monthly meeting agenda...january 2016 monthly meeting 7 notes: #5 – project title: act wellness...
TRANSCRIPT
Officers Jack Kooyoomjian, President
Vice President - Vacant Kathleen Harding, Secretary
Tom Burrell, Acting Treasurer
Others Tom Burrell, PELT Committee Chairman
Jan Cunard, LOCCA Historian
1
MONTHLY MEETING AGENDA
DATE: Thursday, January 28, 2016 TIME: 7:30 p.m.
LOCATION: Development Services Building, Room 107 A&B
AGENDA ITEMS
Introduction of and Remarks by Supervisor Ruth Anderson, Occoquan District
Section A. Project Reviews
#1 – Project Title: Proposed New Elementary School @ the Chinn Center
Representative: Mr. Dave Cline, Associate Superintendent for Finance & Support Services Mr. Dave Beavers, Supervisor of Planning and Financial Services, Office of Facilities Services 703-791-7312 (office) 571-722-6751 (cell) [email protected]
PROJECT DESCRIPTION: The school system is proposing a new elementary school at the Chinn Center to reduce overcrowding at Vaughn ES. The school would consist of 44 classroom accommodating approximately 924 students. Approximately 20 acres is needed for an
elementary school site. There was one public meeting in November 2015 and one on January 7, 2016. Mr. Beavers stated they looked at 12 different sites (9 private and 2 public).Primary concerns expressed by those in attendance:
Transportation – Originally (at the November meeting) access to the site was planned to be Troupe Street and/or Chinn Park Drive. This puts tremendous pressure on the roads due to the build-out of the final section of the Glenn
(Chic-fil-A, the Tribute, and eventually the Apple Federal Credit Union). It appeared as though students that would be coming to this new school would be coming, predominantly, from the
Kenwood Drive
Proposed Site
January 2016 Monthly Meeting
2
south so using Troupe and Chinn Park doesn’t make sense. At the meeting on January 7th, a new site configuration was shown proposing that access to the site would be via a new road coming off the southern portion of the site (a portion of which would be across private land the school system would have to purchase) and onto the Prince William Parkway at Kenwood Drive, a signalized intersection on the Parkway.
Parks and Open Space – There is already a paucity of park space for Occoquan District residents. Ms. Kim Hosen of the Prince William Conservation Alliance (formerly the Occoquan District Planning Commissioner) stated there are approximately 5 acres of parkland per 1,000 residents in the Occoquan District which is far below the standard. The topography of the proposed site is also challenging with wetlands and streams running through the site. One resident offered that each year the Chinn Center drains the pool into a neighboring creek using only gravity to emphasize the point that the land is challenging to build on.
Transparency – The general perception was that there has been little contact and interaction with the general public despite the November meeting that was sparsely attended. Citizens would like more information on the 12 sites that have been looked at and requested that time be provided for their input on other potential sites now that we have a better idea of the problem (overcrowding at Vaughn ES) that is trying to be solved.
NOTES:
January 2016 Monthly Meeting
3
#2 – Project Title: Proposed Verizon Monopole (SUP 2016-006 Verizon Wireless)
Representative: Ed Donohue, Donohue & Stearns, PLC, 201 Liberty Street SW, Leesburg, VA 20175 [email protected] Frank Stearns, Donohue & Stearns, PLC, 201 Liberty Street SW, Leesburg, VA 20175 (703) 726-2547 [email protected]
PROJECT: Verizon is proposing a monopole project in Coles District. The site is located on Prince of Peace Methodist Church property at 6299 Token Forest Drive (see aerial view below). It is 144' monopole with a compound at the base. This project will go to the Planning commission on February 17, 2016.
NOTES:
Prince of Peace
Methodist Church
January 2016 Monthly Meeting
4
#3 – Project Title: LIDL Grocery Store at Tackett’s Village
Representative: Mr. Jay du Von, Attorney, Walsh Colucci Lubeley & Walsh PC , 4310 Prince William Parkway, Suite 300,Prince William, VA 22192 (703) 680-4664,Ext. 5128 Fax: (703) 680-6067 [email protected]
Ms. Jessica L. Pfeiffer, Planner, Walsh Colucci Lubeley & Walsh PC, 4310 Prince William Parkway, Suite 300,Prince William, VA 22192 (703) 680-4664,Ext. 5119 [email protected]
PROJECT: This will be a review of the Tackett's Village proffer amendment (for the Lidl grocery store). This is the same proffer amendment that was presented at our March and October, 2015 meetings. The applicant’s representative told us at the October meeting that they would come back with their transportation consultant, Gorove/Slade, to answer transportation related questions.
The following are concerns shared by LOCCA and OLRCA and expressed at past meetings:
1. The parcel of interest is a prime location on the border of the Regional Employment Center with great potential for a small scale office building. Chris Price from Planning was going to confirm if this is a proffer amendment or requires a proffer and Comp Plan amendment for this intended use.
2. The building size is too large a footprint for this parcel.
3. There are concerns that peak rush hour traffic may be negatively impacted due to left hand turns onto the property possibly causing backups to spill over onto Old Bridge Road. A traffic study is highly encouraged to determine if the location is suitable
NOTES:
January 2016 Monthly Meeting
5
#4 – Project Title: Marquee Hospitality Hotel – Shoppers Best Way
Representative: Sherman Patrick, Jr. AICP, Compton & Duling, L.C., Parkway East at County Center, 12701 Marblestone Drive, Suite 350, Prince William, Virginia 22192-8307 (703) 565-5134 (703) 298-7265 (Cell) [email protected]
PROJECT: This is a request for a proffer amendment. The parcel is currently zoned B-1, General Business which allows hotels by-right. However, the applicant needs an increase in the allowable FAR which is capped at 0.3 by the proffer. The applicant is requesting an increase to 0.5. The normally required FAR in the B-1 is 0.4 so this is also a modification. They are also requesting a height of 75 feet. The normally required maximum height in the B-1 is 45 feet.
January 2016 Monthly Meeting
6
January 2016 Monthly Meeting
7
NOTES:
#5 – Project Title: ACT Wellness Center on Minnieville Road
Representative: Ms, Brandie Schaeffer, Front Door Planning, P.O. Box 1266, Warrenton, VA 20186 703-300-0107 [email protected]
PROJECT: This is a request to rezone approximately 1.96 acres from A-1 to O(L). The property has an existing residential house that will be reused to permit a medical clinic use. The applicant has requested a waiver for curb and gutter requirements. The site is located at 1411 Minnieville Road near the intersection of Dale Boulevard and Minnieville Road (see aerial below). The site is designated Office in the Comprehensive Plan and is located in the Minnieville Road HCOD. The project was heard by the Planning Commission on January 20, 2016.
NOTES:
January 2016 Monthly Meeting
8
#6 – Project Title: Garber Property Landscaping Courtesy Review
Representative:
PROJECT: This is a courtesy review of the parcels of land known as the Liberia Property that was acquired by Mr. Bill Garber. These parcels are located behind the Minnieville shopping center.
NOTES:
January 2016 Monthly Meeting
9
Section B. Announcements and Citizens’ Time
1. Historical Update– Jan Cunard, LOCCA Historian and At-Large Historical Commissioner
2. Economic Development Chapter Update:
Planning Commission Work Sessions
A series of Planning Commission Work Sessions have been held to collect stakeholder input, and inform, discuss, and receive feedback from the Planning Commission. This series of outreach meetings is complete. Staff will now work to draft a new version of the Chapter for review by the Planning Commission and, hopefully, the community at-large.
County Staff Points of Contacts: Ryan Foster, Planner II, Long Range Planner, Prince William Planning Office, 703-792-7615
3. General Notes:
Status of CVB Task Force on the Prince William County Visitor Center in Historic Occoquan
January 2016 Monthly Meeting
10
Section C. 2016 Calendar of Monthly Meetings
Meetings are scheduled for 7:30 pm, normally in the Prince William County Development Services Building, 5 County Complex Court, Prince William, Virginia, unless otherwise announced.
January 28th Development Services Building Room 107A&B Snow Date – February 7
th Location: TBD
Proposed ES at Chinn Park
Verizon Monopole at Prince Of Peace Methodist Church
LIDL at Tackett’s Mill
Marquee Hospitality Hotel
ACT Wellness Center on Minnieville
Garber Property Landscape Courtesy Review
February 25th
Development Services Building Room 107A&B Snow Date – March 3
rd Location: TBD
March 31st
Development Services Building Room 202A&B Snow Date – April 7
th Location: TBD
April 28th
Location: TBD
May 26th
Location: TBD
June 30th
Location: TBD
July 28th Location: TBD
August
NO MEETING
September 29th
Location: TBD
October 27th
Location: TBD
November 17th Location: TBD
December
NO MEETING
Lake Ridge Occoquan Coles Civic Association
of Prince William County P.O. Box 204 Occoquan, Virginia 22125
Project Review Checklist
The Charter Virginia Green Community, 1991
11
This checklist is used as a gauge to determine if the development being reviewed contains those features and design elements that embody community expectations of green building & LEED design, energy independence, "livability," "quality-of-life," historic preservation (including enhancement, tourism, and education), schools, parks, open space, trails, transportation connectivity, and functionally-oriented design concepts. It is not intended to be all-inclusive, but rather highlight those aspects of a development that, over the years, have come to signify the expectations of the community.
Smart Location & Linkage Y N N/A
1 Compatibility with PWC Comprehensive Plan Zoning Intent Land Use Matrix and Map
Review
2 Proximity to Water and Wastewater Infrastructure
3 Imperiled Species and Ecological Communities
4 Wetland and Water Body (RPA) Conservation
5 Floodplain Avoidance
6 Proximity to Projected Capacity of Existing Development and Public Services Including: Utilities; Safety; Transit; Education; Waste Management (Landfill)
7 Reuse and Restoration of Contaminated Land
8 Reduced Automobile Dependence
9 Proximity to Pedestrian and Bicycle Network
10 Steep Slope Protection
11 Site Design for Habitat or Wetlands Conservation
12 Restoration of Habitat or Wetlands
13 Conservation Management of Habitat or Wetlands
14 Proximity to county registered historic site or historic district
Neighborhood Pattern & Design Y N N/A
15 Walkable Streets
16 Compact Development and Open Space Protection Clustering
17 Interparcel Connection
18 Diversity of Residential, Office, and Commercial Uses
19 Mixed-Income Diverse Communities
20 Reduced Parking Footprint
21 Street Network
22 Transit Facilities Proximity and Connection
23 Transportation Demand Management Strategies Technologies and facilities
24 Access to Indoor and Outdoor Recreation Facilities
25 Access to Trails and Bicycle Paths and Storage
26 Universal (Handicap) Accessibility
27 Community Outreach and Design Involvement
28 Tree-Lined and Shaded Streets
29 Neighborhood Schools
30 Buffers and HCOD Review
31 Construction Activity Pollution Prevention
Lake Ridge Occoquan Coles Civic Association
of Prince William County P.O. Box 204 Occoquan, Virginia 22125
Project Review Checklist
The Charter Virginia Green Community, 1991
12
Green Infrastructure & Buildings Y N N/A
32 Green Building Rating
33 Has an analysis been performed on Energy Efficiency Measures?
34 Is a copy of the analysis of Energy Efficiency Measures available for review
Has an Alternative Energy Analysis been performed?
35 Is a copy of the Alternative Energy Analysis available for review
Water Efficient Landscaping
36 Existing Building Reuse
37 Preservation of any Historic Building(s)
38 Adaptive use of any Historic Building(s)
39 Minimize Site Disturbance in Design and Construction
40 Storm water Management
41 Heat Island Reduction
42 Solar Orientation
43 Infrastructure Energy Efficiency Improvements
44 Wastewater management
45 Recycled Content in Infrastructure
46 Waste Management
47 Light Pollution Reduction
Innovation & Design Process Y N N/A
48 Architectural Compatibility with Community
49 Color Scheme Compatibility with Community
50 Material Compatibility with Community
51 Architectural/Color/Material Compatibility with Historic features
Regional Priority Credits Y N N/A
52 Regional Transportation Mitigation
53 Regional Electrical Grid Impact
54 Impact on Regional Health, Safety, and Education Capacity
Proffer Statement(s) Y N N/A
55 Does the applicant commit to the following Condition or Proffer:
"The applicant agrees to meet with [ name of citizen group ] prior to final site plan approval. The purpose of
the meeting will be to conduct a review of the final site plan in terms of landscaping, architectural features,
lighting, signage, placement of buildings, archeological surveys conducted and/or historic preservation action
taken/contemplated, and inform the community of steps taken to meet the standards set forth by LEED. Proof
of such meeting will be a letter from [ name of citizen group ] explaining the outcomes of the meeting. Such
letter will be received prior to approval of the final site plan."