25 (

45)

Mexico Road Mexico Road

Mu

eg

ge

Ro

ad

Ca

ve S

pri

ng

s

Ro

ad

535 (935)

905 (1,115)910 (835)

6,325 (5,165)

3,000 (5,750)2,825 (6,030)

5,995 (4,120)

70

630 (760)

725 (1,270)

3,970 (1,770)

710 (655) 1,020 (1,045)

845 (770)

335 (

765)

5,420 (4,050)910 (835)

4,355 (10,235) 3,535 (6,685)

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

n.t.s.

Page 22: MO 370 Interchange Ramp at Salt River Road - Phase 2

Job# 108-18

12/18/18Exhibit 5B: 2040 Build Traffic Volumes

Salt River Road AJR

Saint Peters, Missouri

Veterans Memorial Pkwy

7070

370

Harry S. Truman Boulevard

5,000 (2,585)2,425 (5,595)

4,790 (3,360)2,210 (4,840)

480 (200)

610 (705)

1,090 (905)

725 (3

05)

60 (1

80)

180 (6

25)

155 (5

75)

215 (755)

760 (390)

125 (475)

575 (250)

185 (140)

420 (6

85)

210 (2

35)

130 (4

80)

660 (8

50)

190 (100)

145 (

190)

740 (

1,4

05)

Sp

en

cer

Ro

ad

Salt River Road

3,5

65 (

1,4

20)

1,8

65 (

4,9

70)

370

325 (205)

660 (965)

775 (200)

1,435 (1

,165)

1,935 (2,065)

985 (1,770)

165 (710)

335

(1,0

70)

170 (360)

Premier Parkway

Spen

cer

Ro

ad

165 (600)

1,1

85 (1,2

15)

375 (1,290)35 (130)

510 (

305)

125 (

115)

150

(555

)

60 (2

65)

480 (365)

235 (230)

310 (470)

535 (520)

Premier Parkway

Legend

( )XX

XX

= Peak Hour Traffic (4:30 - 5:30 )PM PM

= Peak Hour Traffic (7:00 - 8:00 )AM AM

= Existing Side-Street Stop Control

= Existing Traffic Signal

n.t.s.

1,090 (905)

4,240 (2,195)

760 (390)

1,44

0 (3

,825

)

985

(1,7

70)

775 (200)

325 (205)

120 (100)

1,1

15 (

1,0

05)

1,435 (1,165)

425 (1,145)

= Proposed Improvements

165 (710)1,935 (2,065)

425 (1,145)

110 (195)

1,210 (1,620)

5 (

515)

175 (

700)

55 (

150)

105 (

45)

615 (250)

1,2

30 (

1,7

15)

155 (

605)

15 (50)