DEMOLITION SPECIFICATIONS FOR MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV MANAGEMENT OFFICE DEMOLITION MONTGOMERY, ALABAMA PROJECT # CCR -18120 APRIL 22, 2019 COHEN CARNAGGIO REYNOLDS Architecture & Interior Design 2920 1 ST Avenue South Birmingham, Alabama 35233 205/324-8864 phone 205/324-8496 fax

Upload: others

Post on 31-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

DEMOLITION SPECIFICATIONS

FOR

MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV

MANAGEMENT OFFICE DEMOLITION

MONTGOMERY, ALABAMA

PROJECT # CCR -18120

APRIL 22, 2019

COHEN CARNAGGIO REYNOLDS Architecture & Interior Design

2920 1ST Avenue South Birmingham, Alabama 35233

205/324-8864 phone 205/324-8496 fax

Page 2: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE PHASE IV DEMOLITION CCR-18120

TABLE OF CONTENTS 00 01 10 - 1

COHEN CARNAGGIO REYNOLDS Project No. CCR - 18120 2920 1st Avenue South Birmingham, Alabama 35233 (205) 324-8864 tel

SPECIFICATION FOR MONTGOMERY HOUSING AUTHORITY

PARKS PLACE PHASE IV MANAGEMENT OFFICE DEMOLITION

Division 00 Procurement and Contracting Requirements *Note – AIA Documents, forms, and Contracts are not Included in this Project Manual.Project Forms (latest edition) equivalent to the following shall be used (where applicable) forthis project. Copies of the forms can be purchased at aiacontracts.org

00 01 10 Table of Contents 00 11 16 Invitation for Bid 00 21 13 AIA A701, Instructions to Bidders 00 41 33 Bid Form 00 43 36 AIA G705, Proposed Subcontractors Form 00 52 33 AIA A102, Standard Form of Agreement Between Owner and Contractor

where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price

00 61 00 AIA A310, Bid Bond 00 61 05 AIA A312, Performance Bond and Payment Bond 00 62 11 Submittal Transmittal Form 00 62 16 AIA G715, Supplemental Attachment for ACORD Certificate of Insurance 25 00 62 76.16 AIA G702, Application and Certificate for Payment 00 62 76.16 AIA G707A, Consent of Surety to Reduction in or Partial Releases of

Retainage Form 00 62 77 AIA G703, Continuation Sheet 00 62 79 Inventory of Stored Materials 00 63 13 AIA G716, Request for Information (RFI) 00 63 25 Substitution Request Form 00 63 57 AIA G701, Change Order 00 65 16 AIA G704, Certificate of Substantial Completion 00 65 19.13 AIA G706, Affidavit of Payment of Debts and Claims 00 65 19.14 AIA G706A, Contractor’s Affidavit of Release of Liens 00 65 19.19 AIA G707, Consent of Surety to Final Payment 00 72 00 AIA A201, General Conditions of the Contract for Construction 00 73 00 Modified General Conditions

Division 01 General Requirements 01 14 00 Work Restrictions 01 21 00 Allowances 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures

Page 3: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE PHASE IV DEMOLITION CCR-18120

TABLE OF CONTENTS 00 01 10 - 2

01 31 13 Project Coordination 01 31 19 Project Meetings 01 42 19 Reference Standards and Definitions 01 45 00 Quality Control 01 50 00 Temporary Facilities and Controls 01 70 00 Execution and Closeout Requirements

Division 02 Demolition02 41 16

Division 0303 11 00 03 12 00 03 15 00 03 29 20

Structure Demolition

SiteworkSite Clearing Earth Moving Excavation Support and Protection Turf and Grasses

End of Section

2016 Environmental Report of Existing Building.

Addendum #1, dated 04/04/19

Addendum #2, dated 04/05/19

Page 4: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

525 South Lawrence Street Montgomery, Alabama 36104

Abatement and Management Office Demolition at Parks Place

IFB Number 2019-04 TYPE OF PROJECT: Invitation for Bids (IFB) for Management Office Demolition

and Site Amenities at Parks Place DATE OF ISSUANCE: MONDAY, APRIL 22, 2019 DESCRIPTION OF SERVICES: Hazardous Material Abatement and Demolition of an

existing management office building located at Parks Place CONTACT PERSON: JOERETTA SMITH

PROCUREMENT & CONTRACT ADMINISTRATOR [email protected] PRE-BID CONFERENCE: Wednesday, May 1, 2019, 10:00 AM Parks Place Administration Building 660 Cleveland Court Montgomery, Alabama 36104 LAST DAY FOR QUESTIONS: THURSDAY, MAY 2, 2019 SUBMISSION DEADLINE: Tuesday, May 7, 2019 at 3:00PM CST SUBMISSION ADDRESS: Montgomery Housing Authority Attention: Procurement/Contract Office 525 South Lawrence Street Montgomery, Alabama 36104 BID OPENING ADDRESS: Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104 BID OPENING DATE: Wednesday, May 8, 2019 at 2:00PM CST

Page 5: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

A Pre-Bid conference will be held at 10:00AM. (CST) on Wednesday, May 1, 2019, Parks Place Administration Building 660 Cleveland Court Montgomery, Alabama 36104. General Contractors are encouraged to attend. Contractors will have an opportunity to visit the site after the Pre-Bid meeting. Sealed bids will be accepted at the Montgomery Housing Authority, 525 South Lawrence Street, Montgomery, Alabama, 36104, by mail in a bid package prior to the date and time noted above to the attention of Joeretta Smith, Procurement Department. Late submissions will not be accepted. Contractors must be licensed by the General Contractors Licensure Board of Alabama and meet the statutory requirements, including liability and workers compensation insurance and maintaining a license in good standing. All bidders must include a current license number with the submission of the bid. The responsibility for submitting a response to this IFB to the Montgomery Housing Authority on or before the stated time and date will be solely and strictly the responsibility of the respondent. The Housing Authority is not liable for any costs incurred by the Bidder prior to issuance of a contract. The Bidder shall wholly absorb all costs incurred in the preparation and presentation of the bid. 1.0 SCOPE OF SERVICE:

Abatement of hazardous material, building demolition and existing utility terminations associated with the existing management office building located at Parks Place.

2.0 GENERAL CONDITIONS:

2.1 Conformity with IFB All bids must conform to the requirements presented in this IFB. Bids not in conformity may be rejected. Exceptions to any requirement must be clearly noted in the bidders’ response.

2.2 Contract Terms/Consultant Agreement

Contract terms will be for ninety (90) calendar days. All items included in this IFB must be included in the final contract. All contracts between the parties will be governed by and enforced in accordance with Federal HUD regulations and the laws of the State of Alabama.

2.3 License The contractor will have and maintain all required licenses necessary to conduct business in the City of Montgomery and any specialty licenses required to perform required work listed in this IFB. Copies of all licenses must be on file in the Procurement/Contract Office of the Montgomery Housing Authority, prior to contractor starting work.

2.4 Right to Reject Bids The MHA reserves the right to reject any or all bids, to waive technicalities and to accept any offer deemed to be in the best interest of MHA. Montgomery Housing Authority reserves the right to seek additional or new bids and to waive informalities and minor inequities in bids received.

Page 6: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

2.5 Rights to Submitted Material All bids, responses, inquiries or correspondence relating to or in reference to this IFB, and all reports, charts, displays, schedules, exhibits, and other documents provided by companies will become the property of the MHA when received.

2.6 Required Forms

The necessary HUD forms are available for download on our website at: www.mhatoday.org/procurement

Each bid must contain a copy of the following HUD Attachments:

HUD 5369 Instructions for Bidders (Submit with bid) HUD 5369-A Representations/Certifications of Bidders (Submit with bid) HUD 5370 General Conditions for the Contract for Construction HUD 50070 Drug-Free Workplace Certification (Submit with bid) HUD 50071 Certification of Payments to Influence Federal Transactions (Submit

with bid) HUD SF-LLL Disclosure of Lobbying Activities (Submit with bid) Bid Bond Form (Submit with bid) Certificate as to Corporate Principal Form (Submit with bid) Non-Collusive Form (Submit with bid) Bid Form (Submit with bid) MHA Insurance Coverage Checklist MHA Hourly Wage Form DOL Payroll Form WH-347 Vendor Registration Form Davis Bacon Wage Rates Performance Bond Form Labor and Material Payment Bond Form

2.7 Additional Information

All inquiries, requests for site visits and/or additional information relative to this IFB should be directed (ten days prior to bid deadline date and time) to Joeretta Smith, Procurement and Contracts Administrator at [email protected].

2.8 Insurance & Bid Bond

The company must certify/show proof of workers compensation (if applicable), general liability (minimum coverage of $1,000,000 per occurrence) and auto liability ($1,000,000 per occurrence). Insurance coverage must be maintained throughout the term of the contract. Copies of all proof of insurance must be on file in the Procurement Office prior to contractor beginning work. A cashier check or bid bond payable to the MHA in the amount of not less than five (5) percent of the amount of the bid, but not more than $10,000.00, will be required prior to the release of the “Notice to Proceed” to the successful bidder. Successful bidder will be required to furnish and pay satisfactory Performance and Payment Bonds equal to the amount of the contract.

3.0 COMPANY/FIRM INFORMATION:

A major consideration in awarding a contract is the experience and services of the contractor. The following information is requested from each company:

Page 7: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

General Company Information Each company must furnish a brief history of itself including how long it has been in business and any major offices located in Montgomery and/or any major offices located in the Southeast United States. List three references (name, address and telephone number) that may be contacted where similar work has been performed.

4.0 SELECTION PROCESS:

4.1 Invitation for Bids (IFB)

This IFB is intended to provide interested contractors with uniform information concerning the MHA’s requirements for providing the requested services.

4.2 Bid Requirements:

Provide proof of business licenses, insurances, and references Provide list of qualified persons to perform specified jobs Provide a time line for job completion Providing all other things being equal, the contract will be awarded to the

lowest/responsible bidder. If the lowest bidder declines the offer or references do not prove to be true, the contract will be offered to the next lowest bidder, and so on

Bid Packages must include all required HUD Forms Contractor warranty must be in place for one year on all workmanship All equipment warranties must be given to MHA

5.0 BID FORMAT: 5.1 Bids should be written in a concise, straightforward and forthright manner. Superficial

marketing statements and materials should be avoided. Bids should be organized in the following manner, using required forms where appropriate:

1. Company Information Form (Attachment A) 2. Bid Form (Attachment B) 3. HUD required forms listed in Section 2.7

HUD 5369 Instructions for Bidders (Submit with bid) HUD 5369-A Representations/Certifications of Bidders (Submit with bid) HUD 50070 Drug-Free Workplace Certification (Submit with bid) HUD 50071 Certification of Payments to Influence Federal Transactions (Submit with bid) HUD SF-LLL Disclosure of Lobbying Activities (Submit with bid) Certificate as to Corporate Principal Form (Submit with bid) Non-Collusive Form (Submit with bid) Bid Form (Submit with bid)

4. Copy of all required Licenses 5. Current list of references with contact information

5.2 Bid Submittal

Bids must be submitted in a sealed envelope that shows the company’s name and address and clearly written on the outside of the sealed envelope must be the words “Management Office

Page 8: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

Demolition and Site Amenities at Parks Place,” IFB #2019-02, DEADLINE: Tuesday, April 9, 2019 at 2:00 pm CST" - along with Contractor's (AL) License Number. All bids must be submitted in accordance with the conditions and instructions provided herein. Bids must contain all information listed in Section 5.0 Bid Format of this IFB. All bids must remain open for acceptance for sixty (60) days.

6.0 DAVIS BACON WAGE DETERMINATION:

Bidder must agree to pay their employees not less than the minimum wage rates for residential work prescribed by General Decision Number: AL190054, dated January 4, 2019. A copy of that decision is attached to the bid package. In addition, certified weekly payroll forms will be required.

7.0 MATERIALS:

The selected contractor shall provide, install and complete work utilizing proprietary materials and products, as necessary to comply with MHA’s intent and interest in standardizing its materials and products.

8.0 CHANGE ORDERS: In the event change orders are required, the contractor will immediately notify the Project Manager. Change Orders must comply with the following:

a) Contractor must fill out a Construction Change Order Form offering a detailed explanation for the change order itemizing changes to be made

b) Contractor must offer a written itemized estimate, for the amount of money to be

added to the original contracted price signed and dated by the contractor c) Construction Change Order must be approved and signed by MHA’s Executive

Director, Evette Hester, who is the Contracting Officer

The contractor may not proceed with the additional repairs until receiving permission from the MHA, along with a signed Change Order. Beyond the above referenced written communications, Bidders and their representatives may not make any other form of contact with MHA Staff, Board members or residents. Any improper contact by or on behalf of a Bidder may be grounds for disqualification.

9.0 ACCEPTANCE OF WORK & PAYMENTS: 1. Prior to acceptance and approval of payment, the Project Manager must sign-off on all work

completed. 2. Payment to the Contractor shall be made upon acceptance of the work. By virtue of submitting

an invoice, the Contractor certifies that all work for which payment is requested was completed

Page 9: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

in accordance with the scope of work. 3. Acceptance of the work and approval of payment must be in writing and signed by MHA’s

Contracting Officer or their authorized representative, prior to submission to the Finance Department for payment.

10.0 SECTION 3 COMPLIANCE:

All section 3 covered contracts shall include the following clause (referred to as the Section 3 clause):

A. The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing.

The parties to this contract agree to comply with HUD’s regulations in 24 CFR part 135, which implement Section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with the part 135 regulations.

B. The contractor agrees to send to each labor organization or representative of workers with which the contractor has a collective bargaining agreement or other understanding, if any, a notice advising the labor organization or workers’ representative of Section 3 clause and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin.

C. The contractor agrees to include this Section 3 clause in every subcontract subject to compliance with regulations in 24 CFR part 135, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 clause, upon a finding that the subcontractor is in violation of the regulation in 24 CFR part 135. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR part 135.

D. The contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR part 135 require employment opportunities to be directed, were not filled to circumvent the contractor’s obligations under 24 CFR part 135.

Page 10: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

E. Noncompliance with HUD’s regulations in 24 CFR part 135 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts.

F. With respect to work performed in connection with Section 3 covered Indian Housing Assistance, Section 7(b) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450e) also applies to the work to be performed under this contract. Section 7(b) requires that to the greatest extent feasible (i) preference and opportunities for training and employment shall be given to Indians, and (ii) preference in the award of contracts and subcontracts shall be given to Indian organizations and Indian-owned economic enterprises. Parties to this contract that are subject to the provisions of Section 3 and Section 7 (b) agree to comply with Section 3 to the maximum extent feasible, but not in derogation of compliance with Section 7(b).

Page 11: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

Attachment A

The Housing Authority of the City of Montgomery, Alabama PROCUREMENT/CONTRACT OFFICE

525 SOUTH LAWRENCE STREET MONTGOMERY, ALABAMA 36104

TELEPHONE 334-206-7130 | FAX 334-206-7196

COMPANY INFORMATION FORM

COMPANY NAME: ______________________________________________________ ADDRESS: ______________________________________________________ ______________________________________________________ TELEPHONE #: ______________________________________________________ FAX #: ______________________________________________________ E-MAIL: ______________________________________________________ CONTACT (name) ______________________________________________________ YEARS OF OPERATION: ______________________________________________________ DESCRIPTION OF WORK: ____________________________________________________ _____________________________________________________ ESTIMATED # DAYS TO COMPLETE: _________________________________________ (Maximum 90 calendar days) REFERENCES: ______________________________________________________ ______________________________________________________ ______________________________________________________

Page 12: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

The Housing Authority of the City of Montgomery, Alabama Procurement/Contract Office

525 South Lawrence Street Montgomery, Alabama 36104

Telephone 334-206-7130 | fax 334-206-7196

Bid Proposal Form Abatement & Management Office Demolition at Parks Place

IFB No. 2019-04 To: Date: (Awarding Authority)

In compliance with your Advertisement for Bids and subject to all the conditions thereof, the undersigned, From:

(Legal Name of Bidder) hereby proposes to furnish all labor and materials and perform all work required for the construction of

(Project Title) The Bidder, which is organized and existing under the laws of the State of , having its principal offices in the City of , is ☐ a Corporation ☐ a Partnership ☐ an individual ☐ (other) . LISTING OF PARTNERS OR OFFICERS: If Bidder is a Partnership, list all partners and their addresses; if Bidder is a Corporation, list the names, titles, and business addresses of its officers:

BIDDER’S REPRESENTATION: The Bidder declares that it has examined the site of the Work, having become fully informed regarding all pertinent conditions, and that it has examined the Drawings and Specifications (including all Addenda received) for the Work and the other Bid and Contract Documents relative thereto, and that it has satisfied itself relative to the Work to be performed. ADDENDA: The Bidder acknowledges receipt of Addenda Nos. through inclusively. BASE BID: For construction complete as shown and specified, the sum of Dollars ($ )

Page 13: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

IFB Number 2019-04 Management Office Demolition at Parks Place

COMPLETION DATE: Project shall be substantially complete within calendar days. Witness Signature Signature

Print Name and Title Print Name and Title

Date Date

Page 14: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

WORK RESTRICTIONS 01 14 00 - 1

SECTION 01 14 00 – Work Restrictions

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and otherDivision 01 Specification Sections, apply to this Section.

1.2 USE OF PREMISESA. Refer to Section 01 31 19 Project Meetings for Owner Coordination Meeting information.B. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in

which the Work is indicated.C. Contractor shall assume full responsibility for the protection and safekeeping of products under this contract

stored on the site.

PART 2 – PRODUCTS (NOT APPLICABLE)

PART 3 – EXECUTION (NOT APPLICABLE)

End of Section

Page 15: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

ALLOWANCES 01 21 00 - 1

SECTION 01 21 00 - ALLOWANCES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements governing allowances.

1. Selected materials and equipment are specified in the Contract Documents by allowances. Allowances

have been established in lieu of additional requirements and to defer selection of actual materials and

equipment to a later date when additional information is available for evaluation. If necessary,

additional requirements will be issued by Change Order.

B. Types of allowances include the following:

1. Lump-sum allowances.

2. Contingency allowances.

3. Testing and inspecting allowances.

C. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 01 Section "Modification Procedures" specifies procedures for submitting and handling

Change Orders.

1.3 SELECTION AND PURCHASE

A. At the earliest practical date after award of the Contract, advise the Architect of the date when the final

selection and purchase of each product or system described by an allowance must be completed to avoid

delaying the Work.

B. At the Architect's request, obtain proposals for each allowance for use in making final selections. Include

recommendations that are relevant to performing the Work.

C. Purchase products and systems selected by the Architect from the designated supplier.

1.4 SUBMITTALS

A. Submit proposals for purchase of products or systems included in allowances, in the form specified for Change

Orders.

B. Submit invoices or delivery slips to show the actual quantities of materials delivered to the site for use in

fulfillment of each allowance.

C. Submit time sheets and other documentation to show labor time and cost for installation of allowance items

that include installation as part of the allowance.

Page 16: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

ALLOWANCES 01 21 00 - 2

1.5 COORDINATION

A. Coordinate and process submittals for allowance items in same manner as for other portions of the work.

1.6 LUMP SUM ALLOWANCES

A. Allowance shall include cost to Contractor of specific products and materials ordered by Owner or selected by

Architect under allowance.

B. Unless otherwise indicated, Contractor’s costs for taxes, receiving and handling at Project site, labor,

installation, overhead and profit, and similar costs related to products and materials ordered by Owner or

selected by Architect under allowance shall be included as part of the Contract Sum and not part of the

allowance.

C. Unused materials: Return unused materials purchased under an allowance to manufacturer or supplier for

credit to Owner, after installation has been completed and accepted.

1. If requested by Architect, retain and prepare unused material for storage by Owner. Deliver unused

material to Owner’s storage space as directed.

1.7 CONTINGENCY ALLOWANCES

A. Use the contingency allowance only as directed by Architect for Owner’s purposes and only by Change Orders

that indicate amounts to be charged to the allowance.

B. Change Orders authorizing use of funds from the contingency allowance will include Contractor’s related costs

and reasonable overhead and profit margins.

C. At project closeout, credit unused amounts remaining in the contingency allowance to Owner by Change Order.

1.8 TESTING AND INSPECTING ALLOWANCES

A. Testing and inspecting allowances include the cost of engaging testing agencies, actual tests and inspections, and

reporting results.

B. The allowance does not include incidental labor required to assist the testing agency or costs for retesting if

previous tests and inspections result in failure. The cost for incidental labor to assist the testing agency shall be

included in the Contract Sum.

C. Costs of services not required by the Contract Documents are not included in the allowance.

D. At Project closeout, credit unused amounts remaining in the testing and inspecting allowance to Owner by

Change Order.

1.9 ADJUSTMENT OF ALLOWANCES

A. Allowance Adjustment: To adjust allowance amounts, prepare a Change Order proposal based on the

difference between purchase amount and the allowance, multiplied by final measurement of work-in-place

where applicable. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes,

normal product imperfections, and similar margins.

1. Include installation costs in purchase amount only where indicated as part of the allowance.

2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs

Page 17: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

ALLOWANCES 01 21 00 - 3

and other margins claimed.

3. Submit substantiation of a change in scope of work, if any, claimed in Change Orders related to

allowances.

4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey,

measure, or count.

B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the

Contract Documents, whether for the purchase order amount or Contractor’s handline, labor, installation,

overhead, and profit.

PART 2 - PRODUCTS (Not Applicable)

PART 3 – EXECUTION

3.1 EXAMINATION

A. Examine products covered by an allowance promptly upon delivery for damage or defects. Return damaged

or defective products to manufacturer for replacement.

3.2 PREPARATION

A. Coordinate materials and their installation for each allowance with related materials and installations to ensure

that each allowance item is completely integrated and interfaced with related work.

3.3 SCHEDULE OF ALLOWANCES

1. Allowance No. 1, Asbestos Abatement, Demolition & Utility Cap/Removal Allowance:

a. Include an allowance of ten (10) percent of the base bid price for unforeseen asbestos

abatement, building demolition, utility capping and abandoned utility removal items

encountered during construction.

End of Section

Page 18: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

SUBSTITUTION PROCEDURES 01 25 00 - 1

SECTION 01 25 00 – SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and otherDivision 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for handling requests for substitutions madeafter award of the Contract.

B. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 01 Section "Reference Standards and Definitions" specifies the applicability of industrystandards to products specified.

1.3 DEFINITIONS

A. Definitions in this Article do not change or modify the meaning of other terms used in the ContractDocuments.

B. Substitutions: Changes in products, materials, equipment, and methods of construction required by theContract Documents proposed by the Contractor after award of the Contract are considered to be requests for substitutions. The following are not considered to be requests for substitutions:

1. Substitutions requested during the bidding or pricing period, and accepted by Addendum prior to awardof the Contract, are included in the Contract Documents and are not subject to requirements specifiedin this Section for substitutions.

2. Revisions to the Contract Documents requested by the Owner or Architect.3. Specified options of products and construction methods included in the Contract Documents.4. The Contractor's determination of and compliance with governing regulations and orders issued by

governing authorities.

1.4 SUBMITTALS

A. Substitution Request Submittal: The Architect will consider requests for substitution if received within 60 daysafter commencement of the Work. Requests received more than 60 days after commencement of the Workmay be considered or rejected at the discretion of the Architect.

1. Provide substitution request form along with complete documentation showing compliance with therequirements for substitutions, and the following information, as appropriate:

a. Coordination information, including a list of changes or modifications needed to other parts ofthe Work and to construction performed by the Owner and separate contractors, that will benecessary to accommodate the proposed substitution.

b. A detailed comparison of significant qualities of the proposed substitution with those of theWork specified. Significant qualities may include elements, such as performance, weight, size,durability, and visual effect.

c. Product Data, including Drawings and descriptions of products and fabrication and installationprocedures.

d. Samples, where applicable or requested.e. A statement indicating the substitution's effect on the Contractor's Construction Schedule

compared to the schedule without approval of the substitution. Indicate the effect of theproposed substitution on overall Contract Time.

Page 19: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

SUBSTITUTION PROCEDURES 01 25 00 - 2

f. Cost information, including a proposal of the net change, if any in the Contract Sum.g. The Contractor's certification that the proposed substitution conforms to requirements in the

Contract Documents in every respect and is appropriate for the applications indicated.h. The Contractor's waiver of rights to additional payment or time that may subsequently become

necessary because of the failure of the substitution to perform adequately.

2. Architect's Action: If necessary, the Architect will request additional information or documentation forevaluation within one week of receipt of a request for substitution. The Architect will notify theContractor of acceptance or rejection of the substitution within 2 weeks of receipt of the request, orone week of receipt of additional information or documentation, whichever is later. Acceptance will bein the form of a change order.

a. Use the product specified if the Architect cannot make a decision on the use of a proposedsubstitute within the time allocated.

PART 2 – PRODUCTS

2.1 SUBSTITUTIONS

A. Conditions: The Architect will receive and consider the Contractor's request for substitution when one ormore of the following conditions are satisfied, as determined by the Architect. If the following conditions arenot satisfied, the Architect will return the requests without action except to record noncompliance with theserequirements.

1. Extensive revisions to the Contract Documents are not required.2. Proposed changes are in keeping with the general intent of the Contract Documents.3. The request is timely, fully documented, and properly submitted.4. The specified product or method of construction cannot be provided within the Contract Time.

The Architect will not consider the request if the product or method cannot be provided as a result offailure to pursue the Work promptly or coordinate activities properly.

5. The request is directly related to an "or-equal" clause or similar language in the Contract Documents.6. The requested substitution offers the Owner a substantial advantage, in cost, time, energy conservation,

or other considerations, after deducting additional responsibilities the Owner must assume. TheOwner's additional responsibilities may include compensation to the Architect for redesign andevaluation services, increased cost of other construction by the Owner, and similar considerations.

7. The specified product or method of construction cannot receive necessary approval by a governingauthority, and the requested substitution can be approved.

8. The specified product or method of construction cannot be provided in a manner that is compatiblewith other materials and where the Contractor certifies that the substitution will overcome theincompatibility.

9. The specified product or method of construction cannot be coordinated with other materials and wherethe Contractor certifies that the proposed substitution can be coordinated.

10. The specified product or method of construction cannot provide a warranty required by the ContractDocuments and where the Contractor certifies that the proposed substitution provides the requiredwarranty.

B. The Contractor's submittal and the Architect's acceptance of Shop Drawings, Product Data, or Samples forconstruction activities not complying with the Contract Documents do not constitute an acceptable or validrequest for substitution, nor do they constitute approval.

PART 3 - EXECUTION (Not Applicable)

End of Section

Page 20: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 1

SECTION 01 26 00 – CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and otherDivision 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements for handling and processing contractmodifications.

B. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 01 Section "Allowances" for procedural requirements governing the handling and processingof allowances.

2. Division 01 Section "Payment Procedures" for administrative procedures governing Applications forPayment.

3. Division 01 Section "Substitution Procedures" for administrative procedures for handling requests forsubstitutions made after award of the Contract.

1.3 MINOR CHANGES IN THE WORK

A. The Architect will issue supplemental instructions authorizing minor changes in the Work, not involvingadjustment to the Contract Sum or Contract Time, on AIA Form G710, Architect's SupplementalInstructions. Such changes shall be affected by written order issued by the Architect.

1.4 CHANGE ORDER PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: The Architect will prepare and issue a detailed description of proposedchanges in the Work that will require adjustment to the Contract Sum or Contract Time. If necessary, thedescription will include supplemental or revised Drawings and Specifications.

1. Proposal requests issued by the Architect are for information only. Do not consider them as aninstruction either to stop work in progress or to execute the proposed change.

2. Within 5 days of receipt of a proposal request, submit an estimate of cost necessary to execute thechange to the Architect for the Owner's review.

a. Include a list of quantities of products required and unit costs, with the total amount ofpurchases to be made. Where requested, furnish survey data to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.c. Include a statement indicating the effect the proposed change in the Work will have on the

Contract Time.

B. Contractor-Initiated Proposals: When latent or unforeseen conditions require modifications to the Contract,the Contractor may propose changes by submitting a request for a change to the Architect.

1. Include a statement outlining the reasons for the change and the effect of the change on the Work.Provide a complete description of the proposed change. Indicate the effect of the proposed change onthe Contract Sum and Contract Time.

Page 21: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 2

2. Include a list of quantities of products required and unit costs, with the total amount of purchases tobe made. Where requested, furnish survey data to substantiate quantities.

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.4. Comply with requirements in Section "Product Substitutions" if the proposed change requires

substitution of one product or system for a product or system specified.

1.5 ALLOWANCES

A. Allowance Adjustment: For allowance-cost adjustment, base each Change Order Proposal on the differencebetween the actual purchase amount and the allowance, multiplied by the final measurement of work-in-place.Where applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product

imperfections, and similar margins.

1. Include installation costs in the purchase amount only where indicated as part of the allowance.2. When requested, prepare explanations and documentation to substantiate the margins claimed.3. Submit substantiation of a change in scope of work claimed in the Change Orders related to unit-cost

allowances.4. The Owner reserves the right to establish the actual quantity of work-in-place by independent quantity

survey, measure, or count.

1.6 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: When the Owner and the Contractor disagree on the terms of a ProposalRequest, the Architect may issue a Construction Change Directive on AIA Form G714. The ConstructionChange Directive instructs the Contractor to proceed with a change in the Work, for subsequent inclusion in aChange Order. The Architect will take appropriate action on Construction Change Directives.

1. The Construction Change Directive contains a complete description of the change in the Work. Italso designates the method to be followed to determine change in the Contract Sum or Contract Time.

B. Documentation: Maintain detailed records on a time and material basis of work required by the ConstructionChange Directive.

1. After completion of the change, submit an itemized account and supporting data necessary tosubstantiate cost and time adjustments to the Contract.

1.7 CHANGE ORDER PROCEDURES

A. Upon the Owner's approval of a Proposal Request, the Architect will prepare a Change Order, and theArchitect will take appropriate action on a Change Order for signatures of the Owner and the Contractor onAIA Form G701.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

End of Section

Page 22: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

PAYMENT PROCEDURES 01 29 00 - 1

SECTION 01 29 00 – PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and otherDivision 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements governing the Contractor's Applications forPayment.

B. This Section specifies administrative and procedural requirements governing each prime contractor'sApplications for Payment.

1. Coordinate the Schedule of Values and Applications for Payment with the Contractor's ConstructionSchedule, Submittal Schedule, and List of Subcontracts.

C. Related Sections: The following Sections contain requirements that relate to this Section.

1. Schedules: The Contractor's Construction Schedule and Submittal Schedule are specified in Division 1Section "Submittal Procedures."

1.3 SCHEDULE OF VALUES

A. Project Coordination: Coordinate preparation of the Schedule of Values with preparation of the Contractor'sConstruction Schedule.

B. Project Coordination: Each prime Contractor shall coordinate preparation of its Schedule of Values for itspart of the Work with preparation of the Contractors' Construction Schedule.

1. Correlate line items in the Schedule of Values with other required administrative schedules and forms,including:

a. Contractor's Construction Schedule.b. Application for Payment forms, including Continuation Sheets.c. List of subcontractors.d. Schedule of allowances.e. Schedule of alternates.f. List of products.g. List of principal suppliers and fabricators.

2. Submit the Schedule of Values to the Architect at the earliest possible date but no later than 7 daysbefore the date scheduled for submittal of the initial Applications for Payment.

C. Format and Content: Use the Project Manual table of contents as a guide to establish the format for theSchedule of Values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the Schedule of Values:

a. Project name and location.b. Name of the Architect.c. Project number.d. Contractor's name and address.e. Date of submittal.

Page 23: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

PAYMENT PROCEDURES 01 29 00 - 2

2. Arrange the Schedule of Values in tabular form with separate columns to indicate the following foreach item listed:

a. Related Specification Section or Division.b. Description of Work.c. Name of subcontractor.d. Name of manufacturer or fabricator.e. Name of supplier.f. Change Orders (numbers) that affect value.g. Dollar value.

1) Percentage of Contract Sum to nearest one-hundredth percent, adjusted to total 100percent.

3. Provide a breakdown of the Contract Sum in sufficient detail to facilitate continued evaluation ofApplications for Payment and progress reports. Coordinate with the Project Manual table of contents.Break principal subcontract amounts down into several line items.

4. Round amounts to nearest whole dollar; the total shall equal the Contract Sum.

5. Provide a separate line item in the Schedule of Values for each part of the Work where Applicationsfor Payment may include materials or equipment, purchased or fabricated and stored, but not yetinstalled.

6. Provide separate line items on the Schedule of Values for initial cost of the materials, for eachsubsequent stage of completion, and for total installed value of that part of the Work.

7. Margins of Cost: Show line items for indirect costs and margins on actual costs only when such itemsare listed individually in Applications for Payment. Each item in the Schedule of Values andApplications for Payment shall be complete. Include the total cost and proportionate share of generaloverhead and profit margin for each item.

a. Temporary facilities and other major cost items that are not direct cost of actual work-in-placemay be shown either as separate line items in the Schedule of Values or distributed as generaloverhead expense, at the Contractor's option.

1.4 APPLICATIONS FOR PAYMENT

A. Each Application for Payment shall be consistent with previous applications and payments as reviewed andcertified by the Architect and paid for by the Owner.

1. The initial Application for Payment, the Application for Payment at time of Substantial Completion,and the final Application for Payment involve additional requirements.

2. Each monthly application should include the following:

a. Current construction schedule.b. Current Change Order Log, showing the status of all Change Orders.c. Current RFI Log, showing the status of of all RFI’s and Change Orders.d. Current Submittal Log.e. Lein Wavers from suppliers, vendors and subcontractors.

B. Payment-Application Times: Each progress-payment date is indicated in the Agreement. The period ofconstruction Work covered by each Application for Payment is the period indicated in the Agreement.

C. Payment-Application Forms: Use AIA Document G702 and Continuation Sheets G703 as the form forApplications for Payment.

Page 24: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

PAYMENT PROCEDURES 01 29 00 - 3

D. Application Preparation: Complete every entry on the form. Include notarization and execution by a personauthorized to sign legal documents on behalf of the Contractor. The Architect will return incompleteapplications without action.

1. Entries shall match data on the Schedule of Values and the Contractor's Construction Schedule. Useupdated schedules if revisions were made.

2. Include amounts of Change Orders and Construction Change Directives issued prior to the last day ofthe construction period covered by the application.

E. Transmittal: Submit 4 signed and notarized original copies of each Application for Payment to the Architectby a method ensuring receipt within 24 hours. One copy shall be complete, including waivers of lien andsimilar attachments, when required.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate informationrelated to the application, in a manner acceptable to the Architect.

F. Initial Application for Payment: Administrative actions and submittals, that must precede or coincide withsubmittal of the first Application for Payment, include the following:

1. List of subcontractors.2. List of principal suppliers and fabricators.3. Schedule of Values.4. Contractor's Construction Schedule (preliminary if not final).5. Schedule of principal products.6. Schedule of unit prices.7. Copies of building permits.8. Initial progress report.9. Certificates of insurance and insurance policies.10. Performance and payment bonds.11. Submittal Schedule.

G. Application for Payment at Substantial Completion: Following issuance of the Certificate of SubstantialCompletion, submit an Application for Payment.

1. This application shall reflect Certificates of Partial Substantial Completion issued previously for Owneroccupancy of designated portions of the Work.

2. Administrative actions and submittals that shall precede or coincide with this application include:

a. Occupancy permits and similar approvals.b. Warranties (guarantees) and maintenance agreements.c. Test/adjust/balance records.d. Maintenance instructions.e. Final cleaning.f. Application for reduction of retainage and consent of surety.g. Advice on shifting insurance coverages.h. List of incomplete Work, recognized as exceptions to Architect's Certificate of Substantial

Completion.

H. Final Payment Application: Administrative actions and submittals that must precede or coincide withsubmittal of the final Application for Payment include the following:

1. Completion of Project closeout requirements.2. Completion of items specified for completion after Substantial Completion.3. Ensure that unsettled claims will be settled.4. Ensure that incomplete Work is not accepted and will be completed without undue delay.5. Transmittal of required Project construction records to the Owner.6. Proof that taxes, fees, and similar obligations were paid.7. Removal of temporary facilities and services.

Page 25: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

PAYMENT PROCEDURES 01 29 00 - 4

8. Removal of surplus materials, rubbish, and similar elements.9. Change of door locks to Owner's access.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

End of Section

Page 26: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

Project Coordination 01 31 13 - 1

SECTION 01 31 13 - Project Coordination

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and otherDivision 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and supervisory requirements necessary for coordinating constructionoperations including, but not necessarily limited to, the following:

1. General Project Coordination procedures.2. Project Coordination Drawings.3. Cleaning and protection.

1.3 Project Coordination

A. Coordinate construction operations included in various Sections of these Specifications to assure efficient andorderly installation of each part of the Work. Coordinate construction operations included under differentSections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in the sequence required to obtain the best results where installationof one part of the Work depends on installation of other components, before or after its owninstallation.

2. Coordinate installation of different components to assure maximum accessibility for requiredmaintenance, service, and repair.

3. Make provisions to accommodate items scheduled for later installation.4. Coordinate the work with other Prime Contractors.

B. Where necessary, prepare memoranda for distribution to each party involved, outlining special proceduresrequired for Project Coordination. Include such items as required notices, reports, and attendance atmeetings.

1. Prepare similar memoranda for the Owner and separate contractors where Project Coordination oftheir work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures withother construction activities to avoid conflicts and assure orderly progress of the Work. The Contractor shallprepare and submit for the Owner’s information and the Architect’s approval a Construction Schedule for theWork. Such administrative activities include, but are not limited to, the following:

1. Preparation of schedules.2. Installation and removal of temporary facilities.3. Delivery and processing of submittals.4. Progress meetings.5. Project closeout activities.

1.4 SUBMITTALS

A. Project Coordination Drawings: Prepare Project Coordination drawings where careful Project Coordination isneeded for installation of products and materials fabricated by separate entities. Prepare Project Coordinationdrawings where limited space availability necessitates maximum utilization of space for efficient installation of

Page 27: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

Project Coordination 01 31 13 - 2

different components.

1. Show the relationship of components shown on separate Shop Drawings.2. Indicate required installation sequences.3. Provide Project Coordination drawings for mechanical layout prior to installation of ductwork and

piping.4. Comply with requirements contained in Section "Submittals."

B. Staff Names: Within 15 days of commencement of construction operations, submit a list of the Contractor'sprincipal staff assignments, including the superintendent and other personnel in attendance at the Project Site.Identify individuals and their duties and responsibilities. List their addresses and telephone numbers.

1. Post copies of the list in the Project meeting room, the temporary field office, and each temporarytelephone.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 GENERAL Project Coordination PROVISIONS

A. Inspection of Conditions: Require the Installer of each major component to inspect both the substrate andconditions under which Work is to be performed. Do not proceed until unsatisfactory conditions have beencorrected in an acceptable manner.

B. Coordinate temporary enclosures with required inspections and tests to minimize the necessity of uncoveringcompleted construction for that purpose.

3.2 CLEANING AND PROTECTION

A. Clean and protect construction in progress and adjoining materials in place, during handling and installation.Apply protective covering where required to assure protection from damage or deterioration at SubstantialCompletion.

B. Clean and provide maintenance on completed construction as frequently as necessary through the remainderof the construction period. Adjust and lubricate operable components to assure operability without damagingeffects.

C. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completedor in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during theconstruction period. Where applicable, such exposures include, but are not limited to, the following:

1. Excessive static or dynamic loading.2. Excessively high or low temperatures.3. Thermal shock.4. Excessively high or low humidity.5. Water or ice.6. Puncture.7. Abrasion.8. Heavy traffic.9. Soiling, staining, and corrosion.10. Rodent and insect infestation.11. Contact between incompatible materials.12. Excessive weathering.13. Unprotected storage.

Page 28: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

Project Coordination 01 31 13 - 3

14. Improper shipping or handling.15. Theft.16. Vandalism.

End of Section

Page 29: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

PROJECT MEETINGS 01 31 19 - 1

SECTION 01 31 19 - PROJECT MEETINGS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and otherDivision 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements for project meetings, including, but notlimited to, the following:

1. Preinstallation conferences.2. Progress meetings.3. Project Coordination meetings.

B. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 01 Section "Project Coordination" for procedures for coordinating project meetings withother construction activities.

1.3 OWNER COORDINATION MEETING A. Prior to bidding, a conference will be held between Owner, Bidders and Architect to discuss work restrictions

and utility requirements.

1.4 PRECONSTRUCTION CONFERENCE

A. Conduct a Preconstruction conference to discuss the following:1. Introduce project stakeholders.

a. Owner team.b. Architect and Engineering teams.c. Contractor team.d. Building Owner team.

2. Discuss status of alternates.3. Establish regular schedule for progress meetings.4. Review communication protocols for submittals, Requests for Information (RFIs), Architect’s

Supplemental Instructions (ASIs), and Change Orders5. Reiterate items discussed during Landlord coordination meeting.

1.5 PROJECT COORDINATION MEETINGS

B. Conduct Project Coordination meetings at regular intervals convenient for all parties involved. ProjectCoordination meetings are in addition to specific meetings held for other purposes, such as regular progressmeetings and special preinstallation meetings.

C. Request representation at each meeting by every party currently involved in Project Coordination or planningfor the construction activities involved.

PART 2 - PRODUCTS (Not Applicable)

Page 30: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

PROJECT MEETINGS 01 31 19 - 2

PART 3 - EXECUTION (Not Applicable)

End of Section

Page 31: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

REFERENCE STANDARDS AND DEFINITIONS 01 42 19 - 1

SECTION 01 42 19 - REFERENCE STANDARDS AND DEFINITIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and otherDivision 1 Specification Sections, apply to this Section.

1.2 DEFINITIONS

A. General: Basic contract definitions are included in the Conditions of the Contract.

B. "Indicated": The term "indicated" refers to graphic representations, notes, or schedules on the Drawings; orto other paragraphs or schedules in the Specifications and similar requirements in the Contract Documents.Terms such as "shown," "noted," "scheduled," and "specified" are used to help the user locate the reference.Location is not limited.

C. "Directed": Terms such as "directed," "requested," "authorized," "selected," "approved," "required," and"permitted" mean directed by the Architect, requested by the Architect, and similar phrases.

D. "Approved": The term "approved," when used in conjunction with the Architect's action on the Contractor'ssubmittals, applications, and requests, is limited to the Architect's duties and responsibilities as stated in theConditions of the Contract.

E. "Regulations": The term "regulations" includes laws, ordinances, statutes, and lawful orders issued byauthorities having jurisdiction, as well as rules, conventions, and agreements within the construction industrythat control performance of the Work.

F. "Furnish": The term "furnish" means to supply and deliver to the Project site, ready for unloading, unpacking,assembly, installation, and similar operations.

G. "Install": The term "install" describes operations at the Project site including the actual unloading, temporarystorage, unpacking, assembling, erecting, placing, anchoring, applying, working to dimension, finishing, curing,protecting, cleaning, and similar operations.

H. "Provide": The term "provide" means to furnish and install, complete and ready for the intended use.

I. "Installer": An installer is the Contractor or another entity engaged by the Contractor, either as an employee,subcontractor, or contractor of lower tier, who performs a particular construction activity including installation,erection, application, or similar operations. Installers are required to be experienced in the operations they areengaged to perform.

1. The term "experienced," when used with the term "installer," means having successfully completed aminimum of 5 previous projects similar in size and scope to this Project; being familiar with the specialrequirements indicated; and having complied with requirements of authorities having jurisdiction.

J. "Project site" is the space available to the Contractor for performing construction activities, either exclusivelyor in conjunction with others performing work as part of the Project. The extent of the Project site is shownon the Drawings and may or may not be identical with the description of the land on which the Project is tobe built.

K. "Testing Agencies": A testing agency is an independent entity engaged to perform specific inspections or tests,either at the Project site or elsewhere, and to report on and, if required, to interpret results of those inspectionsor tests.

Page 32: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

REFERENCE STANDARDS AND DEFINITIONS 01 42 19 - 2

1.3 INDUSTRY STANDARDS

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicableconstruction industry standards have the same force and effect as if bound or copied directly into the ContractDocuments to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. Publication Dates: Comply with the standards in effect as of the date of the Contract Documents.

C. Conflicting Requirements: Where compliance with 2 or more standards is specified and the standards establishdifferent or conflicting requirements for minimum quantities or quality levels, comply with the most stringentrequirement. Refer uncertainties and requirements that are different but apparently equal to the Architect fora decision before proceeding.

1. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be theminimum provided or performed. The actual installation may comply exactly with the minimumquantity or quality specified, or it may exceed the minimum within reasonable limits. To comply withthese requirements, indicated numeric values are minimum or maximum, as appropriate, for the contextof the requirements. Refer uncertainties to the Architect for a decision before proceeding.

D. Copies of Standards: Each entity engaged in construction on the Project must be familiar with industrystandards applicable to its construction activity. Copies of applicable standards are not bound with the ContractDocuments.

E. Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated.Where abbreviations and acronyms are used in the Specifications or other Contract Documents, they mean therecognized name of the trade association, standards-generating organization, authorities having jurisdiction, orother entity applicable to the context of the text provision. Refer to Gale Research Inc.'s "Encyclopedia ofAssociations," which is available in most libraries.

1.4 SUBMITTALS

A. Permits, Licenses, and Certificates: For the Owner's records, submit copies of permits, licenses, certifications,inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments,correspondence, records, and similar documents, established for compliance with standards and regulationsbearing on performance of the Work.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

End of Section

Page 33: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

QUALITY CONTROL 01 45 00 - 1

SECTION 01 45 00 - QUALITY CONTROL

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and otherDivision 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for quality-control services.

B. Quality-control services include inspections, tests, and related actions, including reports performed byContractor, by independent agencies, and by governing authorities. They do not include contract enforcementactivities performed by the Architect.

C. Inspection and testing services are required to verify compliance with requirements specified or indicated.These services do not relieve Contractor of responsibility for compliance with Contract Documentrequirements.

D. Requirements of this Section relate to customized fabrication and installation procedures, not production ofstandard products.

1. Specific quality-control requirements for individual construction activities are specified in the Sectionsthat specify those activities. Requirements in those Sections may also cover production of standardproducts.

2. Specified inspections, tests, and related actions do not limit Contractor's quality-control proceduresthat facilitate compliance with Contract Document requirements.

3. Requirements for Contractor to provide quality-control services required by the Architect, Owner, orauthorities having jurisdiction are not limited by provisions of this Section.

1.3 RESPONSIBILITIES

A. Contractor Responsibilities: Unless otherwise indicated as the responsibility of another identified entity,Contractor shall provide inspections, tests, and other quality-control services specified elsewhere in theContract Documents and required by authorities having jurisdiction. Costs for these services are included inthe Contract Sum.

1. Where individual Sections specifically indicate that certain inspections, tests, and other quality-controlservices are the Contractor's responsibility, the Contractor shall employ and pay a qualifiedindependent testing agency to perform quality-control services. Costs for these services are includedin the Contract Sum.

2. Where individual Sections specifically indicate that certain inspections, tests, and other quality-controlservices are the Owner's responsibility, the Owner will employ and pay a qualified independent testingagency to perform those services.

B. Retesting: The Contractor is responsible for retesting where results of inspections, tests, or other quality-control services prove unsatisfactory and indicate noncompliance with Contract Document requirements,regardless of whether the original test was Contractor's responsibility.

1. The cost of retesting construction, revised or replaced by the Contractor, is the Contractor'sresponsibility where required tests performed on original construction indicated noncompliance withContract Document requirements.

Page 34: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

QUALITY CONTROL 01 45 00 - 2

C. Duties of the Testing Agency: The independent agency engaged to perform inspections, sampling, and testingof materials and construction specified in individual Sections shall cooperate with the Architect and theContractor in performance of the agency's duties. The testing agency shall provide qualified personnel toperform required inspections and tests.

1. The agency shall notify the Architect and the Contractor promptly of irregularities or deficienciesobserved in the Work during performance of its services.

2. The agency is not authorized to release, revoke, alter, or enlarge requirements of the ContractDocuments or approve or accept any portion of the Work.

3. The agency shall not perform any duties of the Contractor.

D. Project Coordination: Coordinate the sequence of activities to accommodate required services with aminimum of delay. Coordinate activities to avoid the necessity of removing and replacing construction toaccommodate inspections and tests.

1. The Contractor is responsible for scheduling times for inspections, tests, taking samples, and similaractivities.

1.4 SUBMITTALS

A. Unless the Contractor is responsible for this service, the independent testing agency shall submit a certifiedwritten report, in duplicate, of each inspection, test, or similar service to the Architect. If the Contractor isresponsible for the service, submit a certified written report, in duplicate, of each inspection, test, or similarservice through the Contractor.

1. Submit additional copies of each written report directly to the governing authority, when the authorityso directs.

2. Report Data: Written reports of each inspection, test, or similar service include, but are not limited to,the following:

a. Date of issue.b. Project title and number.c. Name, address, and telephone number of testing agency.d. Dates and locations of samples and tests or inspections.e. Names of individuals making the inspection or test.f. Designation of the Work and test method.g. Identification of product and Specification Section.h. Complete inspection or test data.i. Test results and an interpretation of test results.j. Ambient conditions at the time of sample taking and testing.k. Comments or professional opinion on whether inspected or tested Work complies with

Contract Document requirements.l. Name and signature of laboratory inspector.m. Recommendations on retesting.

1.5 QUALITY ASSURANCE

A. Qualifications for Service Agencies: Engage inspection and testing service agencies, including independenttesting laboratories, that are prequalified as complying with the American Council of IndependentLaboratories' "Recommended Requirements for Independent Laboratory Qualification" and that specialize inthe types of inspections and tests to be performed.

1. Each independent inspection and testing agency engaged on the Project shall be authorized byauthorities having jurisdiction to operate in the state where the Project is located.

PART 2 - PRODUCTS (Not Applicable)

Page 35: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

QUALITY CONTROL 01 45 00 - 3

PART 3 - EXECUTION

3.1 REPAIR AND PROTECTION

A. General: Upon completion of inspection, testing, sample taking and similar services, repair damagedconstruction and restore substrates and finishes. Comply with Contract Document requirements for Division1 Section "Cutting and Patching."

B. Protect construction exposed by or for quality-control service activities, and protect repaired construction.

C. Repair and protection is Contractor's responsibility, regardless of the assignment of responsibility forinspection, testing, or similar services.

End of Section

Page 36: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 1

SECTION 01 50 00 – TEMPORARY FACILITIES AND CONTROLS

PART 1 GENERAL

1.01 OWNER REQUIREMENTS

A. Abide by the more stringent of Project Manual requirements or Owner requirements as discussed at Pre-BidConference listed in section 01 11 16 Invitation for Bid.

B. Portions of work not scheduled for demolition shall remain in condition found at project Notice to Proceed,or better.

1.02 TEMPORARY UTILITIES - SEE SECTION 01 51 00

A. Provide and coordinate utilities as discussed in Pre-Bid Conference.

B. New permanent facilities may be used.

1.02 TELECOMMUNICATIONS SERVICES

A. Provide, maintain, and pay for telecommunications services to field office at time of project mobilization.

B. Telecommunications services shall include, at a minimum:

1. Cell phone service for job site superintendent.

1.03 TEMPORARY SANITARY FACILITIES

A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.

B. Maintain daily in clean and sanitary condition.

1.04 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could behazardous to workers or the public, to allow for owner's use of site and to protect existing facilities andadjacent properties from damage from construction operations and demolition.

B. Provide barricades required by governing authorities.

C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.

1.05 VEHICULAR ACCESS AND PARKING

A. Coordinate access and haul routes with governing authorities and Owner.

B. Provide means of removing mud from vehicle wheels before entering streets.

1.06 WASTE REMOVAL

A. As discussed in Pre-Bid Conference.

1.07 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS

A. Remove temporary utilities, equipment, facilities, materials, prior to Substantial Completion inspection.

B. Clean and repair damage caused by installation or use of temporary work.

C. Restore new permanent facilities used during construction to specified condition.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

End of Section

Page 37: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EXECUTION AND CLOSEOUT REQUIREMENTS 01 70 00 - 1

SECTION 01 70 00 – EXECUTION AND CLOSEOUT REQUIREMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and otherDivision 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for contract closeout including, but notlimited to, the following:

1. Inspection procedures.2. Project record document submittal.3. Final cleaning.

1.3 SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for certification of Substantial Completion, completethe following. List exceptions in the request.

1. In the Application for Payment that coincides with, or first follows, the date Substantial Completion isclaimed, show 100 percent completion for the portion of the Work claimed as substantially complete.

a. Include supporting documentation for completion as indicated in these Contract Documentsand a statement showing an accounting of changes to the Contract Sum.

b. If 100 percent completion cannot be shown, include a list of incomplete items, the value ofincomplete construction, and reasons the Work is not complete.

2. Advise the Owner of pending insurance changeover requirements.3. Submit specific warranties, workmanship bonds, maintenance agreements, final certifications, and

similar documents.4. Obtain and submit releases enabling the Owner unrestricted use of the Work and access to services

and utilities. Include permits, certificates, and similar releases.5. Submit record drawings, maintenance manuals, and similar final record information.6. Discontinue and remove temporary facilities from the site, construction tools, and similar elements.7. Complete final cleanup requirements.8. Touch up and otherwise repair and restore marred, exposed surfaces.

B. Inspection Procedures: On receipt of a request for inspection, the Architect will either proceed withinspection or advise the Contractor of unfilled requirements. The Architect will prepare the Certificate ofSubstantial Completion following inspection or advise the Contractor of construction that must be completedor corrected before the certificate will be issued.

1. The Architect will repeat inspection when requested and assure that the Work is substantiallycomplete.

2. Results of the completed inspection will form the basis of requirements for final acceptance.

1.4 FINAL ACCEPTANCE

A. Before requesting final inspection for certification of final acceptance and final payment, complete thefollowing.

Page 38: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EXECUTION AND CLOSEOUT REQUIREMENTS 01 70 00 - 2

1. Submit the final payment request with releases and supporting documentation not previouslysubmitted and accepted. Include insurance certificates for products and completed operations whererequired.

2. Submit an updated final statement, accounting for final additional changes to the Contract Sum.3. Submit consent of surety to final payment.4. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

B. Reinspection Procedure: The Architect will reinspect the Work upon receipt of notice that the Work,including inspection list items from earlier inspections, has been completed, except for items whosecompletion is delayed under circumstances acceptable to the Architect.

1. Upon completion of reinspection, the Architect will prepare a certificate of final acceptance. If theWork is incomplete, the Architect will advise the Contractor of Work that is incomplete or ofobligations that have not been fulfilled but are required for final acceptance.

2. If necessary, reinspection will be repeated.

1.5 RECORD DOCUMENT SUBMITTALS

A. General: Do not use record documents for construction purposes. Protect record documents fromdeterioration and loss in a secure, fire-resistant location. Provide access to record documents for theArchitect's reference during normal working hours.

B. Record Drawings: Maintain a clean, undamaged set of blue or black line white-prints of Contract Drawings.Mark the set to show the actual installation where the installation varies substantially from the Work asoriginally shown. Mark which drawing is most capable of showing conditions fully and accurately. WhereShop Drawings are used, record a cross-reference at the corresponding location on the Contract Drawings.Give particular attention to concealed elements that would be difficult to measure and record at a later date.

1. Mark record sets with red erasable pencil. Use other colors to distinguish between variations inseparate categories of the Work.

2. Mark new information that is important to the Owner but was not shown on Contract Drawings orShop Drawings.

3. Note related change-order numbers where applicable.4. Organize record drawing sheets into manageable sets. Bind sets with durable-paper cover sheets; print

suitable titles, dates, and other identification on the cover of each set.

C. Record Specifications: Maintain one complete copy of the Project Manual, including addenda. Include withthe Project Manual one copy of other written construction documents, such as Change Orders andmodifications issued in printed form during construction.

1. Mark these documents to show substantial variations in actual Work performed in comparison withthe text of the Specifications and modifications.

2. Give particular attention to substitutions and selection of options and information on concealedconstruction that cannot otherwise be readily discerned later by direct observation.

3. Note related record drawing information and Product Data.4. Upon completion of the Work, submit record Specifications to the Architect for the Owner's records.

D. Record Product Data: Maintain one copy of each Product Data submittal. Note related Change Orders andmarkup of record drawings and Specifications.

E. Miscellaneous Record Submittals: Refer to other Specification Sections for requirements of miscellaneousrecord keeping and submittals in connection with actual performance of the Work. Immediately prior to thedate or dates of Substantial Completion, complete miscellaneous records and place in good order. Identifymiscellaneous records properly and bind or file, ready for continued use and reference. Submit to theArchitect for the Owner's records.

PART 2 - PRODUCTS (Not Applicable)

Page 39: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EXECUTION AND CLOSEOUT REQUIREMENTS 01 70 00 - 3

PART 3 - EXECUTION

3.1 FINAL CLEANING

A. General: The General Conditions require general cleaning during construction. Regular site cleaning isincluded in Division 1 Section "Construction Facilities and Temporary Controls."

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface to thecondition expected at a normal site.

1. Complete the following cleaning operations before requesting inspection for certification ofSubstantial Completion.

a. Clean exposed exterior hard-surfaced finishes to a dust-free condition, free of stains, films, andsimilar foreign substances. Leave concrete paving broom clean.

b. Clean the site, including landscape development areas, of rubbish, litter, and other foreignsubstances. Sweep paved areas broom clean; remove stains, spills, and other foreign deposits.Rake grounds that are neither paved nor planted to a smooth, even-textured surface.

C. Removal of Protection: Remove temporary protection and facilities installed for protection of the Workduring demolition.

D. Compliance: Comply with regulations of authorities having jurisdiction and safety standards for cleaning. Donot burn waste materials. Do not bury debris or excess materials on the Owner's property. Do not dischargevolatile, harmful, or dangerous materials into drainage systems. Remove waste materials from the site anddispose of lawfully.

1. Where extra materials of value remain after completion of associated Work, they become the Owner'sproperty. Dispose of these materials as directed by the Owner.

End of Section

Page 40: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

STRUCTURE DEMOLITION 02 41 16 - 1 1 OF 6

SECTION 02 41 16 - STRUCTURE DEMOLITION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions andDivision 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Demolition and removal of buildings and site improvements.

2. Removing below-grade construction.

3. Disconnecting, capping or sealing, and removing site utilities.

4. Salvaging items for reuse by Owner.

B. Related Requirements:

1. Section 011000 "Summary" for use of the premises and phasing requirements.

2. Section 311000 "Site Clearing" for site clearing and removal of above- and below-grade siteimprovements not part of building demolition.

1.3 DEFINITIONS

A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to besalvaged.

B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver toOwner ready for reuse.

1.4 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and theircontents, commemorative plaques and tablets, and other items of interest or value to Owner that may beuncovered during demolition remain the property of Owner.

1. Carefully salvage in a manner to prevent damage and promptly return to Owner.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For refrigerant recovery technician.

B. Schedule of Building Demolition Activities: Indicate the following:

1. Detailed sequence of demolition work, with starting and ending dates for each activity.

Page 41: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

STRUCTURE DEMOLITION 02 41 16 - 2 2 OF 6

2. Temporary interruption of utility services.

3. Shutoff and capping of utility services.

C. Predemolition Photographs or Video: Show existing conditions of adjoining construction and siteimprovements, including finish surfaces, that might be misconstrued as damage caused by demolitionoperations. Comply with Section 013233 "Photographic Documentation." Submit before the Work begins.

D. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recoveringrefrigerant, stating that all refrigerant that was present was recovered and that recovery was performedaccording to EPA regulations. Include name and address of technician and date refrigerant was recovered.

1.6 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program.

1.7 FIELD CONDITIONS

A. Buildings to be demolished will be vacated and their use discontinued before start of the Work.

B. Buildings immediately adjacent to demolition area will be occupied. Conduct building demolition sooperations of occupied buildings will not be disrupted.

1. Provide not less than 72 hours' notice of activities that will affect operations of adjacent occupiedbuildings.

2. Maintain access to existing walkways, exits, and other facilities used by occupants of adjacentbuildings.

a. Do not close or obstruct walkways, exits, or other facilities used by occupants of adjacentbuildings without written permission from authorities having jurisdiction.

C. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

D. Hazardous Materials: Present in buildings and structures to be demolished. A report on the presence ofhazardous materials is on file for review and use. Examine report to become aware of locations wherehazardous materials are present.

1. Hazardous material remediation is specified elsewhere in the Contract Documents.

2. Do not disturb hazardous materials or items suspected of containing hazardous materials exceptunder procedures specified elsewhere in the Contract Documents.

E. On-site storage or sale of removed items or materials is not permitted.

1.8 COORDINATION

A. Arrange demolition schedule so as not to interfere with operations of adjacent occupied buildings.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition.Comply with hauling and disposal regulations of authorities having jurisdiction.

Page 42: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

STRUCTURE DEMOLITION 02 41 16 - 3 3 OF 6

B. Standards: Comply with ASSE A10.6 and NFPA 241.

2.2 SOIL MATERIALS

A. Satisfactory Soils: Comply with requirements in Section 312000 "Earth Moving."

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting demolition operations.

B. Review Project Record Documents of existing construction or other existing condition and hazardousmaterial information provided by Owner. Owner does not guarantee that existing conditions are same asthose indicated in Project Record Documents.

C. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

D. Inventory and record the condition of items to be removed and salvaged. Provide photographs or video ofconditions that might be misconstrued as damage caused by salvage operations. Comply with Section 013233"Photographic Documentation.

3.2 PREPARATION

A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to40 CFR 82 and regulations of authorities having jurisdiction.

B. Salvaged Items: Comply with the following:

1. Clean salvaged items of dirt and demolition debris.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Owner.

4. Transport items to storage area designated by Owner.

5. Protect items from damage during transport and storage.

3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Utilities to be Disconnected: Locate, identify, disconnect, and seal or cap off utilities servingbuildings and structures to be demolished.

1. Owner will arrange to shut off utilities when requested by Contractor.

2. Arrange to shut off utilities with utility companies.

3. If removal, relocation, or abandonment of utility services will affect adjacent occupied buildings, thenprovide temporary utilities that bypass buildings and structures to be demolished and that maintaincontinuity of service to other buildings and structures.

4. Cut off pipe or conduit a minimum of 24 inches below grade. Cap, valve, or plug and seal remainingportion of pipe or conduit after bypassing according to requirements of authorities havingjurisdiction.

Page 43: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

STRUCTURE DEMOLITION 02 41 16 - 4 4 OF 6

5. Do not start demolition work until utility disconnecting and sealing have been completed and verifiedin writing.

3.4 PROTECTION

A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilitiesduring demolition operations. Maintain exits from existing buildings.

B. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support topreserve stability and prevent unexpected movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of demolition.

C. Existing Utilities to Remain: Maintain utility services to remain and protect from damage during demolitionoperations.

1. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized inwriting by Owner and authorities having jurisdiction.

2. Provide temporary services during interruptions to existing utilities, as acceptable to Owner andauthorities having jurisdiction.

a. Provide at least 72 hours' notice to occupants of affected buildings if shutdown of service isrequired during changeover.

D. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and coveredpassageways, where required by authorities having jurisdiction and as indicated. Comply with requirements inSection 015000 "Temporary Facilities and Controls."

1. Protect adjacent buildings and facilities from damage due to demolition activities.

2. Protect existing site improvements, appurtenances, and landscaping to remain.

3. Erect a plainly visible fence around drip line of individual trees or around perimeter drip line ofgroups of trees to remain.

4. Provide temporary barricades and other protection required to prevent injury to people and damageto adjacent buildings and facilities to remain.

5. Provide protection to ensure safe passage of people around building demolition area and to and fromoccupied portions of adjacent buildings and structures.

6. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that areexposed to building demolition operations.

7. Erect and maintain dustproof partitions and temporary enclosures to limit dust, noise, and dirtmigration to occupied portions of adjacent buildings.

E. Remove temporary barriers and protections where hazards no longer exist. Where open excavations or otherhazardous conditions remain, leave temporary barriers and protections in place.

3.5 DEMOLITION, GENERAL

A. General: Demolish indicated buildings and site improvements completely. Use methods required to completethe Work within limitations of governing regulations and as follows:

Page 44: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

STRUCTURE DEMOLITION 02 41 16 - 5 5 OF 6

1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.

2. Maintain fire watch during and for at least two hours after flame-cutting operations.

3. Maintain adequate ventilation when using cutting torches.

4. Locate building demolition equipment and remove debris and materials so as not to impose excessiveloads on supporting walls, floors, or framing.

B. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensureminimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities withoutpermission from Owner and authorities having jurisdiction. Provide alternate routes around closed orobstructed trafficways if required by authorities having jurisdiction.

2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governingenvironmental-protection regulations. Do not use water when it may damage adjacent construction orcreate hazardous or objectionable conditions, such as ice, flooding, and pollution.

C. Explosives: Use of explosives is not permitted.

3.6 DEMOLITION BY MECHANICAL MEANS

A. Proceed with demolition of structural framing members systematically, from higher to lower level. Completebuilding demolition operations above each floor or tier before disturbing supporting members on the nextlower level.

B. Remove debris from elevated portions of the building by chute, hoist, or other device that will convey debristo grade level in a controlled descent.

1. Remove structural framing members and lower to ground by method suitable to minimize groundimpact and dust generation.

C. Salvage: Items to be removed and salvaged are indicated on Drawings.

D. Below-Grade Construction: Demolish foundation walls and other below-grade construction.

1. Remove below-grade construction, including basements, foundation walls, and footings completely.

E. Existing Utilities: Demolish and remove existing utilities and below-grade utility structures.

3.7 SITE RESTORATION

A. Below-Grade Areas: Completely fill below-grade areas and voids resulting from building demolitionoperations with satisfactory soil materials according to backfill requirements in Section 312000 "EarthMoving."

B. Site Grading: Uniformly rough grade area of demolished construction to a smooth surface, free fromirregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.

3.8 REPAIRS

A. Promptly repair damage to adjacent buildings caused by demolition operations.

Page 45: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

STRUCTURE DEMOLITION 02 41 16 - 6 6 OF 6

3.9 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved constructionand demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Do not burn demolished materials.

3.10 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolitionoperations. Return adjacent areas to condition existing before building demolition operations began.

1. Clean roadways of debris caused by debris transport.

END OF SECTION 02 41 16

Page 46: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

SITE CLEARING 31 10 00 – 1

SECTION 03 11 00-SITE CLEARING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:1. Protecting existing vegetation to remain.

2. Removing existing vegetation.

3. Removing above- and below-grade site improvements.

4. Disconnecting, capping or sealing, and removing site utilities.

5. Temporary erosion- and sedimentation-control measures.

1.2 DEFINITIONS

A. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter andsoil organisms.

B. Surface Soil: Soil that is present at the top layer of the existing soil profile at the Project site. In undisturbedareas, the surface soil is typically topsoil; but in disturbed areas such as urban environments, the surface soilcan be subsoil.

C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surfacesoil and is the zone where plant roots grow. Its appearance is generally friable, pervious, and black or adarker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel,and other objects more than 2 inches (50 mm) in diameter; and free of subsoil and weeds, roots, toxicmaterials, or other nonsoil materials.

D. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to beprotected during construction, and indicated on Drawings.

E. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.

1.3 MATERIAL OWNERSHIP

A. Except for stripped topsoil and other materials indicated to be stockpiled or otherwise remain on Owner'sproperty, cleared materials shall become Contractor's property and shall be removed from Project site.

1.4 INFORMATIONAL SUBMITTALS

A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and siteimprovements that establishes preconstruction conditions that might be misconstrued as damage caused bysite clearing.1. Use sufficiently detailed photographs or videotape.

2. Include plans and notations to indicate specific wounds and damage conditions of each tree or otherplants designated to remain.

B. Record Drawings: Identifying and accurately showing locations of capped utilities and other subsurfacestructural, electrical, and mechanical conditions.

Page 47: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

SITE CLEARING 31 10 00 – 2

1.5 PROJECT CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or usedfacilities during site-clearing operations.1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission

from Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authoritieshaving jurisdiction.

B. Utility Locator Service: Notify Alabama One Call (Alabama 811) for area where Project is located before siteclearing.

C. Do not commence site clearing operations until temporary erosion- and sedimentation-control measures arein place.

D. Soil Stripping, Handling, and Stockpiling: Perform only when the topsoil is dry or slightly moist.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in Division 31 Section"Earth Moving."1. Obtain approved borrow soil material off-site when satisfactory soil material is not available on-site.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. Protect existing site improvements to remain from damage during construction.1. Restore damaged improvements to their original condition, as acceptable to Owner.

3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL

A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge ofsoil-bearing water runoff or airborne dust to adjacent properties and walkways, according to erosion- andsedimentation-control drawings and requirements of authorities having jurisdiction.

B. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction untilpermanent vegetation has been established.

C. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal.

3.3 EXISTING UTILITIES

A. Locate, identify, disconnect, and seal or cap utilities indicated to be removed.1. Arrange with utility companies to shut off indicated utilities.

B. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or othersunless permitted under the following conditions and then only after arranging to provide temporary utilityservices according to requirements indicated:

Page 48: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

SITE CLEARING 31 10 00 – 3

1. Notify Owner not less than 2 days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Owner’s written permission.

C. Excavate for and remove underground utilities indicated to be removed.

3.4 SITE IMPROVEMENTS

A. Remove existing above- and below-grade improvements as indicated.

B. Remove slabs, paving, curbs, gutters, and aggregate base as indicated.1. Unless existing full-depth joints coincide with line of demolition, neatly saw-cut along line of existing

pavement to remain before removing adjacent existing pavement. Saw-cut faces vertically.

3.5 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materialsincluding trash and debris, and legally dispose of them off Owner's property.

END OF SECTION 31 10 00

Page 49: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EARTH MOVING 31 20 00 – 1

SECTION 31 20 00 - EARTH MOVING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Preparing subgrades for turf and grasses.

2. Excavating and backfilling for buildings and structures.

1.2 DEFINITIONS

A. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensionsindicated.

1. Authorized Additional Excavation: Excavation below subgrade elevations or beyond indicated linesand dimensions as directed by Engineer. Authorized additional excavation and replacement materialwill be paid for according to Contract provisions for changes in the Work.

2. Bulk Excavation: Excavation more than 10 feet in width and more than 30 feet in length.

3. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines anddimensions without direction by Engineer. Unauthorized excavation, as well as remedial work directedby Engineer, shall be without additional compensation.

B. Fill: Soil materials used to raise existing grades.

C. Rock: Rock material in beds, ledges, unstratified masses, conglomerate deposits, and boulders of rockmaterial that exceed 1 cu. yd. for bulk excavation or 3/4 cu. yd. for footing, trench, and pit excavation thatcannot be removed by rock excavating equipment equivalent to the following in size and performanceratings, without systematic drilling, ram hammering, ripping, or blasting, when permitted:

1. Excavation of Footings, Trenches, and Pits: Late-model, track-mounted hydraulic excavator; equippedwith a 42-inch-wide, maximum, short-tip-radius rock bucket; rated at not less than 138-hp flywheelpower with bucket-curling force of not less than 28,700 lbf and stick-crowd force of not less than18,400 lbf with extra-long reach boom; measured according to SAE J-1179.

2. Bulk Excavation: Late-model, track-mounted loader; rated at not less than 230-hp flywheel power anddeveloping a minimum of 47,992-lbf breakout force with a general-purpose bare bucket; measuredaccording to SAE J-732.

Page 50: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EARTH MOVING 31 20 00 – 2

D. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electricalappurtenances, or other man-made stationary features constructed above or below the ground surface.

E. Subgrade: Uppermost surface of an excavation (such as a utility, i.e. sanitary sewer) or the top surface of afill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.

F. Utilities: On-site underground pipes, conduits, ducts, and cables, as well as underground services withinbuildings.

1.3 ACTION SUBMITTALS

A. DOES NOT APPLY

1.4 INFORMATIONAL SUBMITTALS

A. Material Test Reports: For each on-site soil material proposed for fill and backfill as follows:

1. Classification according to ASTM D 2487.

2. Laboratory compaction curve according to ASTM D 698.

B. Pre-excavation Photographs or Videotape: Show existing conditions of adjoining construction and siteimprovements, including finish surfaces that might be misconstrued as damage caused by earth movingoperations. Submit before earth moving begins.

1.5 QUALITY ASSURANCE

A. DOES NOT APPLY

1.6 PROJECT CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or usedfacilities during earth moving operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permissionfrom Owner and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Owner or authoritieshaving jurisdiction.

Page 51: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EARTH MOVING 31 20 00 – 3

B. Utility Locator Service: Notify Alabama One Call (Alabama 811) for area where Project is located beforebeginning earth moving operations.

C. Do not commence earth moving operations until temporary erosion- and sedimentation-control measures,specified in Division 31 Section "Site Clearing,” are in place.

PART 2 - PRODUCTS

2.1 SOIL MATERIALS

A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available fromexcavations.

B. Satisfactory Soils: Soil Classification Groups CL, GW, GP, GM, SC, SW, SP, and SM according to ASTM D2487; free of rock or gravel larger than 4 inches in any dimension, debris, waste, frozen materials, vegetation,and other deleterious matter.

1. Liquid Limit: less than 50.

2. Plasticity Index: less than 25.

C. Unsatisfactory Soils: Soil Classification Groups GC, ML, OL, CH, MH, OH, and PT according to ASTM D2487, or a combination of these groups.

1. Unsatisfactory soils also include satisfactory soils not maintained within 2 percent of optimummoisture content at time of compaction.

D. Structural Fill: Soil Classification Groups CL, SC, SW, and SM according to ASTM D 2487; free of rock orgravel larger than 4 inches in any dimension, debris, waste, frozen materials, vegetation, and other deleteriousmatter.

1. Structural fill shall be free of organic matter and debris, composed of soils with a Liquid Limit less than50 and a Plasticity Index of 25 or less, and have a maximum dry density greater than 100 pcf.

2. Rock fragments shall be limited to three (3) inches in largest dimension and shall make up no more than40 percent of the fill mass.

3. The following compaction criteria shall be followed for the area:

a. A compaction criterion of at least 95% of the Modified Proctor maximum dry density (ASTMD1557) within a moisture content range to 3% of the soil’s optimum moisture content. Limitlift thickness for fill generally to eight (8) inches loose measure.

4. Backfilling in limited access areas, such as within 5’ of the existing building, shall be accomplished usinglift thickness limited to six (6) inches loose measure.

5. Provide one in-place field density test per lift of compacted fill per 5,000 square feet of fill area.

6. The on-site soils meeting the conditions above, when tested properly, may be used as structural fill inthe building areas. If off-site material is to be used, samples (composed of low plasticity soils) proposedfor use as structural fill at the subject site shall be submitted to the Owner’s Geotechnical Engineer forcompliance testing at least 7 days prior to fill placement. In general, off-site, fine grained soils are to beaerated or moistened as necessary to achieve moisture content within +/- 3% of the Modified ProctorOptimum at the time of compaction.

Page 52: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EARTH MOVING 31 20 00 – 4

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement,lateral movement, undermining, washout, and other hazards created by earth moving operations.

B. Protect and maintain erosion and sedimentation controls during earth moving operations.

C. Protect subgrades and foundation soils from freezing temperatures and frost. Remove temporary protectionbefore placing subsequent materials.

3.2 DEWATERING

A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades,and from flooding Project site and surrounding area.

B. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

1. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate inexcavations. Do not use excavated trenches as temporary drainage ditches.

3.3 EXCAVATION, GENERAL

A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface andsubsurface conditions encountered. Unclassified excavated materials may include rock, soil materials,concrete footings, and obstructions. No changes in the Contract Sum or the Contract Time will beauthorized for rock excavation or removal of obstructions.

1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock,replace with satisfactory soil materials.

2. Remove rock to lines and grades indicated.

3.4 STORAGE OF SOIL MATERIALS

A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing. Place, grade,and shape stockpiles to drain surface water. Cover to prevent windblown dust.

1. Stockpile soil materials away from edge of excavations.

3.5 UNDERCUTTING OF UNSUITABLE SOIL

A. The contractor may be directed by the Engineer to undercut unsuitable soil and haul it off site before beingreplaced by structural fill. Prior to undercutting, the contractor shall survey the ground surface elevation ofthe areas where undercutting would take place. Following undercutting, the contractor must measure thedimensions of the area undercut and survey the elevations of the excavation bottom. The surveyed andmeasured dimensions would serve in determining the undercut volume.

3.6 BACKFILL

A. Place and compact backfill in excavations promptly, but not before completing the following:

1. Demolition/Construction below finish grade including, where applicable, subdrainage, dampproofing,waterproofing, and perimeter insulation.

Page 53: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EARTH MOVING 31 20 00 – 5

2. Surveying locations of underground utilities for Record Documents.

3. Testing and inspecting underground utilities.

4. Removing concrete formwork.

5. Removing trash and debris.

6. Removing temporary shoring and bracing, and sheeting.

7. Installing permanent or temporary horizontal bracing on horizontally supported walls.

B. Place backfill on subgrades free of mud, frost, snow, or ice.

3.7 SOIL FILL

A. Plow, scarify, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material willbond with existing material.

B. Place and compact fill material in layers to required elevations.

C. Place soil fill on subgrades free of mud, frost, snow, or ice.

3.8 SOIL MOISTURE CONTROL

A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill soil layer before compaction towithin 2 percent of optimum moisture content.

1. Do not place backfill or fill soil material on surfaces that are muddy, frozen, or contain frost or ice.

2. Remove and replace, or scarify and air dry, otherwise satisfactory soil material that exceeds optimummoisture content by 2 percent and is too wet to compact to specified dry unit weight.

3.9 COMPACTION OF SOIL BACKFILLS AND FILLS

A. Place backfill and fill soil materials in layers not more than 8 inches in loose depth for material compacted byheavy compaction equipment, and not more than 6 inches in loose depth for material compacted by hand-operated tampers.

B. Place backfill and fill soil materials evenly on all sides of structures to required elevations, and uniformlyalong the full length of each structure.

C. Compact soil materials to not less than the following percentages of maximum dry unit weight according toASTM D 1557:

1. Under demolished buildings:

a. At least 95 percent of the Modified Proctor maximum dry density. The soils shall be moistureconditioned to within 3% of the soil’s optimum moisture content.

3.10 GRADING

A. General: Uniformly grade areas to a smooth surface, free of irregular surface changes. Comply withcompaction requirements and grade to cross sections, lines, and elevations indicated.

Page 54: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EARTH MOVING 31 20 00 – 6

1. Provide a smooth transition between adjacent existing grades and new grades.

2. Cut out soft spots, fill low spots, and trim high spots to comply with required surface tolerances.

B. Site Rough Grading: Slope grades to direct water away from buildings and to prevent ponding. Finishsubgrades to required elevations within the following tolerances:

1. Turf or Unpaved Areas: Plus or minus 1 inch.

3.11 FIELD QUALITY CONTROL

A. Special Inspections: Owner will engage a qualified special inspector to perform the following specialinspections:

1. Determine prior to placement of fill that site has been prepared in compliance with requirements.

2. Determine that fill material and maximum lift thickness comply with requirements.

3. Determine, at the required frequency, that in-place density of compacted fill complies withrequirements.

B. Testing Agency: Owner will engage a qualified geotechnical engineering testing agency to perform tests andinspections.

C. Allow testing agency to inspect and test subgrades and each fill or backfill layer. Proceed with subsequentearth moving only after test results for previously completed work comply with requirements.

D. Testing agency will test compaction of soils in place according to ASTM D 1556, ASTM D 2167,ASTM D 2922, and ASTM D 2937, as applicable. Tests will be performed at the following locations andfrequencies:

1. Demolished Building Areas: At subgrade and at each compacted fill and backfill layer, at least one testfor every 5,000 sq. ft. or less of demolished building area, but in no case fewer than three tests.

E. When testing agency reports that subgrades, fills, or backfills have not achieved degree of compactionspecified, scarify and moisten or aerate, or remove and replace soil materials to depth required; recompactand retest until specified compaction is obtained.

3.12 PROTECTION

A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trashand debris.

B. Repair and reestablish grades to specified tolerances where completed or partially completed surfacesbecome eroded, rutted, settled, or where they lose strength due to subsequent construction operations orweather conditions.

1. Scarify or remove and replace soil material to depth as directed by Owner; reshape and recompact.

C. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill withadditional soil material, compact, and reconstruct surfacing.

1. Restore appearance, quality, and condition of finished surfacing to match adjacent work, and eliminateevidence of restoration to greatest extent possible.

Page 55: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EARTH MOVING 31 20 00 – 7

3.13 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Stockpile satisfactory soil as directed by Owner.

1. Remove waste materials, including unsatisfactory soil, trash, and debris, and legally dispose of them offOwner's property.

END OF SECTION 31 20 00

Page 56: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EXCAVATION SUPPORT AND PROTECTION

31 50 00 - 1

SECTION 31 50 00 - EXCAVATION SUPPORT AND PROTECTION

PART 1 GENERAL

1.1 SUMMARY

A. Section includes temporary excavation support and protection systems.

1.2 PERFORMANCE REQUIREMENTS

A. Furnish, install, monitor, and maintain excavation support and protection system capable of supportingexcavation sidewalls and of resisting soil and hydrostatic pressure and superimposed and construction loads.

1. Delegated Design: Design excavation support and protection system, including comprehensiveengineering analysis by a qualified professional engineer, using performance requirements and designcriteria indicated.

2. Prevent surface water from entering excavations by grading, dikes, or other means.

3. Install excavation support and protection systems without damaging existing buildings, structures, andsite improvements adjacent to excavation.

4. Monitor vibrations, settlements, and movements.

1.3 ACTION SUBMITTALS

A. Shop Drawings: For excavation support and protection system.

1.4 INFORMATIONAL SUBMITTALS

A. Other Informational Submittals:

1. Photographs: Show existing conditions of adjacent construction and site improvements that might bemisconstrued as damage caused by the absence of, the installation of, or the performance of excavationsupport and protection systems. Submit before Work begins.

2. Record Drawings: Identifying and locating capped utilities and other subsurface structural, electrical,or mechanical conditions.a. Note locations and capping depth of wells and well points.

1.5 PROJECT CONDITIONS

A. Interruption of Existing Utilities: Do not interrupt any utility serving facilities occupied by Owner or othersunless permitted under the following conditions and then only after arranging to provide temporary utilityaccording to requirements indicated:

1. Notify Owner no fewer than 2 days in advance of proposed interruption of utility.

2. Do not proceed with interruption of utility without Owner’s written permission.

PART 2 PRODUCTS

2.1 MATERIALS

A. General: Provide materials that are either new or in serviceable condition.

B. Structural Steel: ASTM A 36/A 36M, or ASTM A 992/A 992M.

C. Steel Sheet Piling: ASTM A 328/A 328M, ASTM A 572/A 572M, or ASTM A 690/A 690M; withcontinuous interlocks.

1. Corners: Site-fabricated mechanical interlock or Roll-formed corner shape with continuous interlock.

D. Tiebacks: Steel bars, ASTM A 722/A 722M.

E. Tiebacks: Steel strand, ASTM A 416/A 416M.

PART 3 EXECUTION

3.1 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement,lateral movement, undermining, washout, and other hazards that could develop during excavation supportand protection system operations.

1. Shore, support, and protect utilities encountered.

Page 57: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

EXCAVATION SUPPORT AND PROTECTION

31 50 00 - 2

B. Install excavation support and protection systems to ensure minimum interference with roads, streets, walks,and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permissionfrom Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructedtraffic ways if required by authorities having jurisdiction.

C. Monitor excavation support and protection systems daily during excavation progress and for as long asexcavation remains open. Promptly correct bulges, breakage, or other evidence of movement to ensure thatexcavation support and protection systems remain stable.

D. Promptly repair damages to adjacent facilities caused by installing excavation support and protection systems.

3.2 BRACING

A. Locate bracing to clear columns, floor framing construction, and other permanent work. If necessary tomove brace, install new bracing before removing original brace.

1. Do not place bracing where it will be cast into or included in permanent concrete work unlessotherwise approved by Architect.

2. Install internal bracing, if required, to prevent spreading or distortion of braced frames.

3. Maintain bracing until structural elements are supported by other bracing or until permanentconstruction is able to withstand lateral earth and hydrostatic pressures.

3.3 REMOVAL AND REPAIRS

A. Remove excavation support and protection systems when construction has progressed sufficiently to supportexcavation and bear soil and hydrostatic pressures. Remove in stages to avoid disturbing underlying soils ordamaging structures, pavements, facilities, and utilities.

1. Remove excavation support and protection systems to a minimum depth of 48 inches (1200 mm)below overlaying construction and abandon remainder.

2. Fill voids immediately with approved backfill compacted to density specified in Division 31 Section"Earth Moving."

3. Repair or replace, as approved by Engineer, adjacent work damaged or displaced by removingexcavation support and protection systems.

END OF SECTION 31 50 00

Page 58: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

TURF AND GRASSES 32 92 00 – 1

SECTION 32 92 00 - TURF AND GRASSES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Seeding.

2. Erosion-control material(s).

1.2 DEFINITIONS

A. Manufactured Topsoil: Soil produced off-site by homogeneously blending mineral soils or sand withstabilized organic soil amendments to produce topsoil or planting soil.

B. Pests: Living organisms that occur where they are not desired or that cause damage to plants, animals, orpeople. These include insects, mites, grubs, mollusks (snails and slugs), rodents (gophers, moles, and mice),unwanted plants (weeds), fungi, bacteria, and viruses.

C. Planting Soil: Standardized topsoil; existing, native surface topsoil; existing, in-place surface soil; importedtopsoil; or manufactured topsoil that is modified with soil amendments and perhaps fertilizers to produce asoil mixture best for plant growth.

D. Subgrade: Surface or elevation of subsoil remaining after excavation is complete, or top surface of a fill orbackfill before planting soil is placed.

E. Subsoil: All soil beneath the topsoil layer of the soil profile, and typified by the lack of organic matter andsoil organisms.

F. Surface Soil: Soil that is present at the top layer of the existing soil profile at the Project site. In undisturbedareas, the surface soil is typically topsoil, but in disturbed areas such as urban environments, the surface soilcan be subsoil.

1.3 ACTION SUBMITTALS – N/A

1.4 INFORMATIONAL SUBMITTALS

A. Certification of Grass Seed: From seed vendor for each grass-seed monostand or mixture stating thebotanical and common name, percentage by weight of each species and variety, and percentage of purity,germination, and weed seed. Include the year of production and date of packaging.

B. Qualification Data: NA

C. Product Certificates: NA.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers showingweight, certified analysis, name and address of manufacturer, and indication of conformance with state andfederal laws, as applicable.

B. Bulk Materials:

Page 59: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

TURF AND GRASSES 32 92 00 – 2

1. Do not dump or store bulk materials near structures, utilities, walkways and pavements, or on existingturf areas or plants.

2. Provide erosion-control measures to prevent erosion or displacement of bulk materials, discharge ofsoil-bearing water runoff, and airborne dust reaching adjacent properties, water conveyance systems, orwalkways.

3. Accompany each delivery of bulk fertilizers and soil amendments with appropriate certificates.

1.6 PROJECT CONDITIONS

A. Planting Restrictions: Plant during one of the periods shown on plans. Coordinate planting periods withinitial maintenance periods to provide required maintenance from date of Substantial Completion.

B. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permitplanting to be performed when beneficial and optimum results may be obtained. Apply products duringfavorable weather conditions according to manufacturer's written instructions.

PART 2 - PRODUCTS

2.1 SEED

A. Grass Seed: Fresh, clean, dry, new-crop seed complying with AOSA's "Journal of Seed Technology; Rulesfor Testing Seeds" for purity and germination tolerances.

B. Seed Species: State-certified seed of grass species recommended by ALDOT

C. Grass Seed Mix: Proprietary seed mix as follows:

1. Products: Subject to compliance with requirements, provide the following:

a. ALDOT Seeding Charts

2.2 FERTILIZERS

A. Bonemeal: Commercial, raw or steamed, finely ground; a minimum of 1 percent nitrogen and 10 percentphosphoric acid.

B. Superphosphate: Commercial, phosphate mixture, soluble; a minimum of 20 percent available phosphoricacid.

C. Commercial Fertilizer: Commercial-grade complete fertilizer of neutral character, consisting of fast- andslow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous,and potassium in the following composition:

1. Composition: 1 lb/1000 sq. ft. (0.45 kg/92.9 sq. m) of actual nitrogen, 4 percent phosphorous, and 2percent potassium, by weight.

2. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from aqualified soil-testing laboratory.

D. Slow-Release Fertilizer: Granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen,phosphorus, and potassium in the following composition:

1. Composition: 20 percent nitrogen, 10 percent phosphorous, and 10 percent potassium, by weight.

Page 60: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

TURF AND GRASSES 32 92 00 – 3

2. Composition: Nitrogen, phosphorous, and potassium in amounts recommended in soil reports from aqualified soil-testing laboratory.

2.3 MULCHES

A. Straw Mulch: Provide air-dry, clean, mildew- and seed-free, salt hay or threshed straw of wheat, rye, oats, orbarley.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas to be planted for compliance with requirements and other conditions affecting performance.

1. Verify that no foreign or deleterious material or liquid such as paint, paint washout, concrete slurry,concrete layers or chunks, cement, plaster, oils, gasoline, diesel fuel, paint thinner, turpentine, tar,roofing compound, or acid has been deposited in soil within a planting area.

2. Do not mix or place soils and soil amendments in frozen, wet, or muddy conditions.

3. Suspend soil spreading, grading, and tilling operations during periods of excessive soil moisture untilthe moisture content reaches acceptable levels to attain the required results.

4. Uniformly moisten excessively dry soil that is not workable and which is too dusty.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

C. If contamination by foreign or deleterious material or liquid is present in soil within a planting area, removethe soil and contamination as directed by Architect and replace with new planting soil.

3.2 PREPARATION

A. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, shrubs, and plantings fromdamage caused by planting operations.

1. Protect adjacent and adjoining areas from hydroseeding and hydromulching overspray.

2. Protect grade stakes set by others until directed to remove them.

B. Install erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearingwater runoff or airborne dust to adjacent properties and walkways.

3.3 SEEDING

A. Sow seed with spreader or seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5mph (8 km/h). Evenly distribute seed by sowing equal quantities in two directions at right angles to eachother.

1. Do not use wet seed or seed that is moldy or otherwise damaged.

2. Do not seed against existing trees. Limit extent of seed to outside edge of planting saucer.

B. Sow seed at a total rate recommended by manufacturer.

Page 61: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

TURF AND GRASSES 32 92 00 – 4

c. Protect seeded areas from hot, dry weather or drying winds by applying peat mulch within 24 hours aftercompleting seeding operations. Soak areas, scatter mulch uniformly to a thickness of 3/16 inch (4.8 mm),and roll surface smooth.

3.6 CLEANUP AND PROTECTION

A. Promptly remove soil and debris created by turf work from paved areas. Clean wheels of vehicles beforeleaving site to avoid tracking soil onto roads, walks, or other paved areas.

B. Erect temporary fencing or barricades and warning signs as required to protect newly planted areas fromtraffic. Maintain fencing and barricades throughout initial maintenance period and remove after plantings areestablished.

C. Remove nondegradable erosion-control measures after grass establishment period.

END OF SECTION 32 92 00

Page 62: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

June 7, 2016

Mr. Harold (Kippy) Tate, AIA

Director of Real Estate Development Montgomery Housing Authority

525 South Lawrence Street

Montgomery, Alabama 36104

Re: Report of Environmental Review of Building Materials

Parks Place (Former Cleveland Court)

1026 Rosa Parks Avenue

Montgomery, Alabama

TTL Project No. 600216022

Dear Mr. Tate:

TTL 4154 Lomac Street

Montgomery, AL 36106

334.244.0766

www.TTLUSA.com

TTL, Inc. (TTL) is pleased to provide this report for consulting services for the Montgomery Housing

Authority's (MHA) Parks Place (Former Cleveland Court) Housing Complex located on Rosa Parks

Avenue in Montgomery, Alabama.

Project Background

The former Cleveland Court housing complex is currently undergoing renovations through the

Housing and Urban Development (HUD) Capital Funds Program, and the upgraded complex will be called Parks Place. Parks Place will be reoccupied in three phases starting in January 2017. The

renovations involving the fifteen housing units are underway. Based on conversations with you, the

management building and the community center will be demolished and consolidated into one

structure. The MHA contracted TTL to perform an asbestos assessment of the two buildings to

identify asbestos-containing materials (ACM) and lead-based paint, and to assist the MHA in

creating a scope of work for the selected contractor to follow to properly demolish the buildings and

dispose of suspect materials.

Scope of Services

ACM

TTL subcontracted with Building Environments, Inc., which specializes in inspections of building

materials, to assist in the identification of ACM. Mr. Lee Clayton of Building Environments

conducted the asbestos survey on April 20, 2016. A report of the survey findings is attached.

Asbestos-containing materials were determined to be present in both buildings surveyed. Friable

asbestos-containing ceiling tiles were present in the Community Building. Non-friable vinyl

asbestos floor tile and mastic were present in both buildings.

Mika
Line
Mika
Line
Mika
Line
Page 63: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

Environmental Review of Building Materials Parks Place - Montgomery Housing Authority

Paint

June 7, 2016 TTL Project No. 600216022

On April 20, 2016, TTL collected two composite samples of building materials from each of the

buildings for submittal to an analytical laboratory for analysis for lead using the TCLP (Toxicity

Characteristic Leaching Procedure). The samples were placed in appropriate containers and

shipped to TTL's laboratory in Tuscaloosa, Alabama and analyzed for TCLP lead. No lead was detected in any of the samples. A copy of the laboratory report is attached.

Asbestos Abatement Scope of Work

Building Environments, Inc. was subcontracted to prepare a scope of work for the abatement of the asbestos in both the Community Center and the Administration Building. The scope of work is

attached.

TTL appreciates the opportunity to submit this proposal. If you have any questions, please call us

at (334) 244-0766.

Sincerely,

TTL, Inc.

s��v� Principal Engineer

Attachments: Building Environments, Inc. Asbestos Survey Report

Laboratory Report

Asbestos Abatement Scope of Work

�.�� Project Engineer

Mika
Line
Page 64: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

Building Environments, Inc.

Consultants for asbestos, indoor air qualit)' and site concerns

May 4, 2016

Shannon H. McDonald, P.G. TIL, Inc. 4154 Lomac Street Montgomecy, Alabama 36106 334-244-0766 [email protected]

FBO Kippy Tate, AIA Montgomery Housing Authority Director of Real Estate Development 525 S. Lawrence Street Montgomery, Alabama 36104-4611 334-206-7175 Cell 334-207-7182

Subject: Survey for Asbestos-Containing Material (ACM) Regulated During Demolition The Cleveland Courts Administration Building and the Community Center Building Building Environments, Inc. Project BE-636

To All Concerned:

Building Environments, Inc. has completed the survey for asbestos-containing material (ACM) at the subject location( s), in accordance with our meetings and telephone conversation. These services were provided under the terms of our verbal agreement and our letter dated December 21, 2015. This report has one page of findings for each building. The Bulk Sample Analysis (by Polarized Light Microscopy) Report Summary is attached as an Appendix.

We understand you plan to demolish the subject facility to make way for new construction. This demolition is considered a "commercial" project, which requires identification of ACM, and notification of any asbestos removal prior to beginning work. The sole purpose of this survey is to provide information needed to comply with the EPA National Emission Standard for Hazardous Air Pollutants (NESHAP) which requires that ACM be identified, and most materials removed ("regulated"), in advance of building renovation/demolition. No investigations were made outside the building relative to environmental concerns such as potential site contamination. BE did not address concerns of lead-based paint during demolition.

Vinyl a.fbestosfloor tile (VAT) was identified in both the subject buildings, and asbestos-containing ceiling panels were idmtified in only the Community Center. Before demolition of these structures, BE recommends the Owner file a notification of demolition with the Alabama Department of Environmental Management (ADEM), the local enforcement agency for the NESHAP. Present a copy of this report as evidence that the Buildings were checked for the presence of regulated asbestos materials, and such materials were identified. Document the removal of ACM prior to razing.

Also, prior to demolition, we recommend that the Owner have all friable ACM removed by an experienced, licensed and insured asbestos abatement contractor. However, the VAT can be left in place during the demolition process if certain requirements are met to satisfy ADEM.

Respectfolly Submitted, Building Environments, Inc.

;,�myro� AL Accredited Asbestos Inspector

1/4

P.O. Box 55627 • Birmingham, Alabama 35255 205-321-1223 • e-mail: [email protected]

Mika
Line
Mika
Line
Page 65: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

Survey for Regulated Asbestos-Containing Building Materials (ACM) The Cleveland Courts Administration Building on Rosa Parks Drive in Montgomery

Building Environments, Inc. (BE) completed this survey on April 20, 2016. Mr. F. Lee Clayton, an asbestos Inspector accredited by the Alabama Safe State Program, visited the Building to check for the presence of regulated asbestos-containing building material (ACM)� field-identify ACM which can be� and collect samples of suspect ACM. Samples were then sent to be analyzed, as required, by an accredited laboratory.

Building Description The subject site is a non-residential building located in Cleveland Courts. The original building is wood and metal framed with a crawl space. This original 1941 construction has a red-brick veneer exterior. Two additions on the south side are concrete slab-on-grade buildings with cement masonry unit ( concrete block) walls and wooden-framed roof structures. Asphalt shingle roofing is in good condition. In total there are about 3�050 ft2

of floor space.

Roofing

Exterior

Ceilin&,

HVAC

Flooring

Non-Asbestos-Containing Materials Recently installed asphalt shingles are not considered suspect asbestos material.

Red brick veneer and concrete block are not suspect ACM.

No access to the attic space could be found.

In the offices there are new suspended ceiling panels. Samples #6A & #7 A identified the panels as non-asbestos material.

No asbestos material was observed in/on the heating, ventilation, and air conditioning system. The flue is metal.

Walls are gypsum wallboard on wood or metal framing. Gypsum wallboard (" Sheetrock") is not ACM but the finishing compound can be. Samples #3A, #4A, & #5A were taken from the wallboard joint finishing compound ("mud"), and analysis detected no asbestos.

Asbestos-Containing Materials There is vinyl floor tile exposed in the building's front spaces, underneath newer tile in the hallway� as well as under carpet in the offices. This flooring is non-friable vinyl asbestos tile (VAT), and its adhesive mastic is also ACM, as determined through analysis of samples # lA & #2A. There are at least 1300 ft2 of VAT in the Administration Bldg.

Conclusion and Recommendation Before demolishing this structure, BE recommends the Owner file a notification of demolition with the Alabama Department of Environmental Management (ADEM), the local enforcement agency for the NESHAP. Present a copy of this report as evidence that the building was checked for the presence of regulated asbestos materials, and such materials were identified.

Prior to demolition, we recommend the Owner have the identified VAT removed by an experienced, licensed and insured asbestos abatement contractor, or leave the VAT in place and make special arrangements to conduct the demolition and maintain the site in a manner suitable to ADEM.

2/4

Page 66: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

Survey for Regulated Asbestos-Containing Building Materials (ACM) The Cleveland Courts Community Center on Rosa Parks Drive in Montgomery

Building Environments, Inc. (BE) completed this survey on April 20, 2016. Mr. F. Lee Clayton, an asbestos Inspector accredited by the Alabama Safe State Program, visited the Building to check for the presence of regulated -8Sbestos-c-0ntaining building material (ACM), field-identify ACM which can be, and collect samples- of snsp€ct ACM. Samples were then sent to be analyzed, as required, by an accredited laboratory.

Building Description The subject site is a non-residential building located in Cleveland Courts. This building has about 2,900 gross square feet of:floor space. It is a concrete slab-on-grade building with cement masonry unit (concrete block) walls and CP11C.t$_r00Jpane.ls w.:itb..flat,. built-up multi,.ply J:oofiJ:)g..m.good conditio11.. O.rigiuaJ con tructiog._is ptesm;ned to be in the l 970's.

Roofing

Exterior

Ceilings

HVAC

Ceiling

Flooring

Non-Asbestos-Containing Materials The roofing mastic ("bull") around penetrations was sampled (#11 & #12). Two samples of roofing membrane (#13 & #14) were collected. Analysis of these samples did not identify asbestos.

The cement masonry unit walls are not suspected ACM. Panels under windows and the soffit were observed to be masonry troweled-onto steel mesh, and not considered suspect.

The ceilings in the building section south of the central hallway have a textured finish. This finish is applied to concrete roof panels. Samples #3, #4, & #5 were taken of the textured finish. Asbestos was not detected in the analysis of this ceiling texture. North of the Hallway there is a very fluffy textured ceiling finish (samples #6, #7, & #8). Analysis of these samples did not detect asbestos.

No real attic space, ductwork is above a suspended ceiling.

No asbestos material was observed in/on the heating, ventilation, and air conditioning system.

Walls are painted concrete block and are not considered a suspect ACM.

Asbestos-Containing Materials In the central corridor ("Hallway") there are suspended ceiling panels. Samples # 1 & #2 identified the panels as asbestos-containing material. There are about 250 :ft2 of this friable material.

There is non-friable vinyl asbestos floor tile (VAT), which apparently covers the entire space except for the Kitchen and Restrooms ( about 1700 :ft2). It is covered with carpet in the offices. Samples #9 & #IO were cofiected ofthls tile. Analysis determined it, and the adhesive mastic to contain asoestos.

Conclusion and Recommendation Before demolishing this structure, BE recommends the Owner file a notification of demolition with the Alabama Department of Environmental Management (ADEM), the local enforcement agency for the NESHAP. Present a copy of this report as evidence that the building was checked for the presence of regulated asbestos materials, and such materials were identified.

Prior to demolition, we recommend the Owner have the friable ACM removed by an experienced, licensed and insured asbestos abatement contractor, or leave the VAT in place and make special arrangements to conduct the demolition and maintain the site in a manner suitable to ADEM.

3/4

.,

••

Not in Scope of Work

Mika
Line
Mika
Line
Page 67: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

APPENDIX

Bulk Sample Analysis Polarized Light Microscopy Report Summary

4/4

Page 68: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

Safety Environmental Laboratories and Consulting, Inc:- ;-: r:t;",p{ 1 1;, . -�.-·:. ,--. ' / '�i..., \ � I

\., t

Customer:

Telephone:

Job#: Job Name:

Job Location:

Sl;LC Project#:

Lab

Asbestos Bulle Sample Analysis Repol't 989 Yeager Pkwy. Phone: (205) 823-6200 -. .., - _ • _ --; _..,

· · Pelh11.l\, AL 3S 124 Jl'"-'-: (205) 823-906�

, .. H !I.QI.ii' •• �

Building Environments, Inc. P,O. Box 55627 Birmingham, AL l5255

205-321-1223

BE-636

Sample Receipt Date: 04/20/2016

Sample Analysis Date: 04/21/2016

Sc;1mple Report Date: 04/21/2016

Analysis: Asbestos Identification in Bulk Materials by Polarized Light Microscopy Nlontgomery Housing Authority Cleaveland Courts Admin Building

2016-0630

Method: EPN600/R-93/116 July 1993 - Method for the Determination of Asbestos in Bulk Building Materials

Note: S�e Attached Notes and Descriptions Sheet for Applicable Abbreviations and Notes

Sub- Homo- ¾Non-Customer Layer Asbestos% % Non-AsbestQs Sample sample S;Jmple Location I Description geneous Fibrous Sample No. No. and Type Fibers No.

1A 1A

2A 2A

3A 3A

4A 4A

Page 1 of 3

No. (ves/no)

N/A Admin Building..., Front Room 12" Vinyl Tile

1 Mastic - Yellow, Brittle y

2 Floor Tile - Qffwtiite, Organically Bound y

3 Mastic/Paint - Black/Gray, Bituminous/Resinously Bound

N Unable to separate individual layei:s

N/A Admin Building - Hallway 12" Vinyl Tile

1 Mastic- Yellow, Brittle y

2 Floor Tile - Offwhite, Organically Bo1,1nd y

3 Mastic/Paint- Black/Gray, Bituminous/Resinously Bouncj

N Unable to sepafate individual layers

Admin Building .... Drywall Joint Compound at Electrical Panel

N/A 1 Joint Compound/Paint-White/Offwhite, Granular/Resit<1ously

N Bound Unable to separate individual layers

Admin Building .,. Drywall Joint Com1;>ound in Kitchen

N/A 1 Joint Compound/Paint - White/Offwhite, Granular/Resinously

N Bound Unable to separate individual layers

CML� _;

Analyst Carol Findlay - Microscopy Manager

Technicail Review Brian Ray - Asbestos Analyst

Material

None Detected 2% Synthetic Fibers 98%

3% Chrysotile None Detected 97%

3% Chrysotile 2% Cellulose Fibers 95%

I None Detected

I 2% Synthetic Fibers 98%

I 3% Chrysotile None Detected 97%

3% Chrysotile 2% Cellulose Fil!lers 95%

None Detected None Detected 100%

None Detected None Detected 100%

CiwL� Quality Review

Carol Findlay - Microscopy Manager

Page 69: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

Safety Environmental Laboratories and Consulting, Inc. ....."1i::-t ,";{ r· .. --�:,, . . \_, \ .. , b �.=., !

·�.:� � ..;'

Customer:

Telephone: Job#:

Job Name:

Asbestos Bulk Sample Analysis Report 989 Yeager Pkwy. Phone: (205) 823-6200 .... .j :.' . -� .. : · PeU:unn, AL �H:M Fai: (:WS) 823-9066 uai;.�,.-�.6

Building Environments, Inc.

P .0. Box 55627 Birmingham, AL �5255

205-321-1223

8E-636

Sample Receipt Date: 04/20/2016

Sample Analysis Date: 04/21/2016

Sample Report Date: 04/2112016

Analysis: Asbestos Identification in Bulk Materials by Polarized Light Microscopy

Job Location: Montgomery Hou!ilng Authority Cleaveland Courtl!i Admin Building Method: EPN600/R-93/116 July 1993 - Method for the Determination of Asbestos in Bulk Building Materials

Sl;:LC Project#: 2016-0630 Note: See Attached Notes and Descriptions Sheet for Applicable Abbreviations and Notes

customer Lab

Sample No. Sample

No.

SA SA

6A 6A

7A 7A

igj This report is FINAi,.

Page 2 of 3

Sub-Layer

Homo-sample

No. S:;tmple Location I O!!!scription geneous

No. (ves/no)

Admin Building-. Drywall Joint Compiound in Southeast Office

NIA 1 Joint CompoundiPaint - White/Offw111ite, Granular/Resinously N Bound

Unable to separate individual laye�s

NIA 1 Adm in Building ...,. 2 x 2 Ceiling Tile in Foyer

Ceiling Tile - White/Tan, Fibrous N

Adm in Building ..,. 2 x 2 Ceiling Tile il"I Rear Hall N NIA 1

Ceiling Tile - White/Tan, Fibrous

0 This repqrt is PRELIMINAR'( - pending final QC

(wl�� Analyst

Carol Findlay - Microscopy Manager Technical Review

Brian Ray- Asbestos Analyst

Asbestos% % Non-Asbestos % Non-

and Type I

Fibers Fibrous Material

None Detected None Detected 100%

None Detected 55% Cellulose Fibers

15% Mineral Wool 30%

None Detected 55% Cellulose Fibers

15% Mineral Wool 30%

(wl� Quality Review

Carol Findlay - Micros,copy Manager

Page 70: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

Safety Environmental Laboratories and Consulting, Inc.

Asbestos Bulk Sample Analysis Report 989 Yeager Pkwy. Pellmm, Ak 35 124 : 4 � ',

PLM Notes and Descriptions

1. Upper detection limit: 100%. Lower detection limit: <1 %.

2. Bulk Samples will be stored for 3 months and will then be disposed of ir,i an approved EPA landfill.

Phone; (205) 823-6200 Fl\.�.; (20S) $23w�066

3. Analysis of floor tile or any other resinously bound materials by polarized light microscopy (PLM) using EPA Method 600/R-93/116 dated July 1993 mayyield false-negat,ve results because of method limitations in separating closely bound fibers from matrix mijterial and in detecting fibers of small lengthand/or diameter. When analysis o( such materials by the EPA PLM Method yields negatliVe results for the presence of asbestos we recommend utilizingalternative methods of identification such as Gravimetry, XRD or AEM.

4. Samples are not homogenized by SELC prior to analysis. Distinct material layers within a sample are anafyzed and reportecj separately by SELC. Whenmultiple product$ are submitted by the customer under one sample number, SELC indicc;1tes those distinct products as sub-samples. SELC re;tains allsamples numbers but will designa�e a sample number to those that arE! not given a sample number by the customer.

5. Percentages given are based on a visual estimated calibration.

6. Safety Environmental Laboratories and Consulting, Inc. is a NVLAP accredited laboratory, Lab Code: 200873-0 (ISO/IEC Standard 17025:2005Compliant).

7. Results relate only to the samples tested. All tests were performed under the scope of $ELC's NVLAP i;iocreditation, unlesl,1 indicated otherwise.

8. All samples were received in a condition suitable for analysis ("Good"), unless otherwise noted.

9. This report must not be used to claim product certific,ation, approval, or endorsement by NVLAP, NIST, or any agency of the Federal Government.

10. Analytical lnstru,ment: Olympus Polarized Light Microscope Series BH�2 Model BHT-002

��� Pagel of3 Analyst

Carol Findlay - Microscopy Manager

J .

Technical Review Brian Ray- Asbestos Analyst

�� Quality Review

Carol Findlay- Microscopy Manager

Page 71: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

SEL

Customer;

Address;

Phone:

E-m.iil;

Sample Ty

QAir

,8:lfult.

QPaint

□Soil

QWasle

QOther.

Sample ilAte # �pied

IA

�A 4A

-��A -7A

Safety Environ1nental Laboratories and Consulting, Inc. 989 Yeager Pl-. wy. Pelhnm, AL 35124

Phone: Fa.\'.:

(205) 823-6200(205) 823-9066

£11\'iranmentaf. 1-leufth and Sqfe(1, Solutions

Chain of Custody Form

Fax:

Asbestos Analysis Metals Analysis Turn.Around Time•

0 Asbestos Air • PCM [J Total Cone. - Lead 0 RushiSame Day'

0 Asbestos Air - TEM 0 Total Cone, • RCRA lf-Met:ats Q24 Hours

�LM (EPA 600:R-93i116) 0TCLP - Lead �Hours 0 PLM (EPA Point Count) 0 TCLP - RCRA 11-Metols 0 3 Business Days O0ther: 0 TCLP • Full (w; organics) 0 4 Business Days

QOther: QOther: * Sanr,• r.1T11t11 amilabltjor alT re.sis Aftur s.-iied11fe r·utli of!rcemcr. m1rft1•n,;-1nb 1t11d vaf..•nJ jE'jfS-ilHmfam:..i

_ _.__ ' Santo· du) nm mailable ofter 2 f/0 P.\I � Arcu

TyJli!t Time of Sampling Sample Dcscrirtion Wiped

(e.g. Employee Nnmc, SSN, Bldg, Material) (fi") MBrrm Start Slop

IA,,J-,,,'itt R!t/12 - r _ tf --·1- • � "7F&. r .--......� � I � ,, J. v;,,,,.,; �/4 I/ ,✓ - i. .2 //,� , •... t/ /t 7 '/

I; • Dn,w�n ; Zm I- (I; �(Jt. :.� � �h�. r

. , -Jo 1,,,- --..J.�J� ., // � I/ ,'-r

✓1 ,I' ,I •I JI ✓II ,;, ,Sl u-/�11 .. // ,✓ e:J. )(2.., f'et/,� -r,· (,

... HJ·, �, ..

,, ,, J ' � �AII ... / //

/,1

Flow Ruic Totul (Umin) Vol.

Stnrt Stop (L)

-- .,., l.,J'

,,f; �-t-

,//

SELCUSE

ONLY #

\A t7.A 13A_

u Afj/Jr J,.A...... ' r:::f1\-'

.,

I

Cond

I\

..

- .

V

; A - Arco. B • - P • Pcr�Ohal. E • €xc1m111n

Relinquished by:

Sa e-d By: �ore

Recl!ived By1 Dau: Time

t./ . .J-0-/ b 9 i /c;' " .,

Page 72: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

Safety Environmental Laboratories and Consulting, Inc� . �·,';...\. -. l ��!

,.-i:�-�oJ Asbestos Bulk Sample Analysis Repol't '.l i l

989 Yeager Pkwy. Pelham, AL l5ll4

Phone: (205) 823-6200 Fax: (205) 823-9066

Customer: Bulldlng Environment,, Inc. Sample Receipt Date: 04/20/2016

Sample Analysis Date: 0412112016

Sample Report Date: 04/21/2016 Telephone: Job#:

Job Name: Job Location:

SBLC Project #:

Lab

P.O. Box 55627 Birmingham, AL 35255

205-321-1223

BE-636

Montgomery Housing Authority C�aveland Courts Community Center

2016-0630

Sub-

Analysis: Asbestos Identification in Bulk Materials by Polarized Light Microscopy

Method: EPA/600/R-93/116 July 1993- Method for the Detennination of Asbestos in Bulk Buiidin9 Materials

Note: See Attached Notes an� Descriptions Sheet for Applicable Abbreviations and Notes

Homo- %Non-% Non-Asbestos Asbestos%

Fibrous Customer

Sample sample Layer

Sample Location / Description geneous and Type Fibers Sample No. No.

No.

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 g

Page l of 3

No.

NIA

N/A

N/A

N/A

NIA

NIA

NIA

NIA

NIA

1 Community Center 2 x 2 Ceiling Tile .,. Foyer

Ceiling Tile -White/Tan, Fibrous

Community Center 2 x 2 Ceiling Tile .,. Hallway 1

Ceiling TIie -Whtte/Tan, Fibrous

Community Center Popcorn Textured Ceiling Finish 1

Textured Ceiling - Offwhite, Granular/Spongy

Community Center Popcorn Texture� Ceiling Finish 1

Textured Ceiling Offwhite, Granular/Spongy

Community Center Popcorn Textured Ceiling Finish 1

Textured Ceiling Offwhite, Granular/Spongy

Community Center Fluffy Textured Ceiling Finish 1

Textured Ceiling Yellow, Fibrous

Community Center Fluffy Textured Ceiling Finish 1

Textured Ceiling Yellow, Fibrous

Community Genier Fluffy Textured Ceiling Finish 1

Textured Ceiling Yellow, Fibrous

Community Center 12" Vinyl Tile

1 Floor Tile Tan, Organically Bound

,, � d. ll',UJ{_, •.:JuuA

Analyst

(yes/noJ

N

N

N

N

N

y

y

y

y

Carol Findlay - Microscopy Manager Technical Review

Brian Ray - As;bestos Analyst

3% Chrysotile

3% Chrysotile

None Detected

None Detected

None Detected

None Detected

None Detected

None Detected

7% Chrysotile

85% Mineral Wool

85% Mineral Wool

5% Cellulose Fibets

10% Cellulose Fibers

10% Cellulose Fibers

95% Cellulose Fibers

95% Cellulose Fibers

95% Cellulose Fibers

None Detected

l'l , fl L; .JIL . . 'l_o..l �� ,:JLl..1.ln'UUJ)

Quality Review

Material

12%

12%

95%

90%

90%

5%

5%

5%

93%

Carol Findlay- Microsc;:opy Manager

Not in Scope of Work

Mika
Line
Mika
Line
Page 73: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

Safety Environ111ental Laboratories and Consulting, Inc:. :-·\ �·: l;\.,

��;{ t .;

Customer:

Telephone:

Job#: Job Name:

Job Location:

Sli:LC Project #:

Lab

Asbestos Bulk Sample Analysis Report 989 Yeager Pkwy. Pelluun, AL :, S l 24

Phone: (205) 823-6200 Fax: (205) 823-9066

""/I.I\.:,::!_,�� i-� .... t ..... ,;�a,��.e�

Building Environments, Inc. P.O. Box 55627 Birmingham, AL as255

205-321-1223

aE-636 Montgomery Housing Authority Cleaveland Courts Community Center

2.016-0630

Sub•

Sample Receipt Date: 04/20/2016

Sample Analysis Date: 04/21/2016

Sample Report Date: 04/21/2016

Analysis: Asbestos Identification in Bulk Materials by Polarized Light Microscopy

Method: EPNB00/R-93/116 July 1993 - Method for �he Determination of �bestos in Bulk Building Materials

Note: See Attached Notes and Descriptions Sheet fQr Applicable Abbreviations and Notes

Homo- %Non• Customer Laye� Asbestos% % Non-Asbestos

Sample No. Sample, sample

No. Sample location / Description geneous

and Type Fibers Fibrous

No.

10 10

11 11

12 12

13 13

14 14

[21 This report is FINAL

Page i of 3

No. (yes/no)

2 Mastic - Black, Bituminous y

N/A Community Center 12" Vinyl Tile

1 Mastic - Yellow, Soft y

2 Floor Tile - Tan,. Organically Bound y

3 Mastic - Black, Bituminous y

NIA 1 Community Center Roofing Bull Material

N Roofing - Black, Bituminous

NIA 1 Community Ce1'ter Roofing Bull Material

N Roofing - Black, Bituminous

N/A Community Center Roofing Membrane

1 Membrane - B!.11ck, Bituminous/Fibrous N

2 Insulation - Brown, Fibrous y

N/A Community Center Roofing Membrane

1 Membrane - Black, Bituminous/Fib�ous N

2 Insulation - Brown, Fibrous y

0 This report is PRELIMINA�Y - pending final QC

CM,&L ,]t..M...&la1.1 ) Analyst

Carol Findlay - Microscopy Manager Technical Review

Brian Ray - Asbestos Analyst

I

10% Chrysotile

None Detected

7% Chrysotile

10% Chrysotile

None Detected

None Detected

None Detected

None Detected

None Detected

None Detected

None Detected

<1 % Synthetic Fibers

None Detected!

None Detected

25% Cellulose Fil:!ers

25% Cellulose Fibers

20% Fiberglass

55% Cellulose Fibers

20% Fiberglas.s

55% Cellulose Fibers

C0-11iL ._j�l,'1,tj�tnu; {J

Quality Review

Material

90%

100%

93%

90%

75%

75%

80%

45%

80%

45%

Carol Findlay - Microscopy Manager

Not in Scope of Work

Mika
Line
Mika
Line
Page 74: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

'4 ''1 i •,

Safety Environmr-;ntal Laboratories and Consulting, Inc. �-�-..J?(; 1�.,. ;...',. L· .,, I • ,I (.'.Jl -� \.::!.. J

Asbestos Bulk Sample Analysis Report 989 Yeager Pkwy. Phone; (205) 823-6200 ' ., � .· .. "7 ... �J· -· Pelliam1 AL 35124 Fl.9(; (205) 823-9066 •Ml�Qgf,_�.,.�

PLM Notes and Descriptions

1. Upper detection limit: 100%. Lower detection limit: <1 %.

2. Bulk Samples will be stored for 3 months and will then be disposed of in an approved EPA landfill.

�- Analysis of floor tile or any other resinously bound niaterials by polarized light microscopy (PLM) using E;PA Method 600/R-93/116 dated July 1993 mayyield false-nega.tive results because of method limitations in separating closely bound fibers from matrix material and in detEJcting fibers of small length and/or diameter. When analysis Qf such materials by the EPA PLM Method yields negative results for the presence of asbestos we recommend utilizing alternative methods of identification such as Gravimetry, XRD or AEM.

4. Samples are r'IQt homogenized by SELC prior to an,;1lysis. Distinct material layers within a sample are analyzed and reported separately by SELC. Whenmultiple products are submitted by the customer under one sample .-ivmber, SELC indic;ates those distinct products as sub�samples. SELC retains allsamples numbers but will designate a sample number to those that are not given a sam,ple number by the customer.

5. Percentages given are based on a visual estimated calibration.

�- Safety Environmental LaboratoriEts and Consulting, Inc. is a NVLAP accredited laboratqry, Lab Code: 200873-0 (1SO/IEC Standard 17025:ioosCompliant).

7. Results relate only to the samples tested. All tests were performed under the scope of SELC's NVLAP accreditation, unless indicated otherwise.

a. All samples were received in a condition suitable far analysis ("Goocn, unless otherwise noted.

9. This report must not be used to claim product certification, approval, ,or endorsement by NVLAP, NIST, 9r any agency of the Federal Government.

10. Analytical lnstriument: Olympus Polarized Light Mic;roscope Series BH-2 Model BHT-002

Page 3 of3

(./. C,o ... � ._-Ji_w.&l"").

u? Analyst

Carol Findlay- Microscopy Manager Tecbnh:al Review

Brian Ray - Asbestos Analyst

/l ___ • L[. Ji• I '.,.,.O.l.»t.., ..:..,u,wiU\LJ,, ·

Quality R�view Carol Findlay - MicrQscopy Manager

Not in Scope of Work

Mika
Line
Mika
Line
Page 75: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

..

I

• •

.. , '

SEL

Safety Environmental Laboratories and Consulting, Inc. 989 Ycogcr Pkwy. Pelham, AL 35124

Phone:Fa.x:

(205) 823-6200 (205) 823-9066 f.m•iro11111en1ul, Jleaflh. and Safe(11 Solutions

Chain of Custody Form

Customer:

Address:au:U flj . /;,n �I

i:o:n -,tt,.,n°B>, -�(!, Project Number: 8 I? . (p 36

:::::: . ., ��;;;g t:!,-4. Phone: Fax: PO Number: l'.!.e-t1 "/ E-mail: hlqu Vin!1!!1tf,d, t,!ilt'�li-¥,

,__Lc_

P_

roJ_·.#

_: _1_· a __ 1:._0_1_a_u_� ____ __,,

Samph.•T�

QAirSi'u!k□ PaintQSoifQWaste□Other:

Sample ihee·II S�l.cd

, "fffe ;l

4 �

th 7 8

q

Asbestos Analysis

0 Asbestos Air - PCMCJ A_Jl,estos Air • TEM.0J'PLM (EPA 600/R-93/116)0 PLM (EPA Point Count)O0ther:

Metals Anulysis

0 Toral Cone. - Lead0 Totul Cone. - RCRA 8-MetalsQTCLP-Lead0 TCLP - RCRA 8-Metals0 TCLP • Full (w organics)O0thcr.

Tum-Around Time•

0 Rush/Same Day'024 Hours2'48 Hours0 3 Business Days0 4 Business DaysO0ther:

• Some rAT 1101 urni/able for all 1es1s Alu.rt .rcJwdul� tus/1 organics, 111ulti•mt1al.r. and wte�e1u/ 1,w.r i11 adl'UnceI Same dny '"'' nrnl/ablt ,tjlcr j (l(f f'M

Snmplc Description

(ll,g. Employee Name, SSN, Bldg, Material)

.f3JntnY."' l'-ht- �e_(}.f#': 6,'x,;. J • I)

.,, .,� L)IJ.i/f.f)'/>1,,,,., , , ., • ,,

Jt ,, '" " ,, .P/417",, �1 H ,., ,, / ,, f# ,,, .,.,,, ..

" ,, /;2 ,, t,1;,.J t

Arca 'fypel Wiped

UF> A/13/P/E

a, .. 1, ;,, I,; I/ I/ ,,

'1!Y-A UII.J,,,

,,, ;;.,,'t::;

/ Ce, ,.,�

,�

Time of Snmpling

Stun Stop

�-+o �- A� //,.,�,. 1J,,·/, ""'" � ...,

It

FlowRlltc (lJniin)

Start

. . , .,,,,s, ..,�

Stop

� . ';

�,;, J.. ;, ,��., ,,,,/

Total SELCUSE Vol. ONLY

(LJ # Cond

L 'G2... �

t.f ·'5'°

t"+ e

·�/T ;. ,, IJ fl),M,� 'Ju/. 1/ ff, 4'ie..J 'zl /1 \ \

-;o " ,, J;l.. ,, ,,

\ i7'- ✓1 �

'-lo If ,,

Sa p� By:S'l!ffil!SC

,, ,, ,, �eA./J

.,,, 'I

J..l ff t/, ;,v/

... ��,

I-, /4� Relinquished by:

,✓ I \Z.

\� \ .\4 \. 10 'v

Received By:Date Time

4�·-b

Not in Scope of Work

Mika
Line
Mika
Line
Page 76: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

TTL geotechnical •analytical • materials .environmental----------

3516 Greensboro Avenue P O Drawer 1128 (3S403) Tunalooso, AL 35401

CLIENT:

Project:

Lab ID:

Montgomery Housing Authority

Paint Chips - 600216022

160421041-001

Client Sample ID: Cleveland Court Community Center #1

Analyses

TCLP METALS Lead

Lab ID: 160421041-002

Result PQL

SW1311 /801 0A

< 0.50 0.50

Client Sample ID: Cleveland Court Community Center #2

Analyses

TCLP METALS Lead

Lab ID: 160421041-003

Result PQL

SW1311/6010A

< 0.50 0.50

Client Sample ID: Cleveland Court Administration #1

Analyses Result PQL

TCLP METALS Lead

Lab ID: 160421041-004

SW1311/6010A

< 0.50 0.50

Client Sample ID: Cleveland Court Administration #2

Analyses

TCLP METALS Lead

Page 1 of 1

Result PQL

SW1311/601 0A

< 0.50 0.50

Date: 13-May-16

Lab Order: 160421041

205.34S.0B16 tel 205.343.0635 fax

www.TIUNC.com

Collection Date: 04/20/2016 10:00

Matrix: Solid

MCL Units DF

Prep:(SW1311) 04/27/2016 9:15

5 mg/L 1

Date Analyzed

Analyst: SFC 04/29/2016 11:10

Collection Date: 04/20/2016 10:15

Matrix: Solid

MCL Units DF

Prep:(SW1311) 04/2712016 9:15

5 mg/L 1

Date Analyzed

Analyst: SFC 04/29/2016 11 :10

Collection Date: 04/20/2016 11 :00

Matrix: Solid

MCL Units DF Date Analyzed

Prep:(SW1311) 04/27/2016 9:15

5 mg/L 1 Analyst: SFC 04/29/2016 11: 10

Collection Date: 04/20/2016 11: 15

Matrix: Solid

MCL Units DF

Prep:(SW1311) 04/27/20169:15

5 mg/L 1

artin, Chemist

Date Analyzed

Analyst: SFC 04/2912016 11: 10

Mika
Line
Mika
Line
Page 77: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

TTL geatechnical • analJtical • materials • environmental

3516 Greensboro Avenue 205.34S.0816 tel

P O Drawer 1128 (35403) 20S.343.063S fax

Tuscaloosa, AL 35401 -.nuNC.com

CLIENT:

Project:

Lab Order:

Montgomery Housing Authority

Paint Chips - 600216022

160421041

The samples were analyzed in general accordance with 40 CFR, Part 261.

Date: 13-May-16

CASE NARRATIVE

Page 1 of 1

Page 78: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

TTL WORK

ORDER NUMBER

160421041

TTL � Sheet __ of __

. . \ � ·� Jh Chain of Custody Form Sample Security Requirements

Chent: hl-,a.,� QO(\t, eJ � ��\ I\� �\_ 1. Condition of Contents: ________________ _

Contact: _j ,,S \._j 2. Sealed for Shipping By: ________________ _

Mailing Address: _____________________ _ 3. Initial Contents Temp.: _ __ __ °C Seal Applied Yes __ No __

City, State, Zip: ________________ ______ _ 4. Sampling Status: Complete Expected Completion Date ______ _

5. Custody Seal Intact Upon Receipt by Laboratory: Yes __ _ No ___ _ Phone No.:1 t Date: i J 7J) _ ( ¥' J

6. Condition of Contents: .,.G��P--9=�'--4----------------Sampled By: _______________________ _ 7. Comments: __________________________ _

Sample Site: _______________________ _ 8. Reporting Status: Routine; ASAP By ____ ; Rush By _______ _

TTL Job No.: _____________ Cllent P.O. f ____________ _

Data Time

MID/'( 00:00

�/l.> ""' IIDDO �/u/11. 10:1<

'-1/i,;, /itJ /I OC:

Uft.?/l't' 11:;r

� l.LJl,,1

r f ii 11-e

Sample ID/Location

Description

0.,1<:I Crf- CcM-t.k ltr -:& Iaf\.cA Crt DJ...,. cir .JJ?.-

ue..vuo. -i.d en. '-\��'" � I (' 1-l' -' -e_ l� "-0'\ C. r--1 AJ.>M. ... " � -z._

Sample

Type Salld, Be.

CUSTODY TRANSFERS PRIOR TO SHIPPING

1 .. /) !=./ - '\;._ ., -, ·-

Sample # of Method Containers

Orab Colllp

t I

I

I

Preserv■tlwN

Type

2 -� ' --=¥1'- ,·,�11"-C •• ,_, 2�� � -r-,Y-lle ,It/XO

3 � ,..g-m..,...a,, '7-.:K/ -114 , :,., vv

4 ____________________ _

3 ___________________ _

4 ___________________ _

Analy1la Parameters

Teat Codesll'lel'!._ Meuun,ments

Pb ,C..L� t7b �,V-'

--Ph ]U-C7..h I C,.L 1

SHIPPING DETAILS

Air Bill#: _

TTL, Inc. -Tuscaloosa Office/Laboratory: 3516 Greensboro Avenue, Tuscaloosa, Alabama 35401, Telephone (205) 345-0816, FAX (205) 343-0635

TTL, Inc. - Montgomery Office: 4154 Lomac Street, Montgomery, Alabama 36106, Telephone (334) 244-0766, FAX (334) 244-6668

NOTE: Please read terms and conditions between TTL, Inc. and client on back of form.

Mika
Line
Mika
Line
Page 79: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

ASBESTOS ABATEMENT

PARKS PLACE RENOVATION PROJECT

PART ONE GENERAL

1.01 RELATED DOCUMENTS

A. Campus Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division One Specification Sections, apply to this Section.

1.02 SUMMARY

A. All Work in this Section shall be performed in close coordination with Owner's Salvaging, Project

Phases, Schedules, and work of other Contractors. Work is limited to two buildings on the

Cleveland Court Campus.

B. This Section includes removal of asbestos-containing materials (ACM), as listed in this Section.

In each instance, quantities of ACM are approximate, and Contractor shall bid complete removal

based on his verification of quantity.

C. In the event unidentified ACM is discovered during demolition, Contractor shall remove discovered

material and submit change order request as described in the Contract.

1. Work in the Community Center Building includes, but is not necessarily limited to removal of:

a. About 250 square feet of asbestos suspended ceiling panels in the Corridor.

b. About 1,700 square feet of 12-inch-square light color VAT and its adhesive mastic. In

offices this material is overlain by carpet.

2. Work in the Administration Building includes, but is not necessarily limited to removal of:

a. About 1,300 square feet of light color VAT and its adhesive mastic. In some spaces this

material is overlain by newer tile and/or carpet.

D. Asbestos removal, handling and disposal shall be done in full compliance with Federal, State and

Montgomery County/City regulations.

E. The Contractor shall verify all Work is using materials and methods consistent with established

standards for safe asbestos removal. Work shall be consistent with regulations and the Contract

Documents.

1.03 REFERENCES

Mika
Line
Mika
Line
Mika
Line
Mika
Line
Page 80: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

A. The current issue of each document shall govern. Where conflict among regulations or these

specifications exist, the more stringent requirement shall apply.

I . US Environmental Protection Agency (EPA) National Emissions Standards for Hazardous

Air Pollutants (NESHAP) (40 CFR 61, Subparts A and M), revised November 20, 1990.

2. US Department of Labor Occupational Safety and Health Administration (OSHA)

Asbestos Regulations (29 CFR 1910.1001 and 1926.1101).

3. US Department of Transportation (DOT) Hazardous Substance Regulations ( 40 CFR 1 71

and 173, Subpart J and Section 173.1090).

1.04 SUBMITTALS

A. Make submittals required by the Contract Documents in a timely manner to allow for sufficient

review by the Owner's Representative. Revise and resubmit as necessary to maintain compliance

with Contract Documents.

B. Contractor shall be responsible for documentation of all practices/procedures utilized to execute

the Work. The following items shall be available only upon request for submission to the Owner's

Representative:

1. Names of supervisors, their qualifications and training.

2. Written plans or sketches of planned worker and equipment decontamination enclosure(s).

3. Copy of Contractor's Hazard Communication Program.

4. Description of all special equipment, techniques or methods to be used.

5. Manufacturer's information demonstrating the lowered air pressure filtration system and

the HEPA vacuum system meets the requirements of the Contract Documents.

C. Submit 3 copies of the following Pre-Job Submittals to the Owner's Representative at the

preconstruction meeting. Asbestos removal shall not proceed until these submittals have been

reviewed and approved.

l . Evidence that written notice of commencement of asbestos removal work has been

submitted not fewer than ten business days in advance of removal to:

Alabama Department of Environmental Management Air Division Asbestos Coordinator

P. 0. Box 301463Montgomery, AL 36130334-271-7700

Page 81: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

2. Required permits, sites, and transportation arrangements for disposal of asbestos­

containing or contaminated materials. Information concerning approved landfills in

Alabama may be obtained from:

Alabama Department of Environmental ManagementSolid Waste Division

3. Insurance certificates including General Liability, Worker's Compensation and

Employer's Liability.

4. Certificate of Worker's Training) for each and every asbestos worker.

D. Submit three copies of the following Post-Job Submittals to the Owner's Representative at the

completion of asbestos work. Final payment on the contract will not be made until delivery of this

complete package:

1. Copy of daily logs showing the following: date, entering/exit time, company or agency

represented, and reason for entry for all persons entering the asbestos abatement regulated

areas.

2. Signed receipts from the landfill operator which acknowledge the Contractor's deliveries

of waste material. Receipts shall include the landfill name, date, and quantity of material

delivered.

3. Copy of employee atr monitoring results related to OSHA respiratory protection

compliance.

4. Evidence of final payment of abatement suppliers, disposal subcontractors, and abatement

subcontractors along with release of any liens.

1.05 QUALIFICATIONS

A. Contractor performing asbestos abatement Work shall be approved and licensed by the Alabama

Department of Environmental Management (ADEM).

B. Only trained and experienced asbestos removal workers and supervisors, certified by the State of

Alabama Safe State Program, are to perform the Work.

C. Contractor shall maintain on site, during abatement activity, a Superintendent and a Foreman, each

having not less than one full year of full-time experience in responsible charge of asbestos removal

operations similar in size and scope of this project.

Page 82: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

D. The Superintendent in charge of asbestos removal Work shall remain on site at all times removal

or cleaning is in progress. Superintendent shall enter the regulated area at least daily to check

progress of the Work.

E. The P oreman in charge of asbestos abatement Work shall remain in the regulated area at all times

removal or cleaning is in progress.

1.06 PRODUCT HANDLING

A. Deliver all materials for the project in the original packages, containers, or bundles bearing the

brand name and manufacturer.

B. Store all materials for the project under sufficient cover and in an area to prevent damage or

contamination.

C. Dispose of materials that become contaminated with asbestos in accordance with applicable

regulations.

1.07 WORK SITE CONDITIONS

A. The General and Asbestos Abatement Contractor(s) are hereby notified that asbestos has been

determined by the US Government and private research to be a Cancer-Causing Agent.

Contractors shall provide workers and visitors with respirators and protective clothing meeting the

requirements of 29 CPR 1926.

B. Work will be in unoccupied buildings. Removal activity, especially workers in protective clothing

and equipment, shall remain out of public areas and out of view.

1.08 PERSONNEL PROTECTION

A. Acknowledge sole responsibility for enforcing worker protection requirements at least equal to

those specified in this Section.

B. Prior to commencement of Work, all workers shall be instructed in, and practiced in, the appropriate

procedures of personnel protection and asbestos removal/handling.

C. Provide workers with personally issued and marked respiratory protection equipment approved by

NIOSH and OSHA to be suitable for the asbestos exposure level in the regulated areas in

accordance with OSHA Standard 29 CPR 1926.

D. Provide disposable respirator filters in sufficient quantity for replacement by workers as they

consider necessary or as required by regulations, whichever is more frequent.

Page 83: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

E. Provide respiratory protection from the first contact with asbestos-containing materials (including

site inspection and construction of containment) until acceptance of final clearance by the Owner.

As a minimum, Contractor shall use negative-pressure respirators as long as asbestos materials are

handled on site, awaiting disposal, and until acceptance of clearance inspection. Contractor shall

be responsible for scheduling and providing air sampling with an independent testing laboratory to

determine acceptability of respiratory protection level being used. Contractor shall maintain

conditions that permit collection and accurate analysis of air samples used to determine the level

of protection.

F. If Type C respiratory equipment is used, provide emergency backup air supply for each worker in

the regulated area. Backup air supply should provide sufficient air supply for all workers to safely

exit the regulated area. Emergency equipment should be readily available, if normal air supply is

interrupted.

G. Permit no visitors, except governmental inspectors that have jurisdiction, or persons authorized by

the Owner, in the regulated area after disturbance of asbestos. Any authorized visitor shall be

provided personnel protection.

H. Provide workers, authorized visitors, and Owner's Representative with sufficient sets of protective

disposable clothing consisting of full-body coveralls, headgear, eye protection, knee pads, and

footwear of sizes to properly fit individual workers whenever they are to enter the regulated areas.

I. Post the asbestos decontamination procedures to be followed by all workers and visitors.

J. Provide eye protection and hard hats as required for job conditions or by applicable safety

regulations. Leave reusable footwear, hard hats, and protection devices in the regulated area until

the end of asbestos removal, at which time the items are to be cleaned for re-use or disposed of as

asbestos waste.

K. Maintain a sign-in/out log at the entrance of the regulated area. Maintain the log from the time

the first activity is performed involving the disturbance of, or contact with asbestos, to the

acceptance of final air tests by the Owner. Require all persons entering the regulated area, including

all workers, supervisors, agents and Owner's representatives to sign in and out. Require the name,

time, company or agency represented, and reason for entry on each record of entry.

1.09 DEFINITIONS

A. Terms commonly used and known in the asbestos abatement industry shall prevail.

Page 84: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

PART TWO PRODUCTS

2.01 MATERIALS, TOOLS, AND EQUIPMENT

A. Air Purifying (for internal re-circulation/negative pressure in the work area) shall be by HEPA

Filtration. Ensure that no air movement system exhausts contaminated air from a regulated area to

the outside.

B. Communication Equipment - Shall be suitable for inter-room communications, without interfering

with outside equipment.

C. Other Materials - Provide all other materials, such as fire-retardant lumber, nails, and hardware,

which may be required to construct the decontamination area and the barriers that isolate the

regulated area.

D. Plastic sheeting - Shall be of the thickness specified, in sizes to minimize the frequency of joints.

E. Surfactant (wetting agent) - Shall consist of resin materials in water base which have been tested

to indicate material is non-toxic and non-irritating to skin and eyes, and is non-carcinogenic.

F. Tape - Shall be fiber or other type capable of sealing adjacent sheets of plastic and to maintain

attachment of sheeting to finished or unfinished surfaces of dissimilar materials under both dry and

wet conditions.

G. Warning Labels and Signs - Shall be as required by OSHA Regulation 29 CFR 1926.

PART THREE EXECUTION

3.01 PREPARATION

A. Coordinate sequence of Work with the Construction Manager in order to properly segregate

asbestos regulated areas from areas where other special considerations are required.

B. In company of the Owner's Representative, visit the site and verify the extent and location of

asbestos removal and selective demolition required.

C. Friable ACM Full Enclosure Preparation:

1. Place regulated area under diminished air pressure utilizing HEP A filtration systems which

comply with ANSI 29.2-79. Allow no air movement system or air filtering equipment to

discharge unfiltered air outside the regulated area. Diminished air pressure shall be

maintained inside all regulated areas of asbestos material abatement. The HEPA filtration

system shall be of a capacity to effect a minimum of six air changes every sixty minutes in

the regulated area.

Page 85: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

2. Clean the regulated area locations usmg HEPA vacuum equipment or wet-cleaning

methods as appropriate prior to isolation of the regulated areas. Do not use methods that

raise dust such as dry sweeping or vacuuming with equipment not equipped with HEP A

filtration.

3. Isolate the regulated areas by completely sealing off all openings such as corridors,

doorways, ducts, grills, diffusers, pipe chases, and any other penetrations or permeable

surfaces of the regulated areas with a minimum of 6-mil plastic sheeting sealed with tape.

4. Seal electrical panels, switchboxes, etc. with a minimum of 2 layers of 6-mil plastic

sheeting.

5. Pre-clean asbestos debris from the proposed regulated area, usmg HEPA vacuum

equipment or wet cleaning methods as appropriate.

6. Seal tops of all hollow core and open walls with a minimum of 6-mil plastic sheeting.

7. Construct worker and barrel/equipment decontamination units in compliance with EPA

guidelines concerning number, size, and placement of airlocks on both contaminated and

uncontaminated sides. Construct decontamination units of appropriate materials including

plastic sheeting (to provide airtight barriers) and plywood or other suitable rigid materials

in regulated areas.

8. Cover the floors with a minimum of plastic sheeting being six-mil thickness. Tum each

layer up the wall a minimum of 16 inches and fasten to wall. Cover walls with a minimum

of one layer of four-mil plastic sheeting, overlapping upturned floor plastic not less than

twelve inches. Glue and tape to prohibit air movement across all joints in plastic sheeting.

9. Provide temporary power and lighting ( equipped with ground fault interrupters) as

necessary to maintain a safe work environment. Water and electric power to be supplied

by Owner.

10. Ensure that all barriers and plastic enclosures remain effectively sealed and taped for

duration of asbestos abatement and subsequent cleaning. Repair damaged barriers and

remedy defects immediately upon discovery. Visually inspect enclosures at the beginning

of each work period.

11. Notify Owner's Representative for observation ofregulated area preparation 24 hours prior

to any abatement of asbestos-containing material.

Page 86: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

12. Maintain for the duration of the project from the first activity requiring disturbance of

asbestos-containing materials, a sign-in/out log in the immediate area of the clean room.

Log shall be used by every person who enters the regulated area.

3.02 REMOVAL of FRIABLE ASBESTOS-CONTAINING SUSPENDED CEILING PANELS

A. Coordinate shut-down of mechanical systems with Construction Manager. Prepare the area as

described above in 3.01 C Friable ACM Full Enclosure Preparation.

B. Remove and properly dispose of all asbestos-containing insulation and coatings in accordance with

OSHA Asbestos Regulations 29 CFR 1926.1 101 or as more stringently specified herein.

C. Wet the material sufficiently with amended water to saturate the material without excessive

dripping. Spray the material during removal to maintain wet conditions.

D. Remove the saturated panels and continuously bag material in sealable plastic bags of six-mil

minimum thickness. Do not allow the material to dry out.

E. Remove and bag for disposal the ceiling grid as panels are removed.

F. After removing ceiling, all surfaces shall be wet-cleaned to remove residual accumulated material.

G. Notify Owner's Representative to determine acceptance of the Work.

3.03 REMOVAL of NON-FRIABLE VAT and ADHESIVE MASTIC

A. Prepare the area as described above in 3.01 Preparation excluding 3.0lC 6. and 3.0lC 8.

B. Work areas in logical and planned sequence to minimize slip/fall hazards.

3.04 CLEAN-UP and CLEARANCE TESTING

A. Contractor's Duties:

1. Cooperate with the Owner's Representative in all aspects of the visual checks and air

testing in order to expedite air monitoring and results.

2. Contractor must notify the Owner's Representative 24 hours in advance of abatement

activities and clearance checks and provide Representative access to the Work and in all

locations requested.

B. Clean up:

1. Remove all visible accumulations of asbestos material and debris.

2. Clean all exposed surfaces in the regulated area.

Page 87: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

3. Clean all sealed and impermeable containers, and all equipment ( except that needed for

further cleaning) used in the regulated area and remove from the area via the equipment

decontamination enclosure system.

4. Notify the Owner's Representative for observation of cleaning to check completeness.

C. Clearance Standards:

1. Standard of cleaning for testing and release:

a. Regulated areas and all other decontaminated and cleaned areas shall be considered

clean and ready for air testing when visibly free of debris.

b. Regulated areas determined to not be visibly clean by Owner's Representative

must be recleaned and be approved before requesting any air clearance testing.

D. Clearance Checks and Testing Procedure:

1. Notify the Owner's Representative that the areas are ready for clearance.

2. Upon notice from Contractor that the regulated areas are clean, the Owner's Representative

will conduct visual checks for completeness.

3. Areas which do not comply with the standard of cleaning shall continue to be cleaned by

and at the Contractor's expense until the specified standard of cleaning is achieved.

4. Once considered visually clean by the Owner's Representative, the Testing Laboratory will

conduct tests for the Re-occupancy Level of 0.01 flee utilizing Phase Contrast Microscopy

in general accordance with NIOSH 7400 Method. The cost of all follow-up tests

necessitated by the failure of the air tests to meet the clearance criteria shall be borne by

the Contractor.

5. When air clearance standard of 0.01 flee or less is achieved, and observation by the

Owner's Representative determines that the area has been visually decontaminated, the

decontamination enclosure system shall be removed, and materials disposed of as

contaminated waste. The remaining barriers between contaminated and clean areas, and

temporary entrances to the regulated area/fixtures will be removed and disposed of as

contaminated waste.

E. Final Observation:

1. A final observation of the Work (this Section) will be performed by the Owner's

Representative to determine if the Work areas are visibly clean.

Page 88: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

2. Re-clean at no additional cost to the Owner all areas not found to be visibly clean, or not

meeting air clearance test criteria.

3.05 DISPOSAL of ACM WASTE

A. All ACM waste shall be removed from the Cleveland Courts Buildings on a daily basis.

B. Remove sealed and labeled containers of contaminated material and dispose of accordingly in an

approved sanitary landfill as follows:

1. Pass sealed plastic bags of contaminated material from the regulated area into

decontamination enclosure. All gross materials shall be removed from outside surfaces of

bags in the regulated area prior to passing the bags into the decontamination enclosure.

2. Clean containers (using HEPA vacuum/wet wipe methods) while in the decontamination

enclosure.

3. Pass cleaned containers into decontamination enclosure holding area.

4. Seal asbestos waste in leak-proof impermeable containers labeled in accordance with 29

CFR 1926 or applicable local standards.

5. Label containers with name and location of waste generator.

6. Notify the Owner's Representative not less than 24 hours prior to the time planned for

removing and delivering contaminated waste to the landfill. Representative may elect to

observe this operation.

7. Use only enclosed or covered trucks to haul impermeable containers to prevent loss or

damage to container in route to sanitary landfill.

8. Allow only sealed plastic bags or impermeable containers to be deposited in landfill.

9. Ensure that there are no visible emissions to the outside air from site where ACM waste is

deposited.

10. Submit to the Owner after completion of Work receipts including date, quantity of material,

and signature from authorized representative of landfill operator for all deliveries of waste

material.

3.06 OBSERVATIONS:

A. Owner's Representative will observe the status and progress of the Work for completeness and

general compliance with the requirements of the Contract Documents. Observations will be made

Page 89: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

following complete preparation of the regulated areas, following completion of pre-cleaning prior

to proceeding with actual asbestos abatement, at designated times during the abatement and

cleaning phases, and as appropriate during the Work as outlined elsewhere in the Contract

Documents.

B. Notify the Owner's Representative at least 24 hours in advance for such observations. The Owner's

Representative will make reasonable efforts to comply with the time of requested observation but

Contractor shall not proceed with removal of friable material until such observation by the

Representative is made.

C. Any delay in the completion of the Work caused by lack of advance notice by Contractor to the

Owner's Representative shall not be sufficient cause for any extension of the completion deadline.

Also, compensation for the time spent by Owner's Representative on the Project resulting from

prearranged meetings where the Work has not progressed to the designated point shall be the

responsibility of the Contractor and may be deducted by Owner from future payments due to

Contractor.

D. The Contractor is allowed one pre-removal visual observation and one post-removal visual

clearance observation by the Owner's Representative. The post-removal observation includes one

regulated area Air Clearance test, consisting of five air samples, by the Owner's Representative.

The cost of additional site visits required by Contractor may be deducted by Owner from payments

to the Contractor.

END of SECTION

Page 90: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

ADDENDUM NUMBER ONE 00901 - 1

DOCUMENT 00901 – ADDENDUM NUMBER ONE DATE: April 4, 2019 PROJECT: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV MANAGEMENT OFFICE DEMOLITION 1026 Rosa Parks Avenue Montgomery, Alabama 36108 FROM: Cohen Carnaggio Reynolds 2920 First Avenue South Birmingham, Alabama 35233 TO: Prospective Bidder This addendum forms a part of the Contract Documents and modifies the original Construction Documents Dated March 1, 2019, as noted below.

CLARIFICATIONS:

1. Project Name Terminology in the Asbestos Report – Cleveland Court listed in the asbestos report is the former (previous) name of Parks Place. The administration building listed in the asbestos report is the same management office building to be demolished in our project’s scope of work. Thus, it is the same project site location shown on the Construction Documents.

2. Capping water utilities – Refer to attached Revised Sheet C1.0, Revision #1 dated 04/04/19, for additional details for capping off the water utilities.

3. Erosion Control measures – Refer to attached Revised Sheet C2.0, Revision #1 dated 04/04/19, for

additional erosion control clarifications.

END OF DOCUMENT 00901 Attachments: - Sheets C1.0 & C2.0, Revision #1/Addendum #1, dated 4/4/19.

Page 91: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV ... … · 2016 Environmental Report of Existing Building. Addendum #1, dated 04/04/19 Addendum #2, ... IFB Number 2019-04 Management

MONTGOMERY HOUSING AUTHORITY – PARKS PLACE IV DEMOLITION CCR-18120

ADDENDUM NUMBER TWO 00902 - 1

DOCUMENT 00902 – ADDENDUM NUMBER TWO DATE: April 5, 2019 PROJECT: MONTGOMERY HOUSING AUTHORITY PARKS PLACE PHASE IV MANAGEMENT OFFICE DEMOLITION 1026 Rosa Parks Avenue Montgomery, Alabama 36108 FROM: Cohen Carnaggio Reynolds 2920 First Avenue South Birmingham, Alabama 35233 TO: Prospective Bidder This addendum forms a part of the Contract Documents and modifies the original Construction Documents Dated March 1, 2019, as noted below.

CLARIFICATIONS:

1. Revised Allowance No. 1 – In Spec Section 01 21 00 Allowances, Subsection 3.3-1, revise the wording for Allowance No. 1 as follows: Allowance No. 1 Asbestos Abatement, Demolition & Utility Cap/Removal Allowance: Include a ten (10) percent of base bid allowance for unforeseen asbestos abatement, building demolition, utility capping and abandoned utility removal items encountered during construction.

2. ‘Administration Building’ Terminology in the Asbestos Report – In the 2016 Asbestos Report, only refer to the ‘Administration Building’ references pertaining to this particular project. The ‘Administration Building’ described in the Asbestos Report is the same building as the ‘Management Office’ Building shown on our project’s Construction Documents as mentioned in Addendum #1, dated 04/04/19. Hence ‘Administration Building’ in the Asbestos Report is synonymous with “Management Office’ Building on the drawings. Therefore, delete any references to ‘Community Center Building’ listed in the Asbestos Report from consideration for this project. The ‘Community Center Building’ does not apply to this project.

3. Final Addendum – Addendum #2 is the Final Addendum to be issued.

END OF DOCUMENT 00902