Case Study: Using Modular to Build Green Employee Housing

12.03.10

Page 2: Modular 2.0

These aren’t Mobile Homes!!!

Modular Construction – Employee Modular Construction – Employee HousingHousing

Page 3: Modular 2.0

My first experience with modular construction

SURPRISED – what I learned about modular construction

FASCINATED – by the processEXCITED – by the results

Modular Construction – Employee Modular Construction – Employee HousingHousing

Page 4: Modular 2.0

Provide some history of the modular industry◦What does

“modular construction” mean

◦Where did this industry start

Goals for our ConversationGoals for our Conversation

Page 5: Modular 2.0

Provide a “Case Study” of Club Commons II◦Project

overview◦Process ◦Lessons

learned

Goals for our ConversationGoals for our Conversation

Page 6: Modular 2.0

What does modular construction look like in the future?

Goals for our ConversationGoals for our Conversation

Page 7: Modular 2.0

“Modular housing” is not “Mobile housing”

Can be considered “Prefabricated”

Today’s modular is much different than it has been in the past

Modular Construction – Modular Construction – PerceptionsPerceptions

Page 8: Modular 2.0

Started a century ago

Sears and Roebuck Company

Modular Construction – HistoryModular Construction – History

Page 9: Modular 2.0

Post World War II boomLate 1970, 80’s, & 90’s

technology increased complexities and sizes

Modular Construction – HistoryModular Construction – History

Page 10: Modular 2.0

Today’s technology drives different markets, materials, and solutions

Modular Construction – HistoryModular Construction – History

Page 11: Modular 2.0

Manufacturing in a controlled environment

Process is designed with efficiency and quality in mind

Modular Construction – RealityModular Construction – Reality

Page 12: Modular 2.0

Utilizes “lean process” techniques

Modular Construction – RealityModular Construction – Reality

Page 13: Modular 2.0

Sustainability starts with the plant itself◦Wood cut to standard

lengths reduce waste◦Any wood waste is

passed down the line for alternative uses

◦Full recycling program for all materials

◦Plant standard reduce material waste

Modular Construction – RealityModular Construction – Reality

Page 14: Modular 2.0

Program was for “100” employee beds both seasonal and long term

SkiCo sold to Related Westpac

Club Commons II – Project Club Commons II – Project HistoryHistory

Page 15: Modular 2.0

Location was an obstacle and opportunity

Club Commons II – Project Club Commons II – Project HistoryHistory

Page 16: Modular 2.0

Match existing Club Commons I

Two 3-story buildings – “x” sqft and “x” sqft

Site area – “x” acres

Club Commons II – Project Club Commons II – Project ProgramProgram

Page 17: Modular 2.0

Building One – “x” seasonal employee beds◦“X” 4-bedroom

units

Club Commons II – Project Club Commons II – Project ProgramProgram

Page 18: Modular 2.0

Building Two – “x: long term employee beds◦“X” 1-bedroom

units◦“X” 2-bedroom

units◦“X” 3-bedroom

units

Club Commons II – Project Club Commons II – Project ProgramProgram

Page 19: Modular 2.0

Deciding to go modular vs. traditional

Selecting a modular company as a partner

Reviewing the existing plans for adaptation

Redesigning within the constraints of the modular plan

Club Commons II – Designing Club Commons II – Designing ModularModular

Page 20: Modular 2.0

Bringing on Subcontractors and Consultants early to assess the risks and assist in the design process

Planning the design process to interact with the construction process

Looking for gaps in responsibilities and scope

Innovating every step of the way

Club Commons II – Coordinating Club Commons II – Coordinating ModularModular

Page 21: Modular 2.0

Assessing the modular partner’s sustainable standards

Selecting a LEED consultant for the team

Reviewing an early LEED checklist to understand which points we were going to go after

Submitting our final LEED Silver checklist

Club Commons II – Greening the Club Commons II – Greening the ProjectProject

Page 22: Modular 2.0

Building the floor platformStanding the wallsFinishing the interior – MEPF, drywall,

trim, paint, fixturesFinishing the exterior – building wrap,

windows, claddingTrusses and roofStaging and wrapping for ship

Club Commons II – Factory Club Commons II – Factory ConstructionConstruction

Page 23: Modular 2.0

Finalizing the logistics, sequencing, and schedule

Planning the shipping and staging storage

Constructing the site and utilitiesConstruction of foundation and

crawlspace

Club Commons II Club Commons II Building Modular – Site ActivitiesBuilding Modular – Site Activities

Page 24: Modular 2.0

Box delivery to the site from staging area

Setting the boxesStitching the boxes togetherTotal of “x” boxesSet “x” boxes per day for a total of

“x” set days

Club Commons II – The Set and Club Commons II – The Set and StitchStitch

Page 25: Modular 2.0

Standing the roofConnecting and installing the MEPFConstructing the decksBuilding the stairwells and storage

buildingsFinishing the interiorFinishing the exterior claddingFinalize the site and landscaping

Club Commons II – The On-site Club Commons II – The On-site ConstructionConstruction

Page 26: Modular 2.0

Project duration of: “x” days or 5 months

Project costs of: $xxx per footBuilding 1 = xxxxx sqftBuilding 2 - xxxxx sqft

Club Commons II – The VerdictClub Commons II – The Verdict

Page 27: Modular 2.0

Fire protectionHot Spots and icing issuesRecessed sprinkler heads

Club Commons II – Lessons Club Commons II – Lessons LearnedLearned

Page 28: Modular 2.0

Still primarily residentialMedical is seeing a resurgenceSchools are moving beyond the

Williams ScotsmanLagging behind Europe and Japan

in innovation and use

The Modular Industry – The Modular Industry – Where is it Going Nationally?Where is it Going Nationally?

Page 29: Modular 2.0

Great Britain and northern Europe are leading the way

Constraints of land are drivers for off-site construction

More diversified in the markets that utilize modular construction

Commercial and industrialMedicalSchoolsResidential

The Modular IndustryThe Modular IndustryInternational TrendsInternational Trends

Page 30: Modular 2.0

A history lesson in Modular Construction◦These are not Mobile Homes!!◦The industry is over 100 years old◦Technology is driving the industry to

more diversification and innovation then ever before

◦Need to look beyond the box and beyond our borders for the future

SummarySummary

Page 31: Modular 2.0

A “Case Study” of the Club Common II project◦Designing to be modular◦Coordinating the process◦Utilizing sustainable products and

processes◦Manufacturing for quality◦Combining off-site and on-site

construction for a successful project

Summary Summary

Page 32: Modular 2.0

Where is the industry heading?◦Attitudes and trends are changing in

the US◦The economy and public are

demanding new ideas◦Need to look globally for the thought

leaders in the modular industry

Summary Summary

Page 33: Modular 2.0

Questions? Questions?

Page 34: Modular 2.0

Randell Johnson, AIA, LEED APRandell Johnson, AIA, LEED AP

(303) [email protected]