Page 1: Modernisation Committee on Production and Methods Progress in 2015

Modernisation Committee on Production and

Methods

Progress in 2015

Page 2: Modernisation Committee on Production and Methods Progress in 2015

Current MembershipChair - Rune Gløersen (Norway)Gillian Nicoll / Michael Meagher (Australia)Claude Poirier / Rob McLellan (Canada)Elaine Lucey (Ireland)Alessio Cardacino / Marco di Zio (Italy)Matjaz Jug (Netherlands)Rosemary McGrath (New Zealand) Janusz Dygaszewicz (Poland) Jan Jones (United Kingdom)Hubertus Cloodt / Pal Jancsok (Eurostat)Bruno Urban / David Barraclough (OECD)Valentin Todorov (UNIDO)

Page 3: Modernisation Committee on Production and Methods Progress in 2015

Terms of reference

Consider and make proposals on how to develop the architectures, tools and methods needed to support modernisation in statistical organisations.

Operational responsibility for the maintenance and development of the Common Statistical Production Architecture and associated catalogues of sharable artefacts

Page 4: Modernisation Committee on Production and Methods Progress in 2015

Main areas of work in 2015:Generic Statistical Data Editing ModelsStudy on organisational maturity for

CSPA implementationDraft CSPA Compliancy CookbookMethodology ArchitectureMeetings:

◦Workshop on the Modernisation of Statistical Production

◦Work Session on Statistical Data Editing

Page 5: Modernisation Committee on Production and Methods Progress in 2015

Generic Statistical Data Editing Models

See presentation byJeroen Pannekoek

Page 6: Modernisation Committee on Production and Methods Progress in 2015

Study on organisational maturity for CSPA implementation

Led by ABSQuestionnaire based on the Open Group

Service Integration Maturing Model5 NSOs participated“Significant gap between the current and

the target maturity level for all agencies”Good evaluation method – encourage

wider use

Page 7: Modernisation Committee on Production and Methods Progress in 2015

CSPA Compliancy Cookbook

Draft prepared by Statistics NetherlandsReviewed by CSPA Architecture Working

GroupNew draft planned, based on feedback

so far

Page 8: Modernisation Committee on Production and Methods Progress in 2015

Methodology Architecture

New Zealand and Australia drafted their models

Canada analysed their content, their overlaps and gaps

A common model is in development◦A layered approach is being thought

outMethodology architecture

benefits will be documented