Model Validation – MOD-026 and MOD-027
Sherman Chen PG&E
![Page 2: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/2.jpg)
Previous WECC Requirement
• Generator model validation required for all generating units > 10 MVA, and all generating plants > 20 MVA
• Test required every five years • Test required within 180 days for new
commercial units or existing units which have been modified
![Page 3: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/3.jpg)
Typical Tests Performed
• Open circuit saturation curve • Field resistance test • D-axis dump (generator direct axis reactances
and time constants) • Xq test (generator quadrature axis reactance) • Inertia trip test • Governor step tests (on and off-line) • AVR step tests (on and off-line) • Min and max Var capability
![Page 4: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/4.jpg)
Diablo Canyon Voltage Regulator Test
![Page 5: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/5.jpg)
DCPP #2 AVR Step Test
![Page 6: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/6.jpg)
Validating Models to Actual System Response
![Page 7: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/7.jpg)
Helms 1 Governor Step Test
![Page 8: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/8.jpg)
Dutch Flat 1 Excitation Control
![Page 9: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/9.jpg)
JB Black 1 Mechanical Governor
![Page 10: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/10.jpg)
• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions
• MOD-027 – Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions
NERC MOD Standards
![Page 11: Model Validation – MOD-026 and MOD-027...• MOD-026 – Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions • MOD-027 –](https://reader033.vdocument.in/reader033/viewer/2022043009/5f9a0a9293e91772af4f9170/html5/thumbnails/11.jpg)
Parameter Estimation and Model Validation Tools Utilizing PMU Data Under Evaluation
• Mathworks Parameter Estimation and Model Validation Tool
• EPRI Power Plant Parameter Derivation Tool