5.1 Types of Bituminous Surfacings
Purpose of bituminous surfacing:
shield pavement from traffic wear;
eliminate dust -> improve road user, comfort,
safety;
providing unchanging surface in all weather;
provide reasonable travel speed;
reduce maintenance requirements;
prevent moisture penetration into pavement.
![Page 3: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/3.jpg)
5.1.1 Sprayed Treatments
Further subdivision:
1. Primes – preliminary, before more permanent
cover
2. Primerseals - temporary treatment with aggregate
3. Seals - permanent cover
4. Reseals - seal on an existing seal
5. Surface Enrichment - light binder applied to
existing seal.
![Page 4: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/4.jpg)
Seals (Permanent Covers)
Three types commonly used
one application of binder and one layer of
aggregate (single/single)
one application of binder and two layers of
aggregate (single/double)
two applications of binder and two layers of
aggregate (double/double)(binder, 1st aggregate, binder, 2nd aggregate)
![Page 5: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/5.jpg)
Single/Single Seal (S/S)
Single/single: Most common economical type of seal
new work and reseal treatments
Binder: C170, PMB
Aggregate: 7/10/14/16/20mm
Reference: This lecture is based on “Practitioner’s Guide to Design of
Sprayed Seals – Revision 2000 Method” – Austroads
(2002). Current guide: “Update of the Austroads Sprayed
Design Method” - Austroads (2006).
![Page 6: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/6.jpg)
Single/Double Seal (S/D)
Single/Double: One application of binder and two layer of aggregate
Binder: C170, PMB
Aggregate: 1st layer is larger aggregate
2nd layer is ideally half size of 1st layer
Combinations: 20/10, 20/7, 14/7, 10/5 mm
Note: If not enough binder then more likely windscreen breakage
![Page 7: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/7.jpg)
Double/Double Seal
Double/double: Better than a S/S for areas of high traffic loading &
shear stress (intersections, steep grades, tight curves)
Application: 2 layers of binder, and 2 layers of aggregate
Binder: C170, PMB
Aggregate: 1st layer is larger aggregate
2nd layer is ideally half size of 1st layer
e.g. 20/10, 20/7, 14/7, 10/5 mm
Reference: “Update of the Austroads Sprayed Seal Design Method” –
Austroads (2006). This has been superseded by “Update of
Double/Double Design for Austroads Sprayed Seal Design
Method” – Austroads (2013)
![Page 8: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/8.jpg)
Resealing
Seal on an existing seal to maintain the assets.
Generally S/S is adequate.
Cutback bitumen or Bitumen Emulsion can be
used.
![Page 9: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/9.jpg)
Surface Enrichment
spraying of a light grade of cutback bitumen or
emulsion with no aggregate
binder runs into the voids between the existing
seal stones
extends the life of surface
traffic has to be diverted for some time
![Page 10: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/10.jpg)
Asphalt
A mixture of aggregate and bituminous binder, usually
produced in a mixing plant.
Asphalt (AUS) = asphalt(ic) concrete (USA), bituminous
concrete, hotmix
Bitumen (AUS) = asphalt cement (USA)
![Page 11: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/11.jpg)
Uses of Asphalt
Construction of a new pavement;
Strengthening an existing pavement;
Correcting irregularities in an existing pavement;
Repairing an existing pavement;
Providing a new wearing surface.
![Page 12: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/12.jpg)
Asphalt Types
Dense Graded Mix
usual type
grading of aggregate sizes from fine to coarse
stability depends on grading, binder content, air voids
and density
Open Graded Mix
high air voids, stability depends on interlock
Gap Graded Mix
stability depends on the stiffness of aggregate-binder
mix
![Page 13: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/13.jpg)
5.2 Selection of Surfacing Type
Factors influencing selection:
the pavement structure
economic and financial considerations
riding quality, tolerable roughness
pedestrian use
safety
noise generation
plant, material availability
waterproofing requirements
![Page 14: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/14.jpg)
5.3 Design of Sprayed Surfacings
![Page 15: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/15.jpg)
5.3.1 Selection of Primer and Application Rate
Preliminary cover prior to applying more permanent cover.
Functions of a prime:
provide bond between pavement and seal coat;
minimise effect of dust after sweeping;
strengthen pavement surface by increased cohesion;
provide short term running surface prior to sealing;
allow proof testing of pavement;
act as waterproof membrane which assist in stabilisingthe pavement moisture condition
![Page 16: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/16.jpg)
PrimerPrimer: Typically cutback bitumen, (AMC00 – AMC1) or
Specially formulated emulsion primer
Selection: Based on knowledge and experience
Rates: Application rates vary from 0.6 L/m2 (damp pavement) to 1.3
L/m2 (dry pavement)
PRIME is preferred treatment for new roads before more
permanent cover (only for limited trafficking).
![Page 17: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/17.jpg)
5.3.2 Selection of Primerseals
Aim: 1. Temporary treatment to carry traffic several months.2. Allows the normal seal coat to be applied in more
favourable weather.
Primerbinders: Typically cutback bitumen (AMC 4 or 5)Winter use: 15% cutter: Summer use: 10% cutterCRS emulsion (60 & 70% bitumen) can be an alternativeBase rates plus allowances. Typically 1.2 – 1.4 L/m²
Aggregate: 5, 7 & 10 mm (usually less than 7 mm)
Typical life: Up to 12 monthsApply final permanent cover to complete the treatment.
![Page 18: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/18.jpg)
5.3.3 Design of Seals and Reseals
1. Select type of seal.
single/single; single/double; double/double
2. Select aggregate size.
� Depends on the type of treatment; traffic; noise;
pavement condition; alignments.
� For two aggregate coasts: 2nd half size of the first.
3. Select aggregate type.
![Page 19: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/19.jpg)
4. Select aggregate application rate.
Larger aggregate (≥ 10 mm):
• Conventional bitumen: 900 / ALD (m2/m3)
• Polymer modified binder: 750 / ALD (m2/m3)
For 7 mm aggregate: 200 to 250 (m2/m3)
Allow allowances for loss: spreading, whip-off; stockpile.
Typical: 5% for 20mm; 10% for 7mm
Multiple application work:
1st - as for single/single
2nd - past experience/trials (70% single/single ?)
![Page 20: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/20.jpg)
5. Select binder type.
Bitumen; cutback bitumen; multigrade bitumen; fluxed
bitumen; bitumen emulsion; polymer modified binders.
Most common in Australia: C170, some C320 in hotter
areas
Flux - usually maximum of 5% by volume.
Cutter - mainly depends on road/air temperatures and
traffic volume. Use Fig. 5.3 to determine quantity.
![Page 21: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/21.jpg)
6. Select binder application rate.
Basic application rate (litres per square metre)
= ALD x Void Factor (VF)
Void Factor (VF) = Vf + Va + Vt
Vf – Basic Voids Factor (based on traffic volume)
Va – Aggregate adjustment
Vt – Adjustment for traffic effects
![Page 22: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/22.jpg)
Basic Void factor
Upper limit: BleedingLower limit: Stripping
![Page 23: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/23.jpg)
Table 5.6 Aggregate Adjustment (Va)
![Page 24: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/24.jpg)
Table 5.7 Traffic Effects Adjustment (Vt)
![Page 25: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/25.jpg)
Example
Design the surfacing for
New England Highway, 8 km north Warwick
Reconstruction: 2 km length, 2 lane road
Traffic: 3800 vehicles per day
Pavement condition: “Hungry”
Basalt aggregate available:
Nominal size ALD (mm)
20 mm 12 mm
15 mm 10 mm
10 mm 7 mm
7 mm
![Page 26: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/26.jpg)
1. Select Surface Treatment
Prime and seal
2 coat seal (D/D) – why?
Traffic: 3800 veh/day (includes 22%
commercial)
![Page 27: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/27.jpg)
2. Design of Prime
Porous surface: use heavy primer, AMC1 cutback bitumen
Application rate 1.0 l/m2
Any aggregate?
AMC00
AMC0AMC1, AMC2
![Page 28: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/28.jpg)
3. Design of Seal - Aggregate
Aggregate?
(a) 20 mm + 10 mm
Application?
(b) 83 m2/m3 + 150 m2/m3 (including reductions)
![Page 29: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/29.jpg)
3. Design of Seal - Binder
Type?
(c) Bitumen + Cutter
How much cutter?
Assume road temperature: 35°C
Cutter: 2%
![Page 30: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/30.jpg)
3. Design of Seal - Binder
Application rate?
Design void factor (VF)
Application: 1.5 l/m2 + 1.0 l/m2
![Page 31: Module 5A Design of Bituminous Surfacings–Part A Dr ...myassignment.help.com.1.s3.amazonaws.com/172864_719320035.… · Module 5A Design of Bituminous Surfacings–Part A Dr.Andreas](https://reader033.vdocument.in/reader033/viewer/2022042915/5f53b131abb5b52d042134fc/html5/thumbnails/31.jpg)
Summary
Prime: AMC1
Seal – Class 170 bitumen + 2% cutter
1st coat: 20 mm aggregate @ 83 m2/m3
Binder 1.5 l/m2
2nd coat: 10 mm aggregate @ 150 m2/m3