mos seminar in brussels 21.11 - european commission · mos seminar in brussels 21.11.2019. door2lng...

8
Antti Laukkanen MoS Seminar in Brussels 21.11.2019

Upload: others

Post on 27-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MoS Seminar in Brussels 21.11 - European Commission · MoS Seminar in Brussels 21.11.2019. DOOR2LNG -project • Upgrade of the maritime links integrated in the multimodal container

Antti Laukkanen

MoS Seminar in

Brussels 21.11.2019

Page 2: MoS Seminar in Brussels 21.11 - European Commission · MoS Seminar in Brussels 21.11.2019. DOOR2LNG -project • Upgrade of the maritime links integrated in the multimodal container

DOOR2LNG -project

• Upgrade of the maritime links integrated in the multimodal container transport routes

• Member states involved: Finland, Germany, United Kingdom and the Netherlands

• Implementation time: 16/02/2016-30/06/2020• Maximum EU grant: EUR 16 863 000

• The Project in practice:• Implementation of environmental efforts of

four new LNG-fueled container vessels –Containerships Oy

• Development of port infrastructure –removing bottlenecks of inefficiency and investing in cargo handling capacity and infrastructure – RST, PD Ports, Multi-Link Terminals Ltd

Page 3: MoS Seminar in Brussels 21.11 - European Commission · MoS Seminar in Brussels 21.11.2019. DOOR2LNG -project • Upgrade of the maritime links integrated in the multimodal container

DOOR2LNG -project

Page 4: MoS Seminar in Brussels 21.11 - European Commission · MoS Seminar in Brussels 21.11.2019. DOOR2LNG -project • Upgrade of the maritime links integrated in the multimodal container

• LNG-fuelled vessels:• Three vessels investment done and vessels

are operational in Europe• One vessel to be delivered from China Dec

2019• In addition Containerships have ordered two

additional LNG-fuelled vessels (outside the project)

• Crane investments within RST (Rotterdam):• Done

• Crane & infra investments within PD Ports (Teesport):• Crane investments done• Gate upgrade done• Transparency pilot to be finalised end 2019

beginning 2020• Crane investments within Multi-Link Terminals

• Crane investment ongoing• Crane upgrade to be done spring 2020

DOOR2LNG –project – current status

Page 5: MoS Seminar in Brussels 21.11 - European Commission · MoS Seminar in Brussels 21.11.2019. DOOR2LNG -project • Upgrade of the maritime links integrated in the multimodal container

Delay in the Project: Typhoon Mangkhut September 16th 2018

Source: The Atlantic / Japan Meteorological Agency

Source: Mapsofworld.com / Containerships

Shipyard

Page 6: MoS Seminar in Brussels 21.11 - European Commission · MoS Seminar in Brussels 21.11.2019. DOOR2LNG -project • Upgrade of the maritime links integrated in the multimodal container

• River Pearl flooded heavily in the dock of Shipyard

• Shipyard missed to screw in the bottom plugs of the vessel and to close the ICCP openings during those days.• Vessel was in the “dry dock”

• Water flooded into second vessel cargo hold & engine room with 2,5 meters => delay caused for the vessels to be delivered

• For next vessels: Main engine, shaft generator, gear box & other equipment in the dock / warehouse => water flooded there as well

• Chain reaction: Only one vessel can be equipped at time: Second delayed -> third vessel delayed -> fourth vessel delayed

• Inspection of damage done, drying the equipment, ordering new equipment…many months

Delay of almost 12 months for whole project

Delay in the Project: Typhoon Mangkhut Source: The Atlantic / Jennifer Pollard via Reuters

Source: The Atlantic Bobby Yip / Reuters

Page 7: MoS Seminar in Brussels 21.11 - European Commission · MoS Seminar in Brussels 21.11.2019. DOOR2LNG -project • Upgrade of the maritime links integrated in the multimodal container

DOOR2LNG –project – experiences

• Get commitment from each project partner before sending the application to INEA (memorandum of understanding etc.)

• Have frequent monthly project meetings & minutes of those Skype / physical meetings

• Ensure full time resource for project administration (either internal or external)

• Pay attention to clear & simple language in reports and forget business specific jargon

• In case of changes in Actions, inform / consult your INEA Project Manager before sending official Amendment Request

Page 8: MoS Seminar in Brussels 21.11 - European Commission · MoS Seminar in Brussels 21.11.2019. DOOR2LNG -project • Upgrade of the maritime links integrated in the multimodal container

Clean Business Innovation

Intra Europe Door to Door deliveries, via the

Motorways of the Sea, reducing trucks pollution for an Environment friendly solutions

Clean Business Innovation• Co2 reduction (reduce regional transport footprint)

• Boldness (lead the technology change : from LNG to Electric)

• Integrity (Respect our staff, our customers, our environment)

We are introducing the eco-friendly 5-step service:

Biofuel/ E-Truck

LNG - Vessel RailBiofuel/ E-Truck

Rail