Monitoring planCase study: quarry
July 1, 2013
Extraction of 4.51 million cubic meters of calcareous material of which 4 millioncubic meters for the expansion.
Development of mining for a time span of 15 years, on 3 lots of five years.
During the period of activity would be maintained a septum masking against theviability present.
The project would develop in an area of approximately 22.5 hectares, includingboth the allowed that the request for the extension, in which approximately 14.5hectares are occupied by forest.
The project area is included within the expansion dell'IBA066 “Carso”, the SICIT3340006 “Carso Triestino e Goriziano” and the ZPS IT3341002 “Aree carsichedel Friuli Venezia Giulia”.
- It will be a maximum presence of means of transport correlated activity in theproject of approximately 10 trucks per hour in each direction.
- On the quarry at an altitude of 75 m above sea level is expected processing ofthe extracted material (sorting, crushing, screening) through the use of a fixedinstallation already exists, and, in case of specific market needs, includingthrough the use a self-propelled crushing plant.
Valutazione degli impatti emissivi nello SIA relativi almeno a PM10, NOx, NO2, C6H6
Verifica degliindicatori diattività
Emissioni significative
Emissioni nonsignificative
Valutazione degli impatti immissivi.Set minimo:PM10: media annuale, superamenti mediagiornalieraNOx: media annualeNO2: media annuale, superamenti media orariaC6H6: media annuale
Misure mitigativeulteriori
Definizione dei livelli diammissibilità
Verifica dei limiti di legge:misurazioni indicative aisensi del D.Lgs 155/2010
Variazioni nonmisurabili
Variazioni misurabili
NOx > SVS aree nonedificate
Verifica del pattern immissivo
Verifica dei livelli di ammissibilità di NOxper la vegetazione
Verifica dei livelli di ammissibilitàdi PM10/NO2/C6H per lapopolazione
PM10/NO2/C6H6 > SVSaree edificate
Verifica dell’applicazione delle misure di mitigazione,compensazione o prescrizioni.Verifica degli indicatori di attività
Impattoincerto Impatto
prevedibile
Livelli elevati
Individuazione impatti significativi
Comunicazione degli esiti del monitoraggio.Implementazione database informatico, relazione tecnica, relazione di sintesi.
Analisi degli impatti verificati Impatti negativi imprevistiArchiviazione Impatti confermati
Livelli accettati
Impacts Calculated in EIS
Activity Pollutant Emission
factor
(1)
Emissions
(t/year)
(2)
Mitigations
(typology)
(3)
Mitigated
emissions
(t/year)
(4)
holes PM10
explosions PM10, COV, NOx
excavation PM10
Use means of work PM10, gas
handling (conveyor, loading,
unloading ...)
PM10
crushers PM10
Wind on piles PM10
Paved roads PM10, gas
Unpaved roads PM10, gas
Action of wind on the area of
excavation
PM10
traffic PM10, gas
more
(1)Emission factor and bibliography(2)Value of calculated emission(3)Which mitigation activity?(4)Value of mitigated emission
Working process
Activities
Pollutant
Bibliographic sources
http://www.eea.europa.eu/publications/emep-eea-emission-inventory-guidebook- 2009http://www.sinanet.isprambiente.it/it/inventaria/disaggregazione-2000/db/http://www.emisia.com/copert/General.htmlhttp://www.epa.gov/ttnchie1/ap42/http://www.arpat.toscana.it/documentazione/catalogo-pubblicazioni-arpat/linee-guida-per-intervenire-sulle-attivita-che-producono-polveri
Emissionfactors
[Factors ofactivity]
Emissions withand withoutmitigations
Impacts Calculated in EIS
Significant emission. To calculate emission impact you can use “Linee Guida per la valutazione delleemissioni di polveri provenienti da attività di produzione, manipolazione, trasporto, carico o stoccaggiodi materiali polverulenti” adopted by Provincia di Firenze delibera n. 231 - 03.11.2009.You must verify
- flat plain- meteorology- background concentrations (20 µg/m3)- time emission: 10 h/d
To calculate immission you must consider a set of parameters:- average annual PM10 (µg/m3);- number of exceedances of the daily average PM10: 50 µg/m3;- number of exceedances of the hourly average NO2: 200 µg/m3- average annual NO2 : 40 µg/m3;- average annual NOx 30 µg/m3;- average annual C6H6: 5 µg/m3.
You can use an atmospheric dispersion model
http://www.epa.gov./scram001/
Impacts Calculated in EIS
Impacts Calculated in EIS
Uncertain impact quantification for a quarry:- Problems in the background: existing sources;- Problems for the dispersion models: complex terrain, …;- Problems for input data: no data for all sources.
[If you are in this situation you must consider if it’s a criticalsituation (for high background or sensible receptors) or not.In the first case you must put in monitoring plan a sampling pointto verify the respect of standards (with the criteria of D.Lgs155/2010) also in ante operam.If not, you can consider only an activity diary]
Impacts Calculated in EIS
Remember that to calculate eligibility values you must add theimpact values to the background values.
http://www.arpa.fvg.it/cms/tema/aria/menu_dx/menu_dx_documenti_presentazioni.htmlhttp://www.arpa.fvg.it/cms/tema/aria/menu_dx/menu_dx_richieste_dati.htmlhttp://www.regione.fvg.it/rafvg/cms/RAFVG/ambiente-territorio/pianificazione-gestione-territorio/FOGLIA201/ (PRMQA)http://www.regione.fvg.it/rafvg/cms/RAFVG/ambiente-territorio/pianificazione-gestione-territorio/FOGLIA2/ (PAR)
If the values are not sustainable, you must apply mitigation actionsand redo the assessment.
If the values are sustainable, you must check whether the impactsare significant.
Punti di verifica
Verifica del pattern immissivo
Punti di controllo
Verifica degli standard normativi
Punti di controllo
Verifica degli standard normativi
Impacts Calculated in EIS
Significant impact for a quarry, for air quality.If you can find areas, out of quarry area, in which the variation ofthe parameter calculated is grater then the normal variability(measurable change).
Inquinante Parametro Zona Normale variabilità Zone di montagna e di pianura 2 g/m3 Media annuale Zona triestina 3 g/m3 Zone di montagna e di pianura 6
PM10
Numero di super amenti annui della media giornaliera di 50 g/m3 Zona triestina 10
NOx Media annuale Tutta la regione 7 g/m3 Media annuale Tutta la regione 2 g/m3 NO2 Numero superamenti annui d ella media oraria di 200 g/m3
Non definita Non definito
Benzene Media annuale Tutta la regione 0.5 g/m3
Example of normal variability in FVG (2005 - 2010)
Impacts Calculated in EIS
Significant impacts -> measure in the verification pointseligibility levels below the upper assessment threshold (D.Lgs155/2010)
•Measurements in ante-operam and in work.•Choose the tool.•Choose two points: maximum immission point and backgroundpoint.•Measurements at the same time.•In the same time you must monitor also emissions and meteo.•In the report you must write expected values for all points and allphases.
Impacts Calculated in EIS
Significant impacts -> measure in the control pointseligibility levels greater then the upper assessment threshold(D.Lgs 155/2010)
•Measurements that follow the criteria of D.Lgs 155/2010•In ante operam and in phase of work•In the same time you must monitor also emissions and meteo.•In the report you must write expected values for all points and allphases
Impacts Calculated in EIS
Inquinante Parametro Soglia di valutazione superiore Media annuale 28 g/m3 PM10 Numero di superamenti annui della media giornaliera
35 g/m3 da non superare più di 3 5 volte in un anno civile
NOx Media annuale 24 g/m3 Media annuale 32 g/m3 NO2 Numero superamenti annui della media oraria
140 g/m3 da non superare più di 18 volte in una anno civile
Benzene Media annuale 3.5 g/m3
D.Lgs 155/2010 SVS
PM10 annual average
Number of days exceeding 50 ug/m3
NO2 annual average
-the impact of the quarry is grater than normalvariability only for PM10 annual average in thereceptor number 2 (out of quarry area).
-We don’t have any information about backgroundconcentration.
-We suppose that total impact is below SVS.
-In monitoring plan we consider two verification points:one in maximum simulated value and one to monitorbackground.
An idea for monitoring plan
-We can choose point number 1 as background andpoint number 2 as maximum.
-we don’t know if two points have the samebackground so we can do ante-opera measurements..
-To have good statistic values we need to measure forabout one month.
-In “work-in-progress” phase we have to measure foranother month in the two points.
-you have to calculate how much money you spend onthis plan
Is a good idea for monitoring plan?
-Prepare the document
-Follow the guideline
-Remember that’s necessary to monitor also sourcesand meteo
-The procedure for unforeseen impacts must beachievable
-fill in the required tables to make the work of themonitoring plan easier
Monitoring plan
Defini zio ne operativa del piano di monitoragg io
Fase t emporale: CO
Attività prevista Attività effettuata
Sito di misura XXX XXX
Indiri zzo Presso l’abitato di XXX XXX
Coordinate, quota Non definito Non definite: a 90 m dalla strada principale che sale da XXX verso il comune di YYY sul retro di un’abitazione
Parametro PM10 PM10 Meteo (vv; dir.v.;pioggia)
Scopo del punto di misura in questa fase
documentare la sostanziale persistenza dei livelli di qualità dell ’aria tuttora esistenti, se non l’auspicabile miglioramento, sia a livello locale che a livello comunale
Descrivere le caratteristiche meteo locali in termini di direzione del vento e piovosità; verificare la scarsa piovosità richiesta per le misure
Modal ità di misura Non specificata Gravimetrico UNI-EN 12341 Stazione meteorologica
Nu mero di
campagne di misura
previste
2 all’anno una in periodo invernale ed una estivo
Campagna numero 1
Durata di una
campagna
10 giorni 10 giorni 10 giorni
Valore Non definito Media feriale: 23.2 ug/m3 (*) Bianco: 20 ug/m3
Pioggia durante le ore di attività il giorno ….
Note La valutazione dell’impa tto è stata effe ttuata con calmet-calpuff in termini qualitativi per individuare i punti di maggior immissione
Il giorno … è festivo e pertanto il campione acquisito corrisponde al bianco richiesto
Metadati
Monitoraggio della
sorgente
Non richiesto
Azioni da svolgere in caso di impatti negativi imprevisti
Non specificate