modular erection_srikanth
TRANSCRIPT
4
Deck Panel Erection
Cellar Deck Erection Erection Weight - 230 MT
Main Deck Erection Erection Weight - 170 MT
6
PLQP Project Structures
PLQP Jacket Flare Tripod Jacket
Jacket Details
Weight – 3000 MT
Length – 67m
Double batter
No of Pre Fab Modules – 62 no’s
Jacket Details
Weight – 1300 MT
Length – 72.5 m
Double batter
No of Pre Fab Modules – 6 no’s
7
DDW1 Bridge Flare Bridge Part 2
Flare Bridge Part 1
Bridge Details
Weight – 400 MT
No of Modules – 2 no’s
Bridge Details
Weight – 645 MT
Length – 67m
No of Modules – 2 no’s
Bridge Details
Weight – 175 MT
No of Modules – 1 no
PLQP Project Structures
30
Flare Tripod B2 Leg with Skirt Sleeve Erection
Weight – 230 MT
600 MT (1 no) 300 MT (1 no) 250 MT (2 no’s)
Lift Details
Length – 72.5 m
Elevation – 32 m
Cranes used
33
Flare Tripod Mudmat Erection
Weight – 230 MT
600 MT (1 no) 250 MT (4 no’s)
Lift Details
Dim – 31m x 25m
Elevation – 32 m
Cranes used
Inst. Angle – 4°
38
Module Weight
(MT)
Dimensions
(L x B x H) m
Inst. Ele.( m)
1 PFS 1 98 7 x 5 x 20.19 10
2 PFS 2 105 7 x 5 x 24.716 30.19
3 PFS 3 51 7 x 5 x 13.845 54.906
4 PFS 4 76 7 x 5 x 16.14 10
5 PFS 5 87 7 x 5 x 18.145 26.14
6 PFS 6 62 7 x 5 x 16.404 44.286
7 PFS 7 47 7 x 5 x 8.06 60.69
8 PFS 8 56 7 x 6 x 12.6 68.75
9 PFS 9 54 6 x 4.75 x 14.06 0.5
10 PFS 10 44 6 x 4.75 x 15.99 14.56 m
11 PFS 11 43 7 x 5 x 19.5 30.55
12 PFS 12 36 6 x 4.75 x 18.7 50.05
Pla
tfo
rm
er r
eacto
r
CC
R S
tair
To
wer
CC
R T
ow
er 1
CC
R T
ow
er 2
1
2
4
5
6
7
8
9
3
10
11
12
CCRG PFS Modules Summary
39
Pre-fabrication of CCRG Modules has been carried out within 1Km from the final installation location & subsequently shifted using SPMT’s. Upending of the modules is carried out at an elevation of 21m.
Transportation of PFS Modules