Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Upload: moris-west

Post on 11-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Monroe Street Access Management and

Lake Ella Implementation Study

CRTPA Board MeetingJanuary 23, 2012

Page 2: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Study Background• Previous CRTPA Efforts

▫CRTPA Transportation Systems Management (TSM) Project List

▫Pedestrian Emphasis Intersection in 2004 Bike/Ped Plan (N. Monroe @ Lake Ella)

▫North Monroe Street Design and Safety Study▫East Sixth Avenue Sidewalk Project

• Other Agency Efforts▫Sense of Place▫Frenchtown/Southside Redevelopment Area▫Downtown Redevelopment Area/ Pedestrian

Connectivity Plan

Page 3: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Study Area

•Monroe Street Access Management▫From just south of

Magnolia Drive▫To John Knox Road

•Lake Ella Median Implementation ▫From Tharpe Avenue▫To E. 7th Avenue

Page 4: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Study Tasks

•Data Collection and GIS•Assessment of Existing Conditions•Coordination

▫State & Local Agencies▫Public & Private Stakeholders

•Access Management Research•Public Involvement•Lake Ella Implementation•Development of Corridor Action Plan

Page 5: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Study Tasks• Coordination

▫The Project Team will meet monthly and includes: Community Redevelopment Area (CRA)

representatives COT Public Works Downtown Improvement Authority Neighborhood Associations Midtown Business Association StarMetro Tallahassee/Leon County Planning / PLACE Staff

▫Close coordination with FDOT Safety and Operations

Page 6: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Study Tasks

•Public/Stakeholder Involvement▫Open House Public Meetings▫Focused Smaller Group Meetings▫Information gathering and education

•Access Management Research▫Actual case studies of before and after

results▫Expectations vs. reality particularly from

the business standpoint▫Safety and capacity impacts

Page 7: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Study Tasks

•Lake Ella Implementation Study▫Builds on of FSU Design Studio

Possible Alternatives include: signage, median implementation, crosswalks, flashing lights, or pedestrian activated signal

▫Coordination with FDOT will be extensive▫Public involvement will include small group

meetings and public open houses

Page 8: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Project Schedule We are Here

Page 9: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Project Update

•Conducted project kick-off meetings•Updated GIS information and aerial

images•Laid out access management baseline•Collected FDOT crash data •Conducted access management research

Page 10: Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012

Next Steps

•Attend Project Team meeting•Complete existing conditions analysis•Complete crash analysis•Hold first coordination meeting with

FDOT •Hold first set of public meetings (Spring

2012)