modular erection_srikanth

41
Rigging Engineer 15 th Jul 2014

Upload: srikanth-chadalavada

Post on 02-Aug-2015

88 views

Category:

Documents


0 download

TRANSCRIPT

Rigging Engineer

15th Jul 2014

2

DDW1 Wellhead Platform Project

3

DDW1 Well Head Platform

4

Deck Panel Erection

Cellar Deck Erection Erection Weight - 230 MT

Main Deck Erection Erection Weight - 170 MT

5

PLQP Project

6

PLQP Project Structures

PLQP Jacket Flare Tripod Jacket

Jacket Details

Weight – 3000 MT

Length – 67m

Double batter

No of Pre Fab Modules – 62 no’s

Jacket Details

Weight – 1300 MT

Length – 72.5 m

Double batter

No of Pre Fab Modules – 6 no’s

7

DDW1 Bridge Flare Bridge Part 2

Flare Bridge Part 1

Bridge Details

Weight – 400 MT

No of Modules – 2 no’s

Bridge Details

Weight – 645 MT

Length – 67m

No of Modules – 2 no’s

Bridge Details

Weight – 175 MT

No of Modules – 1 no

PLQP Project Structures

8

Weight – 3000 MT

Length – 67m

PLQP Jacket

9

Jacket Frame Row 2 Erection

10

Jacket Frame Row 2 Erection

11

Jacket Frame Row 1 Erection

12

Jacket Frame Row 1 Erection

13

Birds Eye view of Pre assembly area

14

Star Frame Erection

15

Row 2 Roll up

16

Row 2 Roll up

17

Row 2 Roll up

18

PLQP Jacket Mudmat Frame Erection

19

PLQP Jacket Mudmat Frame Erection

20

Row 1 Roll up

21

Row 1 Roll up

22

Row 1 Roll up

23

EL +6.5 Frame Erection

24

EL +6.5 Frame Erection

25

Row A X Frame Erection

26

Row A X & K Frame Erection

27

Caisson Pipe Erection

28

Sump Caisson Erection

29

Sump Caisson Erection

30

Flare Tripod B2 Leg with Skirt Sleeve Erection

Weight – 230 MT

600 MT (1 no) 300 MT (1 no) 250 MT (2 no’s)

Lift Details

Length – 72.5 m

Elevation – 32 m

Cranes used

31

Flare Tripod B2 Leg with Skirt Sleeve Erection

32

Tripod B2 Leg Erection

33

Flare Tripod Mudmat Erection

Weight – 230 MT

600 MT (1 no) 250 MT (4 no’s)

Lift Details

Dim – 31m x 25m

Elevation – 32 m

Cranes used

Inst. Angle – 4°

34

Flare Tripod Mudmat Erection

35

Other Lifts

36

Ariel View of Pre-assembly Locations

37

Pipe Rack Portal Erection

38

Module Weight

(MT)

Dimensions

(L x B x H) m

Inst. Ele.( m)

1 PFS 1 98 7 x 5 x 20.19 10

2 PFS 2 105 7 x 5 x 24.716 30.19

3 PFS 3 51 7 x 5 x 13.845 54.906

4 PFS 4 76 7 x 5 x 16.14 10

5 PFS 5 87 7 x 5 x 18.145 26.14

6 PFS 6 62 7 x 5 x 16.404 44.286

7 PFS 7 47 7 x 5 x 8.06 60.69

8 PFS 8 56 7 x 6 x 12.6 68.75

9 PFS 9 54 6 x 4.75 x 14.06 0.5

10 PFS 10 44 6 x 4.75 x 15.99 14.56 m

11 PFS 11 43 7 x 5 x 19.5 30.55

12 PFS 12 36 6 x 4.75 x 18.7 50.05

Pla

tfo

rm

er r

eacto

r

CC

R S

tair

To

wer

CC

R T

ow

er 1

CC

R T

ow

er 2

1

2

4

5

6

7

8

9

3

10

11

12

CCRG PFS Modules Summary

39

Pre-fabrication of CCRG Modules has been carried out within 1Km from the final installation location & subsequently shifted using SPMT’s. Upending of the modules is carried out at an elevation of 21m.

Transportation of PFS Modules

40

CCRG PFS Modules

41

CCRG PFS Modules