mp 359 360 00 130 8 - south dakota public utilities commission · ml-sd-m n-0793.0000...

1
W_UTM14_AERIAL_18195 W_UTM14_0874 W_UTM14_AERIAL_18196 WSC2SDMI001 W_UTM14_AERIAL_15777 W_UTM14_AERIAL_15779 W_UTM14_AERIAL_15780 NWI_426261 W_UTM14_AERIAL_18197 WSC2SDMI002 NWI_426856 S_UTM14_AERIAL_15778 ML-SD-MN-0793.0000 ML-SD-MN-0794.0000 ML-SD-MN-0795.0000 ML-SD-MN-0796.0000 ML-SD-MN-0797.0000 MATCHLINE 0+00 MATCHLINE 130+00 PIPELINE WARNING SIGNS 10 EA CATHODIC TEST STATION 2 EA AERIAL MARKER 1 EA PIPELINE MARKERS 0 EA AS-BUILT ALIGNMENT 1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG. 2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG. KEYSTONE MAINLINE (NPS 30 2009) ROSWELL SECTION SPREAD 3B DISCIPLINE 03 SHEET 1 OF 20 SHEETS STA. 0+00 TO STA. 130+11 UEI LOYS ALVIN GRAY, III SD CE9004 1835 1835-03-ML-02-001 2 ML-SD-MN-0794.0000 ML-SD-MN-0797.0000 NATURAL GROUND TOP OF PIPE ML-SD-MN-0796.0000 ML-SD-MN-0795.0000 ML-SD-MN-0793.0000 ML-SD-MN-0792.0000 12,306' 348' 2 7 MATCHLINE 130+11 130+11 0+00 ROSWELL PUMP STATION SEE DWG. 1835-01-ML-03-124 7 112+30 113+10 2 1,701' FBE 2 5,310' FBE 7 58+45 59+20 7 2 5,295' FBE 236TH STREET 238TH STREET 80' FBE O.C. 75' FBE O.C. 30" O.D. X 0.386" W.T., API-5LX-70 W/FBE COATING 30" O.D. X 0.516" W.T., API-5LX-70 W/FBE COATING & 5+50 193' FBE BR. 426TH AVENUE MP 360 MP 359 238TH STREET RD-SD-MN-0796.0000 236TH STREET RD-SD-MN-0792.0000 ML-SD-MN-0792.0000 426TH AVENUE RD-SD-MN-0791.0000 3+89 EDGE OF ROAD 3+99 CL 426TH AVENUE 4+03 OVERHEAD 4+15 EDGE OF ROAD 4+40 OVERHEAD 4+47 EDGE OF ROAD 4+60 CL 236TH STREET 4+72 EDGE OF ROAD 18+83 FENCE 18+85 BEGIN SLOUGH 21+50 CL SLOUGH 24+17 END SLOUGH 24+19 FENCE 45+72 P.I. 00°35'43" RT. 45+79 FENCE 59+33 FENCE 59+59 OVERHEAD 77+88 FENCE 90+15 FENCE 101+04 FENCE 106+84 FENCE 108+61 BEGIN SLOUGH 110+55 CL SLOUGH 112+40 OVERHEAD 112+52 END SLOUGH 112+61 EDGE OF ROAD 112+73 CL 238TH STREET 112+85 EDGE OF ROAD 112+92 BEGIN SLOUGH 113+04 CL SLOUGH 113+15 FENCE 113+30 END SLOUGH 113+44 WATER SUPPLY LINE 116+91 BEGIN SLOUGH 118+73 CL SLOUGH 123+97 END SLOUGH (BARBED WIRE) (BARBED WIRE) 112+41 FENCE (BARBED WIRE) (BARBED WIRE) 0+00 18+78 45+73 59+24 130+00 112+64 4+56 3+96 2+06 P.I. 04°34'38" LT. 2+23 P.I. 52°14'04" LT. 3+85 EDGE OF ROAD 3+96 CL 426TH AVENUE 3+99 OVERHEAD 4+11 EDGE OF ROAD 4+37 OVERHEAD 4+44 EDGE OF ROAD 4+56 CL 236TH STREET 4+69 EDGE OF ROAD 5+66 P.I. 10°30'04" RT. 6+04 P.I. 10°30'34" RT. 6+42 P.I. 11°25'45" RT. 6+81 P.I. 15°44'36" RT. 8+50 P.I. 01°15'33" RT. 17+67 P.I. 04°33'47" LT. 18+78 FENCE 18+80 BEGIN SLOUGH 21+45 CL SLOUGH 24+11 END SLOUGH 24+14 FENCE 45+66 P.I. 00°35'43" RT. 45+72 FENCE 59+25 FENCE 59+52 OVERHEAD 77+79 FENCE 90+07 FENCE 100+95 FENCE 106+74 FENCE 108+51 BEGIN SLOUGH 110+45 CL SLOUGH 112+31 OVERHEAD 112+42 END SLOUGH 112+51 EDGE OF ROAD 112+64 CL 238TH STREET 112+76 EDGE OF ROAD 112+82 BEGIN SLOUGH 112+94 CL SLOUGH 113+06 FENCE 113+20 END SLOUGH 113+34 WATER SUPPLY LINE 116+81 BEGIN SLOUGH 118+63 CL SLOUGH 123+87 END SLOUGH (BARBED WIRE) (BARBED WIRE) 112+32 FENCE (BARBED WIRE) (BARBED WIRE) 46+29 5.4' CVR. 59+32 6.9' CVR. FOR PUMP STATION ASSEMBLY MATERIAL SEE DWG. 1835-01-ML-03-124 POWERLINE, HT. = 30' POWERLINE POWERLINE, HT. = 30' POWERLINE 116+41 124+21 107+59 111+22 111+63 111+90 101+05 90+19 77+54 45+78 (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) 19+19 24+75 18+84 24+68 LAT. 43.946108 LONG. -97.685165 LAT. 43.960303 LONG. -97.689127 113 30"- 55° 3 DIA RAD WELD FITTING 0.515" W.T., Y-70 W/ 2-4 FEET LONG 30" O.D. X 0.515" W.T., API-5LX-70 PUPS 423 ROSWELL PUMP STATION ASSEMBLY (+357') (41) (26) (3) (53) 423 357' FBE 3+57 MP 361 LAT. 43.931900 LONG. -97.681290 2+09 P.I. 04°34'38" LT. 2+26 P.I. 52°14'04" LT. 5+69 P.I. 10°30'04" RT. 6+08 P.I. 10°30'34" RT. 6+46 P.I. 11°25'45" RT. 6+85 P.I. 15°44'36" RT. 8+55 P.I. 01°15'33" RT. 17+72 P.I. 04°33'47" LT. 82+07 P.I. 00°02'41" RT. 82+15 P.I. 00°02'41" RT. 111+50 P.I. 00°02'31" RT. 111+59 P.I. 00°02'31" RT. 2+06 P.I. 04°34'38" LT. 2+23 P.I. 52°14'04" LT. 5+66 P.I. 10°30'04" RT. 6+04 P.I. 10°30'34" RT. 6+42 P.I. 11°25'45" RT. 6+81 P.I. 15°44'36" RT. 8+50 P.I. 01°15'33" RT. 17+67 P.I. 04°33'47" LT. 45+66 P.I. 00°35'43" RT. 82+07 P.I. 00°02'41" RT. 111+50 P.I. 00°02'31" RT. 23+71 M.P. 359 76+51 M.P. 360 129+31 M.P. 361 MATCHLINE 130+00 ROSWL-A0-MOV-0102 4+18 FIBER OPTIC CABLE 4+22 FIBER OPTIC CABLE 5+12 FENCE (BARBED WIRE) 5+15 FENCE (BARBED WIRE) 3+64 50+85 6.3' CVR. TEST SECTION 3B-3 ILTO-026-2010 90+14 6.3' CVR. 1 EA FOR CONTINUATION SEE DWG. 1835-03-ML-02-002 FOR CONTINUATION SEE DWG. 1834-03-ML-02-020 M.P. 358.55 TO M.P. 361.02 1) ALL CHAINAGES ARE IN FEET UNLESS OTHERWISE SPECIFIED. 2) DATUM ELEVATION AND PROJECTION ARE BASED ON MEAN SEA LEVEL AND NAD 83. 3) FIELD PIPE LOCATING REQUIRED TO DETERMINE PLACEMENT OF PIPELINE WITHIN PERMANENT EASEMENT. 4) UNLESS OTHERWISE NOTED, 48 INCHES MINIMUM COVER EXCEPT 36 INCHES IN AREAS OF CONSOLIDATED ROCK. 5) NO ACTUAL AS-BUILT GROUND SHOTS WERE TAKEN AT THIS LOCATION. THE PROFILE REPRESENTS A PROJECTION FROM SHOTS TAKEN AT 150' TO 250' INTERVALS. 7) THE SUBSTANTIAL CONSTRUCTION COMPLETION DATE, BASED ON CALIPER PIG RUN, WAS OCTOBER 31, 2009 FOR M.P. 343.98 TO 377.31, NOVEMBER 01, 2009 FOR M.P. 377.29 TO 403.97 AND AUGUST 17, 2009 8) ORIGINAL IN-SERVICE DATE OF THE KEYSTONE PIPELINE (PHASE 1): JUNE 30, 2010. 9) CPS CALCULATION DATE: MAY 2010. 10) ORION STATION SERIES NUMBER: 1182700. 6) THE TYPE OF COATING APPLIED TO THE FIELD WELDS DURING THE ORIGINAL CONSTRUCTION WAS TWO COMPONENT LIQUID EPOXY. THE COATING PRODUCTS USED WERE DENSO 7200 OR SPC SP-2888. 11) TO DETERMINE THE MILE POST AT A GIVEN LOCATION, ADD THE 3D STATION NUMBER FROM THIS SEGMENT TO STATION NUMBER 18931+49 AND DIVIDE BY 5280. FOR M.P. 403.90 TO 422.96. ABRASION RESISTANT OVERCOAT 423 1835-01-ML-03-124 5 ROSWELL PUMP STATION 1835-01-ML-03-125 0 ROSWELL PUMP STATION 1835-01-ML-03-126 0 PS-SD-MN-0791.0000 LAT. 43.96624239 LONG. -97.69145752 PS-SD-MN-0791.0000 110+38 TELEPHONE LINE ROSWELL PUMP STATION 10/02/22 0+00 CENTERLINE OF MLV ROSWL-A0-MOV-0102 0+00 CENTERLINE OF MLV 4+07 PUMP STATION PROPERTY LINE 6.0' CVR. CLR. UNK. POWERLINE, HT. = 35' 6.4' CVR. 3.6' CLR. (ABOVE) POWERLINE, HT. = 35' 110+29 TELEPHONE LINE 6.0' CVR. 3.5' CLR. (ABOVE) POWERLINE POWERLINE 360 4+04 PUMP STATION PROPERTY LINE 3+54 ROAD ROW EXIT PUMP STATION 3+57 ROAD ROW EXIT PUMP STATION 1 EA

Upload: others

Post on 23-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MP 359 360 00 130 8 - South Dakota Public Utilities Commission · ml-sd-m n-0793.0000 ml-sd-mn-0794.0000 ml-sd - 0795. 000 ml-sd-mn-0796.0000 ml-sd-mn-0797.0000 m a t c h l i n e

W_UTM14_AERIAL_18195

W_UTM14_0874W_UTM14_AERIAL_18196

WSC2SDMI001

W_UTM14_AERIAL_15777

W_UTM14_AERIAL_15779

W_UTM14_AERIAL_15780

NWI_426261

W_UTM14_AERIAL_18197

WSC2SDMI002

NWI_426856

S_UTM14_AERIAL_15778

ML-SD-MN-0793.0000 ML-SD-MN-0794.0000 ML-SD-MN-0795.0000 ML-SD-MN-0796.0000 ML-SD-MN-0797.0000

MAT

CH

LIN

E

0+

00

MAT

CH

LIN

E

13

0+00

PIPELINE WARNING SIGNS 10 EACATHODIC TEST STATION 2 EAAERIAL MARKER 1 EA

PIPELINE MARKERS 0 EA

AS-BUILT ALIGNMENT

1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG.2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG.

KEYSTONE MAINLINE (NPS 30 2009) ROSWELL SECTION

SPREAD 3B DISCIPLINE 03

SHEET 1 OF 20 SHEETS

STA. 0+00 TO STA. 130+11

UEI

LOYS ALVIN GRAY, III SD CE9004

1835

1835-03-ML-02-001 2

ML-SD-MN-0794.0000

ML-SD-MN-0797.0000

NATURAL GROUND

TOP OF PIPE

ML-SD-MN-0796.0000

ML-SD-MN-0795.0000

ML-SD-MN-0793.0000

ML-

SD

-MN

-079

2.00

00

12,306'348'

27

MA

TCH

LIN

E

130

+11

130+

11

0+00

ROSWELL PUMP STATIONSEE DWG. 1835-01-ML-03-124

7112+

30

113+

10

2

1,701' FBE

2

5,310' FBE

758+4

5

59+2

0

72

5,295' FBE

236T

H S

TREE

T

238T

H S

TREE

T

80' FBE O.C.

75' FBE O.C.

30" O.D. X 0.386" W.T., API-5LX-70 W/FBE COATING30" O.D. X 0.516" W.T., API-5LX-70 W/FBE COATING &

5+50

193' FBE BR.

426TH AVENUE

MP360

MP359

238T

H S

TRE

ET

RD

-SD

-MN

-079

6.00

00

236T

H S

TRE

ET

RD

-SD

-MN

-079

2.00

00

ML-

SD

-MN

-079

2.00

00

426T

H A

VE

NU

ER

D-S

D-M

N-0

791.

0000

3+89

ED

GE

OF

RO

AD

3+99

CL

426T

H A

VE

NU

E4+

03 O

VE

RH

EA

D

4+15

ED

GE

OF

RO

AD

4+40

OV

ER

HE

AD

4+47

ED

GE

OF

RO

AD

4+60

CL

236T

H S

TRE

ET

4+72

ED

GE

OF

RO

AD

18+8

3 F

EN

CE

18+8

5 B

EG

IN S

LOU

GH

21+5

0 C

L S

LOU

GH

24+1

7 E

ND

SLO

UG

H24

+19

FE

NC

E

45+7

2 P

.I. 0

0°35

'43"

RT.

45+7

9 F

EN

CE

59+3

3 F

EN

CE

59+5

9 O

VE

RH

EA

D

77+8

8 F

EN

CE

90+1

5 F

EN

CE

101+

04 F

EN

CE

106+

84 F

EN

CE

108+

61 B

EG

IN S

LOU

GH

110+

55 C

L S

LOU

GH

112+

40 O

VE

RH

EA

D

112+

52 E

ND

SLO

UG

H11

2+61

ED

GE

OF

RO

AD

112+

73 C

L 23

8TH

STR

EE

T11

2+85

ED

GE

OF

RO

AD

112+

92 B

EG

IN S

LOU

GH

113+

04 C

L S

LOU

GH

113+

15 F

EN

CE

113+

30 E

ND

SLO

UG

H11

3+44

WA

TER

SU

PP

LY L

INE

116+

91 B

EG

IN S

LOU

GH

118+

73 C

L S

LOU

GH

123+

97 E

ND

SLO

UG

H

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

112+

41 F

EN

CE

(B

AR

BE

D W

IRE

)

(BA

RB

ED

WIR

E)

0+00

18+7

8

45+7

3

59+2

4

130+

00

112+644+563+96

2+06

P.I.

04°

34'3

8" L

T.2+

23 P

.I. 5

2°14

'04"

LT.

3+85

ED

GE

OF

RO

AD

3+96

CL

426T

H A

VE

NU

E3+

99 O

VE

RH

EA

D

4+11

ED

GE

OF

RO

AD

4+37

OV

ER

HE

AD

4+44

ED

GE

OF

RO

AD

4+56

CL

236T

H S

TRE

ET

4+69

ED

GE

OF

RO

AD

5+66

P.I.

10°

30'0

4" R

T.6+

04 P

.I. 1

0°30

'34"

RT.

6+42

P.I.

11°

25'4

5" R

T.6+

81 P

.I. 1

5°44

'36"

RT.

8+50

P.I.

01°

15'3

3" R

T.

17+6

7 P

.I. 0

4°33

'47"

LT.

18+7

8 F

EN

CE

18+8

0 B

EG

IN S

LOU

GH

21+4

5 C

L S

LOU

GH

24+1

1 E

ND

SLO

UG

H24

+14

FE

NC

E

45+6

6 P

.I. 0

0°35

'43"

RT.

45+7

2 F

EN

CE

59+2

5 F

EN

CE

59+5

2 O

VE

RH

EA

D

77+7

9 F

EN

CE

90+0

7 F

EN

CE

100+

95 F

EN

CE

106+

74 F

EN

CE

108+

51 B

EG

IN S

LOU

GH

110+

45 C

L S

LOU

GH

112+

31 O

VE

RH

EA

D

112+

42 E

ND

SLO

UG

H11

2+51

ED

GE

OF

RO

AD

112+

64 C

L 23

8TH

STR

EE

T11

2+76

ED

GE

OF

RO

AD

112+

82 B

EG

IN S

LOU

GH

112+

94 C

L S

LOU

GH

113+

06 F

EN

CE

113+

20 E

ND

SLO

UG

H11

3+34

WA

TER

SU

PP

LY L

INE

116+

81 B

EG

IN S

LOU

GH

118+

63 C

L S

LOU

GH

123+

87 E

ND

SLO

UG

H

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

112+

32 F

EN

CE

(B

AR

BE

D W

IRE

)

(BA

RB

ED

WIR

E)

46+2

9 5

.4' C

VR

.

59+3

2 6

.9' C

VR

.

FOR PUMPSTATIONASSEMBLYMATERIALSEE DWG.1835-01-ML-03-124

PO

WE

RLI

NE

, HT.

= 3

0'P

OW

ER

LIN

E

PO

WE

RLI

NE

, HT.

= 3

0'P

OW

ER

LIN

E

116+

41

124+

21

107+

59

111+

2211

1+63

111+

90

101+

05

90+1

9

77+5

4

45+7

8

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

19+1

9

24+7

5

18+8

4

24+6

8

LAT. 43.946108 LONG. -97.685165

LAT. 43.960303 LONG. -97.689127

113 30"- 55° 3 DIA RAD WELD FITTING 0.515" W.T., Y-70W/ 2-4 FEET LONG 30" O.D. X 0.515" W.T., API-5LX-70 PUPS

423 ROSWELL PUMP STATION ASSEMBLY (+357')

(41) (26) (3) (53)

423

357' FBE

3+57

MP361LAT. 43.931900

LONG. -97.681290

2+09

P.I.

04°

34'3

8" L

T.2+

26 P

.I. 5

2°14

'04"

LT.

5+69

P.I.

10°

30'0

4" R

T.6+

08 P

.I. 1

0°30

'34"

RT.

6+46

P.I.

11°

25'4

5" R

T.6+

85 P

.I. 1

5°44

'36"

RT.

8+55

P.I.

01°

15'3

3" R

T.

17+7

2 P

.I. 0

4°33

'47"

LT.

82+0

7 P

.I. 0

0°02

'41"

RT.

82+1

5 P

.I. 0

0°02

'41"

RT.

111+

50 P

.I. 0

0°02

'31"

RT.

111+

59 P

.I. 0

0°02

'31"

RT.

2+06

P.I.

04°

34'3

8" L

T.2+

23 P

.I. 5

2°14

'04"

LT.

5+66

P.I.

10°

30'0

4" R

T.6+

04 P

.I. 1

0°30

'34"

RT.

6+42

P.I.

11°

25'4

5" R

T.6+

81 P

.I. 1

5°44

'36"

RT.

8+50

P.I.

01°

15'3

3" R

T.

17+6

7 P

.I. 0

4°33

'47"

LT.

45+6

6 P

.I. 0

0°35

'43"

RT.

82+0

7 P

.I. 0

0°02

'41"

RT.

111+

50 P

.I. 0

0°02

'31"

RT.

23+7

1 M

.P. 3

59

76+5

1 M

.P. 3

60

129+

31 M

.P. 3

61

MA

TCH

LIN

E

130

+00

RO

SW

L-A

0-M

OV

-010

2

4+18

FIB

ER

OP

TIC

CA

BLE

4+22

FIB

ER

OP

TIC

CA

BLE

5+12

FE

NC

E (B

AR

BE

D W

IRE

)5+

15 F

EN

CE

(BA

RB

ED

WIR

E)

3+64

50+8

5 6

.3' C

VR

.

TEST SECTION 3B-3ILTO-026-2010

90+1

4 6

.3' C

VR

.

1 EA

FOR

CO

NTI

NU

ATIO

N S

EE

DW

G.

1835

-03-

ML-

02-0

02

FOR

CO

NTI

NU

ATIO

N S

EE D

WG

.

1834

-03-

ML-

02-0

20

M.P. 358.55 TO M.P. 361.02

1) ALL CHAINAGES ARE IN FEET UNLESS OTHERWISE SPECIFIED.

2) DATUM ELEVATION AND PROJECTION ARE BASED ON MEAN SEA LEVEL AND NAD 83.

3) FIELD PIPE LOCATING REQUIRED TO DETERMINE PLACEMENT OF PIPELINE WITHIN PERMANENT EASEMENT.

4) UNLESS OTHERWISE NOTED, 48 INCHES MINIMUM COVER EXCEPT 36 INCHES IN AREAS OF CONSOLIDATED ROCK.

5) NO ACTUAL AS-BUILT GROUND SHOTS WERE TAKEN AT THIS LOCATION. THE PROFILE REPRESENTS A PROJECTION FROM SHOTS TAKEN AT 150' TO 250' INTERVALS.

7) THE SUBSTANTIAL CONSTRUCTION COMPLETION DATE, BASED ON CALIPER PIG RUN, WAS OCTOBER 31, 2009 FOR M.P. 343.98 TO 377.31, NOVEMBER 01, 2009 FOR M.P. 377.29 TO 403.97 AND AUGUST 17, 2009

8) ORIGINAL IN-SERVICE DATE OF THE KEYSTONE PIPELINE (PHASE 1): JUNE 30, 2010.

9) CPS CALCULATION DATE: MAY 2010.

10) ORION STATION SERIES NUMBER: 1182700.

6) THE TYPE OF COATING APPLIED TO THE FIELD WELDS DURING THE ORIGINAL CONSTRUCTION WAS TWO COMPONENT LIQUID EPOXY. THE COATING PRODUCTS USED WERE DENSO 7200 OR SPC SP-2888.

11) TO DETERMINE THE MILE POST AT A GIVEN LOCATION, ADD THE 3D STATION NUMBER FROM THIS SEGMENT TO STATION NUMBER 18931+49 AND DIVIDE BY 5280.

FOR M.P. 403.90 TO 422.96.

ABRASION RESISTANT OVERCOAT

423 1835-01-ML-03-124 5 ROSWELL PUMP STATION1835-01-ML-03-125 0 ROSWELL PUMP STATION1835-01-ML-03-126 0

PS

-SD

-MN

-079

1.00

00

LAT. 43.96624239LONG. -97.69145752

PS-SD-MN-0791.0000

110+

38 T

ELE

PH

ON

E L

INE

ROSWELL PUMP STATION

10/02/22

0+00

CE

NTE

RLI

NE

OF

MLV

RO

SW

L-A

0-M

OV

-010

20+

00 C

EN

TER

LIN

E O

F M

LV

4+07

PU

MP

STA

TIO

NP

RO

PE

RTY

LIN

E

6.0'

CV

R.

CLR

. UN

K.

PO

WE

RLI

NE

, HT.

= 3

5'

6.4'

CV

R.

3.6'

CLR

. (A

BO

VE

)

PO

WE

RLI

NE

, HT.

= 3

5'

110+

29 T

ELE

PH

ON

E L

INE

6.0'

CV

R.

3.5'

CLR

. (A

BO

VE

)

PO

WE

RLI

NE

PO

WE

RLI

NE

360

4+04

PU

MP

STA

TIO

NP

RO

PE

RTY

LIN

E

3+54

RO

AD

RO

W

EX

IT P

UM

P S

TATI

ON

3+57

RO

AD

RO

W

EX

IT P

UM

P S

TATI

ON

1 EA