Page 1: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Montague Road, Fred Wigg and John Walsh Towers

Page 2: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4

1. Introduction

Background

The brief from Waltham Forest:

“The estate was identified in the Waltham Forest Estates Review, (October 2010), as one of two estates within the borough with the highest priority for regeneration intervention.”

The Estates Review in 2010 identified key areas requiring intervention :

- Poor relationship to housing & street - Isolated sunken parking - Poor quality streetscape - Very high 5 yr maintenance costs - High 30 year investment costs - High transfer requests

This study seeks to address these issues through by considering of all options for the long term future of the estate

Pollard Thomas Edwards were appointed in 2013 to undertake a study of the homes at Montague Road.

A number of consultants have been appointed to input specialist advice relating to the options appraisal: These are viability, structure, fire, sustainability.

Page 3: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Fred Wigg and John Walsh Towers Entrances - Opportunities and challenges

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 8

DRAMATIC OPEN SPACE AT THE RAISED ENTRANCE LEVEL THE RAISED ENTRANCE LEVEL HAS EXTRA BINS WITH A BINSTORE FOR THE CHUTE AT THE LOWEST LEVEL

ENTRANCE HAS THE POTENTIAL FOR VIEWS OUT ACROSS THE PARK

EXISTING REFUSE CHUTE IS SMALL AND ONLY ACCOMMODATES REFUSE NOT RECYCLING

REFUSE CHUTES HAVE STORES AT LOWEST LEVEL

BINS AT UPPER LEVEL CAN BE UNSIGHTLY

Page 4: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Fred Wigg and John Walsh Towers Circulation and fire escapes

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 10

- Management of fire escape

- Complicated Strategy

- Common parts are unnatractive

STAIRS BALCONY ESCAPE

CORRIDORS

Page 5: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 11

Fred Interiors

Wigg and John Walsh Towers

- All flats are dual aspect

- Living rooms look over the flats

- Good sized rooms

- Obstructed views

LIVING ROOM BEDROOM

BATHROOM

KITCHEN

Page 6: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 12

2. Project Objectives

1. to be a catalyst for change in this area

2. to create a long term sustainable

community

3. to work with residents

4. to address the fire strategy

Page 7: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

4. Design Options for the future

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 15

Option 1. Minimal Refurbishment

- No major change but immediate problems dealt with

Option 2. New Build, with demolition of towers

- New buildings at Montague Road

Option 3. Transformation through refurbishment

- Fred Wigg and John Walsh Towers would be totally refurbished to a high

standard, plus new build infill

Page 8: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 16

Option 1. Minimal Refurbishment

— Fire strategy resolved

— Essential structural maintenance

— Limited internal upgrading

— Some streetscape improvements

— Buildings would meet the Waltham

Forest Standard

— Shopping list approach

1. Fire Safety works - to allow balconies to be privately occupied

2. Balcony improvements (following fire strategy changes)

3. Heating system modernised

4. Repairs to structure

5. Entrances and security - Common parts

6. Entrances and security - Individual flats

7. Cleaning and Maintenance strategy

8. Landscape improvements

9. Car parking improvements

10. Refuse Strategy

11. New Kitchens

12. New bathrooms

Page 9: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 17

Option 1. Minimal Refurbishment

Strengths

—Work can be completed using existing available

budget

—Fire strategy is resolved as part of work reducing

management costs to Ascham Homes

—‘Quick fix’ solution

—Work could be completed within approximately 12

months

—Residents are not moved during the works

—Low capital costs, utilising existing budget

—Work at the base of the towers could improve the

connection to the street

Weaknessess

—Limited benefits to the surrounding streets

—No new homes are created

—Energy standards will not improve significantly

—Not a long term solution as further works may be

required in future years

—The towers’ appearance would not change

dramatically

Page 10: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 18

Option 2. Demolition and New Build

OTHER

USE

— Demolition of Fred Wigg and John Walsh Towers

— New scheme fully rebuilt

— Modern homes

6 ST

USE

8 ST

N

Page 11: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 19

Option 2. Demolition and New Build

Strengths

—Eradicates all problems with existing buildings

—New buildings improve the overall quality of site with

knock on benefits to surrounding streets

—Improve energy performance for residents, comfort

levels are improved and energy bills lowered

—The site has fabulous views that will be a benefit to

new homes

—Housing mix (tenure and size of homes) can be

tailored to suit the borough’s needs ; affordable rent,

shared ownership, private sales can all be included

Weaknesses

—Most disruptive to residents

—Historic value of the towers architecturally and as a

local landmark is lost.

—Overall numbers of homes are not radically

increased

(capacity studies show up to about 50 additional

new homes maximum)

—Potential loss of affordable homes, depending on

financial viability

—Phased development with lengthy construction times

(at least 3-6 years)

Perspective view

Page 12: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Option 3. Transformation

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 21

- Complete strip out of existing building to concrete

frame

- Total refurbishment of all interiors and exteriors

- New building to sit between the towers

- Re organised parking and landscape

- Introduce mix of tenure

- High quality finishes across all tenures

Page 13: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Option 3. Transformation

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 22

Strengths

—Transformation of all external and internal areas

—Creates additional new homes that assist decanting

and phasing requirements

—The addition of a new building improves the overall

quality of site together with transformation of

existing buildings

—Improved energy performance for existing homes,

comfort levels are improved and energy bills lowered

—Residents can stay on the site although moves may

be necessary to suit phasing

—Tenure and mix of new homes can be to LBWF

requirements

—The towers are an iconic local landmark

Weaknesses

—Disruption to residents with decanting from old home

to new home

—Major site construction works with programme of at

least 3-4 years

—loss of some affordable homes on the Montague

Road

site to create a mixed tenure community, off site

provision to be located on satellite sites within the

borough

Park Hill Sheffield, view of interior

Page 14: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Option 3. Transformation

23 Pollard Thomas Edwards Montague Road - Officers Workshop 29 May 2014

savills Waltham Forest

-·-'-"7-

..

I

.

":!I

;:ri -·

..

7

-44=U

rr·

r ug

13

.

ID

I

I

1:1

....,. - --

d I I!.-:-::-.:;;:-

"T ..l. .;:- .,.. L

• I

l .L

=a

I :.. 0 I

:::n:l [

l oo T = '4 .14 .££ :r· £": T-r= c i- oo

H tDOILiBJ= .-IA..I-,I- -u:-I::.-:x:

-

" -l

li I I i 1 r.n1 .J lla0.11971'

AIT ILIYATION sa a

. ·--.

• ""ij, ( •

-" -""" ..... ":j-"-- ...

'.i

II

M

,IiiIn; .J;I '

ll:

II 'rrl::ri ln::ii tt:::n r .

• it: :'il lrt:l':n it:; ::n Ire

lrt:En Ia;[;D 'a;i

4 I ff ' it r:n IrE · l

• '--"'-·

---- r;;; J I·

._

·1 1::7' ·-

111.11

. I---f 1

1-t----l·-r==l

Cj =1

L rrn1 ' )t I ti l l! I I I

WilT ILIVATION

Page 15: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Option 3. Transformation

24 Pollard Thomas Edwards Montague Road - Officers Workshop 29 May 2014

savills Waltham Forest

=

n

I f

·

All interior spaces would be completely refurbished

- - - - 1111 =:::::::;-!

6'2.

!ell lffll P.l

1

l I l I

l

1.0'¥\ERLEVEL I LMNG

)-

l-

.J

.... ::1

o;=

UPPERLEVEL/6ECR S

Page 16: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

25 Pollard Thomas Edwards Montague Road - Officers Workshop 29 May 2014

savills Waltham Forest

Option 3. Transformation Entrances will be welcoming

Page 17: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

26 Pollard Thomas Edwards Montague Road - Officers Workshop 29 May 2014

savills Waltham Forest

Option 3. Transformation Entrances will be welcoming

. .... ....

.·--·-'

• ,. ,. • ,. o I

-- - --- -----

/

I

/

Page 18: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Option 3. Transformation

Examples of new buildings for the infill building:

— Modern design to fit into the

existing buildings

— Approximately 6 storeys

— Built to provide new homes for

existing residents

Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 27

Page 19: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Montague Road -Officers Workshop 29 May 2014 Pollard Thomas Edwards 28

savills Waltham Forest

Option 3. Transformation Image of transformed towers

Page 20: Montague Road, Fred Wigg and John Walsh Towers...Pollard Thomas Edwards Montague Road — Officers Workshop 29 May 2014 4 1. Introduction Background The brief from Waltham Forest:

Montague Road -Officers Workshop 29 May 2014 Pollard Thomas Edwards 29

savills Waltham Forest

Ir

• 7 ..

..

II .

! . r - I;;; ""·

Questions and Discussion

•.•. 1.3. II

10

A a C D t F C G F t DC 8 A

- I

:er

- I ,....

::I

I • ... r-r ..-·' T""T: ·- i"T :r. -;r I

,.....,.....-. i:TT,1- :I

.L

I r £

4

a

• L I E

.... - ... ;(' r•

I ;::;p: f.";; I I _i iT'1 . r

Wt•t II.IYATI OM IAil li.IYATION