FEDERAL MINISTRY OF POWER MID-TERM ACHIEVEMENTS OF PRESIDENT GOODLUCK JONATHAN, GCFR, IN THE POWER SECTOR PRESENTED AT THE 2013 MINISTERIAL PLATFORM FOR THE PERIOD OF MAY, 2011 – MAY 2013 ON TUESDAY, JULY 23rd, 2013 BY PROF. CHINEDU NEBO, OON, NPOM HONOURABLE MINISTER OF POWER & HAJIYA ZAINAB IBRAHIM KUCHI, FICMC HONOURABLE MINISTER OF STATE FOR POWER FEDERAL MINISTRY OF POWER 1

Upload: oak-tv

Post on 03-Apr-2016

219 views

Category:

Documents


0 download

DESCRIPTION

Presented by Prof. Chinedu Nebo, OON, NPOM Honourable Minister Of Power

TRANSCRIPT

Page 1: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

MID-TERM ACHIEVEMENTS OF PRESIDENT GOODLUCK JONATHAN, GCFR, IN THE POWER SECTOR

PRESENTED AT THE 2013 MINISTERIAL PLATFORM

FOR THE PERIOD OF MAY, 2011 – MAY 2013

ON TUESDAY, JULY 23rd, 2013

BY

PROF. CHINEDU NEBO, OON, NPOM HONOURABLE MINISTER OF POWER

& HAJIYA ZAINAB IBRAHIM KUCHI, FICMC HONOURABLE MINISTER OF STATE FOR POWER

FEDERAL MINISTRY OF POWER

1

Page 2: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 2 FEDERAL MINISTRY OF POWER

Page 3: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 3 FEDERAL MINISTRY OF POWER

Page 4: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 4 FEDERAL MINISTRY OF POWER

Page 5: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 5 FEDERAL MINISTRY OF POWER

Page 6: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 6

AMBASSADOR (DR) GODKNOWS IGALI OON, FNAH Permanent Secretary, Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Page 7: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Let me start by acknowledging the high-level political will of His Excellency, President Dr. Goodluck Ebele Jonathan, GCFR and His Excellency, Vice-President, Arc. Mohammed Namadi Sambo, GCON, to have launched the process fundamental to the transformation witnessed in the power sector in recent years. Without this level of commitment, the achievements recorded from 2011 to date would not have been realised. More importantly, the launching of the Power Sector Roadmap by Mr. President in August, 2010 has accelerated the pace of the reform and the significant achievements recorded so far in the power sector.

Introduction

7 FEDERAL MINISTRY OF POWER

Page 8: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

• PTFP • GenCos

• TCN • DisCos

• NDPHC • NBET

• NELMCO • EMS

• NAPTIN • REA

• HYPERDEC

• Residential

• Commercial

• Industrial

• NERC • FMoP

Policy Regulation

Operations Customers

Introduction…Cont’d. Power Sector Structure

8 FEDERAL MINISTRY OF POWER

Page 9: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Introduction…Cont’d.

Focus on Activities of the Power Sector

Power stability, reliability & sustainability

Diversification of energy mix (large hydros, renewables & coal)

Electricity market stabilization Improving rural access to electricity

Human capacity development

Improving policy and regulatory environment for rapid growth through private investment

Reducing production cost and making manufacturing sector

more competitive

Empowering SMEs with more power supply and creating

employment

9 FEDERAL MINISTRY OF POWER

Page 10: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER FEDERAL MINISTRY OF POWER

Omotosho 304MW

Ibom 190MW

Afam VI 650MW

Shiroro 600MW

Jebba 540MW

Kainji 760MW

Egbin 1,320MW

Delta 900MW

Afam I-V 726MW

Okpai 450MW

Sapele 720MW

Omoku 120MW

N I G E R I A

Power Generation.

Existing Power Stations Connected to Grid

Design Installed

Capacity (MW)

Kainji 760

Jebba 540

Shiroro 600

Olorunsogo 304

Egbin 1320

Sapele - FGN 720

Delta 900

Afam I-V 726

Afam VI (Shell) 650

Okpai Omoku Omotosho 304

Geregu 414

AES 294

Ibom Power 190 Olorunsogo 304MW

AES 294MW

Geregu 414MW

450

120

10

Page 11: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Power Generation. Cont’d

Rehabilitation Works

11

• Shiroro: Repair works on Unit 2 which led to recovery of 150MW in 2012

Hydropower Plant.

• Jebba: Hydro Power Station preventive maintenance of 2G2 in 2012 to

ensure availability and sustainability of 96.4MW.

• Egbin: In 2012, several worn parts of the plant were replaced with new

ones. This has improved plant reliability from 60% to more than

70%.

• Kainji: Rehabilitation works on 1G5 & 1G12 Units to recover 220MW

capacity by Dec 2014.

FEDERAL MINISTRY OF POWER

Page 12: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Power Generation. Cont’d

Rehabilitation Works – Kainji Hydro Power Station

Rehabilitation works on 1G5 & 1G12 Units to recover 220MW capacity by Dec 2014

12 FEDERAL MINISTRY OF POWER

Page 13: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER FEDERAL MINISTRY OF POWER 13

Mambilla 3050MW

Calabar 563MW

Geregu-2 434MW

Olorusogo-2 675MW

Omotosho-2 451MW

Alaoji 960MW

Egbema 338MW

Omoku 225MW

Ihovbor 450MW

Sapele 450MW

Gbarain 225MW

Kaduna 215MW

Katsina wind 10MW

Zungeru 700MW

Kashimbila 40MW

Gurara 30MW

Installed Capacity (MW)

Katsina 10

Kaduna 215

Zungeru 700

Gurara I 30

Mambilla 3,050

Olorunsogo -2 675

Omotosho - 2 451

Geregu - 2 434

Kashimbilla 40

Ihovbor 450

Sapele 450

Gbarin 225

Omoku 225

Alaoji 960

Egbema 338

Calabar 563

13

Power Generation. Cont’d

Newly Completed/On-going Power Plants for Increased Generation

Page 14: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Power Generation. Cont’d

Completed Generation Projects in the period under review

14

S/No Power Station Date MW Cumulative MW

1 Olorunsogo Jan-11 112.5 112.5

2 Olorunsogo Feb-11 112.5 225.0

3 Olorunsogo May-11 112.5 337.5

4 Sapele Aug-11 112.5 450.0

5 Olorunsogo Nov-11 112.5 562.5

6 Sapele Feb-12 112.5 675.0

7 Alaoji Apr-12 112.5 787.5

8 Omotosho Apr-12 112.5 900.0

9 Olorunsogo Jul-12 112.5 1,012.5

10 Sapele Aug-12 112.5 1,125.0

11 Omotosho Aug-12 112.5 1,237.5

12 Alaoji Sep-12 112.5 1,350.0

13 Omotosho Oct-12 112.5 1,462.5

14 Sapele Oct-12 112.5 1,575.0

15 Omotosho Dec-12 112.5 1,687.5

FEDERAL MINISTRY OF POWER

Page 15: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Energy Mix

In order to enhance the security of power supply, government is assiduously working towards the diversification of the fuel mix. In this regard, the nation’s vast resources of coal, wind, solar, biomass and hydropower potentials are being fully exploited. • Feasibility Studies on the development of coal to power are on-

going in five(5) coal blocks in Enugu axis and three (3) coal blocks in Benue, Kogi and Gombe axis. Progress of work on the studies is at 25% and is expected to focus on clean coal technology.

• Feasibility Studies on ten (10) dams with small hydropower potentials which commenced in Y2011 have been completed and ready for concession.

15 FEDERAL MINISTRY OF POWER

Page 16: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Hydro Power Development in Nigeria

16

• Zungeru project in Niger State…………………….700MW

• Mambilla project – Taraba State…………………..3,050MW

• Gurara II project – Niger State……………………...360MW

• Gurara I Project Niger State…………………………..30MW

• Itisi project – Kaduna State……………………………40MW

• Kashimbilla project – Taraba State…………………40MW

• Other Small/medium hydropower projects – Nationwide

FEDERAL MINISTRY OF POWER

Page 17: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Hydro Power Development in Nigeria Small/Medium Hydropower studies completed by FMP from 2011 to date

S/N DAM STATE CAPACITY (MW)

1 Oyan Ogun 10

2 Ikere Gorge Oyo 6

3 Bakolori Zamfara 3

4 Challawa Kano 7.5

5 Tiga Kano 10

6 Kampe Kogi 3

7 Owena Ondo 0.45

8 Doma Nasarawa 1

9 Zobe Katsina 0.30

10 Jibia Katsina 4

17 FEDERAL MINISTRY OF POWER

Page 18: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Hydro Power Development in Nigeria

360MW GURARA II Multi-purpose Project

C.A. 2,510

km2

C.A. 2,840

km2 Gurara II

Located 140km downstream of Gurara I and 40km from Abuja Design basis: 360MW and 1,130GWhr of energy per annum IRR = 8.9% at MYTO tariff Estimated cost: US$800m Irrigation potential: 8,000Ha

18 FEDERAL MINISTRY OF POWER

Page 19: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Hydropower Development in Nigeria (Zungeru)

19

The construction of the 700MW Zungeru hydropower project was approved by FEC in

2012 in favour of a consortium of Messrs. Sinohydro/CNEEC in the contract sum of

US$ 1.237 billion and a completion period of 48 months.

FEDERAL MINISTRY OF POWER

Page 20: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Hydropower Project in Nigeria Zungeru

20

•Ground breaking ceremony for the project was performed by His Excellency President Goodluck Jonathan, GCFR on 28th May, 2013

FEDERAL MINISTRY OF POWER

Page 21: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

River Basins with Large and Small Scale Hydropower Potential

Focus on Renewable Energy Resources Development

Solar Map Hydro Potentials

21 FEDERAL MINISTRY OF POWER

River Basins with Large and Small Scale Hydropower Potential

Page 22: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Focus on Renewable Energy Resources Development

contd.

Wind Map

22 FEDERAL MINISTRY OF POWER

Page 23: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

The 10 MW Katsina Windfarm Power Project is at 98% completion and will soon be commissioned

Focus on Renewable Energy Resources Development contd.

23 FEDERAL MINISTRY OF POWER

Page 24: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Nigeria’s Transmission Grid

24

• Transmission development activities are mainly carried out by Transmission

Company of Nigerian (TCN) and Niger/Delta Power Holding Company

(NDPHCN) under the National Independent Power Project (NIPP).

• TCN Projects are funded through the statutory budgets from the FGN.

• NIPP projects are funded by the 3-tiers of the government from the excess crude

account.

• For the period under review several transmission projects have been completed

which lead to modest increase in the nation’s transmission capacity as listed in

the following slides.

FEDERAL MINISTRY OF POWER

Page 25: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

330kV System

Capacity (blue line)

6870 MW 5650 KM

Nigeria 330kV Network

25

Nigeria’s Transmission Grid

FEDERAL MINISTRY OF POWER

Page 26: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Nigeria’s Transmission Grid Completed Transmission Projects (Substations) - NIPP

26

PROJECT DESCRIPTION MVA

LOT 9-A 330/132/33KV Ganmo SS (New) 300

LOT 9-B 132/33KV Ayede SS (Ext.) 150

LOT 10-A 132/33KV Central Area SS (Ext.) 60

LOT 10-B 330/132KV Katampe SS (Ext.) 150

LOT 10-C 132/33KV Kumbotso SS (Ext.) 60

LOT 10-D 330/132/33KV Mando SS (Ext.) 150

LOT 11-A 132/33KV Agbara SS (Ext.) 60

LOT 11-B 132/33KV Ikeja West SS (Ext.) 150

LOT 11-C 132/33KV Ojo SS (Ext.) 120

LOT 11-D 132/33KV Oworonsoki SS (Ext.) 120

LOT 13-A 330/132KV Aja G.I.S. SS (Ext.) 150

LOT 13-B 132KV Aja G.I.S. SS (Ext.)

LOT 24-1 330/132KV Papalanto SS (New) 450

LOT 26-1 330/132KV Omotosho SS (New) 450

LOT 27A 330KV Sapele SS (Rehab. & Ext.)

LOT 27B 330KV Benin SS (Rehab.)

TOTAL 2,370

FEDERAL MINISTRY OF POWER

Page 27: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Nigeria’s Transmission Grid Completed Transmission Projects (Lines) - NIPP

27

PROJECT

DESCRIPTION

LENGTH (KM)

LOT 9-C 330KV DC Ganmo-(Jebba/Osogbo SC - Turn in/Turn out) 12

LOT 9-D 132KV DC Ganmo-(Ilorin/Oshogbo SC Turn in/Turn out) 2

LOT 19-3A 330KV DC Ihovbor-(Benin Main-Oshogbo) (Line A) 17

LOT22-2 330KV DC Ajaokuta-Lokoja-Gwagwalada 222

LOT 24-2 330KV DC Papalanto-(Ikeja West/Ayede) 16

LOT 26-2 330KV DC Omotosho - Ikeja West 5

TOTAL 274

FEDERAL MINISTRY OF POWER

Page 28: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 28

Nigeria’s Transmission Grid Completed Transmission Projects - TCN

Completed Projects from 2011 to Date

S/N Title of Project Project

Location Deliverables

1 Construction of 150MVA 330/132/33kV T/F and 330kV bays at Onitsha and Benin.

Edo & Anambra 150MVA increase in transformer capacity at 330kV Voltage level at Onitsha

2 Calabar 2x150MVA, 330/132/33kV Substation and line bay at Alaoji Substation.

Cross River & Abia

300MVA Transformer capacity at 330kV level in Calabar, Cross River State

3 Construction of Alaoji-Umuahia 132kV DC line Abia 50km of 132kV Transmission line. Increase wheeling capacity to Umuahia, Abia State

4 Umuahia 2x30/40MVA, 132/33kV Substation Abia 80MVA Transformer capacity at 132kV level in Umuahia, Abia State

5 Gombe-Damaturu-Maiduguri 330kV line. Gombe, Yobe & Borno

376km of 330kV Transmission line. Increase wheeling capacity to Yobe and Borno States

6 Jos - Kafanchan 132KV D/C Line . Plateau & Kaduna

80km of 132kV Transmission line. Increase wheeling capacity to Kafachan & Environs, Kaduna State

7 2 x 30MVA 132/33KV S/S at Pankshin and Makeri Plateau 60MVA Transformer capacity at 132kV level in Makeri & Pankshin towns in Plateau State

FEDERAL MINISTRY OF POWER

Page 29: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 29

Nigeria’s Transmission Grid

Completed Transmission Projects - TCN

Completed Projects from 2011 to Date

S/N Title of Project Project Location Deliverables

8 3rd Benin - Onitsha 330KV DC Line Edo, Delta & Anambra 131km of 330kV Transmission line. Increase wheeling capacity to Onitsha & Environs, Anambra States

9 Rehabilitation of Sokoto – Talata Mafara 132KV DC line Sokoto & Zamfara Recovery of 125km of 132kV Transmission line

10 Transmission & Supply of Substation at Tamburawa Water Facility

Kano 80MVA Transformer capacity at 132kV level in Tamburawa

11 1X30 MVA 132/33 KV SS at Kwanar Dangora Kano 30MVA Transformer capacity at 132kV level in Kwanar Dangora

12 Reinforcement of Birnin Kebbi and Kumbotso Substations with 1x150MVA, 330/132kV transformer each.

Kebbi and Kano States 150MVA transformer capacity increase at 330kV level in both Birnin Kebbi and Kano

1 Kainji-New Bussa 330kV single-circuit transmission line Kainji to New Bussa in Niger State

8.6km of 330kV transmission line to link Kainji and New Bussa

FEDERAL MINISTRY OF POWER

Page 30: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 30

Nigeria’s Transmission Grid.

On-Going TCN Projects at advanced stages of Implementation

S/N

Project Description Name of Contractor Project

Location Project Total Cost

(Naira) Project Deliverables

Status of Implementation (%)

Impact of Project

1 Arochukwu 2x30/40MVA, 132/33kV substation

Omen International Ltd. Abia State 937,496,022.58 80MVA Transformer capacity at 132kV level in Arochukwu, Abia State

86% Improvement of Power supply to Arochukwu and environs and enhancement of socio-economic life of the people.

2 Mbalano-Okigwe 132kv SC line

Atlantic Engineering & Construction

Mbalano (Abia) to Okigwe (Imo)

329,754,483.86 20km of 132kV Transmission line.

100% Improvement of Power supply to Okigwe and environs and enhancement of socio-economic life of the people.

3 Okigwe 2x30/40MVA 132/33kV Substation

Union Allied Engineering Ltd.

Imo State 1,839,789,715.03 80MVA Transformer capacity at 132kV level in Okigwe, Imo State

60% Improvement of Power supply to Okigwe and environs and enhancement of socio-economic life of the people.

4 Umuahia-Ohafia 132kv SC line

Harlesden Engineering Ltd

Umuahia to Ohafia in Abia State

1,257,267,830.78 49.5km of 132kV Transmission line.

60% Improvement of Power supply to Ohafia and environs and enhancement of socio-economic life of the people.

5 Ohafia 2x30/40MVA 132/33kV substation.

Union Allied Engineering Ltd.

Abia State 1,972,613,202.90 80MVA Transformer capacity at 132kV level in Ohafia, Abia State

60% Improvement of Power supply to Ohafia and environs and enhancement of socio-economic life of the people.

6 Mbalano 2x30/40MVA 132/33kV substation.

Union Allied Engineering Ltd.

Abia State 1,409,011,316.42 80MVA Transformer capacity at 132kV level in Mbalano, Abia State

60% Improvement of Power supply to Mbalano and environs and enhancement of socio-economic life of the people.

Page 31: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 31

Nigeria’s Transmission Grid.

On-Going TCN Projects at advanced stages of Implementation

S/N Project Description Name of Contractor Project

Location Project Total Cost

(Naira) Project Deliverables

Status of Implementation

(%) Impact of Project

7 1x150MVA,330/132KV Transformer at Birnin Kebbi and Reinforcement at 330/132KV substation at Kumbotso

MBH Power Kebbi and Kano States

3,559,832,144.00 150MVA Transformer capacity at 330KV level in Birnin Kebbi

98% Improvement of Power supply to Birnin Kebbi, Kumbotso and envirohancemens and enhance ment of socio-economic activities in the areas.

8 Kainji - New Bussa 132KV DC Transmission line & 330KV SC River crossing

Dextron Engineering Ltd Kainji to New Bussa, Niger State

308,108,608.00 132kV and 330KV transmission lines to wheel more power to Nerw Bussa.

98% Improvement of Power supply to New Bussa and environs and enhancement of socio-economic life of the people.

9 Katampe-National Stadium 132kv DC line

ABB Powerlines; Energo Nigeria Ltd

FCT 2,656,115,130.98 8.4km of 132kV double-circuit underground cable and 4km of 132kV DC overhead transmission line.

55% Improvement of Power supply to the FCT.

10 Kainji 1x150MVA, 330/132KV & 2x30/40MVA substation at New Bussa

MBH Power Niger State 4,599,287,900.00 150MVA Transformer capacity in kainji, Niger State.

89% Improvement of Power supply to New Bussa and environs and enhancement of socio-economic life of the people.

11 2x60MVA, 132/33KV Substation at Odogunyan and Ayobo with 132KV DC line Ikeja west - Ayobo.

LAGA CePower Lagos State 3,657,155,630.00 120MVA Transformer capcity at 132kV level at Odogunyan and Ayobo.

89% Improvement of Power supply to Odogunyan, Ayobo and environs and improvement of socio-economic activities in the areas.

12 Ikorodu - Odogunyan - Shagamu 132KV DC Transmission line

PPCL/ Westcom JV Ikorodu to Odogunyan, Lagos State

3,192,097,186.00 132kV DC transmission line from Ikorodu to Odogunyan

52% Improvement of Power supply to Odogunyan, Shagamu and environs and improvement of socio-economic activities in the areas.

13 Damaturu 330/132kV Substation

Parsian High VoltageDiv./ Cartlark Int'l Ltd

Yobe State 2,502,960,280.52 150MVA Transformer capacity at 330kV level in Damaturu, Yobe State

80% Improvement of Power supply to Damaturu and environs and improvement of socio-economic activities in the areas.

Page 32: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 32

Nigeria’s Transmission Grid.

On-Going TCN Projects at advanced stages of Implementation

S/N Project Description Name of

Contractor Project

Location Project Total Cost

(Naira) Project Deliverables

Status of Implementati

on (%) Impact of Project

14 Nnewi 2x60 MVA 132kV substation

Valenz Holdings (Nig) Ltd.

Anambra State 735,801,070.00 120MVA Transformer capacity at 330kV level in Nnewi

65% Improvement of Power supply to Nnewi and environs and improvement of socio-economic activities in the areas.

15 Kafanchan 132kv 2 x 60mva Substation

Valenz Holding Ltd Kaduna State 1,407,774,049.57 120MVA Transformer capacity at 132kV level in Kafanchan

80% Improvement of Power supply to Kafanchan and environs and improvement of socio-economic activities in the areas.

16 Makeri - Pankshin 132KV DC Line

Mogabs Nig. Ltd Makeri to Pankshin, Plateau State

1,295,611,365.16 Rehabilitation of 122km of 132kV Transmission line.

75% Improvement of Power supply to Pankshin and environs and improvement of socio-economic activities in the areas.

17 2 x 30MVA 132/33KV S/S at Pankshin and Makeri

North China/EESE Plateau State 1,783,781,485.32 60MVA Transformer capacity at 132kV level in Makeri & Pankshin towns in Plateau State

100% Improvement of Power supply to Makeri, Pankshin and environs and improvement of socio-economic activities in the areas.

18 Kano- Walalanbe 132KV Line (Turn in and out of Dan agundi-Dakata 132KV single Cct Line) and 2 x 30/40MVA S/S at Walalambe

GIT Kano Sate 1,783,781,485.32 132kV DC Transmission line & 80MVA Transformer capacity at 132kV level in Walalambe

55% Improvement of Power supply to Kano and environs and improvement of socio-economic activities in the areas.

19 Yelwa - Yauri 2 x 30/40MVA S/S and 100KM of 33KV Line

Valenz/ Electromontaz

Kebbi State 1,242,074,910.89 100km of 33kV line & 80MVA Transformer capacity at 132kV level in Yelwa, Kebbi State

60% Improvement of Power supply to Yelwa, Yauri and environs and improvement of socio-economic activities in the areas.

20 Umuahia - Mbalano 132KV Line

Santon Energy L:td Abia State 991,759,726.68 30km of 132kV DC Transmission line.

67% Improvement of Power supply to Mbalano and environs and improvement of socio-economic activities in the areas.

21 Ohafia - Arochukwu 132KV Line

Mogabs Nig. Ltd Abia State 856,128,363.00 40km of 132kV DC Transmission line.

45% Improvement of Power supply to Arochukwu and environs and improvement of socio-economic activities in the areas.

Page 33: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 33

Nigeria’s Transmission Grid.

On-Going TCN Projects at advanced stages of Implementation

S/N Project Description Name of

Contractor Project

Location Project Total Cost

(Naira) Project Deliverables

Status of Implementati

on (%) Impact of Project

22 Kukwaba 2x60MVA, 132/33kV substation

North China Power Egnineering

FCT 2,568,846,118.51 120MVA Transformer capacity at 132kV level in Kukwaba, FCT

40% Improvement of Power supply to the FCT.

23 2x60MVA, 132KV/33 at Aboh -Mbaise S/S

Ashtavinayaka/Bran Engineering

Imo State 1,480,777,014.45 120MVA Transformer capacity at 132kV level in Aboh Mbaise in Imo State

65% Improvement of Power supply to Aboh Mbaise and environs and improvement of socio-economic activities in the areas.

24 2x60 MVA, 132/33 kV substation at Ideato and 2 x132KV Line Bays at Okigwe

Ashtavinayaka/Bran Engineering

Imo State 1,739,004,381.00 120MVA Transformer capacity at 132kV level in Ideato in Imo State

60% Improvement of Power supply toIdeato and environs and improvement of socio-economic activities in the areas.

25 2x60 MVA, 132/33 kV substation at Oba and 2 x132KV Line Bays at Nnewi

Xian/GIT Engineering Anambra State 1,863,432,339.00 120MVA Transformer capacity at 132kV level in Oba.

45% Improvement of Power supply to Oba and environs and improvement of socio-economic activities in the areas.

26 Oshogbo- Ede 132KV DC Line

Aster Infrast/Aster Teleservices

Osun State 1,490,085,721.56 15km of 132kV DC transmission line

53% Improvement of Power supply to Ede and environs and improvement of socio-economic activities in the areas.

27 DC 132kV line from Alscon to Ibom Power and Switching Station to link the GIS at Alscon with associated bay extensions at Ibom Power - Akwa Ibom State

KEC International Limited

Akwa Ibom State

747,246,322.01 2.5km of 132kV DC Transmission line and 150km of 132kV DC underground Cable

45% Improvement of Power supply to Akwa Ibom State and improvement of socio-economiclife of the people.

28 Reconductoring of Afam-Port Harcourt 132kV line

Electrical Solutions Ltd Ricers State 290,000,000.00 Rehabilitation of 37.8km of 132kV Transmission line with increased wheeling capacity

100% Improvement of Power supply to Port Harcourt and environs and improvement of socio-economic activities in the areas.

FEDERAL MINISTRY OF POWER

Page 34: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Nigeria’s Transmission Grid NIPP Completed Transmission Projects

LOT 10-B (Charnel/AkAy 150MVA 330/132kV Katampe SS (Extension) in full service

LOT 11-B (Charnel/AkAy 150MVA 330/132kV Ikeja West SS (Extension) in full service

34 FEDERAL MINISTRY OF POWER

Page 35: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Distribution Activities

35

To ensure availability of un-interrupted power supply to

the consumers, this administration executed various

distribution projects (maintenance/expansion) across the

country through the eleven (11) Electricity Distribution

Companies (DisCos)

FEDERAL MINISTRY OF POWER

Page 36: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

NIPP Completed Distribution Projects

36

• Abuja Zone –

- ABUJA - AIRPORT 33KV DC LINE

- APO 1 X 15MVA INJECTION S/S TRANSFORMER

• Benin Zone –

- IHOVBOR 2 X 2.5MVA INJECTION S/S TRANSFORMER

- AKURE Main 1x15mva INJECTION TRANSFORMER

• Eko –

- NEW IDUMAGBO 1 X 15MVA INJECTION S/S TRANSFORMER

- Beckely 1 X 15mva Injection S/S Transformer

- Alagbon 1 X 15mva Injection S/S Transformer

- Fowler 1 X 15mva Injection S/S Transformer

- Apapa Road 1 X 15mva Injection S/S Transformer

- Nitel 1 X 15mva Injection S/S Transformer

- Tincan 1 X 15mva Injection S/S Transformer

- Agbara 1 X 15mva Injection S/S Transformer

- Ajangbadi 1 X 15mva Injection S/S Transformer

• Ibadan Zone

- Akobo 1 X 15mva Injection S/S Transformer

- Awe - Oyo 1 X 7.5mva Injection S/S Transformer

- Samanda 1 X 15mva Injection S/S Transformer

- Apata 1 X 15mva Injection S/S Transformer

- Ikiru Road 1 X 15mva Injection S/S Transformer

-Tinumola 1 X 7.5mva Injection S/S Transformer

FEDERAL MINISTRY OF POWER

Page 37: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

NIPP Completed Distribution Projects contd.

37

• Ikeja - IPAKODO 1 X 15MVA INJECTION S/S TRANSFORMER - IJEDE 1 X 15MVA INJECTION S/S TRANSFORMER - AGBOWA 1 X 15MVA INJECTION S/S TRANSFORMER - OWUTU 1 X 15MVA INJECTION S/S TRANSFORMER - IMOTA 1 X 15MVA INJECTION S/S TRANSFORMER - MAGODO 1 X 15MVA INJECTION S/S TRANSFORMER • Kaduna - ZAMBIAN CRESCENT 1 X 2.5MVA INJECTION S/S TRANSFORMER - KAGORO 1 X 7.5MVA INJECTION S/S TRANSFORMER - NARAYI 2 X 2.5MVA INJECTION S/S TRANSFORMER • Jos - PANKSHIN 1 X 7.5MVA INJECTION S/S TRANSFORMER - SHENDAM 1 X 7.5MVA INJECTION S/S TRANSFORMER - COMPLETED INJECTION S/S = 31 - CAPACITY = 492.5 MVA - COMPLETED CSP TRANSFORMERS = 2514 - COMPLETED 11KV LINES = 1221KM, 33KV = 230KM

FEDERAL MINISTRY OF POWER

Page 38: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 38

DisCos Completed Distribution Projects

ENUGU ELECTRICITY DISTRIBUTION COMPANY

PROJECTS COMPLETED FROM 2011 TO DATE

DisCos Installed Transformer Capacity from 2011 to date

S/N Description Year

2011 2012 2013 (as at 31st May)

1 33/11KV Injection Substation (MVA) 959.75 974.75 1,083.50

2 33/0.415KV Distribution Substation (MVA)

972.67 1,028.62 1,047.32

3 11/0.415KV Distribution Substation (MVA)

1,600.99 1,657.84 1,680.74

ENUGU ELECTRICITY DISTRIBUTION COMPANY

PROJECTS COMPLETED FROM 2011 TO DATE

DisCos Installed 33KV and 11KV Overhead Lines from 2011 to date

S/N Description

Year

2011 2012 2013 (as at 31st

May)

1 33KV Overhead lines (Km) 6,596.50 6,651.95 6,924.80

2 11KV Overhead lines (Km) 3,464.80 3,504.00 3,522.90

FEDERAL MINISTRY OF POWER

Page 39: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

SOME COMPLETED INJECTION SUBSTATION & SWITCH YARD in 2012

39

DisCos Completed Distribution Projects contd. Ikeja DisCo

FEDERAL MINISTRY OF POWER

Page 40: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 40

REA was reactivated in June, 2012, to improve rural access to electricity.

The Ministry has developed a draft REA Strategy and Implementation Plan

and it is being finalized.

REA will focus on increased exploitation of renewables and the facilitation

of rural electrification projects.

The Agency carried out Survey, Design, Procurement and Award of

several rural electrification projects under 2012 capital appropriation.

Rural Electrification Agency (REA)

FEDERAL MINISTRY OF POWER

Page 41: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

The Reform Process : Progress So Far

The Electric Power Sector Reform (EPSR) Act of 2005 provided the platform for the reform of deregulating the Nigerian Electricity Supply Industry (NESI) from the control, ownership and regulation of the sector by the Federal government to a private sector-driven industry. The launching of the Roadmap by Mr. President in August 2010 has led to significant progress in the implementation of the structural reforms outlined in the Act. The major achievements to date are as follows: i. Bidding and selection of preferred bidders for the 10 Distribution Companies

and the 5 Generation Companies was concluded in November 2012, contracts have been signed and bidders have already made initial payments of 25% of the bid price.

ii. Presidential Power Reform Transaction signing and presentation of certificates for payments of initial deposits to successful bidders of the DisCos and GenCos by Mr. President was performed on 22nd April, 2013.

iii. Handing over of TCN to Manitoba Hydro International for management contract concluded. Schedule of Delegated Authority (SODA) give to Manitoba

41 FEDERAL MINISTRY OF POWER

Page 42: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

The Reform Process : Progress So Far contd.

iv. The Nigerian Electricity Regulatory Commission (NERC) has been reconstituted, strengthened and now is fully operational.

v. NERC launched MYTO 2 cost-reflective tariff in June, 2012, which is now operational.

vi. Nigeria Bulk Electricity Trading (NBET) PLC was incorporated in July, 2010 and is now in operation as a credit-worthy off - taker.

vii. The Nigeria Electricity Liability Management Company (NELMCO) was established in 2010 to assume and manage the assets, liabilities and other obligations that could not be earlier transferred from PHCN to any successor company

viii. Resolution of Labour issues is almost completed and payment of severance package to commence this week.

ix. Investor confidence evidenced by increased investment and signing of MoUs. Most recent being the MoU signed with Power China Corporation to develop 20,000 MW of Thermal Power Plants with associated substations and transmission lines up to 10,000 km

x. Sale of Ten (10) power plants built by the Niger Delta Power Holding Company Ltd commenced with road-shows in Lagos, London, Hong Kong and New York.

42 FEDERAL MINISTRY OF POWER

Page 43: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

The Reform Process : Progress So Far contd.

43 FEDERAL MINISTRY OF POWER

Page 44: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

The Reform Process : Progress So Far

iv. T

44

His Excellency, the Vice President , Arc. Namadi Sambo presenting certificates to one of the Core investors in the on-going privatisation of the Power Sector.

FEDERAL MINISTRY OF POWER

Page 45: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Reform Process:

Resolution of all labour issues

Seated from the left: The Honourable Minister of State for Finance, Yerima Ngama; Honourable Minister of State for Power, Hajiya Zainab Ibrahim Kuchi; Honourable Minister of Labour and Productivity, Emeka Wogu together with Labour Union in the sector.

45 FEDERAL MINISTRY OF POWER

Page 46: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 46

A robust Nigeria Electricity Supply Industry requires a well-trained work force. Hence, strategies have been put in place to improve the competences of the existing work force through skill enhancement and professional development programmes. Part of these strategies include the establishment of the National Power Training Institute of Nigeria (NAPTIN) to ensure that the human capital needs of the sector are met. Key achievements include:

1. Rehabilitated six(6) existing Regional Training Centres (RTC) inherited from PHCN and building of 2 new ultra-modern training centres in Jos and Kano

2. Commenced intensive training of 1,000 graduate engineers (Graduate Skill Development Program)

3. Trained 70 engineers across the power sector on renewable energy options (solar, wind + hybrid)

4. Commissioned Power System Training Simulator at Ijora RTC in October, 2012

Capacity Building

National Power Training Institute (NAPTIN)

FEDERAL MINISTRY OF POWER

Page 47: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 47

5. Laid foundation for the development of NAPTIN’s permanent site at Idu Industrial Layout, Abuja in October 2012

6. Completed rehabilitation of mechanical workshop at Ijora Regional Training Center (RTC), Lagos.

7. Installed / commissioned NAPTIN’s e-Learning platform in December, 2012

8. Installed / commissioned renewable hybrid solar PV + wind demonstration plants at Kainji RTC in November 2012

9. Completed Faculty profiling and curriculum development in December, 2012

10.Signed MoU with PNN Nigeria Limited (an indigenous renewable energy company) on the Training of 1,500 youths on installation and maintenance of solar PVs

11.Developed and commissioned 60 and 36-room executive hostel / guest house for trainees at Kainji and Akangba RTCs respectively.

12.Trained about 5,340 professionals to date since inception

Capacity Building National Power Training Institute (NAPTIN)

FEDERAL MINISTRY OF POWER

Page 48: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Capacity Building

National Power Training Institute (NAPTIN)

Various Projects Completed and Commissioned by NAPTIN in 2012

ENGINEERING LABORATORY ,

KAINJI

Electric Power System Simulator, Ijora

MECHANICAL WORKSHOP,

NAPTIN RTC IJORA

EXECUTIVE HOSTEL AT

AKANGBA RTC

Electric Power System Simulator, Ijora

EXECUTIVE HOSTEL AT

AKANGBA RTC

48 FEDERAL MINISTRY OF POWER

Page 49: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Capacity Building

National Power Training Institute (NAPTIN)

49

Various Training Courses Organized In 2012 Covering Technical And Administrative Skills

Scheduled Training Undertaken

FEDERAL MINISTRY OF POWER

Page 50: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 50

Stakeholder Engagements

• Nigeria/Niger Joint Commission Meetings in Abuja & Niamey. • West African Power Pool Meetings. • ECREEE meeting at Cape Verde. • Engagements with Investors from international countries • Meetings with Development Partners. • Meetings with Manitoba Hydro International of Canada. • Meeting with AfDB, World Bank, JICA, EU, GIZ, USAID, USTDA, DFID, UNIDO, NAIF

etc. • Meeting with BOI on MoU for financial services for Public Private Partnership. • Bilateral Meetings with Reps of various countries on power sector development

(Sweden, Germany, Italy etc.) • Engagements with private investors (including FDI’s) in power sector • MYTO II tariff consultation with stakeholders • As part of advocacy, the Ministry had working visits and consultations with

traditional rulers.

FEDERAL MINISTRY OF POWER

Page 51: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Stakeholders Engagements

As part of advocacy visits, HMP on working visit to the HRH. Emir of Zazzau, Alh. Shehu Idiris.

Tariff consultation with Oba of Lagos in May 2012

FEDERAL MINISTRY OF POWER 51

Page 52: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

52

Stakeholders Engagements

From left: Vice Chairman Senate Committee on Power, Sen. Chris Ngige; Chairman, Sen. Philip Aduda; HMP, Prof. Chinedu Nebo; HMSP, Hajiya Zainab Ibrahim Kuchi; Permanent Secretary Ministry of Power, Amb. Godknows Igali, during Senate committee on Power’s visit to the Ministry.

FEDERAL MINISTRY OF POWER

Page 53: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Summary of Key Output/Achievements

53 FEDERAL MINISTRY OF POWER

Page 54: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Record Peak Generation of 4,517.6MW . Record Average Energy Sent Out of 4,028.85MWh/h

Key Output/Achievements.

Generation

54 FEDERAL MINISTRY OF POWER

Page 55: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 55

8,4979,9209,097

2012-2013 2011 2010

Installed Generation Capacity MW

5,5636,522

3,700

2010 2011 2012-2013

Available Generation Capacity MW

Page 56: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 56

Key Output/Achievements.

Transmission

TCN Installed Transformer Capacity (MVA) at 330 and 132kV Transmission Voltage Levels

0

2000

4000

6000

8000

10000

12000

2007 2008 2009 2010 2011 2012

MVA @330/132kV

MVA @132/33kV

Volt Level 2007 2008 2009 2010 2011 2012 2013

MVA @330/132kV

6,098 6,398 6848 7,688 8,138 8,686 Being Up-

Dated MVA @132/33kV

8,244 8,350 8,590 9,130 9,800 10,792

FEDERAL MINISTRY OF POWER

Page 57: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

3,640

4,527

2,800

2010 2011 2012

Transmission Wheeling Capacity (MW)

Transmission Wheeling Capacity (MW)

Page 58: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

NIPP TCN TOTAL

58

Summary of deliverables of completed

Transmission line Projects from 2011 to date

FEDERAL MINISTRY OF POWER

Substation

capacity (MVA)

Transmission

line coverage

(Km.)

850 3,220 MVA

780.6 1,045.6 Km

2,370

274

Page 59: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Power Distribution Capacity at

33/11kV (MVA)

Abuja: 568 633 Benin: 529 625 Eko: 844 1019 Enugu: 668 757 Ibadan: 960 1057 Ikeja: 935 1058 Jos: 397 448 Kaduna: 368 390 Kano: 397 483 P/H: 550 681 Yola: 144 174

Disco YR 2011

Total 6,360 7,325

YR 2012

MVA MVA

59

Key Output/Achievements.

Distribution

FEDERAL MINISTRY OF POWER

Page 60: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 60

8

16

12

Average no of hours of power availability per day

2012 2011 2010

Average No of Hours of Power availability per day

Page 61: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Transmission

Distribution

▪ 5515MW

▪ 12%

▪ 6360 MW

▪ N151 Billion

▪ 6870MW

▪ 12%

▪ 7325 MW

▪ N189 Billion

Generation ▪ 9,097MW ▪ 5,563MW ▪ 4,089 MW ▪ 27,692MWH

▪ 9,920MW ▪ 6,522MW ▪ 4,517 MW ▪ 29,196MWH

▪ Installed Capacity ▪ Available Capacity ▪ Record Peak Generation ▪ Average Energy Delivered

▪ Transmission capacity (nominal)

▪ Technical losses

▪ Distribution capacity (nominal)

▪ Total Revenue Collection from the Market

Sector

Reforms

• All power reform institutions are established and in operation

• FGN/Labour signed agreement and its implementation is at advanced stage

• Privatization of 10 DisCos and 5 GenCos at advanced stage

• TCN management has been handed over to Management Contractors

(Manitoba of Canada) and TCN Board Inaugurated.

Target Metric 2011 May, 2013

61

Key Output/Achievements

FEDERAL MINISTRY OF POWER

Page 62: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Projection for 2013 and beyond

62 FEDERAL MINISTRY OF POWER

Page 63: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Going forward, the Ministry will pursue vigorously the following:

• Restructuring of Ministry of Power and its Agencies to cope with the evolving role in a privatised environment.

• Private Investment - including Foreign Direct Investments (FDI) in

the Power sector (IPPs, distribution, renewable energy & capacity building)

• Transmission Grid Expansion (Super Grid)

• Develop framework for alternative funding of transmission projects that will allow recovery of investments.

• Renewable Energy Resource Development .

• Electricity Market Development.

• Effective Monitoring & Evaluation.

Focus in 2013 and beyond

FEDERAL MINISTRY OF POWER

Page 64: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

• Conclusion of labour-related issues. • Develop Local Content framework in the power sector.

• Promoting Energy Efficiency and Conservation.

• Collaborate with other agencies to check vandalisation of

power infrastructure.

• Improving rural access to electricity.

• Divestment of NIPP sales now at bidding stage (EoI bid submission closed July 19, 2013).

• Conclude privatisation process by the end of 2013.

Focus in 2013 and beyond contd.

FEDERAL MINISTRY OF POWER

Page 65: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Focus in 2013 and beyond contd.

• Development of the major coal fields as this will contribute between 3000 - 4000 MW power to the National grid towards improving energy mix and security of supply when implemented.

• Establishment of National Council on Power to harmonize the activities of different

players: Federal Government, State Governments, Local Governments etc. for effective coordination of efforts in the Power Sector.

• The Ministry will leverage on the abundant Renewable Energy sources in the country which are environmentally friendly to increase power generation and guarantee security of supply.

• Graduate Trainee programme aimed at producing personnel equipped with the basic skills required in the Power Sector.

• The Ministry will consolidate the gains in the previous years performance and improve availability of power supply between 16 – 24 hours per day for Nigerians.

FEDERAL MINISTRY OF POWER

Page 66: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Future Plan for Transmission Expansion

(330kV and Super Grid Networks)

ONITSHA

KAINJI

JEBBA/GS

JEBBA/TS

SHIRORO

AJAOKUTA

Abeokuta

Ikeja

Akure

Benin

Asaba

Port Harcourt

Owerri

Uyo

ALAGBADO

Birnin Kebbi

Minna

Kaduna

Abuja

Jos

Bauchi

Gombe

Damaturu

Maiduguri Kano

IIorin

Ado Ekiti

Lokoja

Lafia

Makurdi

MAKURDI

Enugu Akwa

Umuahia

Ibadan

Sokoto

Gusau

Katsina

Hadejia

Jalingo

Yola

Abakaliki

Calabar

JIGAWA

KANO

KATSINA

SOKOTO

ZAMFARA

KEBBI

KWARA

KADUNA

ABUJA

NIGER

NASSARAWA

TARABA

YOBE

PLATEAU

BENUE

EBONYI

CROSS RIVER

AN AMBRA

OSUN

BAYELSA

KOGI

EDO

ABIA

RIVERS DELTA

ONDO

OYO

ENUGU

IMO

ADAMAWA

BORNO

GOMBE

BAUCHI

EKITI

LAGOS

AKWA IBOM

ATLANTIC OCEAN

NIGER

REPUBLIC

OF BENIN

REPUBLIC

OF CAMEROON

REPUBLIC

OF

CHAD

TRANSMISSION LINE LEGEND

BULK SUPPLY POINT

HYDROELECTRIC POWER STATION

THERMAL POWER STATIONS

330 kV

H

SAPELE P/ST.

DELTA POWER ST.

OGUN

Osogbo

EGBIN P/ST.

NIGERIA

Potiskum

Niamey

132 kV

2

3

2

3

4

2

2

Aliade

Mambila

Bali

2

AFAM POWER ST.

2

2

330kV LINES – MULTIPLE CIRCUITS

330kV LINES - EXISTING

2

2

2005 : new

2

2015 : new

2015 : new

2015 : new

2015 :

3rd Circuit

2010 : new

2015 : new

2010: new

2

2

4 2015 : new

SAPELE

P/ST.

Okitipupa

Geregu

2015 : 2nd Circuit

Agip

Zaria

2015 : new

2015 : new

2015 : new

2015 : new

700kV LINES – SUPER GRID

700 / 330kV SUBSTATION

Mambila Hydro

66 FEDERAL MINISTRY OF POWER

Page 67: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

•General Electric

•Siemens AG

•Daewoo E&C

•Electrobras

•EDF/ETDE

•Power China Corp.

Investors from all over the world have shown commitment and keen interest in Nigeria’s Power sector owing to the clearly defined programme set out by its government

-Asia (China, India, South Korea) -Europe (Germany, Nordic Countries, UK) -North America (United States, Canada) -Africa (South Africa) -South America (Brazil)

These companies have all signed Memorandum of

Understanding with the Nigerian Government to support

Power Projects with a new approach of providing equity in

the investment

Focus on Partnerships & Investment

Activities in 2013

67 FEDERAL MINISTRY OF POWER

Page 68: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER 68

Conclusion

The Power Sector has recorded appreciable improvement in power delivery in the period under review despite daunting challenges. The Ministry will intensify effort in the implementation of the Roadmap and will ensure completion of key projects/programmes with renewed vigour in 2013 and beyond. Consequently, we seek continuous support and understanding from our numerous stakeholders. The Ministry is committed to ensuring that improved service delivery level is maintained during and after the transition to private ownership of the GenCos and DisCos. The Ministry wishes to express its profound gratitude to the Hon. Minister of Petroleum Resources for working assiduously to provide the thermal plants with adequate gas We also thank the Hon. Minister of Information for providing the platform to present our sectoral achievements over the past two years. The Power Sector revolution will unleash Nigeria into her new season of peace, progress, prosperity and development.

FEDERAL MINISTRY OF POWER

Page 69: MP2013: Presented by the Federal Ministry of Power

FEDERAL MINISTRY OF POWER

Lighting up

Nigeria 24/7

Thank You

69 FEDERAL MINISTRY OF POWER