![Page 1: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/1.jpg)
Moving Bridges and StructuresApril 2020
![Page 2: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/2.jpg)
We strive to be the premier engineering solutions partner,
committed to delivering complex projects from vision
to reality for a sustainable lifespan.
Our vision
2
![Page 3: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/3.jpg)
Founded in 1911, SNC-Lavalin is a global fully integrated professional services and project
management company and a major player in the ownership of infrastructure. From offices around the world, SNC-Lavalin's employees are proud to build what matters. Our teams provide comprehensive end-to-end project solutions – including capital investment, consulting, design,
engineering, construction, sustaining capital and operations and maintenance – to clients in oil and gas, nuclear, mining and metallurgy, infrastructure and power.
On July 3, 2017, SNC-Lavalin acquired Atkins, one of the world’s most respected design, engineering and project management consultancies.
A world leaders
3
![Page 4: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/4.jpg)
Joined forces
On July 3 2017, SNC-Lavalin and Atkins joined forces
+
› One of the world’s most respected design, engineering
and project management consultancies serving
infrastructure, transportation and energy sectors
› A leading engineering and construction group in
the world offering services in oil and gas, mining
and metallurgy, infrastructure and power
› Major player in the ownership of infrastructure
Change Footer here: Insert > Header and Footer (delete if none)
4
![Page 5: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/5.jpg)
Increased geographic reach
› An established and balanced footprint
› Greater “at-scale” European and
Middle Eastern presence
› Atkins Energy segment allocated 41% Europe, 46%
North America, 9% Middle East & Africa and 4%
Asia Pacific
› Atkins segmentation based on fiscal year ended March
31, 2016 applied to twelve month period ended
September 30, 2016
› Pro forma financials based on SNC-Lavalin fiscal year
ended December 31, 2016 and Atkins twelve month
period ended September 30, 2016
~16,000
employees
~12,000
employees
~17,500
employees
~4,500 employeesAmericas
Europe
Middle-East
& Africa
Asia Pacific
Change Footer here: Insert > Header and Footer (delete if none)
5
![Page 6: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/6.jpg)
Moving Bridges
6
![Page 7: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/7.jpg)
Change Footer here: Insert > Header and Footer (delete if none)
7
180m span pedestrian and cycle lifting bridge over the Thames.
Preliminary design and value engineering.
Rotherhithe to Canary WharfLondon
![Page 8: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/8.jpg)
Media City Salford QuaysSalford
8Exemplar design and supervision of
mechanical, electrical and hydraulic system.
![Page 9: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/9.jpg)
Tees Transporter BridgeMiddlesbrough
Change Footer here: Insert > Header and Footer (delete if none)
9
Tees Transporter BridgeMiddlesborough
Special Inspection and structural assessment.
![Page 10: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/10.jpg)
10
Poole Harbour BridgePoole
Exemplar design and detailed specification of
mechanical, electrical and hydraulic system.
![Page 11: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/11.jpg)
11
A47 Breydon Road BridgeGreat Yarmouth
HE Area 6 Strategic Structure
Condition and resilience inspection of the bridge’s M&E systems.
Outline design for upgrade of the hydraulics and control systems
![Page 12: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/12.jpg)
12
Warsaw Road Swing BridgePortsmouth Ontario
Site inspection, detailed design, check and tender documentation of the
replacement structure, mechanical and electrical equipment. A Parks
Canada historic bridge with a 20m opening span.
Upgraded the parapets without altering the external appearance
![Page 13: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/13.jpg)
13
Lower Brewers Swing BridgeWashburn Ontario
Site inspection and assessment timber structure and mechanical equipment.
A Parks Canada historic bridge with a 13m opening span.
![Page 14: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/14.jpg)
Change Footer here: Insert > Header and Footer (delete if none)
14
Snoveltorp Swing BridgeGota Kanel, Sweden
Independent 3rd party check of all M&E aspects of the detailed design.
![Page 15: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/15.jpg)
Change Footer here: Insert > Header and Footer (delete if none)
15
WGIS Lift BridgeSalford
Employer’s Agent, contract supervision, overseeing commissioning
![Page 16: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/16.jpg)
Change Footer here: Insert > Header and Footer (delete if none)
16
Lowry BridgeSalford
Detailed design and manufacturing drawings for mechanical and hydraulics equipment.
Authoring of control software and network design. Commissioning of all moving sections.
![Page 17: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/17.jpg)
Change Footer here: Insert > Header and Footer (delete if none)
17
Gateshead Millennium BridgeGateshead
Exemplar design and detailed specification of mechanical, electrical and
advanced control system. Dynamic modelling of bridge lift. Supervision of the
mechanical, hydraulic and electrical control design, installation and commissioning.
![Page 18: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/18.jpg)
18
Wirral A BridgeWirral
Category 3 check of all the design of
mechanical, electrical and control systems.
Commissioning support to Peel Ports
![Page 19: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/19.jpg)
A12 Lowestoft Bascule BridgeLowestoft
19
HE Area 6 Strategic Structure
Refurbishment of the lift drive systems,
including additional component resilience
against flooding
![Page 20: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/20.jpg)
Dutch River Swing BridgeGoole
20
Detailed design of mechanical,
electrical and control system.
![Page 21: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/21.jpg)
21
High Orchard Folding Bascule BridgeGloucester
Exemplar design, site supervision and as-built certification
of the mechanical, electrical and hydraulic systems.
![Page 22: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/22.jpg)
Great Wharf Bridge – Canary WharfLondon Docklands
22
Detailed design and supervision of mechanical, electrical and
hydraulic system.
![Page 23: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/23.jpg)
Rolling Bascule Bridges
23Design of Jubilee Bridge locking & emergency drive mechanism
![Page 24: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/24.jpg)
Upper Bank Street – Canary WharfLondon Docklands
24
![Page 25: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/25.jpg)
Preliminary design of the structure, mechanical, electrical and control systems for a 13m opening span swing bridge.
Designed to carry 241T mobile dock cranes
Tender design of the structure, mechanical, electrical and control systems for a 52m span bascule bridge.
Value engineered the compact technical space and jack down pier.
Change Footer here: Insert > Header and Footer (delete if none)
25
Newport Dock Swing BridgeNewport Gwent
River Yare 3rd CrossingGreat Yarmouth
![Page 26: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/26.jpg)
Other moving bridges
26
Forton Lake Lifting Bridge
Glasgow Science Centre Bridge
Torquay Pedestrian Footbridge
River Yeo Swing Bridge
Maryport Lift Footbridge
Bridge of Scottish Invention
![Page 27: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/27.jpg)
Investigation of Moving Bridge Problems
27
![Page 28: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/28.jpg)
Botlek Lift BridgeRotterdam
28
Investigation into the premature failure of roller bearings
![Page 29: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/29.jpg)
29
Design Reliability: Investigation of mechanical defects
Failed sheave bearing
![Page 30: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/30.jpg)
30
Design Reliability: Investigation of control system defects
• Confidential client: Investigation of system failure during commissioning.
![Page 31: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/31.jpg)
Change Footer here: Insert > Header and Footer (delete if none)
31
Samuel Beckett Swing BridgeDublin
A review of the operation and maintenance for Dublin City
Council, following a number of early maintenance concerns
![Page 32: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/32.jpg)
Link Span Bridges
32
![Page 33: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/33.jpg)
33
Dover Harbour Berth 6 Link SpanDover
Category 3 check of the Link Span bridge and associated
M&E systems. Dynamic analysis of the pedestrian bridge.
![Page 34: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/34.jpg)
34
King George Dock Passenger Terminal Link Spans
Hull
Detailed design of the pedestrian and vehicle
link spans to accommodate a 10m tidal range.
![Page 35: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/35.jpg)
35
Dover Harbour Berth 6 Link SpanDover
Category 3 check of the Link Span bridge and associated
M&E systems. Dynamic analysis of the pedestrian bridge.
Pembroke Dock RoRo Link Span Milford Haven
Detailed design of the mechanical and electrical
equipment for an extension to the existing RoRo Link Span.
.
![Page 36: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/36.jpg)
Other Moving Structures
36
![Page 37: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/37.jpg)
Falkirk Wheel BoatliftFalkirk
37Detailed design of mechanical, electrical system.
Continued maintenance support
![Page 38: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/38.jpg)
Halley VI Research StationAntarctica
38
Detailed design of hydraulic leg
jacking and control system.
Design for reliability,
maintainability and
environmental restrictions
On site commissioning
![Page 39: Moving Bridges and Structurescomprehensive end-to-end project solutions –including capital investment, consulting, design, engineering, construction, sustaining capital and operations](https://reader033.vdocument.in/reader033/viewer/2022043016/5f3938a83f8abf44323ce37f/html5/thumbnails/39.jpg)
The KelpiesFalkirk
39
Concept and detailed design of moving sculpture linked to lock
reservoir.
Detailed design of sculpture support structure