![Page 1: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/1.jpg)
09
May
20
13
TIM COLLINS, PORTLAND WATER BUREAU KEVIN LARSON, PORTLAND WATER BUREAU
RICH BLACKMUN, BLACK & VEATCH
MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL WITHDRAWAL
![Page 2: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/2.jpg)
AGENDA • Project Background and Drivers
• Design Approach
• Constructing in an Active Unfiltered Drinking Water Reservoir
2
![Page 3: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/3.jpg)
PROJECT BACKGROUND AND DRIVERS
3
![Page 4: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/4.jpg)
The Dam 2 Towers Improvement Project is located at the Bull Run Watershed Reservoir 2.
BULL RUN WATERSHED
• Source: Portland Water Bureau (www.portlandoregon.gov)
Project Site
Headworks
Reservoir 1 and Dam 1
Reservoir 2 and Dam 2
4
![Page 5: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/5.jpg)
• Portland’s primary water supply since 1895
• Serves 900,000 people
• 26 miles east of the City of Portland
• Protected by special federal legislation
• No commercial logging
• Closed to ALL public access
• Federal land co-managed with City of Portland
BULL RUN WATERSHED PARAMETERS
5
![Page 6: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/6.jpg)
• Product of a 10-year collaborative process
• 50-year plan to protect and improve aquatic habitat
• 49 actions over the next 50 years
• The Watershed will be managed to improve the fish habitat
• Compliance with the ESA and CWA requirements
• Provide regulatory certainty for PWB operation of Bull Run Watershed
HABITAT CONSERVATION PLAN (HCP)
6
![Page 7: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/7.jpg)
• The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP
• The project was designed to allow the City to manage water temperatures in the lower Bull Run River by adding the ability to select water from three elevations in Bull Run Reservoir No. 2
• Optimum water conditions for fish will be maintained in the lower Bull Run River
DAM 2 TOWERS IMPROVEMENTS
7
![Page 8: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/8.jpg)
DESIGN APPROACH
8
![Page 9: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/9.jpg)
NORTH AND SOUTH TOWERS 1960’S North Tower
South Tower
9
![Page 10: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/10.jpg)
NORTH AND SOUTH TOWER - 2010
North Tower South Tower
10
![Page 11: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/11.jpg)
CONCEPTUAL DESIGN – NORTH TOWER ALTERNATIVES
New Wetwell with Temperature Control Panels
New Wetwell with Slide Gate
New Separate Tower
11
![Page 12: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/12.jpg)
PHYSICAL MODEL BY NHC
12
![Page 13: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/13.jpg)
VIEWING OF NHC’S MODEL
Viewing Operation of Model Vortex Inside
Wetwell
Vortex Outside Wetwell
13
![Page 14: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/14.jpg)
CONSTRUCTING IN AN ACTIVE UNFILTERED DRINKING WATER RESERVOIR
14
![Page 15: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/15.jpg)
• CM/GC Contractor and Partnering Agreement
• Major Construction Activities
• CM/GC Mobilization and Access
• Dredging
• Wet Well Fabrication and Installation
• Pre-Fabricated Building Construction and Installation
OVERVIEW
15
Relief Gates
Electrical Control Room
Access
Floating Dock
Boom Crane
6 Trash Racks and
6 Slide Gates
![Page 16: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/16.jpg)
• Partnering agreement established between AAC, PWB, and B&V
• Moderated by a management consultant
• Open forum for issue and resolution as well as project planning
• The CM/GC Contractor selected was Advanced American Construction (AAC)
• AAC is experienced in heavy civil/marine construction, industrial and diving services
CM/GC CONTRACTOR AND PARTNERING AGREEMENT
16
![Page 17: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/17.jpg)
CM/GC MOBILIZATION AND ACCESS
17
![Page 18: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/18.jpg)
CM/GC MOBILIZATION AND ACCESS
18
![Page 19: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/19.jpg)
• Bathymetric Survey conducted to develop dredging and grading plan
• Dredging required to remove accumulated sediment and material around the foundation of the tower
• 1500 CY of Cut
• Removed by a clamshell bucket
• Many large boulders were removed
• 365 CY of Fill
• Fill material is 6 inch quarry spalls
• ArmorFlex articulated concrete mattress placed on top of all cut and filled areas for stabilization
DREDGING
19
![Page 20: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/20.jpg)
• During dredging work, a silt curtain was installed
• The silt curtain encompassed the work area and extended from the water surface all the way down to the reservoir bottom
• Turbidity Monitoring
• Turbidity levels were monitored using turbidity buoys and hand held monitors
• PWB monitored and checked turbidity levels throughout the work
• South tower was online during dredging work
• All material removed was transported to material barges and then loaded into sealed dump trucks
DREDGING (CON’T)
20
![Page 21: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/21.jpg)
DREDGING WORK
21
![Page 22: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/22.jpg)
DREDGING WORK
22
![Page 23: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/23.jpg)
• Wet well is being fabricated at Oregon Iron Works (OIW)
• OIW created a SolidWorks model of wet well structure
• Model assisted in identifying conflicts as well as determining a solution, prior to fabrication
• Wet well was divided into eight sections plus the base
• Size of sections were based on maximum allowable size able to be transported by truck
WET WELL FABRICATION AND INSTALLATION
23
![Page 24: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/24.jpg)
WET WELL BASE FABRICATION
24
![Page 25: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/25.jpg)
WET WELL SECTION 2 - FABRICATION
25
![Page 26: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/26.jpg)
Surface preparation important to ensure adherence of coating
WET WELL FABRICATION PAINT PREPARATION
26
![Page 27: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/27.jpg)
WET WELL SECTION IN TRANSIT TO SITE
27
![Page 28: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/28.jpg)
WET WELL BASE DELIVERY
28
![Page 29: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/29.jpg)
WET WELL BASE INSTALLATION
29
![Page 30: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/30.jpg)
Pre-fabricated building being transferred to material barge
PRE-FABRICATED BUILDING INSTALLATION
28 February 2013
30
![Page 31: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/31.jpg)
NORTH TOWER
31
![Page 32: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/32.jpg)
• Complete fabrication and installation of remaining wet well sections
• Installation of all mechanical and electrical equipment
• Substantial completion – August 2013
• Commissioning
• System startup and testing
• Operation & Maintenance Manual
NEXT STEPS
32
![Page 33: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/33.jpg)
Thank you!
33
![Page 34: MODIFYING EXISTING DAM INTAKE FOR MULTI-LEVEL … · •The Bull Run Dam 2 Tower Improvement Project is one of the 49 actions of the HCP •The project was designed to allow the City](https://reader034.vdocument.in/reader034/viewer/2022050217/5f629d4a051b42168c1842ae/html5/thumbnails/34.jpg)
www.bv.com
© Black & Veatch Holding Company 2012. All Rights Reserved. The Black & Veatch name and logo are registered trademarks of Black & Veatch Holding Company.