Move of ALFA stations

Dorothea Pfeiffer (EN-MEF)20th LTEX meeting 11.07.2013

Move of ALFA stations at IP1• Aim is to gain angular and t-resolution by increasing distance

between RP stations• Project awaiting approval of ATLAS• Visit with ALFA, LHC integration, EN-CV, TE-VSC, TE-MPE and

transport on May 15th

2

11.0

7.20

13

DQR.A7R1

IP1 RR17

DQR.B7R1 DQR.C7R1

20 th

LTEX

Mee

ting

D

orot

hea

Pfei

ffer (

EN-M

EF)

RR17 (sector 12)

3

• Space available if DQR.C7R1 is shifted by 30 cm towards IP1• ALFA RP stations will be de-installed in September 2013

DQRB.RR17.EE.A12

DQR.C7R1

11.0

7.20

1320

th LT

EX M

eetin

g

Dor

othe

a Pf

eiffe

r (EN

-MEF

)

RR17 (sector 12)

430 cm

• To shift DQR 3 by 30 cm towards IP1, the straight pieces of pipe have to be removed

11.0

7.20

1320

th LT

EX M

eetin

g

Dor

othe

a Pf

eiffe

r (EN

-MEF

)

RR13 (sector 81)

5

• Space available if DQRB.RR13.EE.A81 is put on top of DQR.C7L1 (as it is already the case for DQRB.RR17.EE.A12 on top of DQR.C7R1)

• ALFA RP stations already de-installed in June 2013

DQRB.RR13.EE.A81

DQR.C7L1

11.0

7.20

1320

th LT

EX M

eetin

g

Dor

othe

a Pf

eiffe

r (EN

-MEF

)

RR13 (sector 81)

6

CRYOGENIC VALVE BOX

• Space available blue support is shortened at red line, and CRYOGENIC VALVE BOX and BOITIER/COFFRET ELECTROVANNE have to be moved

• Afterwards there is enough clearance to install the ALFA station safely in the new location, as the photo of the ALFA 2D envelope shows

ALFA RP station 2D envelope

BOITIER/COFFRET ELECTROVANNE

20 th

LTEX

Mee

ting

D

orot

hea

Pfei

ffer (

EN-M

EF)

11.0

7.20

13

Work Summary

7

• No support pieces for DQRs to be manufactured• New pieces of beam pipe are not needed• Cabling work for DQRs not needed• In sector 12:• Only the straight pipes between DQR.C7R1 and DQR.B7R1 have to

be removed and DQR.C7R1 moved by 30 cm towards DQR.B7R1• Intervention can be carried out in two days during DQR upgrade

• In sector 81:• Work is needed at DFBA electronics. A. Perin (TE-CRG), estimates a

cost of 20 kCHF and a work duration of two weeks to cut the support, install a new support, produce new cables and move the two boxes

• DQRB has to be put on top of DQR.C7L1 (like it already was done in sector 12)