Modular / Prefab Construction: Speed, Reliability, Quality March 2015 Jack Pouchet, VP Business Development and Energy Initiatives

Upload: others

Post on 13-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Modular / Prefab Construction: Speed, Reliability, Quality

March 2015

Jack Pouchet, VP Business Development and Energy Initiatives

Page 2: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Emerson Network Power Data Center Construction Migration Path

Pre-Fabricated Data Center

Full Data Center Solution

Selected Partners

New Paradigm: “Data Center as a Solution”–

This Reduces the Total Cost of Ownership.

Traditional Data Centers

Project Management

Building & Construction

Power, Cooling, & Monitoring

IT Applications & Hardware

Many Vendors

Data

Cen

ter

Co

mp

on

en

ts

Page 3: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

What is a Pre-Fabricated Data Center?

Traditional “Stick-Build”

– Build = creating physical structure

– Install = adding critical infrastructure and IT gear

Pre-Fabricated Modules

– Manufacture = pre-fabricating modules in factory, comprising critical infrastructure equipment

– Install = placing modules inside an existing structure, or outside, connecting utilities, and adding IT gear

Pre-Fabricated Building

– Manufacture = pre-fabricating structures in factory, plus pre-fabricating critical infrastructure modules

– Assemble = combining structures into one superstructure, loading modules, connecting utilities, and adding IT gear

Design Build Install

Emerson Data Center

Design Manufacture Install

NBN Australia Data Center

Facebook Data Center

Design Manufacture Assemble

Page 4: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Pre-Fabricated Data Center Value Prop: Rapid Deployment

Customer Need:

– Quicker Response to their Customers’ Unforecasted Demand

– Faster Time to Revenue

Differentiation: Vertical Integration

– Collapse the supply chain by procuring/producing Subsystems

– All Subsystems pre-assembled, fully integrated, and tested in factory, with proven Quality Assurance processes (ISO-9001).

– Fabrication and transportation occur in parallel with site selection, preparation, civil works, and construction.

“Stick Build”

Pre-Fabricated Solution

Source: Emerson Network Power Asia Pacific

TIME SAVED 40%

Page 5: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Emerson Network Power Pre-Fabricated Data Center Examples

Australia – 10 Turnkey Data Centers, 40MW Total Capacity

– Concurrent Nationwide Deployment in 12 Months

– End-to-End Project Mgmt. & Civil Works Partnership

Spain – MCDC Size = 1200m2 / 12,900 sq ft Capacity = 1.1MW

– 38 x 2-Story Modules Delivered 6 Months After Order

Myanmar – 3 Data Centers, 3.3MW Total Capacity

– 17 ”Meccano” Module Kits Erected on Site

Sweden – Pre-Fabricated Data Center Size

– End-to-End Project Mgmt. & Civil Works Partnership

– Project Ongoing: 15-Month Program, 9-Month Deployment

Continuum of Design Techniques to Meet Customers’ Needs

Page 6: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Pre-Fabricated Data Center Reference Design – 15MW Building

Energy Hall

Data Hall A

Evaporative

Air Handler

Unit IT

Modules

Power

Modules

Water

Treatment

Modules

Unit IT

Modules

https://www.facebook.com/LuleaDataCenter

Page 7: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Pre-Fabricated Data Center Reference Design – 1.5MW Modules

IT

Hall

10 Central

Energy Hall

IT

Hall

9

IT

Hall

8

IT

Hall

7

IT

Hall

6

IT

Hall

1

IT

Hall

2

IT

Hall

3

IT

Hall

4

IT

Hall

5

Page 8: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

1.5MW Design Concept 1

Expandable modular building

– Unit IT for Data Hall, Office Space, Storage

– Modules for Power, Water Treatment, Sprinkler Room

Direct evaporative cooling (N+1)

– incl. external water pump and tank

Centralized UPS system (N+1)

– incl. 10-min backup VRLA batteries (N+1)

LV Switchgear

MV Switchgear (two grid sources) and MV/LV Transformer

300kW Generators (2N) for the critical IT load only (300kW)

– 330 racks @ 4.5kW/rack = 1.5MW full load

Dry sprinkler and VESDA detection

Building Monitoring System

Page 9: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Pre-Fabricated Data Center – Modular Building Components

Page 10: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Power Container – Power Skid Power Hall Building Block

Factory Production – not

Field Construction

Page 11: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Modular power systems

Power Skids

Enclosures

Rapid Deployment Data Centers

Integrated packages, built and pretested in factory environment

Simplified configuration and greater scalability

Systems right-sized during design phase

Simplify and increase speed of deployment

Most can be deployed in 14-16 weeks

Skidded Condensers

Page 12: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Reserve/Catcher Bus Rapid Deployment Example

12

Page 13: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Configuration Concepts 1500kW using 500kW Base Module Ratings

UPS

1-2 500kW

R

R = Rectifier B = Bypass

B

Dist

PDU 300kW

B

Syst

em B

us

A

UPS

1-1 500kW

R B B

Dist

PDU 300kW

Dist

PDU 300kW Future

UPS

1-1 500kW

Future

R B

Dist

PDU 300kW Future

Syst

em B

us

B

Dist

PDU 300kW

Dist

PDU 300kW

Dist

PDU 300kW Future

UPS

1-2 500kW

Future

R B

Dist

PDU 300kW Future

Dist

PDU 300kWFuture

Dist

PDU 300kW Future

UPS

1-2 500kW

Future

R B

Dist

PDU 300kWFuture

Dist

PDU 300kW Future

UPS

1-1 500kW

Future

B R

Page 14: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Configuration Concepts 1600kW using 800kW Base Module Ratings

UPS

1-2 800kW

R

R = Rectifier B = Bypass

B

Dist

PDU 300kW

B

Syst

em B

us

A

UPS

1-1 800kW

R B B

Dist

PDU 300kW

Dist

PDU 300kW

UPS

1-1 800kW

Future

R B

Dist

PDU 300kWFuture

Dist

PDU 300kW Future

Dist

PDU 300kW Future

Syst

em B

us

B

Dist

PDU 300kW

Dist

PDU 300kW

Dist

PDU 300kW

UPS

1-2 800kW

Future

R B

Dist

PDU 300kWFuture

Dist

PDU 300kW Future

Dist

PDU 300kW Future

Page 15: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

15

Production not Construction

Skid and/or stick / equipment

Uniquely integrated, fully commissioned, rapidly deployed

Produced at Liebert AC Power Factory

UPS Rect

Input

Liebert NXL 1100kW, Skid Mounted Design

Page 16: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

16

Liebert NXL 1100kW or 2x625kW (N+1) Skid Mounted Design

Page 17: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Emerson Network Power Data Center Deployments: NBN Co., Australia

On-Site Activity

– Local Site Preparation

• Local codes managed seamlessly through PMO and partners

• Contractor cost minimized with Emerson Procurement Process

– Project Management Office expedited and minimized Change Management

• 50+ member team: Project Directors, Schedulers, Surveyors, Auditors, Procurement, Supply Chain, Contracts, Engineering, Testing & Commissioning

Experience and Execution:

Integrated and Managed 40MW Capacity at 10 Sites Concurrently

Page 18: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Skid Power

Engineered to 1.5MW to match IT Hall

ISO-Container sized skids for easy transport

Fully pre-wired at the factory, ready for plug-and-play

All system level components factory tested

Eliminate field wiring issues – connections, terminations, size, polarity, grounding, etc.

Page 19: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Adiabatic Cooling Module

Factory Production – not Field Construction

Page 20: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Emerson Network Power Selected Deployments – Last Three Years

Sao Paolo Brazil

Lagos Nigeria

Lagos Nigeria`

IT / Data

Telecom

Industrial

Washington USA

Ontario Canada

Florida USA

Amsterdam Netherlands

Kaiserslautern Germany

Ljubliana Slovenia

Zagreb Croatia

Rome Italy

Sicily Italy

Sofia Bulgaria

Kabul Afghanistan

Male Maldives

Stockholm Sweden Oslo

Norway

Mariehamn Aland Island

Turku Finland

St. Petersburg Russia

Moscow Russia

Hanau Germany

Pristina Kosovo

Accra Ghana

Dubai UAE

Doha Qatar

Siberia Russia

Almaty Kazakhstan

Basra Iraq

Perth Australia

Adelaide Australia

Melbourne Australia

Sydney Australia

Brisbane Australia

Barcelona Spain

Boras Sweden

Orebro Sweden

Archangelsk Russia

Port Harcourt Nigeria

Libreville Gabon

Juba South Sudan

Page 21: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Pre-Packaged Power

Coming to a Data Center near you, soon!

– Quicker ‘Go Live’ times

– Reduced overall facility costs

– Improved Quality

– End-to-End tested systems

– Easier installation

– Faster start-up and commissioning

– Improved serviceability

Page 22: Modular / Prefab Construction: Speed, Reliability, Quality · Data Center Construction Migration Path Pre-Fabricated Data Center Full Data Center Solution Selected Partners New Paradigm:

Q & A

Thank you!

The floor is open