systems. The flexible, modular vehicles are also fitted with BOMBARDIER* FLEXX* Metro 3000 bogies that was specifically adapted to suit the existing infrastructure.
The trains provided effective public transport during the 2010 Commonwealth Games that was held in New Delhi, home to almost 19 million people.
Since�2007,�Bombardier�Transportation�has��been�awarded�four�train�orders�by�the�Delhi�
Metro�Rail�Corporation�Ltd�(DMRC),��for�a�total�of�776�BOMBARDIER* MOVIA* ��metro�cars�–�making�it�one�Bombardier’s��
largest�metro��eets�in�the�world.�
The first units of carbodies, bogies and propulsion system were manufactured at production facilities in Europe, with subsequent units produced at Bombardier’s site in Savli, Vadodara. Key elements of the complete design were done locally in India. This project used a design approach that enabled a high degree of localisation and transfer of technology processes.
These high capacity vehicles feature advanced technologies, such as stainless steel carbodies, and the reliable BOMBARDIER* MITRAC* propulsion and control
METROS
MOVIA�metro�interior�for�Delhi
Project�ScheduleContract award (RS2) July 2007
Contract award (Option) March 2008
Contract award (RS5) July 2010
Contract award (RS7) August 2011
Final vehicle delivery (RS2) May 2010
Final vehicle delivery (RS5) October 2011
Final vehicle delivery (RS7) November 2013
Contract award (RS11) June 2015
Vehicle�DataType of vehicle MOVIA metro
Quantity ordered 776 cars
Train consist 4 and 6 and 8 -car trainsets
Dimensions�and�Weight4-car train length over couplers 89,680 mm
Driving trailer car length 22,600 mm
Intermediate motor car length 22,240 mm
Intermediate trailer car length 22,240 mm
Car width, max 3,200 mm
Car height, max (ARL) 4,048 mm
Floor height (ARL) 1,130 mm
Ceiling height 2,050 mm
Platform height, typical 1,090 mm
Bogie distance 15,000 mm
Wheel base 2,500 mm
Final vehicle delivery (RS11) February 2018
Technical�Characteristics�Line voltage 25 kV
Train configuration
• 4-car train• 6-car train• 8-car train
DT-M-M-DTDT-M-T-M-M-DTDT-M-T-M-T-M-M-DT
Minimum curve radius (operational) 200 m
Minimum curve radius (depot) 17S m
Seats DT 42, M/T 50
Track gauge 1,676 mm
Bodyshell Stainless steel
Brakes Regenerative brakes
Bogies FLEXX Metro 3000
Propulsion system MITRAC TC1420
Control system MITRAC IP-technology
Performance�and�CapacityMax. operational speed 85 km/h
Starting acceleration 0.82 m/s2
Emergency retardation 1.3 m/s2
Service retardation 1.0 m/s2
Capacity (8 passengers/m') 1,480
No of seated passengers
• DT car • M/T car • 4-car train • 6-car train • 8-car train
42 50 184 284 384
Standing area
• DT car• M/T car• 4-car train• 6-car train• 8-car train
39.75 m2 41.25 m2 162 m2 244.5 m2
327m2
*Trademark(s) of Bombardier Inc. or its subsidiaries.
www.bombardier.com
Bombardier�Transportation
NEW�DELHI,�INDIA
Bombardier was responsible for the supply of the rolling stock for the Delhi Metro Lines II (Yellow Line), III and IV (Blue Line) of the Phase I and II in the network.