Dario Hidalgo, PhDAileen Carrigan, MUP
December 14th, 2010
1
Modernizing Public Transport: Lessons
Learned from Bus Reforms in Latin
America and Asia
![Page 2: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/2.jpg)
http://www.embarq.org/en/modernizing-
public-transportation
![Page 3: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/3.jpg)
![Page 4: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/4.jpg)
Projects with very different scope
5
One corridor Several corridors
Feeder lines
Route reorganization
of the whole city
No Inte
gra
tion
Inte
gra
tion
Metrobús – Mexico (1, 2)
BRT – Beijing (1, 2, 3)
TransMilenio - Bogotá
Metrovía - Guayaquil
Jakarta (1, 2, 3)
Quito (Trole, Ecovía, North)
Transantiago
Interligado – Sao PauloMegabús - Pereira
RIT - Curitiba
Rea Vaya -Johannesburg
Janmarg – Ahmedabad
Istanbul, Turkey
Optibus – Leon, Guanajuato
Transmetro – Guatemala
Metropolitano - Lima
BRT - Guanzhou
Macrobús - Guadalajara MIO - Cali
Metrolínea- BucaramangaTransmetro - Barranquilla
Reviewed
![Page 5: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/5.jpg)
All the reviewed systems include BRT
components
6
Exclusive bus
lanes
Large buses with
multiple doors
Stations with prepayment
and level access
Centralized
control
Distinctive
image
![Page 6: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/6.jpg)
Project focus: structural change in
transit provision, not just to build and
operate BRT corridors
Traditional Operation* Transformed Operation
Private operators or associations
under permits or concessions, with
weak supervision by government
New private companies under
contracts and with strong
supervision of government
(new agencies)
* Not applicable to Beijing, Ahmedabad Sao Paulo
![Page 7: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/7.jpg)
Traditional Operation* Transformed Operation
Competition in the market
(“guerra del centavo” penny war)
Competition for the market
(bidding process)
or consolidation of existing
operators (direct negotiation with of
new contracts/concessions)
* Not aplicable to Beijing, Ahmedabad, partial in Sao Paulo
![Page 8: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/8.jpg)
![Page 9: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/9.jpg)
![Page 10: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/10.jpg)
![Page 11: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/11.jpg)
Diverse Sizes
(2009)
![Page 12: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/12.jpg)
Varied throughput
(2009)
![Page 13: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/13.jpg)
Commercial speed
(2009)
![Page 14: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/14.jpg)
Operational productivity
(2009)
![Page 15: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/15.jpg)
Capital productivity
(2009)
![Page 16: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/16.jpg)
Capital Cost
(2009)
![Page 17: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/17.jpg)
User Fares
(2009)
![Page 18: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/18.jpg)
Common issues in Planning
• Insufficient funding for studies and design
• Lack of experience with BRT (staff and local consultants)
• Implementation focus, not adequate preparation
• Low user fares – tight financial planning
• Local implementation teams outside existing bureaucracy (latter staff of new agencies)
19
Trinary Road System-Curitiba
Trolebús en el Centro Histórico - Quito
Fo
to: U
RB
S,
20
00
Fo
to: D
. H
ida
lgo
20
06
![Page 19: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/19.jpg)
Decision Processes
• Political will and leadership at the top level fast implementation
• Need for regulatory and instutional changes (creation of new agencies)
• Funding from external or new sources
20
Northwestern Terminal – León, México
Metrobús Insurgentes – México DF
Fo
to: D
. H
ida
lgo
20
06
Fo
to: D
. H
ida
lgo
20
06
![Page 20: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/20.jpg)
Rushed implementation – most difficulties
solved within few weeks
• Incomplete infrastructure and fare collection and control systems
• Lack of training for bus operators
• Insufficient user education
• Public protests
21
Fo
to: J. E
rnst 2
00
5
Jakarta
Beijing BRT
Fo
to: D
. H
ida
lgo
20
06
![Page 21: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/21.jpg)
Common operational concerns
• High occupancy levels
• Long waiting times for feeder services
• Road surface maintenance
• Pick-pocketing
22
![Page 22: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/22.jpg)
The main structural problems are institutional
or regulatory
• User fares are defined after political negotiations – absence of
operational subsidies - financial stress
• Expansion is difficult after initial lines
– Opposition from existing operators
– Lack of political priority and funding for infrastructure
• Lack of dedicated funding for maintenance
• Lack of integration with normal bus services (except Santiago, which
suffered from profound planning and implementation difficulties)
23
Fotos: D. Hidalgo 2006, 2007
Megabús – Pereira Metrovía - Guayaquil Transantiago - Santiago
![Page 23: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/23.jpg)
Despite issues, most systems have been
succesful
• Quality and performance are better than in the systems they replaced
• Main achievement: travel time reduction and increased safety and reliability
– Efficiency gains resulted in reduced energy consumption and decreased pollutant emissions
– Improved urban environments
24
![Page 24: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/24.jpg)
Filename/RPS Number
What Went Wrong
• Rushed implementation – several components
incomplete
• Very tight financial planning – non technical user fares
• Very high occupancy levels (160 pax/bus standard for
articulated buses is not accepted by the users)
• Early deterioriation of infrastructure (lack of road surface
reinforcement or problems in design/construction)
• Implementation of fare collection systems requires
longer time tables and very tight supervision
• Insufficient user education
Common problems
![Page 25: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/25.jpg)
Recommendations
• Planning
• Decision process
• Type of implementation
• Implementation process
• Design and operation
• Structural issues
• Further studies
26
![Page 26: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/26.jpg)
![Page 27: Modernizing Public Transport Webinar](https://reader033.vdocument.in/reader033/viewer/2022061220/54bcb4cb4a7959c6538b45c7/html5/thumbnails/27.jpg)
¡Muchas Gracias!