moving armor target (mat) track jacob feist cleon stanley thomas hutton sladana lazic 03/30/2006
TRANSCRIPT
Moving Armor Target Moving Armor Target (MAT) Track(MAT) Track
Jacob FeistJacob FeistCleon StanleyCleon Stanley
Thomas HuttonThomas HuttonSladana LazicSladana Lazic
03/30/200603/30/2006
Agenda:Agenda: Project ScopeProject Scope
Review of Initial Review of Initial DesignsDesigns
Review Final DesignReview Final Design
AssemblyAssembly
Problems and Problems and SolutionsSolutions
Final Final accomplishmentsaccomplishments
Project ScopeProject Scope Portable and lightweightPortable and lightweight
Use Commercial Off The Use Commercial Off The Shelf (COTS) itemsShelf (COTS) items
Interlocking parts that Interlocking parts that can be transported in a can be transported in a commercial truck commercial truck
Reduced cost through Reduced cost through reduced labor and reduced labor and maintaincemaintaince
Mount on any soil base Mount on any soil base with minimum with minimum preparationpreparation
Project SpecificationsProject Specifications
Length of TrackLength of Track 1000 ft – 1800 ft1000 ft – 1800 ft
Elevation of TrackElevation of Track Up to 20 inchesUp to 20 inches
Minimum Radius of Minimum Radius of TrackTrack
430 ft430 ft
Slope Grade of the Slope Grade of the TrackTrack
-5 to +5 degrees-5 to +5 degrees
Maximum Weight of Maximum Weight of Track ComponentsTrack Components
150 lbs150 lbs
MAT WeightMAT Weight 2100 lbs2100 lbs
MAT DimensionsMAT Dimensions 7 ft by 22 ft7 ft by 22 ft
MAT SpeedMAT Speed 55 ft/s55 ft/s
Review of Initial DesignsReview of Initial Designs
Base DesignBase Design Elevation DesignElevation Design Main Frame DesignMain Frame Design
Review of Initial DesignsReview of Initial Designs
InsertInsert Rail interlockingRail interlocking
Final DesignFinal Design
Final concept is a Final concept is a fusion of previous fusion of previous ideas.ideas.
Angled side supports Angled side supports are used to add are used to add stability to the stability to the design.design.
Crossbars are moved Crossbars are moved in order to adjust the in order to adjust the height of the rails.height of the rails.
Final ConceptFinal Concept: Primary : Primary ComponentsComponentsCrossbar:Crossbar:
Main Support:Main Support:
Final ConceptFinal Concept: Primary : Primary ComponentsComponents
Breaking Support:Breaking Support:Side Arm:Side Arm:
AssemblyAssembly• Assemble the Main Base Supports• Assemble the Side Angled Supports
AssemblyAssembly• Add Crossbars to the Main Base Supports• Add Side Angled Supports
AssemblyAssembly• Connect the Main Rails to the Crossbars using the insert• Repeat the steps above and add to the first part
AssemblyAssembly
Final Assembled ViewFinal Assembled View
CalculationsCalculations: Main Rail: Main Rail
Weight:Weight:
Less that 150 lbs, Less that 150 lbs, the max weight as the max weight as set by sponsorset by sponsor
90 lbs should be 90 lbs should be easy to move and easy to move and handlehandle
CalculationsCalculations: Main Rail: Main Rail
Bending Stress:Bending Stress:
The total stress in The total stress in the beam is less than the beam is less than the yield stressthe yield stress
Gives a Factor of Gives a Factor of Safety of 2.4Safety of 2.4
This shows that the This shows that the main rail will support main rail will support the total weight of the the total weight of the test carttest cart
CalculationsCalculations: Main Rail: Main Rail
Deflection:Deflection:
Rail bends downward Rail bends downward with most weight with most weight expectedexpected
Displacement Displacement approximately 1/8 inchapproximately 1/8 inch
Some deflection Some deflection expected, 1/8 inch expected, 1/8 inch small enough to be small enough to be toleratedtolerated
Problems and SolutionsProblems and Solutions DesignDesign
Cost/BudgetCost/Budget
Order stalled due to Order stalled due to financial difficulties financial difficulties
Storage of materialStorage of material
Transportation of materialTransportation of material
MachiningMachining
AssemblyAssembly
Final AccomplishmentsFinal Accomplishments
Easier assemblyEasier assembly: : Simple collar-pin design; Simple collar-pin design; minimum toolsminimum tools
Reduced assembly time:Reduced assembly time:one section: ~5min 34secone section: ~5min 34secfull track: ~22hrsfull track: ~22hrs
Smaller assembly team:Smaller assembly team: three peoplethree people
Mobility:Mobility: all part weigh less than 150 all part weigh less than 150 lbslbs
Height and terrain adjustableHeight and terrain adjustable
QuestionsQuestions