moving people overview
DESCRIPTION
Moving People Overview. Key Themes. Road Hierarchy/Classification. Strategic freight corridors Strategic public transport corridors Review and implementation of protection options. TransPriority. Reduce travel demands by linking transport and land use planning - PowerPoint PPT PresentationTRANSCRIPT
Moving People Overview
Key Themes
Road Hierarchy/Classification
• Strategic freight corridors• Strategic public transport corridors• Review and implementation of
protection options
TransPriority• Reduce travel demands by linking transport and land use planning• Encouraging high occupancy travel models• Encouraging cycling and walking• Making existing roads more efficient• Facilitating access and mobility for freight on appropriate routes• Targeted investment in road improvements/extensions
TransPriority
Belmont_Smartroads.jpgCockburn_Smartroads.jpg
Active Traffic Management• Incident Management• Incident Response Teams• CCTV• Real Time Information• Travel Advice• Event Management• Future Technology
Performance Monitoring
• Performance Monitoring for Freeways• Performance Monitoring for Control of Access Highways• Performance Monitoring for High Order Arterial
Highways/Roads
Operational Plans for the Arterial Highways and Roads
• Better Management the Arterials• Non Build Improvement Options• Intersection Upgrades-Hot Spots• Traffic Signals Management
Technology Innovations
• Foundation ITS (Optic Fibre etc)• Variable Message Signs• Incident Detection• Travel Time Signs• Use of Phone APPs Long Term Vehicle to Vehicle Technology
Managed Freeways
• Ramp Signalling on on-ramps• Pilot on Kwinana Freeway• Staged roll out
Grade Separation• Road/Road• Road/Freight Rail• Road/Urban Passenger Rail• Prioritisation List• Funding for Project Development
Grade separation.jpg
Network Improvements
• We need to Invest in Existing Network• Road Duplication and Extension Priority List• Hot Spot Intersection Improvement Program• Funding for Project Development
Planning for Beyond 2031• Population of about 3.5m by approximately 2050• Planning is needed for longer term planning• Various scenarios to be modelled• Additional river crossings likely
Moving Freight Update
• About 80% complete• Large amount of stakeholder input Rail and road capacity review Definition of freight network RAV access Road Network Development west of the Kwinana Freeway Infrastructure priority list
Questions