Strategies for Improved Performance of Moment
Connections:
WELDING
Required minimum toughness for weld metal:
Required CVN forall welds in SFRS:20 ft.-lbs at 00 F
Required CVN forDemand Criticalwelds:40 ft.-lbs at 700 F
ANSI/AISC 341-10 Section A3.4
-
7/27/2019 Moment Resisting Frames - Part2
4/70
WELDING
Improved practices for backing bars and weld tabs
Typical improved practice:
Remove bottom flange backing bar
Seal weld top flange backing bar
Remove weld tabs at top and bottom flange welds
Greater emphasis on quality and quality control (AISCSeismic Provisions Chapter J)
Strategies for Improved Performance of Moment
Connections:
-
7/27/2019 Moment Resisting Frames - Part2
5/70
Typical Pre-Northridge
Bottom Flange Weld
-
7/27/2019 Moment Resisting Frames - Part2
6/70
Improved POST-Northridge Bottom Flange Weld
Weld tabs andrunoff regions
removed; ground
smooth
Back-up bar removed; root visually
inspected, defects removed; smallreinforcing fillet weld placed at
bottom of groove weld
-
7/27/2019 Moment Resisting Frames - Part2
7/70
Typical Pre-Northridge
Top Flange Weld
-
7/27/2019 Moment Resisting Frames - Part2
8/70
Improved POST-
Northridge Top
Flange Weld
Weld tabs and
runoff regions
removed;
ground
smooth
Back-up bar left in place; smallfillet weld placed between bar
and column face
-
7/27/2019 Moment Resisting Frames - Part2
9/70
Strategies for Improved Performance of Moment
Connections:Materials (Structural Steel)
Introduction of expected yield stress into designcodes
Fy = minimum specified yield strength
Ry = 1.5 for ASTM A36 (hot-rolled shapes and bars)= 1.1 for A572 Gr. 50 and A992
Expected Yield Stress = Ry Fy
ANSI/AISC 341-10 Table A3.1
-
7/27/2019 Moment Resisting Frames - Part2
10/70
Strategies for Improved Performance of Moment
Connections:
Materials (Structural Steel)
Introduction of ASTM A992 steel for wide flangeshapes
ASTM A992
Minimum Fy = 50 ksi
Maximum Fy = 65 ksi
Minimum Fu = 65 ksi
Maximum Fy / Fu = 0.85
-
7/27/2019 Moment Resisting Frames - Part2
11/70
-
7/27/2019 Moment Resisting Frames - Part2
12/70
-
7/27/2019 Moment Resisting Frames - Part2
13/70
Pre-Northridge
Improved
-
7/27/2019 Moment Resisting Frames - Part2
14/70
Strategies for Improved Performance of Moment
Connections:
Connection Design
Development of Improved Connection Designsand Design Procedures
Reinforced Connections
Proprietary Connections
Reduced Beam Section (Dogbone)Connections
Other SAC Investigated Connections
-
7/27/2019 Moment Resisting Frames - Part2
15/70
Reinforced Connection
Cover-Plated
Connection
Cover plates fillet welded
to beam flanges, thencombinedbeam flange
and cover plate groove
welded to face of column
-
7/27/2019 Moment Resisting Frames - Part2
16/70
Cover-Plated Connection
Improvedperformance in
general, but
costly to
construct
-
7/27/2019 Moment Resisting Frames - Part2
17/70
Cover-Plated Connection About 2/3 of specimensdeveloped total plasticrotation of 0.03 radwithout brittle fracture
(strong panel zone) Others, panel zone
yielding dominatedresponse
2 specimens with boltedwebs failed in brittlemanner (< 0.02 radplastic rotation)
Brittle fracture inspecimen for whichwelding procedure notenforced
Failure in specimen withLONG cover plate
Not sufficiently
reliable?
Susceptible to sameproblems of weld
quality and through-
thickness behavior of
column flange?
-
7/27/2019 Moment Resisting Frames - Part2
18/70
Reinforced Connection
Flange Rib
Connection
Like cover-plated connection,
connection is stronger than
beam, plastic hinge formation
forced away from face of
column
-
7/27/2019 Moment Resisting Frames - Part2
19/70
Flange RibConnection
-
7/27/2019 Moment Resisting Frames - Part2
20/70
Lee, C.H. et al. (2005) Experimental Study of Cyclic Seismic Behavior of
Steel Moment Connections Reinforced with Ribs, Journal of Structural
Engineering, Vol. 131, No. 1, January 1, 2005
-
7/27/2019 Moment Resisting Frames - Part2
21/70
Reinforced Connection
Haunched
Connection
May be at bottom flange or
both top and bottom flanges
Initially tested as four pre-Northridge connections
repaired with bottom
triangular T-shaped haunches
H h d C ti
-
7/27/2019 Moment Resisting Frames - Part2
22/70
Haunched Connections
Generally good
performance inlaboratory
Costly to construct
Not included asprequalified for newbuildings in FEMA350
Recommended SeismicDesign Criteria for NewSteel Moment-FrameBuildings(2000) More on FEMA 350 later
-
7/27/2019 Moment Resisting Frames - Part2
23/70
Reduced Beam
Section (RBS)
Also called Dogbone
connection; less costly, simplerthan reinforced connections
Forces hinge formation to
occur within reduced section
-
7/27/2019 Moment Resisting Frames - Part2
24/70
RBS has become one of the most common moment
connection details used in current practice.
(More details later )
-
7/27/2019 Moment Resisting Frames - Part2
25/70
Proprietary Connection
Side Plate
Connection
Beam flanges NOT directly
welded to column flanges;
forces transferred through sideplates.
http://www.sideplate.com/
-
7/27/2019 Moment Resisting Frames - Part2
26/70
-
7/27/2019 Moment Resisting Frames - Part2
27/70
Connections Investigated Through
SAC-FEMA Research Program
-
7/27/2019 Moment Resisting Frames - Part2
28/70
Reduced Beam
Section (RBS)
-
7/27/2019 Moment Resisting Frames - Part2
29/70
WeldedUnreinforced
Flange - Bolted
Web (WUF-B)
-
7/27/2019 Moment Resisting Frames - Part2
30/70
Welded
Unreinforced
Flange - Welded
Web (WUF-W)
-
7/27/2019 Moment Resisting Frames - Part2
31/70
Free Flange
Connection
-
7/27/2019 Moment Resisting Frames - Part2
32/70
-
7/27/2019 Moment Resisting Frames - Part2
33/70
Bolted Unstiffened
End Plate
-
7/27/2019 Moment Resisting Frames - Part2
34/70
Bolted Stiffened
End Plate
-
7/27/2019 Moment Resisting Frames - Part2
35/70
Bolted Flange
Plate
-
7/27/2019 Moment Resisting Frames - Part2
36/70
Double Split Tee
Typically treated
as a partially-
restrainedconnection
(effects of
connection
flexibility must
be included inoverall frame
analysis).
R lt f SAC FEMA R h P
-
7/27/2019 Moment Resisting Frames - Part2
37/70
Results of SAC-FEMA Research Program
Recommended Seismic Design Criteria
for Steel Moment Frames FEMA 350Recommended Seismic Design Criteria for New Steel Moment-
Frame Buildings
FEMA 351Recommended Seismic Evaluation and Upgrade Criteria for
Existing Welded Steel Moment-Frame Buildings
FEMA 352Recommended Postearthquake Evaluation and Repair Criteria
for Welded Steel Moment-Frame Buildings
FEMA 353Recommended Specifications and Quality Assurance
Guidelines for Steel Moment-Frame Construction for Seismic
Applications
-
7/27/2019 Moment Resisting Frames - Part2
38/70
FEMA 350
Nine momentconnection details just
shownprequalifiedconnections
Recommended designprocedures, limits of
usage (e.g., OMF only,W36 beams andshallower, flange
thickness limits, webconnection, etc.)
Not a standard; butstill a valuable
reference
-
7/27/2019 Moment Resisting Frames - Part2
39/70
New standardReplaced FEMA 350
Prequalifiedrigorousprogram of testing, analytical
evaluation and review by theconnection prequalificationreview panel (CPRP).
Reduced Beam Section(RBS)
Bolted Stiffened andUnstiffened Extended EndPlate
ANSI/AISC 358-05
Connection Prequalification
-
7/27/2019 Moment Resisting Frames - Part2
40/70
Connection Prequalification
AISC Connection Prequalification
Review Panel ANSI/AISC 341-10 Chapter K
Connections shall be prequalified based on
test data satisfying Section K1.3, supportedby analytical studies and design models.The combined body of evidence must besufficient to assure that the connection can
supply the required story drift angle forSMF and IMF systems . on a consistentand reliable basis within the specified limitsof prequalification.
-
7/27/2019 Moment Resisting Frames - Part2
41/70
ANSI/AISC 358-10
Proprietary Connections
Reduced Beam Section (RBS)
-
7/27/2019 Moment Resisting Frames - Part2
42/70
Reduced Beam Section (RBS)
Bolted Unstiffened Extended End Plate (BUEEP)
-
7/27/2019 Moment Resisting Frames - Part2
43/70
Bolted Unstiffened Extended End Plate (BUEEP)
Bolted Stiffened Extended End Plate (BSEEP)
-
7/27/2019 Moment Resisting Frames - Part2
44/70
Welded Unreinforced Flange Welded
-
7/27/2019 Moment Resisting Frames - Part2
45/70
Welded Unreinforced FlangeWelded
Web (WUF-W)
Kaiser Bolted Bracket (KBB)
-
7/27/2019 Moment Resisting Frames - Part2
46/70
Kaiser Bolted Bracket (KBB)
-
7/27/2019 Moment Resisting Frames - Part2
47/70
Steel Connections: Proprietary or Public Domain? by P. Cordova & R.
Hamburger, Modern Steel Construction, October 2011
-
7/27/2019 Moment Resisting Frames - Part2
48/70
Experimental Evaluation of Kaiser
Bolted Bracket Steel Moment-Resisting Connections
Scott M. Adan and William Gibb
AISC Engineering Journal 2009
http://www.steelcastconnections.com/
ConXtech ConXL moment connection
-
7/27/2019 Moment Resisting Frames - Part2
49/70
ConXtech ConXL moment connection
-
7/27/2019 Moment Resisting Frames - Part2
50/70
-
7/27/2019 Moment Resisting Frames - Part2
51/70
http://dcm-designs.com/steel-prefabricated-moment-frame/
This innovative
connection system
enables beams to besimply lowered and locked
onto square columns in
the field, resulting in a
dimensionally accuratestructural chassis. The
system is often referred to
as a full-scale erector set.
http://www.conxtech.com
/conx-system/
VIDEO CLIP
Connections in process of prequalification
http://www.conxtech.com/conx-videos/introduction-to-conxtech/http://www.conxtech.com/conx-videos/introduction-to-conxtech/ -
7/27/2019 Moment Resisting Frames - Part2
52/70
Connections in process of prequalification
Double Tee
Simpson Strong Frame SENSE TSC
Side Plate
SOM Pin Fuse Joint
Double Tee
-
7/27/2019 Moment Resisting Frames - Part2
53/70
Double Tee
http://www.aisc.org/uploadedcontent/2012NASCCSessions/N11/
Simpson Strong Frame (Yield Link)
-
7/27/2019 Moment Resisting Frames - Part2
54/70
Simpson Strong Frame (Yield Link)
http://www.aisc.org/uploadedcontent/2012NASCCSessions/N11/
-
7/27/2019 Moment Resisting Frames - Part2
55/70
SidePlate
-
7/27/2019 Moment Resisting Frames - Part2
56/70
SidePlate
http://www.aisc.org/uploadedcontent/2012NASCCSessions/N11/
SOM Pin Fuse Joint
-
7/27/2019 Moment Resisting Frames - Part2
57/70
SOM Pin Fuse Joint
Steel Connections: Proprietary or Public Domain? by P. Cordova & R.
Hamburger, Modern Steel Construction, October 2011
SOM Pin Fuse Joint
-
7/27/2019 Moment Resisting Frames - Part2
58/70
SOM Pin Fuse Joint
-
7/27/2019 Moment Resisting Frames - Part2
59/70
http://www.som.com/content.cfm/pin_fuse_joint
-
7/27/2019 Moment Resisting Frames - Part2
60/70
-
7/27/2019 Moment Resisting Frames - Part2
61/70
-
7/27/2019 Moment Resisting Frames - Part2
62/70
-
7/27/2019 Moment Resisting Frames - Part2
63/70
A number of
experiments havebeen conducted
with specimens
with weak panel
zones
-
7/27/2019 Moment Resisting Frames - Part2
64/70
-
7/27/2019 Moment Resisting Frames - Part2
65/70
Very weak panel
zone; localizedkinks cause
strain
concentrations,
ultimately leadingto fracture in
vicinity of beam
flange groove
welds.
-
7/27/2019 Moment Resisting Frames - Part2
66/70
Same specimen
as previous slide.
Connection failed
at moment well
below Mp
-
7/27/2019 Moment Resisting Frames - Part2
67/70
"kink" at corners
of panel zone
-
7/27/2019 Moment Resisting Frames - Part2
68/70
-
7/27/2019 Moment Resisting Frames - Part2
69/70
-1200
-800
-400
0
400
800
1200
-0.08 -0.06 -0.04 -0.02 0 0.02 0.04 0.06 0.08
Panel Zone g (rad)
PanelZoneShe
arForce(kips)
Composite RBS Specimen with
Weak Panel Zone
g
Observations on Panel Zone Behavior
-
7/27/2019 Moment Resisting Frames - Part2
70/70
Very high ductility is possible.
Localized deformations (kinking) at cornersof panel zone may increase likelihood offracture in vicinity of beam flange groovewelds.
Current AISC Seismic Provisions permitslimited yielding in panel zone (SpecificationJ10.6 for available strength)