monitoring of business energy performance for fit-out redevelopment potential and behaviour change...

14
A case-study Monitoring of energy for refurbishment and behaviour change potential James Brittain CEng MEI MEng MSc Director, the Discovery Mill www.theDiscoveryMill.co.uk [email protected] Mobile: 07970 221 251

Upload: emex

Post on 18-Feb-2017

53 views

Category:

Engineering


1 download

TRANSCRIPT

Page 1: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

A case-study

Monitoring of energy for refurbishment and

behaviour change potential

James Brittain CEng MEI MEng MSc Director, the Discovery Mill www.theDiscoveryMill.co.uk [email protected] Mobile: 07970 221 251

Page 2: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

Introductions

James Brittain CEng MEI MEng MSc Director & Consultant, the Discovery Mill

20+ years experience in technical and behavioural solutions • Tailored investment strategies, campaigns and quick/ low cost solutions

• Building development, FM and operational projects

• Consultant Editor for Croner Energy Management (industry bible)

The Discovery Mill

Energy & sustainability management through people • Hands-on support, Apps, training for champions/significant energy users

• Work with the T2 Sustainable Retail Project won the Innovation project

of the year, Environment & Energy Awards, 2014

• Work with LCMB & Birmingham Airport on behaviour change was “highly

commended” at the Energy Awards 2015

Energy & Sustainability management through people

Page 3: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

T2 Sustainable Retail Project

Energy & Sustainability management through people

186 retail units, 46 retailers

Connect up design and ops teams

26% average unit energy savings

delivered compared to T5

baselines

Worth £330,000 savings a year

Estimated potential of £1.5m if

applied across all retail areas

Page 4: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

Energy assessment – Restaurant example

Energy & Sustainability management through people

£107,000

Energy Bill

a year

Page 5: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

Energy performance

Energy & Sustainability management through people

36% better

than its

design

energy target

Page 6: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

Technical thinking

Energy & Sustainability management through people

Reduce

power

required

Most of

the time

Provide

auto

controls

Page 7: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

On-demand thinking

Energy & Sustainability management through people

Reduce

power

required

On only

when

required

Make it

easy to

control

Work with

operational

practices &

behaviours

Page 8: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

High spec, modular equipment

Energy & Sustainability management through people

Page 9: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

High spec, modular equipment

Energy & Sustainability management through people

Page 10: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

Daily demand profiles

Energy & Sustainability management through people

5-10% plus

further

potential in

busiest week

Page 11: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

Daily diaries

Energy & Sustainability management through people

Before:

“These ovens

are in constant

use and so are

kept on all day”

During the

monitoring week:

“We think we can

turn one oven off

at 11am and two

off at 2pm” Potential

5-10% savings

across the

kitchen

Page 12: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

Equipment fire-up schedule

Energy & Sustainability management through people

1 more hour

saved over the

year would

equate 5%

savings, approx

£6k/year

Provides a

method to

stretch times

in a managed

way

Page 13: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

Energy & Sustainability management through people

1.05

kWh per

Cover

Operational

Processes

Behaviours

& Practices

Technical

Measures

Refurb

Design

1.99

kWh per

Cover

Operational

Processes

Technical

Measures

Refurb

Design

Behaviours

& Practices

Driving and measuring savings

Page 14: Monitoring of Business Energy Performance for Fit-out Redevelopment Potential and Behaviour Change – a case study

A case-study

Monitoring of energy for refurbishment and

behaviour change potential

James Brittain CEng MEI MEng MSc Director, the Discovery Mill www.theDiscoveryMill.co.uk [email protected] Mobile: 07970 221 251