Sl No Name & Location of the work Estimated Cost (in lakhs) Stage of the Work IMPLEMENTING AGENCY Amount Released to IA Balance If Any Type of works 1 2 3 4 5 6 7 8 1 Providing cement concerte pavement from Bandappa's house to Somashettihalli halli Road at Kereguddahalli village, Bangalore North Taluk, Bangalore Dist. 4.50 work completed EE, PRED, Bangalore 4.50 0.00 Road 2 Construction of RCC Drain from Kereguddahalli Village, to Bandappa's Garden at Bangalore North Taluk, Bangalore District. 7.99 work completed EE, PRED, Bangalore 7.99 0.00 Road 3 Providing concerte Road at Ganigarahalli Village, Somashetty halli Grama Panchayath, Bangalore North Taluk, Bangalore District. 8.00 work completed EE, PRED, Bangalore 8.00 0.00 Road 4 Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist. 8.00 work completed EE, PRED, Bangalore 8.00 0.00 Road 5 Providing concrete road at chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmipuram, Bangalore North, Bangalore Dist 8.00 work completed EE, PRED, Bangalore 8.00 0.00 Road 6 Providing concrete road - stage 1, at Hosahalli village, Jala hobli, Bangalore North, Bangalore Dist 8.00 work completed EE, PRED, Bangalore 8.00 0.00 Road 7 Providing concrete road at Kodagalahatti village, Jala hobli, Bangalore North, Bangalore Dist 8.00 work completed EE, PRED, Bangalore 8.00 0.00 Road 8 Improvement to the road that joins Tharahunase to Bettenahalli in Jala hobli, Bangalore urban district 10.00 work completed EE, PRED, Bangalore 10.00 0.00 Road 9 Improving the road that joins Marenahalli, Jala hobli 4.00 work completed EE, PRED, Bangalore 4.00 0.00 Road 10 Providing cement concrete road at 17th ward, 4th Cross, Vrushabhavti Nagar,N.G.O colony, Bangalore. ( Stage 1) 3.49 work completed EE, PRED, Bangalore 3.49 0.00 Road 11 Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2) 7.10 work completed EE, PRED, Bangalore 7.10 0.00 Road 12 Providing cement concrete road and drainage from Narayanappa's house to Munimuttappa's house and Chikka Kempanna's house to Doddayya's house in Chagalatti, Jala hobli, Bangalore district. 8.00 work completed EE, PRED, Bangalore 8.00 0.00 Road 13 Building of community hall for Margadarshi Mahila Samaaja (R) at No.114, 6th cross, Narasipura layout, Vidyaranyapura, Bangalore 1.00 work completed Project Manager, Nirmithi Kendra Urban 1.00 0.00 Civic Amenities 14 Construction of Size Stone masonery Drain at first main road near School in kamala nagar, Bangalore urban District. Stage-1 5.00 work completed EE, PRED, Bangalore 5.00 0.00 Road 15 Construction of Size Stone masonery Drain first main road near Deenaseva School in kamala nagar, Bangalore urban District. 5.00 work completed EE, PRED, Bangalore 5.00 0.00 Road 16 Improvement of asphalt to roads swaranappa layout at Bhuvaneshwaranagar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1 8.00 work completed EE, PRED, Bangalore 8.00 0.00 Road 17 Improvement of asphalt to roads swaranappa layout at Bhuvaneshwaranagar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd 8.00 work completed EE, PRED, Bangalore 8.00 0.00 Road Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District. Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2009-10

Upload: citizen-matters

Post on 20-Jan-2016

64 views

Category:

Documents


0 download

DESCRIPTION

MPLADS DB Chandregowda 2014-2009

TRANSCRIPT

Page 1: MPLADS DB Chandregowda 2014-2009

Sl No Name & Location of the workEstimated Cost (in lakhs)

Stage of the WorkIMPLEMENTING AGENCY

Amount Released to IA

Balance If Any

Type of works

1 2 3 4 5 6 7 8

1

Providing cement concerte pavement from Bandappa's house to Somashettihalli halli Road at Kereguddahalli village, Bangalore North Taluk,Bangalore Dist.

4.50 work completedEE, PRED, Bangalore

4.50 0.00 Road

2 Construction of RCC Drain from Kereguddahalli Village, to Bandappa's Garden at Bangalore North Taluk, Bangalore District.

7.99 work completedEE, PRED, Bangalore

7.99 0.00 Road

3 Providing concerte Road at Ganigarahalli Village, Somashetty halli Grama Panchayath, Bangalore North Taluk, Bangalore District.

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

4Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist.

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

5Providing concrete road at chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmipuram, Bangalore North, Bangalore Dist

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

6Providing concrete road - stage 1, at Hosahalli village, Jala hobli, Bangalore North, Bangalore Dist

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

7Providing concrete road at Kodagalahatti village, Jala hobli, Bangalore North, Bangalore Dist

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

8Improvement to the road that joins Tharahunase to Bettenahalli in Jala hobli, Bangalore urban district

10.00 work completedEE, PRED, Bangalore

10.00 0.00 Road

9Improving the road that joins Marenahalli, Jala hobli

4.00 work completedEE, PRED, Bangalore

4.00 0.00 Road

10Providing cement concrete road at 17th ward, 4th Cross, Vrushabhavti Nagar,N.G.O colony,Bangalore. ( Stage 1)

3.49 work completedEE, PRED, Bangalore

3.49 0.00 Road

11Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2)

7.10 work completedEE, PRED, Bangalore

7.10 0.00 Road

12Providing cement concrete road and drainage from Narayanappa's house to Munimuttappa's house and Chikka Kempanna's house to Doddayya's house in Chagalatti, Jala hobli, Bangalore district.

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

13Building of community hall for Margadarshi Mahila Samaaja (R) at No.114, 6th cross, Narasipura layout, Vidyaranyapura, Bangalore

1.00 work completed

Project Manager, Nirmithi Kendra Urban

1.00 0.00Civic Amenities

14Construction of Size Stone masonery Drain at first main road near School in kamala nagar, Bangalore urban District. Stage-1

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

15 Construction of Size Stone masonery Drain first main road near Deenaseva School in kamala nagar, Bangalore urban District.

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

16Improvement of asphalt to roads swaranappa layout at Bhuvaneshwaranagar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

17Improvement of asphalt to roads swaranappa layout at Bhuvaneshwaranagar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.

Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2009-10

Page 2: MPLADS DB Chandregowda 2014-2009

18Building concrete road from Narasimha Murthy's house to Philomina school in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

19

Building concrete road from Rangaswamy's house to Muneshwara temple in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

20

Building concrete road from Shivalingayya's house to Krishnappa's house in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

21

Building concrete road from Shankara's house to Muneshwar temple in Nanjappa Layout, vighneshwara Nagar, Herohalli, BBMP ward no. 72, in Yashwanthpur Assembly constituency Bangalore North

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

22 Building cement concrete road from Palakamma Nagara main road to Nagaraju's house in Chikkajaga village, Bangalore North

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

23Road development work from Bagalur main road to towards hosahalli (500 meters) Bangalore north talluk, vidya nagara

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

24Cement concrete road from Chikkabasavaraju home to Bhimarao home, Bangalore north talluk, uttanahalli vilage

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

25Cement concrete road from Venkoba rao home to Aanjanappa home, Bangalore North Talluk Sonnappanahalli grama panchayath, Kaadigaanahalli village

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

26Cement concrete road from Rajanna home to Sampangappa home, Kaadigaanahalli village

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

27Cement concrete road from Main road to Minchappa home, Bangalore North talluk, Uttanahalli Village

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

28Cement concrete road from Muniraju home to Krishnappa home, Bangalore North Talluk, Uttanahalli Village

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

29Cement concrete road from Palakammanagara Patil home to Krishnappa home, Bangalore North Talluk, Chikkajala Talluk

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

30 Road Development work from Bagaluru Main road to Hosahalli side (500-1000 meters), Vidya Nagar, Bangalore North Talluk

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

31Cement concrete road, Behind Mutyalamma Temple, Doddajala village, Bangalore north Talluk

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

194.08 194.08 0.00

Released from Govt. of India

Amount Released

to IABalance

EE PRED 193.08 193.08 0.00

Nirmithi Kendra 1.00 1.00 0.00

Other DC's 0.00 0.00 0.00194.08 194.08 0.00

Administrative sanction

200.00

Page 3: MPLADS DB Chandregowda 2014-2009

YearSl No Name & Location of the work

Estimated Cost (in lakhs)

Stage of the WorkIMPLIMENTING

AGENCY

Amount Released

to IA

Balance If Any

Type of works

1 2 3 4 5 6 7 8

2009-20101

Providing cement concerte payment from Bandrappa's house to samashitti halli Road at Kenigadda halli village, Bangalore North Taluk,Bangalore Dist.

4.50 work completedEE, PRED, Bangalore

4.50 0.00 Road

2009-20102

Construction of RCC Drain from Kiveguddahalli Village, to Banmddappa's Garden at Bangalore North Taluk, Bangalore District.

7.99 work completedEE, PRED, Bangalore

7.99 0.00 Road

2009-20103

Providing concerte Road at Ganigarahalli Village, Samashutty halli Grama Panchayath, Bangalore North Taluk, Bangalore District.

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

2009-20104

Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist.

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

2009-20105

Providing concerete to roadrata chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

2009-20106

Cement concrete road construstion work stage -1, Hosahalli village, Jaalahalli Hoobli, Bangalore North Talluk

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

2009-20107

Cement concrete road construction work, Kodagalahatti Village, Jalahalli Hobli8.00 work completed

EE, PRED, Bangalore

8.00 0.00 Road

2009-20108

Road Development work, from Tarahunase to Bettenahalli village joining road, Jaalahalli Hobli10.00 work completed

EE, PRED, Bangalore

10.00 0.00 Road

2009-20109

Road Development work, Marenahalli Joining road, Jaalahalli Hobli4.00 work completed

EE, PRED, Bangalore

4.00 0.00 Road

2009-201010 Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti Nagar,N.G.O colony,

Bangalore. ( Stage 1)3.49 work completed

EE, PRED, Bangalore

3.49 0.00 Road

2009-201011

Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2)

7.10 work completedEE, PRED, Bangalore

7.10 0.00 Road

2009-201012 Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa

home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli8.00 work completed

EE, PRED, Bangalore

8.00 0.00 Road

2009-2010

13Community hall construction for Margadarshi Mahila Samaja ® , No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore

1.00 work completed

Project Manager,

Nirmithi Kendra Urban

1.00 0.00Civic

Amenities

2009-201014

Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

2009-201015

Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

2009-201016

Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

2009-201017

Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

2009-201018

Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

2009-201019

Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

2009-201020

Concrete Road Construction work from Shivalingayya home to Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

Page 4: MPLADS DB Chandregowda 2014-2009

2009-201021

Concrete Road Construction work from Shankara Home to Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72

8.00 work completedEE, PRED, Bangalore

8.00 0.00 Road

2009-201022

Road development chain 0-500, from Vidya Nagara Main road to Hosahalli village side, Bangalore North Talluk

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

2009-201023

Cement Concrete road from ChikkaBasavaraju Home to Bhimarav road, Uttanahalli Village, Bangalore North Talluk

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

2009-201024

Cement Concrete Road from Venkobarao home to Anjanappa home, Sonnappanahalli Village, Bangalore North Talluk

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

2009-201025

Cement Concrete Road from Rajanna Home to Sampangappa Home, Kadiganahalli Village5.00 work completed

EE, PRED, Bangalore

5.00 0.00 Road

2009-201026

Cement Concrete Road from Main road to Virajappa Home, Ukkenahalli village, Bangalore North Talluk

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

2009-201027

Cement Concrete road from Muniraju home to Krishnappa home, Uttanahalli Village, Bangalore North Talluk

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

2009-201028

Cement concrete road till Palakammanagara Home, Chikkajaga village, Bangalore North Talluk5.00 work completed

EE, PRED, Bangalore

5.00 0.00 Road

2009-201029

Road development work (500-1000 meter) Bangalore North Talluk, Vidyanagara, Bagaluru Mairn road to Hosahali village

5.00 work completedEE, PRED, Bangalore

5.00 0.00 Road

2009-201030

Cement concrete road behind Mutyalamma temple, Doddajaala, Bangalore North Talluk5.00 work completed

EE, PRED, Bangalore

5.00 0.00 Road

189.08 189.08 0.00

Released from Govt. of India

Amount Released

to IABalance

EE PRED 188.08 188.08 0.00

Nirmithi Kendra 1.00 1.00 0.00 188.08

Other DC's 0.00 0.00 0.00189.08 189.08 0.00

Administrative sanction

200.00

Page 5: MPLADS DB Chandregowda 2014-2009

Year

Sl No Name & Location of the workEstimated

Cost (in lakhs)

Status of the WorkIMPLIMENTING

AGENCY

Amount Released to

IABalance If Any Remarks

1 2 3 4 5 6 7 8

2010-2011 1Concrete road construction work Stage -1, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 2Concrete road construction work Stage -2, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 3 Road development work Stage - 1, Malurappa mane, K.R. Pura Hobli 5.00 work completed EE PRED 5.00 0.00 Road2010-2011 4 Road development work Stage - 2, Malurappa mane, K.R. Pura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 5Road development work from Doddagollarahalli Banian tree road to Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 6Road Development work, from Doddagollarahatti Pipeline road to Govt Primary school, Yashavantapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 7Concrete Road construction work for all the (cross) subroads, Doddagollarahatti village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 8Culvert and Road development work for Doddagollarahatti (cross roads) Subroads, Yashavanthapura hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011

9Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt)

5.00 work completed EE PRED 5.00 0.00 Road

2010-2011

10Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt)

5.00 work completed EE PRED 5.00 0.00 Road

2010-2011

11Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt)

5.00 work completed EE PRED 5.00 0.00 Road

2010-2011

12Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt)

5.00 work completed EE PRED 5.00 0.00 Road

2010-2011

13Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt)

5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 14Road development work Stage - 1 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 15Road development work Stage - 2 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 16Road development work Stage - 3 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 17Road development work Stage - 4 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 18 Road construction work, MM Road, Chikkabanavara, Yashawanthapura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 19Road Construction work Stage - 1, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 20Road Construction work Stage - 2, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 21Road Construction work Stage - 3, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 22Road Construction work Stage - 4, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 23Road Construction work Stage - 5, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011

24Construction of sky light roofing for the park at Kethamaranahalli in Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore.

8.00 work completed EE PRED 8.00 0.00Civic

Amenities

2010-2011 25 One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North Talluk 1.50 work completed EE PRED 1.50 0.00 Water

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2010-11

Page 6: MPLADS DB Chandregowda 2014-2009

2010-2011

26Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side)

5.00 work completed EE PRED 5.00 0.00Civic

Amenities

2010-2011

27Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk - from Chainage 98.00 to 196.00 (left side)

5.00 work completed EE PRED 5.00 0.00Civic

Amenities

2010-2011 28Borewell digging work, Bagalahalli village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore North Talluk 1.50 work completed EE PRED 1.50 0.00 Water

2010-2011

#REF!Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011#REF!

Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh Temple main circle, K.R.Puram assembly constituency (6 Nos solar street Lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011#REF!

K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No's solar street lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011#REF!

K.R Puram Bus stand, K.R.puram railway station front gate K.R. puram assembly contituency ( 6 No's solar street lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011

#REF!Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. puram assembly contituency ( 6 No's solar street lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011#REF!

Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011#REF!

Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No's solar street lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011

#REF!Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No's solar street lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011#REF!

Dasarahalli main road, Byatarayanapura assembly constituency. (6 No's solar street lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011#REF!

Saraswathipura Main road, Byatarayanapura assembly constituency (6 No's solar street lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011#REF!

Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No's solar street lights)

4.41 work completed Nirmithi Kendra 4.41 0.00Street

lighting

2010-2011#REF! R.T. Nagar main road, Hebbal assembly constituency (2 No's solar street lights) 1.47 work completed Nirmithi Kendra 1.47 0.00

Street lighting

2010-2011 #REF!Borewell work, for Drinking water to Parimala Nagara, Nandini Layout, Mahalakshipuram ward no. 43 1.50 work completed EE PRED 1.50 0.00 Water

2010-2011

#REF! Oldage Home building construction work, Sy no.113, Shree Shankara Balaga, New Park road, Malleshwaram, Bangalore

1.00 work completed EE PRED 1.00 0.00Civic

Amenities

2010-2011 #REF!Road Development work Stage - 1, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 #REF!Road Development work Stage - 2, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 #REF!Road Development work Stage - 3, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road

2010-2011 #REF! Road Development work, from Kempapura Maruthi Nagara Mainroad, Bangalore North Talluk 5.00 work completed EE PRED 5.00 0.00 Road208.48 208.48 0.00

Released from Govt. of India

Amount Released to IA

Balance

EE PRED 158.50 158.5 0.00

Nirmithi Kendra 49.98 49.98 0.00

Other DC's 0.00 0.00 0.00

Administrative sanction

200.00

Page 7: MPLADS DB Chandregowda 2014-2009

208.48 208.48 0.00

Page 8: MPLADS DB Chandregowda 2014-2009

YearSl No Name & Location of the work

Estimated Cost (in lakhs)

Stage of the Work

IMPLIMENTING AGENCY

Amount Released to IA

Balance If Any

Type of Works

1 2 3 4 5 6 7 8

2011-20121 Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore 2.00 work completed EE PRED 2.00 0.00 Water

2011-20122

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 1st Cross

5.00 work completed EE PRED 5.00 0.00 Others

2011-20123

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 2nd Cross

5.00 work completed EE PRED 5.00 0.00 Others

2011-20124

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 3rd Cross

5.00 work completed EE PRED 5.00 0.00 Others

2011-20125

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 4th Cross

5.00 work completed EE PRED 5.00 0.00 Others

2011-20126

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 5th Cross

5.00 work completed EE PRED 5.00 0.00 Others

2011-20127

Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village, Maruthi Nagara, Dwaraka Nagara Road development work

5.00 work completed EE PRED 5.00 0.00 Road

2011-20128

Maruthi Nagara subroad (cross) road Development work5.00 work completed EE PRED 5.00 0.00 Road

2011-20129

Maruthi Nagara New Layout Road development work5.00 work completed EE PRED 5.00 0.00 Road

2011-201210

Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village BET School Road Development

5.00 work completed EE PRED 5.00 0.00 Road

2011-201211 Road Development work 1 & 2nd road, from Hesaraghatta road to Dwarakanagara,

Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-201212

Road Development work, 1st Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201213

Road Development work, 2nd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201214

Road Development work, 3rd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201215

Road development work 250-500, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli

5.00 work completed EE PRED 5.00 0.00 Road

2011-201216

Road development work 500-750, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli

5.00 work completed EE PRED 5.00 0.00 Road

2011-201217

Cement Concrete road construction work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North tAlluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201218

Cement concrete road construction work, near Ashwathkatte, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201219

Cement concrete road work, from Rajanna home to till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201220

Cement concrete road work, till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201221

Cement concrete road construction work, for Bipass road, Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201222

Borewell digging, Motor implimentation & Getting power supply form KEB, M.Hosahalli village,

5.00 under progress EE PRED 2.50 2.50 Water

2011-201223

Borewell digging, Motor implimentation & Getting power supply form KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli

5.00 under progress EE PRED 2.50 2.50 Water

2011-201224

Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli

5.00 under progress EE PRED 2.50 2.50 Water

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.

Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2011-12

Page 9: MPLADS DB Chandregowda 2014-2009

2011-201225

Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli

5.00 under progress EE PRED 2.50 2.50 Water

2011-201226

Road development work, Cross -1, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku

5.00 work completed EE PRED 5.00 0.00 Road

2011-201227

Road development work, Cross -2, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku

5.00 work completed EE PRED 5.00 0.00 Road

2011-201228

Road development work, Cross -3, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku

5.00 work completed EE PRED 5.00 0.00 Road

2011-201229

Road development work, Cross Roads, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku

5.00 work completed EE PRED 5.00 0.00 Road

2011-201230

Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201231

Road development work (0-100) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201232

Road development work (100-200) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201233

Road development work (200-300) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201234

Road development work form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201235

Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201236

Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201237

Road development work and Jalli work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201238

Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201239

Road development work and Jalli work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201240

Road development work and Jalli work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201241

Road development work and Jalli work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201242

Road development work and Jalli work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201243

Road development work and Jalli work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201244

Road development work and Jalli work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201245

Road development work and Jalli work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50 work completed EE PRED 2.50 0.00 Road

2011-201246

Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.

5.00 work completed EE PRED 5.00 0.00 Water

2011-201247

Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.

5.00 work completed EE PRED 5.00 0.00 Water

2011-201248

Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk

5.00 work completed EE PRED 5.00 0.00 Water

2011-201249

Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk

5.00 work completed EE PRED 5.00 0.00 Water

2011-201250

Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk

5.00 work completed EE PRED 5.00 0.00Civic

Amenities

Page 10: MPLADS DB Chandregowda 2014-2009

2011-201251

Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk

5.00 work completed EE PRED 5.00 0.00Civic

Amenities

2011-201252 Gutter construction work, from Acharappa home to Mahimaraju home, K.Gollahalli

Village, Kengeri Hobli3.00 work completed EE PRED 3.00 0.00

Civic Amenities

2011-201253

Road development work from Gudimavu main road to Devagere Harijana Colony, K.Gollahalli Gramapanchayath village, Bangalore south talluk

4.25 work completed EE PRED 4.25 0.00 Road

2011-201254

Road development work form Kenchanapalya village to Paadri colony, K.Gollahalli Gramapanchayath, Bangalore South Talluk

1.50 work completed EE PRED 1.50 0.00 Road

2011-201255 Pipeline implementation and Getting power supply from KEB, Maralukunte village,

Marenahalli Gramapanchayath, Jala Hobli5.00 work completed EE PRED 5.00 0.00

Civic Amenities

2011-201256 Road Development work from H.Gollahalli main road to Kabbalamma Temple,

K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-201257

Library construction, Gonipura vilage, Yashawanthapura limits5.00 work completed EE PRED 5.00 0.00

Civic Amenities

2011-201258 Women empowerment Building work (streeshakti bhavana) Gonipura village,

Yashawanthapura limits5.00 work completed EE PRED 5.00 0.00

Civic Amenities

2011-201259 Gutter construction work from Mallappa home to Narayanaswamy home,

Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk4.00 work completed EE PRED 4.00 0.00

Civic Amenities

2011-201260

Improvement and Asphalting to roads in sonnappa layout at bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage -2.

4.00 work completed EE PRED 4.00 0.00 Road

2011-201261

Improvement of Asphalting to roads in sonnappa layout at bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage -2.

4.00 work completed EE PRED 4.00 0.00 Road

2011-201262

Formation and metalling the roads of siddappa layout 1st cross, K.R.puram hobli Bangalore North Parlimentary Constituency

2.50 work completed EE PRED 2.50 0.00 Road

2011-201263

Formation and metalling the roads of siddappa layout 2st cross, K.R.puramhobli Bangalore North Parlimentary Constituency

2.50 work completed EE PRED 2.50 0.00 Road

2011-201264

Formation and metalling the roads of Motappa Layout 1st cross, K.R. Puram hobli, Bangalore north, Parliamentary constituency.

2.50 work completed EE PRED 2.50 0.00 Road

2011-201265

Formation and metalling the roads of Motappa Layout 2st cross, KR Puram hobli, Bangalore north, Parliamentary constituency.

2.50 work completed EE PRED 2.50 0.00 Road

2011-201266

Formation and metalling the roads of Motappa Layout 3rd cross, KR Puram hobli, Bangalore north, Parliamentary constituency.

2.50 work completed EE PRED 2.50 0.00 Road

2011-201267

Formation and metalling the roads of Motappa Layout 4th cross, KR Puram hobli, Bangalore north, Parliamentary constituency.

2.50 work completed EE PRED 2.50 0.00 Road

2011-201268

Chainlink Compund construction work, ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk

5.00 work completed EE PRED 5.00 0.00 Education

2011-201269

Concrete road development work, Beside ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201270

Primary School Building construction, Gonipura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore South Talluk

4.00 work completed EE PRED 4.00 0.00 Education

2011-201271 Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No. 22

Ganganagar, Bangalore North18.62 work completed Nirmithi Kendra 18.62 0.00

Civic Amenities

2011-201272 Community hall construction work Stage -1, Near Pattalamma temple, Kaggali pura

village, Uttarahalli Hobli, Bangalore South Village.5.00 work completed EE PRED 5.00 0.00

Civic Amenities

Page 11: MPLADS DB Chandregowda 2014-2009

2011-201273 Community hall construction work Stage -2, Near Pattalamma temple, Kaggali pura

village, Uttarahalli Hobli, Bangalore South Village.5.00 work completed EE PRED 5.00 0.00

Civic Amenities

2011-201274 Community hall construction work Stage -3, Near Pattalamma temple, Kaggali pura

village, Uttarahalli Hobli, Bangalore South Village.5.00 work completed EE PRED 5.00 0.00

Civic Amenities

2011-201275

Road Development work, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201276

Road Development work Stage-1, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201277

Road Development work Stage-2, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201278

Road development work, Anjeneya temple road, Veerashettihalli village, Yashawanthpura hobli, Bangalore North talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201279

Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201280

Gutter Work, From chikkaBanavara to Kempapura Road, Yashwanthpura hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201281

Gutter work, From Dwarakanagara Cross to Kodohalla, Yashwanthpura hobli, Bangalore north Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201282

Road Development work, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201283

Concret road work, from Dasappanapalya main road to Kereguddadahalli, Bangalore north talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201284

Concrete road work from Chowdeshwari layotu borewell to mini water tank, Kereguddadahalli, Bangalore north Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-201285

Road development work and jalli work Stage - 1, Siddappa layout, Kalkere village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201286

Road development work and jalli work Stage - 2, Siddappa layout, Kalkere village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201287

Road development work and Jalli work Stage - 1, Kariyappa Layout, Kalkere village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201288

Road development work and Jalli work Stage - 2, Kariyappa Layout, Kalkere village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201289

Road development work and Jalli work Stage - 1, Motappa ayout, Kalkere village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201290

Road development work and Jalli work Stage - 2, Motappa ayout, Kalkere village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201291

Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage-1

5.00 work completed EE PRED 5.00 0.00 Road

2011-201292

Formation of concrete road Development near Sri.Anjaneya swamy temple, Tippur village K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 2

5.00 work completed EE PRED 5.00 0.00 Road

2011-201293

Formation of concrete rod development near sri.Anjaneya swamy temple Tippur village, K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 3

5.00 work completed EE PRED 5.00 0.00 Road

2011-201294

Road development work, Muneshwara Layout, Kalkere Village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201295

Road development work, 2nd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201296

Road development work, 3rd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201297

Road development work, 4th cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

Page 12: MPLADS DB Chandregowda 2014-2009

2011-201298

Road development work 0 - 250, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-201299

Road development work 250-500, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012100

Road development work 500 - 750, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012101

Road development work 750-1000, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012102

Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-2012103

Rock Guttor construction, Brothers colony, Chikkabanavara, Yashwanthpura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-2012104

Concrete road development work, Tirumalapura Village, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-2012105

Development work in New Layout, Banapathi nagara, GanigaraHalli village, Bangalore north Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-2012106

5th Concrete Road Development work, Maruthi Nagara, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-2012107

Concrete road development work, 6th cross, Gulbarga Slum, Newlayout, Ganigarahalli, Bangalore north Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-2012109

Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts)

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012110

Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts)

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012111

Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts)

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012112

Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts)

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012113

Improvement and metalling the road in sunny layout 1st cross in ward No. 54, Bangalore North.

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012114

Improvement and metalling the road in sunny layout 2st cross in ward No. 54, Bangalore North.

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012115

Improvement and metalling the road in sunny layout 3st cross in ward No. 54, Bangalore North.

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012116

Improvement and metalling the road in sunny layout 4st cross in ward No. 54, Bangalore North.

2.50 work completed EE PRED 2.50 0.00 Road

2011-2012117 Improvement and metalling the roads from channasandra main road to NRI layout,

in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)2.50 work completed EE PRED 2.50 0.00 Road

2011-2012118 Improvement and metalling the roads from channasandra main road to NRI layout,

in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)2.50 work completed EE PRED 2.50 0.00 Road

2011-2012119 Improvement and metalling of roads at 1st cross Udaya layout, Kodige halli,

Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district.5.00 work completed EE PRED 5.00 0.00 Road

2011-2012120 Improvement and metalling of roads at 2nd cross, srirama layout, Kodige halli,

Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.5.00 work completed EE PRED 5.00 0.00 Road

2011-2012121 Improvement and metalling of roads at 3nd cross, srirama layout, Kodige halli,

Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.5.00 work completed EE PRED 5.00 0.00 Road

Page 13: MPLADS DB Chandregowda 2014-2009

2011-2012122

Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara, Byatarayanapura, Bangalore South Talluk

13.00 work completed EE PRED 13.00 0.00 Road

2011-2012123

Road development work, 1st cross, Ganesha Layout, Bangalore Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-2012124

Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-2012125

Road development work from 1 stage to 2nd stage Bhavani Layout, Tirumalapura Village, Yashwanthpura hobli, Bangalore north Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-2012126

Concrete road development work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-2012127 Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara

mainroad, Yashwanthpura Hobli, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-2012128 Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara

mainroad, Yashwanthpura Hobli, Bangalore north Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-2012129

4 Rooms construction work, 1st floor, Govt Higher Primary School, Chikkabanavara village

22.50 work completed EE PRED 22.50 0.00 Education

2011-2012130 To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout 2.00 work completed EE PRED 2.00 0.00 Water

2011-2012131 To dig Borewel in Amrutha Nagar 2.00 work completed EE PRED 2.00 0.00 Water

2011-2012132 Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore 10.00 work completed KRIDL 10.00 0.00

Civic Amenities

2011-2012133

Community Hall construction, Near BDA Park, Opposite VaiyalliKaval education trust, Bangalore north MP constituency

10.00 work completed EE PRED 10.00 0.00Civic

Amenities

2011-2012134

Road development work form Kempapura mainroad to Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-2012135 Road development work from Basavaraju home to Nagaraju home, Kempapura

Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk5.00 work completed EE PRED 5.00 0.00 Road

2011-2012136

Gutter work Stage - 2, Gonipura village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore South Talluk

5.00 work completed EE PRED 5.00 0.00 Road

2011-2012137

Concrete road construction work, 4th A, B, & C corss, ward no. 102, Vrushabhavathi Nagara, Vinayakanagara

10.00 work completed EE PRED 10.00 0.00 Road

2011-2012 138 2 % Administration expinditure 10.00 DC 10.00 0.00 Others624.87 614.87 10.00

Released from Govt. of India

Amount Released

to IABalance

EE PRED 596.25 586.25 10.00Nirmithi Kendra 18.62 18.62 0.00DC 10.00 10.00

TOTAL 624.87 614.87 10.00

Administrative sanctioned Accurded

580.30

Page 14: MPLADS DB Chandregowda 2014-2009

YearSl No Name & Location of the work

Estimated Cost (in lakhs)

Stage of the Work

IMPLIMENTING AGENCY

Expenditure incurred

Balance If Any

Type of works

1 2 3 4 5 6 7 8

2012-20131

Borewell digging work, Coffee Board Layout welfare association ®, Hebbala Kempapura

2.00 Under Progress EE PRED, Bangalore 0.00 2.00 Water

2012-20132

Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20133

Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20134

Road development work, from Backword community colony to Main road, Kannuru village, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20135

1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20136

3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20137 Road development work Stage - 1, Maragondanahalli village Main road to

Maragondanahalli Lake road, Channasandra Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20138 Road development work Stage -2, Maragondanahalli village Main road to

Maragondanahalli Lake road, Channasandra Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20139 Road development work, Maragondanahalli village Mainroad to

Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201310 Road development work, Cross road, Maragondanahalli village Mainroad to

Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201311

from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201312

Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, Kengeri Hobli, K.gollahalli

6.00 Completed EE PRED, Bangalore 6.00 0.00 Road

2012-201313

Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201314

Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201315

Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201316

Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201317

Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201318

Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201319

Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201320

Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201321

Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201322

Road development work, Ganesha Temple road, Dasappanapalya, ChikkaBanavara village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2012-13

Page 15: MPLADS DB Chandregowda 2014-2009

2012-201323

3 Borewell digging, Motor pump & Tank work, Ward 39, Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout,

12.00 Completed EE PRED, Bangalore 12.00 0.00 Water

2012-201324

Busstand construction, Tavarekere village, Tavarekere hobli, Bangalore South Talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00Civic

Amenities

2012-201325 CC road construction work, from Main road to till Amir saab home, Kengeri

main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201326

CC road construction work, Bank colony, Tavarekere village, Tavarekere Hobli, Bangalore south talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201327

Drinking water overhead Tank construction work, Vinayaka Nagara, Ramohalli Gramapanchayath Limits

10.00 Completed EE PRED, Bangalore 10.00 0.00 Water

2012-201328

Concrete road work, from Murugesh home to Hanumantappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk

4.90 Completed EE PRED, Bangalore 4.90 0.00 Road

2012-201329

Concrete road work, from Chennaveerayya home to Nanjappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk

4.90 Completed EE PRED, Bangalore 4.90 0.00 Road

2012-201330

Concrete road work, from Indramma home to Anganavadi, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk

4.90 Completed EE PRED, Bangalore 4.90 0.00 Road

2012-201331

1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201332

1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201333 Drinking water supply work, ChannaVenkatappa home street, Tagachaguppe

Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-201334

Concrete road work stage - 1, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201335

Concrete road work stage - 12, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201336

Orphanage home, Cultural hall construction in 3 acers of land, Shree bhavana rushi padmapeeta mahasamstana ® , Ullala, Yashwanthpura hobli, Bangalore north talluk,

5.00 Completed EE PRED, Bangalore 5.00 0.00Civic

Amenities

2012-201337

Tar road work, 790-948, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201338

Tar road work, 948-1106, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201339

Tar road work, 1106-1264, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201340

Tar road work, 1264-1422, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201341

Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201342

Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201343

Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201344

Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201345

Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201346

Road development work, 1 & 2nd cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 16: MPLADS DB Chandregowda 2014-2009

2012-201347

Road development work, 3rd &4th cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

48Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

49Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

50Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201351

Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201352

Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201353 Concrete construction work for cross roads, Maruthi Nagara, Somashettihalli

Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201354

Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201355

Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201356

Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201357

Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201358

Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201359

Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201360

Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201361

Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201362 Road development work, from Maragondanahalli mainroad lake main road

to Kachaaramma temple road, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201363

Road development work, from shivaramegowda home to MWS borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201364

Road development work, 2nd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201365

Road development work, 3rd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201366

Road development work, 4th cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 17: MPLADS DB Chandregowda 2014-2009

2012-201367

Road development work, Kannur main road to Kannuru Lake road, Hosuru, Yalahanka, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013 68 Parkinsons Agencing research foundation Indira nagar Bangalore 2.84 Completed Nirmithi Kendra 2.84 0.00 Health

2012-2013 69 2 Borewell digging work in Bhuvaneshwari Nagara layout 4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-201370

Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201371

Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201372

Road development work Stage - 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201373

Road development work Stage - 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201374

Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore

4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-2013 75 Drinking water supply to Saptagiri layout, Doddabidarakallu village 4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-201376

Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201377

Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201378

Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201379

Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201380

Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201381

Borewell digging work for drinking water, BHEL layout welfare assocation, Rajarajeshwari Nagara Bangalore

2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201382

water supplying work, Amrutha halli Mainroad to Shobha piper mart opposite, Byatarayanapura BBMP, Bangalore

2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201383

Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency

13.00 Under Progress EE PRED, Bangalore 0.00 13.00Civic

Amenities

2012-2013 84 Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward No.7 Bangalore 2.00 completed EE PRED, Bangalore 2.00 0.00 Water

2012-201385

Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree), Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south tallku

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013 86Road development work from, AK colony to Devegere village, Devagere village,

K.Gollahalli village, Kengeri Hobli, Bangalore South talluk3.00 Completed EE PRED, Bangalore 3.00 0.00 Road

2012-201387

Concrete road development work, from Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore

south Talluk1.00 Under Progress EE PRED, Bangalore 0.00 1.00 Road

2012-201388

Road development work from Main road to Ankappa home, Kalkere village, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013 89Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli

Gramapanchayath, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201390

2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, Jala Hobli

4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-2013 91Building construction for councelling center and other activities, Mahila Dakshata

samiti Bengaluru, 10.00 Completed Nirmithi Kendra 10.00 0.00

Civic Amenities

2012-201392

Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba Veerashaiva Sanhga ®

5.00 Completed EE PRED, Bangalore 5.00 0.00Civic

Amenities

2012-201393

Gutter construction road, ST colony, Dinnepalya, Kaggalipura Gramapanchayath, Uttarahalli hobli, Bangalore south talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201394

PU college building work, Janasave trust, Channenahalli, Tavarekere hobli, Bangalore south talluk

10.00 Completed EE PRED, Bangalore 10.00 0.00 Education

Page 18: MPLADS DB Chandregowda 2014-2009

2012-2013 95 1 Borewell digging, Vayunandana Layout, Bangalore north MP constituency 2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-2013 96 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village 2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-2013 97 Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk 2.50 Completed EE PRED, Bangalore 2.50 0.00 Road

2012-2013 98 Concrete road work, Turahunase Village, Jala Hobli, Bangalore north Talluk 2.50 Under Progress EE PRED, Bangalore 0.00 2.50 Road

2012-2013 991 bore digging work, ward no.6, Thanisandra, Byatarayanapura Constituency,

Bangalore2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-2013100

Road development work, Cross road, Brothers colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013101

Road development, Masjid road, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013102 Road developmentwork, from Mahalingam home to Ganganna home, Brother

colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013103 Road developmentwork, from Harish Home to Manohar home, Brother

colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013104

Road developmentwork,1st cross, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Total 505.54 482.04 23.50

Released from Govt. of India

Expenditure

incurredBalance

EE PRED 492.70 469.20 23.50Nirmithi Kendra 12.84 12.84 0.00Other DC's 0.00 0.00 0.00

TOTAL 505.54 482.04 23.50

Administrative sanctioned Accurded

500.00

Page 19: MPLADS DB Chandregowda 2014-2009

YearSl No Name & Location of the work

Estimated Cost (in lakhs)

Stage of the Work

IMPLIMENTING AGENCY

Expenditure incurred

Balance If AnyType of works

1 2 3 4 5 6 7 8

2013-2014 1 Road development work, Maruthi Nagara, Bangalore north Talluk 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-20142

Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-20143

Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-20144

Concrete work , From Main road to Yallappa home, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-20145

Road development work, from Venkataswamy home to Chikkavenkatappa home, Maruthi Nagara, Bangalore north Talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-20146

Road development work, from Ganapathi nagara Main road to Narasimhayya home, Bangalore north Talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-2014 7 Concrete Road work, Chikkabanavara village, Bangalore north Talluk, 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-2014 8 Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-2014 9 Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-2014 10 Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201411

Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201412

Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201413

Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201414

Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 15 Road development road, Sadguru Layout, Bangalore North Layout 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201416

Road development work, Main road, Shiradi Layout, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201417

Road development work, 1st cross road, Shiradi Layout, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201418

Road development work, 2nd cross road, Shiradi Layout, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 19 Road development work, Netravathi Layout, Bangalore north talluk 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 20 RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201421

1 Borewell digging work for Bagaluru village, Bagalur Gramapanchayath, Jala hobli, Bangalore north taluk

2.00 Under Progress EE PRED, Bangalore 0.00 2.00 Water

2013-201422

Road development work, Kodigehalli mainroad to borewell, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201423

Road development work, Kudalasangama Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201424

Road development work, Nanjundeshware layout Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201425

Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201426

Road development work, Commnity hall mainroad, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore (Urban) District.Name of The M.P : D.B.Chandregowda. Hon'ble M.P. Year 2013-14

Page 20: MPLADS DB Chandregowda 2014-2009

2013-201427

Road development work, Kuvempu Nagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201428 Road development work, Kodigehalli main road to Kodigehalli lake road,

Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201429

Road development work stage - 1, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201430

Road development work stage - 2, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201431

Road development work Stage - 1, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201432

Road development work , from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201433

Road development work Stage - 3, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201434

RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north Talluk,5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201435

Road development work from Lakshmipura village to Lakshmipura Janata colony, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201436

Road development work stage - 1, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201437

Road development work stage - 2, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201438

Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201439

Road developent work, From Kalkere Graveyard to Patalappa home, Kalkere village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201440

Concrete road work and road development work, Agara colony, Agara Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201441

Concrete road work and road development work, from Amrutanarayana swamy majjana bavi road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201442

Concrete road work and road development work, from Amrutanarayana swamy mountain road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201443 Student hostel constructio work, KR Puram vidhanasabha constituency, Shri

ramakrishna vivekananda sadhana kshrethra ® Bangalore north MP constituency5.00 Under Progress Nirmithi Kendra 2.50 2.50

Civic Amenities

2013-201444

Road development work, from Karubele Mainroad to Panchayath, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201445 Concrete road construction work, from K.gollahalli main road to Dairy Krishnappa

home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201446

Concrete road construction work, from Beerappa home to Papanna home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201447 Concrete road construction work, from dalappa home to gramapanchayath new

building, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201448 Cement concrete road construction work for rest of the village roads, chagalahatti

village, Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 0.00 5.00 Road

2013-201449

concrete road construction in SPG colony, Tavarekere illage, Tavarekere hobli, yashwanthpra vidhasabha constituecny, bangalore south talluk

15.00 Under Progress Nirmiti Kendra 7.50 7.50 Road

2013-201450

RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, Kodigehalli gramapanchayath, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Others

Page 21: MPLADS DB Chandregowda 2014-2009

2013-201451

Road development work, Aniketana nagara mainroad, Kodigehalli gramapanchayath, Bangalore north taluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 52 Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 53 Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn 5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201454

Road development work, from Kannalli Sigehalli gate to Banashankari Layout, Kodigehalli Gramapanchayath, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201455

Concrete road construticon, till suvarnamma home, Dasappanapalya, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201456

Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk

4.00 Completed EE PRED, Bangalore 4.00 0.00 Road

2013-201457

Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk

4.00 Completed EE PRED, Bangalore 4.00 0.00 Road

2013-201458 concrete road work, from Kempapur main road to Palani home, Somashettihali

gramapanchayath, Yashwanthpura hobli, Banglaore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201459

Concrete road work, from Palani home to vishwanath home, Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201460

Cement concrete road work, to 1st & 2nd crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201461

Cement concrete road work, to 3rd and 4th crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201462

Road development work, 1st cross, Maruthi Nagara, Somashettihalli gramapanchayath, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 63Formation and metalling the roads from kalkere pond road to Mr.Rajendra's house in K.R Puram Hobli Bangalore urban District

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-2014 64 and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli 5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-2014 65Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma's House in K.R,.Puram Hobli Bangalore

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-2014 66Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-2014 67Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-2014 68Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 69Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 70Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 71Formation and metalling the roads of Mr. Shashidhar's house in varanasi layout at K.R.Puram Hobli Bangalore Urban District

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 72improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014 73Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201474

Road development work, 1st & 2nd Cross, richard layout, Kalkere village, Bangalore north MP constituency

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201475

Road development work, 3rd & 4th Cross, richard layout, Kalkere village, Bangalore north MP constituency

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Road

2013-201476

Jalli work, from Paradise home 2nd cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Others

2013-201477

Jalli work, from Paradise home 2st cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Others

2013-201478

Borewell digging work, Jagalahatti village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore north talluk

2.00 Under Progress EE PRED, Bangalore 0.00 2.00 Water

Page 22: MPLADS DB Chandregowda 2014-2009

2013-201479

pump motor and Pipeline implementing work, Chagalahatti village, Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Water

2013-201480

compound wall construciton, Daradahalli village temple, Mudigere talluk, Chikkamagaluru Dist

5.00 Completed DC Chikkamagalur 5.00 0.00Civic

Amenities

2013-201481

Lingeshwara Lake development work, Daradahalli, Mudigere talluk, Chikkamagaluru dist

5.00 Completed DC Chikkamagalur 5.00 0.00Civic

Amenities

2013-2014 82formation of metalling the roads Mr.Krishnamurthy's house roads in kalkere Village, Bangalore North Bangalore

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads

2013-2014 83Improvement and metalling the roads of Mr.Puttaswamy layout roads in Channasandra Village Bangalore North Parlimentary Constituency Bangalore

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads

2013-2014 84formation of Metalling the roads of Richard's layout water Tank roads in Kalkere Village Bangalore North Parlimentary Constituency Bangalore

5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads

2013-201485 Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School,

Manjunath nagara, KR Pura hObli, Bangalore East talluk5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads

2013-201486 Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School,

Manjunath nagara, KR Pura hObli, Bangalore East talluk5.00 Under Progress EE PRED, Bangalore 0.00 5.00 Roads

2013-201487

Borewell digging work in New layouts of Tippenahalli and doddabidarakallu villages, Doddabidarakallu ward

4.00 Under Progress EE PRED, Bangalore 0.00 4.00 Water

2013-2014 88 UttaraKhand Floods rehabilatiton fund 10.00 - - 0.00 10.00 OthersTotal 446.00 253.00 193.00

Released from Govt. of India

Expenditure incurred

Balance

EE PRED 406.00 233.00 173.00Nirmithi Kendra 20.00 10.00 10.00Other DC's 10.00 10.00 0.00Uttar Khand 10.00 0.00 10.00

TOTAL 446.00 253.00 193.00

Abstract:

Sl No Name & Location of the workEstimated

Cost (in lakhs)

Expenditure incurred

Balance If Any

1Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in M Hosahalli village,

5.00 2.50 2.50Water

2Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in Chokkanahalli Village, Marenahalli Gramapanchayath, Jala hobli

5.00 2.50 2.50Water

3Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in Marasandra village, Marenahalli Gramapanchayath, Jala hobli

5.00 2.50 2.50Water

4Borewell digging, Pipeline implementation, Motor implimentantion and Getting power supply form KEB in Marasandra village, Marenahalli Gramapanchayath, Jala hobli

5.00 2.50 2.50Water

Total 20.00 10.00 10.00

For the year 2011-12

For the year 2012-13

Administrative sanctioned Accurded

250.00

payment to be made towards works sanction during previous year since

Page 23: MPLADS DB Chandregowda 2014-2009

Sl.No Name & Location of the workEstimated

Cost (in lakhs)

Expenditure incurred

Balance If Any

1Concrete road construciton work, TurahuNase village, Jala Hobli, Bangalore north Talluk

2.50 0.00 2.50Road

2Bus stop shelter in Tavarekere village, Tavarekere hobli, Bangalore South Talluk

5.00 0.00 5.00 Civic Amenities

3Concrete road construction work form Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengeri hobli

1.00 0.00 1.00Road

4 Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency

13.00 0.00 13.00 Civic Amenities

5Borewell digging work, Coffee Board Layout welfare association ®, Hebbala Kempapura

2.00 0.00 2.00Water

Total 23.50 0.00 23.50

2011-12 20.00 10.00 10.002012-13 23.50 0.00 23.502013-14 446.00 253.00 193.00Total 489.50 263.00 226.50

2% administrative charges for the year 2012-13 0.00 0.00 10.002% administrative charges for the year 2013-14 0.00 0.00 10.00

Toal 0.00 0.00 20.00Grand total 489.50 263.00 246.50

Page 24: MPLADS DB Chandregowda 2014-2009

FinalName of The M.P : D.B.Chandre Gowda

Year

Sl No Name & Location of the workEstimated Cost (in lakhs)

Stage of the Work

IMPLIMENTING AGENCY

Amount Released to IA

Balance If AnyType of works

1 2 3 4 5 6 7 8 9

2009-2010

1

Providing cement concerte payment from Bandrappa's house to samashitti halli Road at Kenigadda halli village, Bangalore North Taluk,Bangalore Dist.

4.50work completed

EE, PRED, Bangalore 4.50 0.00 Road

2009-20102 Construction of RCC Drain from Kiveguddahalli Village, to

Banmddappa's Garden at Bangalore North Taluk, Bangalore District.7.99

work completed

EE, PRED, Bangalore 7.99 0.00 Road

2009-20103 Providing concerte Road at Ganigarahalli Village, Samashutty halli

Grama Panchayath, Bangalore North Taluk, Bangalore District.8.00

work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-20104 Improvements to Bangalore Mittaganahalli road in Jala Hobli,

Bangalore North Taluk, Bangalore Urban Dist.8.00

work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-20105

Providing concerete to roadrata chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist

8.00work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-20106 Cement concrete road construstion work stage -1, Hosahalli village,

Jaalahalli Hoobli, Bangalore North Talluk8.00

work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-20107 Cement concrete road construction work, Kodagalahatti Village,

Jalahalli Hobli8.00

work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-20108 Road Development work, from Tarahunase to Bettenahalli village

joining road, Jaalahalli Hobli10.00

work completed

EE, PRED, Bangalore 10.00 0.00 Road

2009-20109

Road Development work, Marenahalli Joining road, Jaalahalli Hobli4.00

work completed

EE, PRED, Bangalore 4.00 0.00 Road

2009-201010

Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti Nagar,N.G.O colony,Bangalore. ( Stage 1)

3.49work completed

EE, PRED, Bangalore 3.49 0.00 Road

2009-201011 Providing cement concrete road at 17th ward, 3rd main road,

Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2)7.10

work completed

EE, PRED, Bangalore 7.10 0.00 Road

2009-2010

12Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli

8.00work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-201013 Community hall construction for Margadarshi Mahila Samaja ® ,

No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore1.00

work completed

Project Manager, Nirmithi Kendra Urban

1.00 0.00Civic Amenities

2009-201014

Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.

5.00work completed

EE, PRED, Bangalore 5.00 0.00 Road

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore NorthYears 2009-2014

Page 24

Page 25: MPLADS DB Chandregowda 2014-2009

Final

2009-201015

Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.

5.00work completed

EE, PRED, Bangalore 5.00 0.00 Road

2009-201016 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara

ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 18.00

work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-201017 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara

ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd8.00

work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-2010

18Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency

8.00work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-2010

19Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency

8.00work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-201020

Concrete Road Construction work from Shivalingayya home to Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72

8.00work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-201021

Concrete Road Construction work from Shankara Home to Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72

8.00work completed

EE, PRED, Bangalore 8.00 0.00 Road

2009-201022 Road development chain 0-500, from Vidya Nagara Main road to

Hosahalli village side, Bangalore North Talluk5.00

work completed

EE, PRED, Bangalore 5.00 0.00 Road

2009-201023 Cement Concrete road from ChikkaBasavaraju Home to Bhimarav

road, Uttanahalli Village, Bangalore North Talluk5.00

work completed

EE, PRED, Bangalore 5.00 0.00 Road

2009-201024 Cement Concrete Road from Venkobarao home to Anjanappa home,

Sonnappanahalli Village, Bangalore North Talluk5.00

work completed

EE, PRED, Bangalore 5.00 0.00 Road

2009-201025 Cement Concrete Road from Rajanna Home to Sampangappa Home,

Kadiganahalli Village5.00

work completed

EE, PRED, Bangalore 5.00 0.00 Road

2009-201026 Cement Concrete Road from Main road to Virajappa Home,

Ukkenahalli village, Bangalore North Talluk5.00

work completed

EE, PRED, Bangalore 5.00 0.00 Road

2009-201027 Cement Concrete road from Muniraju home to Krishnappa home,

Uttanahalli Village, Bangalore North Talluk5.00

work completed

EE, PRED, Bangalore 5.00 0.00 Road

2009-201028 Cement concrete road till Palakammanagara Home, Chikkajaga

village, Bangalore North Talluk5.00

work completed

EE, PRED, Bangalore 5.00 0.00 Road

2009-201029 Road development work (500-1000 meter) Bangalore North Talluk,

Vidyanagara, Bagaluru Mairn road to Hosahali village5.00

work completed

EE, PRED, Bangalore 5.00 0.00 Road

2009-201030 Cement concrete road behind Mutyalamma temple, Doddajaala,

Bangalore North Talluk5.00

work completed

EE, PRED, Bangalore 5.00 0.00 Road

189.08 189.08 0

Page 25

Page 26: MPLADS DB Chandregowda 2014-2009

Final

2010-20111

Concrete road construction work Stage -1, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli,

5.00work completed

EE PRED 5.00 0.00 Road

2010-20112

Concrete road construction work Stage -2, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli,

5.00work completed

EE PRED 5.00 0.00 Road

2010-20113

Road development work Stage - 1, Malurappa mane, K.R. Pura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-20114

Road development work Stage - 2, Malurappa mane, K.R. Pura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-20115

Road development work from Doddagollarahalli Banian tree road to Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2010-20116 Road Development work, from Doddagollarahatti Pipeline road to

Govt Primary school, Yashavantapura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-20117 Concrete Road construction work for all the (cross) subroads,

Doddagollarahatti village, Yashavanthapura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-20118 Culvert and Road development work for Doddagollarahatti (cross

roads) Subroads, Yashavanthapura hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-2011

9Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt)

5.00work completed

EE PRED 5.00 0.00 Road

2010-2011

10Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt)

5.00work completed

EE PRED 5.00 0.00 Road

2010-2011

11Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt)

5.00work completed

EE PRED 5.00 0.00 Road

2010-2011

12Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt)

5.00work completed

EE PRED 5.00 0.00 Road

2010-2011

13Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt)

5.00work completed

EE PRED 5.00 0.00 Road

2010-201114 Road development work Stage - 1 for Ganapathi nagara,

Chikkabanavara village, Yashavanthapura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-201115 Road development work Stage - 2 for Ganapathi nagara,

Chikkabanavara village, Yashavanthapura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

Page 26

Page 27: MPLADS DB Chandregowda 2014-2009

Final

2010-201116 Road development work Stage - 3 for Ganapathi nagara,

Chikkabanavara village, Yashavanthapura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-201117 Road development work Stage - 4 for Ganapathi nagara,

Chikkabanavara village, Yashavanthapura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-201118 Road construction work, MM Road, Chikkabanavara,

Yashawanthapura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-201119 Road Construction work Stage - 1, Janatha Colony, Chikkabanavara

village, YashawanthaPura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-201120 Road Construction work Stage - 2, Janatha Colony, Chikkabanavara

village, YashawanthaPura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-201121 Road Construction work Stage - 3, Janatha Colony, Chikkabanavara

village, YashawanthaPura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-201122 Road Construction work Stage - 4, Janatha Colony, Chikkabanavara

village, YashawanthaPura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-201123 Road Construction work Stage - 5, Janatha Colony, Chikkabanavara

village, YashawanthaPura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2010-201124

Construction of sky light roofing for the park at Kethamaranahalli in Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore.

8.00work completed

EE PRED 8.00 0.00Civic Amenities

2010-201125 One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North

Talluk1.50

work completed

EE PRED 1.50 0.00 Water

2010-201126

Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side)

5.00work completed

EE PRED 5.00 0.00Civic Amenities

2010-2011

27Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk - from Chainage 98.00 to 196.00 (left side)

5.00work completed

EE PRED 5.00 0.00Civic Amenities

2010-201128 Borewell digging work, Bagalahalli village, Marenahalli

Gramapanchayath, Jala Hobli, Bangalore North Talluk1.50

work completed

EE PRED 1.50 0.00 Water

2010-2011

#REF!

Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011#REF!

Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh Temple main circle, K.R.Puram assembly constituency (6 Nos solar street Lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011#REF!

K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

Page 27

Page 28: MPLADS DB Chandregowda 2014-2009

Final

2010-2011#REF!

K.R Puram Bus stand, K.R.puram railway station front gate K.R. puram assembly contituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011

#REF!

Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. puram assembly contituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011#REF!

Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011#REF!

Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011

#REF!Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011#REF!

Dasarahalli main road, Byatarayanapura assembly constituency. (6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011#REF!

Saraswathipura Main road, Byatarayanapura assembly constituency (6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011#REF!

Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00Street lighting

2010-2011#REF!

R.T. Nagar main road, Hebbal assembly constituency (2 No's solar street lights)

1.47work completed

Nirmithi Kendra 1.47 0.00Street lighting

2010-2011#REF! Borewell work, for Drinking water to Parimala Nagara, Nandini

Layout, Mahalakshipuram ward no. 431.50

work completed

EE PRED 1.50 0.00 Water

2010-2011#REF! Oldage Home building construction work, Sy no.113, Shree Shankara

Balaga, New Park road, Malleshwaram, Bangalore1.00

work completed

EE PRED 1.00 0.00Civic Amenities

2010-2011#REF! Road Development work Stage - 1, Lake Behind Road, Ganigara

village, Yashawanthapura Hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2010-2011#REF! Road Development work Stage - 2, Lake Behind Road, Ganigara

village, Yashawanthapura Hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2010-2011#REF! Road Development work Stage - 3, Lake Behind Road, Ganigara

village, Yashawanthapura Hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2010-2011#REF! Road Development work, from Kempapura Maruthi Nagara

Mainroad, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

208.48 208.48 0

2011-20121

Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore

2.00work completed

EE PRED 2.00 0.00 Water

Page 28

Page 29: MPLADS DB Chandregowda 2014-2009

Final

2011-20122 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara

village, Maruthi Nagara 1st Cross5.00

work completed

EE PRED 5.00 0.00 Others

2011-20123 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara

village, Maruthi Nagara 2nd Cross5.00

work completed

EE PRED 5.00 0.00 Others

2011-20124 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara

village, Maruthi Nagara 3rd Cross5.00

work completed

EE PRED 5.00 0.00 Others

2011-20125 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara

village, Maruthi Nagara 4th Cross5.00

work completed

EE PRED 5.00 0.00 Others

2011-20126 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara

village, Maruthi Nagara 5th Cross5.00

work completed

EE PRED 5.00 0.00 Others

2011-20127 Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara

village, Maruthi Nagara, Dwaraka Nagara Road development work5.00

work completed

EE PRED 5.00 0.00 Road

2011-20128

Maruthi Nagara subroad (cross) road Development work5.00

work completed

EE PRED 5.00 0.00 Road

2011-20129

Maruthi Nagara New Layout Road development work5.00

work completed

EE PRED 5.00 0.00 Road

2011-201210 Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara

village BET School Road Development5.00

work completed

EE PRED 5.00 0.00 Road

2011-201211

Road Development work 1 & 2nd road, from Hesaraghatta road to Dwarakanagara, Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-201212 Road Development work, 1st Cross, Sandhya Nagara,

Yashawanthapura Hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201213 Road Development work, 2nd Cross, Sandhya Nagara,

Yashawanthapura Hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201214 Road Development work, 3rd Cross, Sandhya Nagara,

Yashawanthapura Hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201215 Road development work 250-500, Kempapura, Maruthi Nagara,

Bangalore North talluk, Yashawanthapura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2011-201216 Road development work 500-750, Kempapura, Maruthi Nagara,

Bangalore North talluk, Yashawanthapura Hobli5.00

work completed

EE PRED 5.00 0.00 Road

2011-201217 Cement Concrete road construction work, Lakshmipura village,

Yashwanthpura Hobli, Bangalore North tAlluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201218 Cement concrete road construction work, near Ashwathkatte,

Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

Page 29

Page 30: MPLADS DB Chandregowda 2014-2009

Final

2011-201219

Cement concrete road work, from Rajanna home to till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-201220 Cement concrete road work, till Sangappa home, Lakshmipura village,

Yashwanthapura village, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201221 Cement concrete road construction work, for Bipass road,

Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201222

Borewell digging, Motor implimentation & Getting power supply form KEB, M.Hosahalli village,

5.00under progress

EE PRED 2.50 2.50 Water

2011-201223

Borewell digging, Motor implimentation & Getting power supply form KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli

5.00under progress

EE PRED 2.50 2.50 Water

2011-201224

Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli

5.00under progress

EE PRED 2.50 2.50 Water

2011-201225

Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli

5.00under progress

EE PRED 2.50 2.50 Water

2011-201226 Road development work, Cross -1, New Layout, Ganiganahalli village,

Yashwanthpura village, Bangalore North tallku5.00

work completed

EE PRED 5.00 0.00 Road

2011-201227 Road development work, Cross -2, New Layout, Ganiganahalli village,

Yashwanthpura village, Bangalore North tallku5.00

work completed

EE PRED 5.00 0.00 Road

2011-201228 Road development work, Cross -3, New Layout, Ganiganahalli village,

Yashwanthpura village, Bangalore North tallku5.00

work completed

EE PRED 5.00 0.00 Road

2011-201229 Road development work, Cross Roads, New Layout, Ganiganahalli

village, Yashwanthpura village, Bangalore North tallku5.00

work completed

EE PRED 5.00 0.00 Road

2011-201230 Road development work, Ganapathi nagara cross road,

Yashwanthpura hobli, Bangalore North talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201231

Road development work (0-100) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-201232

Road development work (100-200) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-201233

Road development work (200-300) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-201234

Road development work form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-201235 Road development work, Ganapathi nagara cross road,

Yashwanthpura hobli, Bangalore North talluk5.00

work completed

EE PRED 5.00 0.00 Road

Page 30

Page 31: MPLADS DB Chandregowda 2014-2009

Final

2011-201236

Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201237

Road development work and Jalli work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201238

Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201239

Road development work and Jalli work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201240

Road development work and Jalli work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201241

Road development work and Jalli work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201242

Road development work and Jalli work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201243

Road development work and Jalli work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201244

Road development work and Jalli work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201245

Road development work and Jalli work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00 Road

2011-201246

Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.

5.00work completed

EE PRED 5.00 0.00 Water

2011-201247

Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.

5.00work completed

EE PRED 5.00 0.00 Water

2011-201248

Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk

5.00work completed

EE PRED 5.00 0.00 Water

2011-201249

Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk

5.00work completed

EE PRED 5.00 0.00 Water

2011-201250

Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk

5.00work completed

EE PRED 5.00 0.00Civic Amenities

2011-201251

Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk

5.00work completed

EE PRED 5.00 0.00Civic Amenities

2011-201252 Gutter construction work, from Acharappa home to Mahimaraju

home, K.Gollahalli Village, Kengeri Hobli3.00

work completed

EE PRED 3.00 0.00Civic Amenities

Page 31

Page 32: MPLADS DB Chandregowda 2014-2009

Final

2011-201253

Road development work from Gudimavu main road to Devagere Harijana Colony, K.Gollahalli Gramapanchayath village, Bangalore south talluk

4.25work completed

EE PRED 4.25 0.00 Road

2011-201254 Road development work form Kenchanapalya village to Paadri

colony, K.Gollahalli Gramapanchayath, Bangalore South Talluk1.50

work completed

EE PRED 1.50 0.00 Road

2011-201255 Pipeline implementation and Getting power supply from KEB,

Maralukunte village, Marenahalli Gramapanchayath, Jala Hobli5.00

work completed

EE PRED 5.00 0.00Civic Amenities

2011-201256

Road Development work from H.Gollahalli main road to Kabbalamma Temple, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-201257

Library construction, Gonipura vilage, Yashawanthapura limits5.00

work completed

EE PRED 5.00 0.00Civic Amenities

2011-201258 Women empowerment Building work (streeshakti bhavana) Gonipura

village, Yashawanthapura limits5.00

work completed

EE PRED 5.00 0.00Civic Amenities

2011-201259

Gutter construction work from Mallappa home to Narayanaswamy home, Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk

4.00work completed

EE PRED 4.00 0.00Civic Amenities

2011-201260

Improvement and Asphalting to roads in sonnappa layout at bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage -2.

4.00work completed

EE PRED 4.00 0.00 Road

2011-201261

Improvement of Asphalting to roads in sonnappa layout at bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage -2.

4.00work completed

EE PRED 4.00 0.00 Road

2011-201262 Formation and metalling the roads of siddappa layout 1st cross,

K.R.puram hobli Bangalore North Parlimentary Constituency2.50

work completed

EE PRED 2.50 0.00 Road

2011-201263 Formation and metalling the roads of siddappa layout 2st cross,

K.R.puramhobli Bangalore North Parlimentary Constituency2.50

work completed

EE PRED 2.50 0.00 Road

2011-201264 Formation and metalling the roads of Motappa Layout 1st cross, K.R.

Puram hobli, Bangalore north, Parliamentary constituency.2.50

work completed

EE PRED 2.50 0.00 Road

2011-201265 Formation and metalling the roads of Motappa Layout 2st cross, KR

Puram hobli, Bangalore north, Parliamentary constituency.2.50

work completed

EE PRED 2.50 0.00 Road

2011-201266 Formation and metalling the roads of Motappa Layout 3rd cross, KR

Puram hobli, Bangalore north, Parliamentary constituency.2.50

work completed

EE PRED 2.50 0.00 Road

2011-201267 Formation and metalling the roads of Motappa Layout 4th cross, KR

Puram hobli, Bangalore north, Parliamentary constituency.2.50

work completed

EE PRED 2.50 0.00 Road

2011-201268 Chainlink Compund construction work, ChikkaBanavara Govt high

School, yashawanthapura hobli, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00 Education

2011-201269 Concrete road development work, Beside ChikkaBanavara Govt high

School, yashawanthapura hobli, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00 Road

Page 32

Page 33: MPLADS DB Chandregowda 2014-2009

Final

2011-201270 Primary School Building construction, Gonipura village, K.Gollahalli

Gramapanchayath, Kengeri hobli, Bangalore South Talluk4.00

work completed

EE PRED 4.00 0.00 Education

2011-201271 Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No.

22 Ganganagar, Bangalore North18.62

work completed

Nirmithi Kendra 18.62 0.00Civic Amenities

2011-201272 Community hall construction work Stage -1, Near Pattalamma temple,

Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.5.00

work completed

EE PRED 5.00 0.00Civic Amenities

2011-201273 Community hall construction work Stage -2, Near Pattalamma temple,

Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.5.00

work completed

EE PRED 5.00 0.00Civic Amenities

2011-201274 Community hall construction work Stage -3, Near Pattalamma temple,

Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.5.00

work completed

EE PRED 5.00 0.00Civic Amenities

2011-201275 Road Development work, Tirumalapura, Yashawanthapura hobli,

Bangalore North talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201276 Road Development work Stage-1, Tirumalapura, Yashawanthapura

hobli, Bangalore North talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201277 Road Development work Stage-2, Tirumalapura, Yashawanthapura

hobli, Bangalore North talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201278 Road development work, Anjeneya temple road, Veerashettihalli

village, Yashawanthpura hobli, Bangalore North talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201279 Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar,

Yashwanthpur hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201280 Gutter Work, From chikkaBanavara to Kempapura Road,

Yashwanthpura hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201281 Gutter work, From Dwarakanagara Cross to Kodohalla,

Yashwanthpura hobli, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201282 Road Development work, New layout, Maruthi Nagar, Yashwanthpur

hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201283 Concret road work, from Dasappanapalya main road to

Kereguddadahalli, Bangalore north talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201284 Concrete road work from Chowdeshwari layotu borewell to mini

water tank, Kereguddadahalli, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-201285 Road development work and jalli work Stage - 1, Siddappa layout,

Kalkere village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201286 Road development work and jalli work Stage - 2, Siddappa layout,

Kalkere village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

Page 33

Page 34: MPLADS DB Chandregowda 2014-2009

Final

2011-201287 Road development work and Jalli work Stage - 1, Kariyappa Layout,

Kalkere village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201288 Road development work and Jalli work Stage - 2, Kariyappa Layout,

Kalkere village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201289 Road development work and Jalli work Stage - 1, Motappa ayout,

Kalkere village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201290 Road development work and Jalli work Stage - 2, Motappa ayout,

Kalkere village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201291

Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage-1

5.00work completed

EE PRED 5.00 0.00 Road

2011-201292

Formation of concrete road Development near Sri.Anjaneya swamy temple, Tippur village K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 2

5.00work completed

EE PRED 5.00 0.00 Road

2011-201293

Formation of concrete rod development near sri.Anjaneya swamy temple Tippur village, K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 3

5.00work completed

EE PRED 5.00 0.00 Road

2011-201294 Road development work, Muneshwara Layout, Kalkere Village,

Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201295 Road development work, 2nd cross, Muneshwara Layout, Kalkere

village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201296 Road development work, 3rd cross, Muneshwara Layout, Kalkere

village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201297 Road development work, 4th cross, Muneshwara Layout, Kalkere

village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201298 Road development work 0 - 250, from Vanirashi channasandra

Mainroad to NRI Layout, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-201299 Road development work 250-500, from Vanirashi channasandra

Mainroad to NRI Layout, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-2012100 Road development work 500 - 750, from Vanirashi channasandra

Mainroad to NRI Layout, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-2012101 Road development work 750-1000, from Vanirashi channasandra

Mainroad to NRI Layout, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00 Road

2011-2012102

Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-2012103 Rock Guttor construction, Brothers colony, Chikkabanavara,

Yashwanthpura Hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

Page 34

Page 35: MPLADS DB Chandregowda 2014-2009

Final

2011-2012104 Concrete road development work, Tirumalapura Village, Bangalore

north Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-2012105 Development work in New Layout, Banapathi nagara, GanigaraHalli

village, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-2012106 5th Concrete Road Development work, Maruthi Nagara, Bangalore

north Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-2012107 Concrete road development work, 6th cross, Gulbarga Slum,

Newlayout, Ganigarahalli, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-2012

work completed

Road

2011-2012

109Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts)

2.50work completed

EE PRED 2.50 0.00 Road

2011-2012

110Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts)

2.50work completed

EE PRED 2.50 0.00 Road

2011-2012

111Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts)

2.50work completed

EE PRED 2.50 0.00 Road

2011-2012

112Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts)

2.50work completed

EE PRED 2.50 0.00 Road

2011-2012113 Improvement and metalling the road in sunny layout 1st cross in

ward No. 54, Bangalore North.2.50

work completed

EE PRED 2.50 0.00 Road

2011-2012114 Improvement and metalling the road in sunny layout 2st cross in

ward No. 54, Bangalore North.2.50

work completed

EE PRED 2.50 0.00 Road

2011-2012115 Improvement and metalling the road in sunny layout 3st cross in

ward No. 54, Bangalore North.2.50

work completed

EE PRED 2.50 0.00 Road

2011-2012116 Improvement and metalling the road in sunny layout 4st cross in

ward No. 54, Bangalore North.2.50

work completed

EE PRED 2.50 0.00 Road

2011-2012117

Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)

2.50work completed

EE PRED 2.50 0.00 Road

2011-2012118

Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)

2.50work completed

EE PRED 2.50 0.00 Road

2011-2012119

Improvement and metalling of roads at 1st cross Udaya layout, Kodige halli, Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district.

5.00work completed

EE PRED 5.00 0.00 Road

Page 35

Page 36: MPLADS DB Chandregowda 2014-2009

Final

2011-2012120

Improvement and metalling of roads at 2nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.

5.00work completed

EE PRED 5.00 0.00 Road

2011-2012121

Improvement and metalling of roads at 3nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.

5.00work completed

EE PRED 5.00 0.00 Road

2011-2012122 Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara,

Byatarayanapura, Bangalore South Talluk13.00

work completed

EE PRED 13.00 0.00 Road

2011-2012123

Road development work, 1st cross, Ganesha Layout, Bangalore Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-2012124

Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-2012125 Road development work from 1 stage to 2nd stage Bhavani Layout,

Tirumalapura Village, Yashwanthpura hobli, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-2012126 Concrete road development work, Lakshmipura village,

Yashwanthpura Hobli, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00 Road

2011-2012127

Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-2012128

Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-2012129 4 Rooms construction work, 1st floor, Govt Higher Primary School,

Chikkabanavara village22.50

work completed

EE PRED 22.50 0.00 Education

2011-2012130

To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout

2.00work completed

EE PRED 2.00 0.00 Water

2011-2012131 To dig Borewel in Amrutha Nagar 2.00

work completed

EE PRED 2.00 0.00 Water

2011-2012132

Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore

10.00work completed

KRIDL 10.00 0.00Civic Amenities

2011-2012133 Community Hall construction, Near BDA Park, Opposite VaiyalliKaval

education trust, Bangalore north MP constituency10.00

work completed

EE PRED 10.00 0.00Civic Amenities

2011-2012134

Road development work form Kempapura mainroad to Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-2012135

Road development work from Basavaraju home to Nagaraju home, Kempapura Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00 Road

2011-2012136 Gutter work Stage - 2, Gonipura village, K.Gollahalli

Gramapanchayath, Kengere hobli, Bangalore South Talluk5.00

work completed

EE PRED 5.00 0.00 Road

Page 36

Page 37: MPLADS DB Chandregowda 2014-2009

Final

2011-2012137 Concrete road construction work, 4th A, B, & C corss, ward no. 102,

Vrushabhavathi Nagara, Vinayakanagara10.00

work completed

EE PRED 10.00 0.00 Road

2011-2012138

2 % Administration expinditure10.00 DC 10.00 0.00 Others

624.87 614.87 10

2012-20131

Borewell digging work, Coffee Board Layout welfare association ®, Hebbala Kempapura

2.00Under Progress

EE PRED, Bangalore 0.00 2.00 Water

2012-20132

Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20133

Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20134

Road development work, from Backword community colony to Main road, Kannuru village, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20135

1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20136

3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20137

Road development work Stage - 1, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20138

Road development work Stage -2, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-20139

Road development work, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201310

Road development work, Cross road, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201311

from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201312

Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, Kengeri Hobli, K.gollahalli

6.00 Completed EE PRED, Bangalore 6.00 0.00 Road

2012-201313

Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201314

Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201315

Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201316

Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201317

Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201318

Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201319

Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201320

Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 37

Page 38: MPLADS DB Chandregowda 2014-2009

Final2012-2013

21Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201322 Road development work, Ganesha Temple road, Dasappanapalya,

ChikkaBanavara village, Bangalore north Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201323

3 Borewell digging, Motor pump & Tank work, Ward 39, Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout,

12.00 Completed EE PRED, Bangalore 12.00 0.00 Water

2012-201324 Busstand construction, Tavarekere village, Tavarekere hobli,

Bangalore South Talluk5.00

Under Progress

EE PRED, Bangalore 0.00 5.00Civic Amenities

2012-201325

CC road construction work, from Main road to till Amir saab home, Kengeri main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201326

CC road construction work, Bank colony, Tavarekere village, Tavarekere Hobli, Bangalore south talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201327

Drinking water overhead Tank construction work, Vinayaka Nagara, Ramohalli Gramapanchayath Limits

10.00 Completed EE PRED, Bangalore 10.00 0.00 Water

2012-201328

Concrete road work, from Murugesh home to Hanumantappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk

4.90 Completed EE PRED, Bangalore 4.90 0.00 Road

2012-201329

Concrete road work, from Chennaveerayya home to Nanjappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk

4.90 Completed EE PRED, Bangalore 4.90 0.00 Road

2012-201330

Concrete road work, from Indramma home to Anganavadi, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk

4.90 Completed EE PRED, Bangalore 4.90 0.00 Road

2012-201331

1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore

2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201332

1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore

2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201333

Drinking water supply work, ChannaVenkatappa home street, Tagachaguppe Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk

4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-201334 Concrete road work stage - 1, from Veternary hospital to Ramesh bin

Bullayya home, Somanahalli village, Bangalore south talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201335 Concrete road work stage - 12, from Veternary hospital to Ramesh bin

Bullayya home, Somanahalli village, Bangalore south talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201336

Orphanage home, Cultural hall construction in 3 acers of land, Shree bhavana rushi padmapeeta mahasamstana ® , Ullala, Yashwanthpura hobli, Bangalore north talluk,

5.00 Completed EE PRED, Bangalore 5.00 0.00Civic Amenities

2012-201337

Tar road work, 790-948, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201338

Tar road work, 948-1106, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201339

Tar road work, 1106-1264, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201340

Tar road work, 1264-1422, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 38

Page 39: MPLADS DB Chandregowda 2014-2009

Final2012-2013

41Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201342

Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201343

Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201344

Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201345

Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201346 Road development work, 1 & 2nd cross, from Maragondanahalli

Mainroad to NRI Layout, Bangalore north MP constituency,5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201347 Road development work, 3rd &4th cross, from Maragondanahalli

Mainroad to NRI Layout, Bangalore north MP constituency,5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

48Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

49

Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

50

Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

51Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

52Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201353

Concrete construction work for cross roads, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

54Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

55Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013

56Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 39

Page 40: MPLADS DB Chandregowda 2014-2009

Final

2012-201357

Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201358

Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201359

Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201360

Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201361

Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201362 Road development work, from Maragondanahalli mainroad lake main

road to Kachaaramma temple road, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201363 Road development work, from shivaramegowda home to MWS

borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201364 Road development work, 2nd cross from Shivaramegowda home,

Udaya Layout, Kodigehalli village, Yashwanthpura hobli5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201365 Road development work, 3rd cross from Shivaramegowda home,

Udaya Layout, Kodigehalli village, Yashwanthpura hobli5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201366 Road development work, 4th cross from Shivaramegowda home,

Udaya Layout, Kodigehalli village, Yashwanthpura hobli5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201367

Road development work, Kannur main road to Kannuru Lake road, Hosuru, Yalahanka, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201368 Parkinsons Agencing research foundation Indira nagar Bangalore 2.84 Completed Nirmithi Kendra 2.84 0.00 Health

2012-201369

2 Borewell digging work in Bhuvaneshwari Nagara layout4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-201370

Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201371

Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201372

Road development work Stage - 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201373

Road development work Stage - 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201374

Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore

4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-201375

Drinking water supply to Saptagiri layout, Doddabidarakallu village4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-201376

Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201377

Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201378

Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201379

Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 40

Page 41: MPLADS DB Chandregowda 2014-2009

Final2012-2013

80Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201381

Borewell digging work for drinking water, BHEL layout welfare assocation, Rajarajeshwari Nagara Bangalore

2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201382

water supplying work, Amrutha halli Mainroad to Shobha piper mart opposite, Byatarayanapura BBMP, Bangalore

2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201383 Community hall construction, Milk colony, 4th cross, ward no.66, 64,

Bangalore north MP Constituency13.00

Under Progress

EE PRED, Bangalore 0.00 13.00Civic Amenities

2012-201384

Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward No.7 Bangalore

2.00 completed EE PRED, Bangalore 2.00 0.00 Water

2012-2013

85Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree), Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south tallku

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201386

Road development work from, AK colony to Devegere village, Devagere village, K.Gollahalli village, Kengeri Hobli, Bangalore South talluk

3.00 Completed EE PRED, Bangalore 3.00 0.00 Road

2012-201387

Concrete road development work, from Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore south Talluk

1.00Under Progress

EE PRED, Bangalore 0.00 1.00 Road

2012-201388

Road development work from Main road to Ankappa home, Kalkere village, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201389

Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli Gramapanchayath, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201390

2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, Jala Hobli

4.00 Completed EE PRED, Bangalore 4.00 0.00 Water

2012-201391

Building construction for councelling center and other activities, Mahila Dakshata samiti Bengaluru,

10.00 Completed Nirmithi Kendra 10.00 0.00Civic Amenities

2012-201392 Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba

Veerashaiva Sanhga ® 5.00 Completed EE PRED, Bangalore 5.00 0.00

Civic Amenities

2012-201393 Gutter construction road, ST colony, Dinnepalya, Kaggalipura

Gramapanchayath, Uttarahalli hobli, Bangalore south talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-201394

PU college building work, Janasave trust, Channenahalli, Tavarekere hobli, Bangalore south talluk

10.00 Completed EE PRED, Bangalore 10.00 0.00 Education

2012-201395

1 Borewell digging, Vayunandana Layout, Bangalore north MP constituency

2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201396 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village 2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-201397

Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk2.50 Completed EE PRED, Bangalore 2.50 0.00 Road

2012-201398

Concrete road work, Turahunase Village, Jala Hobli, Bangalore north Talluk

2.50Under Progress

EE PRED, Bangalore 0.00 2.50 Road

2012-201399

1 bore digging work, ward no.6, Thanisandra, Byatarayanapura Constituency, Bangalore

2.00 Completed EE PRED, Bangalore 2.00 0.00 Water

2012-2013100 Road development work, Cross road, Brothers colony,

Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 41

Page 42: MPLADS DB Chandregowda 2014-2009

Final

2012-2013101 Road development, Masjid road, Brother colony, Chikkabanavara,

Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013102

Road developmentwork, from Mahalingam home to Ganganna home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013103

Road developmentwork, from Harish Home to Manohar home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2012-2013104 Road developmentwork,1st cross, Brother colony, Chikkabanavara,

Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

505.54 482.04 23.5

2013-20141

Road development work, Maruthi Nagara, Bangalore north Talluk5.00

Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-20142

Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-20143

Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-20144

Concrete work , From Main road to Yallappa home, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-20145 Road development work, from Venkataswamy home to

Chikkavenkatappa home, Maruthi Nagara, Bangalore north Talluk5.00

Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-20146

Road development work, from Ganapathi nagara Main road to Narasimhayya home, Bangalore north Talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-20147

Concrete Road work, Chikkabanavara village, Bangalore north Talluk, 5.00

Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-20148

Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk5.00

Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-20149

Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201410

Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201411

Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201412

Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201413

Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201414

Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201415

Road development road, Sadguru Layout, Bangalore North Layout5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201416

Road development work, Main road, Shiradi Layout, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201417

Road development work, 1st cross road, Shiradi Layout, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201418

Road development work, 2nd cross road, Shiradi Layout, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 42

Page 43: MPLADS DB Chandregowda 2014-2009

Final2013-2014

19Road development work, Netravathi Layout, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201420

RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201421

1 Borewell digging work for Bagaluru village, Bagalur Gramapanchayath, Jala hobli, Bangalore north taluk

2.00Under Progress

EE PRED, Bangalore 0.00 2.00 Water

2013-201422

Road development work, Kodigehalli mainroad to borewell, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201423 Road development work, Kudalasangama Main road, Kodigehalli

Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00

Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201424

Road development work, Nanjundeshware layout Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201425 Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli

Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00

Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201426 Road development work, Commnity hall mainroad, Kodigehalli

Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00

Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201427 Road development work, Kuvempu Nagara, Kodigehalli

Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201428

Road development work, Kodigehalli main road to Kodigehalli lake road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201429 Road development work stage - 1, Pillappa Layout, Kanakanagara,

Channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201430 Road development work stage - 2, Pillappa Layout, Kanakanagara,

Channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201431 Road development work Stage - 1, from Kalkere OM shakti Teple to

Kalkere lake road, Kalkere village, Bangalore North MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201432 Road development work , from Kalkere OM shakti Teple to Kalkere

lake road, Kalkere village, Bangalore North MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201433 Road development work Stage - 3, from Kalkere OM shakti Teple to

Kalkere lake road, Kalkere village, Bangalore North MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201434

RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north Talluk,

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201435

Road development work from Lakshmipura village to Lakshmipura Janata colony, Bangalore north Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201436 Road development work stage - 1, Motappa Layout, Kanakanagara,

Channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201437 Road development work stage - 2, Motappa Layout, Kanakanagara,

Channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 43

Page 44: MPLADS DB Chandregowda 2014-2009

Final2013-2014

38Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201439

Road developent work, From Kalkere Graveyard to Patalappa home, Kalkere village, Bangalore north MP constituency

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201440 Concrete road work and road development work, Agara colony, Agara

Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014

41Concrete road work and road development work, from Amrutanarayana swamy majjana bavi road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-2014

42Concrete road work and road development work, from Amrutanarayana swamy mountain road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201443

Student hostel constructio work, KR Puram vidhanasabha constituency, Shri ramakrishna vivekananda sadhana kshrethra ® Bangalore north MP constituency

5.00Under Progress

Nirmithi Kendra 2.50 2.50Civic Amenities

2013-201444 Road development work, from Karubele Mainroad to Panchayath,

K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00

Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201445

Concrete road construction work, from K.gollahalli main road to Dairy Krishnappa home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201446

Concrete road construction work, from Beerappa home to Papanna home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201447

Concrete road construction work, from dalappa home to gramapanchayath new building, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201448

Cement concrete road construction work for rest of the village roads, chagalahatti village, Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 0.00 5.00 Road

2013-201449

concrete road construction in SPG colony, Tavarekere illage, Tavarekere hobli, yashwanthpra vidhasabha constituecny, bangalore south talluk

15.00Under Progress

Nirmiti Kendra 7.50 7.50 Road

2013-201450

RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, Kodigehalli gramapanchayath, Bangalore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Others

2013-201451

Road development work, Aniketana nagara mainroad, Kodigehalli gramapanchayath, Bangalore north taluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201452

Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201453

Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201454 Road development work, from Kannalli Sigehalli gate to Banashankari

Layout, Kodigehalli Gramapanchayath, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201455 Concrete road construticon, till suvarnamma home, Dasappanapalya,

Yashwanthpura hobli, Bangalore north talluk5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

Page 44

Page 45: MPLADS DB Chandregowda 2014-2009

Final

2013-201456 Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli

village, Yashwanthpura hobli, Bangalore north talluk4.00 Completed EE PRED, Bangalore 4.00 0.00 Road

2013-201457 Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli

village, Yashwanthpura hobli, Bangalore north talluk4.00 Completed EE PRED, Bangalore 4.00 0.00 Road

2013-201458

concrete road work, from Kempapur main road to Palani home, Somashettihali gramapanchayath, Yashwanthpura hobli, Banglaore north talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201459

Concrete road work, from Palani home to vishwanath home, Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201460

Cement concrete road work, to 1st & 2nd crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201461

Cement concrete road work, to 3rd and 4th crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201462

Road development work, 1st cross, Maruthi Nagara, Somashettihalli gramapanchayath, Yashwanthpura hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201463

Formation and metalling the roads from kalkere pond road to Mr.Rajendra's house in K.R Puram Hobli Bangalore urban District

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201464

and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201465

Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma's House in K.R,.Puram Hobli Bangalore

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201466

Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201467

Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201468

Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201469

Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201470

Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201471

Formation and metalling the roads of Mr. Shashidhar's house in varanasi layout at K.R.Puram Hobli Bangalore Urban District

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201472

improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201473

Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore

5.00 Completed EE PRED, Bangalore 5.00 0.00 Road

2013-201474

Road development work, 1st & 2nd Cross, richard layout, Kalkere village, Bangalore north MP constituency

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201475

Road development work, 3rd & 4th Cross, richard layout, Kalkere village, Bangalore north MP constituency

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Road

2013-201476 Jalli work, from Paradise home 2nd cross to happy garden, sunil

layout, channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Others

Page 45

Page 46: MPLADS DB Chandregowda 2014-2009

Final

2013-201477 Jalli work, from Paradise home 2st cross to happy garden, sunil

layout, channasandra village, Bangalore north MP constituency5.00 Completed EE PRED, Bangalore 5.00 0.00 Others

2013-201478

Borewell digging work, Jagalahatti village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore north talluk

2.00Under Progress

EE PRED, Bangalore 0.00 2.00 Water

2013-201479 pump motor and Pipeline implementing work, Chagalahatti village,

Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk5.00

Under Progress

EE PRED, Bangalore 0.00 5.00 Water

2013-201480 compound wall construciton, Daradahalli village temple, Mudigere

talluk, Chikkamagaluru Dist5.00 Completed DC Chikkamagalur 5.00 0.00

Civic Amenities

2013-201481 Lingeshwara Lake development work, Daradahalli, Mudigere talluk,

Chikkamagaluru dist5.00 Completed DC Chikkamagalur 5.00 0.00

Civic Amenities

2013-201482

formation of metalling the roads Mr.Krishnamurthy's house roads in kalkere Village, Bangalore North Bangalore

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Roads

2013-201483

Improvement and metalling the roads of Mr.Puttaswamy layout roads in Channasandra Village Bangalore North Parlimentary Constituency Bangalore

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Roads

2013-201484

formation of Metalling the roads of Richard's layout water Tank roads in Kalkere Village Bangalore North Parlimentary Constituency Bangalore

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Roads

2013-201485

Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Roads

2013-201486

Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk

5.00Under Progress

EE PRED, Bangalore 0.00 5.00 Roads

2013-201487

Borewell digging work in New layouts of Tippenahalli and doddabidarakallu villages, Doddabidarakallu ward

4.00Under Progress

EE PRED, Bangalore 0.00 4.00 Water

2013-201488

UttaraKhand Floods rehabilatiton fund10.00 - - 0.00 10.00 Others

446 253 193

Page 46

Page 47: MPLADS DB Chandregowda 2014-2009

Raw data FinalName of The M.P : D.B.Chandre Gowda

Year

Sl No Name & Location of the workEstimated Cost (in lakhs)

Stage of the Work

IMPLIMENTING AGENCY

Amount Released to IA

Balance If Any

2013-20141

Road development work, Maruthi Nagara, Bangalore north Talluk5.00

Under Progress

EE PRED, Bangalore

0.00 5.00

2013-20142

Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk5.00

Under Progress

EE PRED, Bangalore

0.00 5.00

2013-20143

Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk5.00

Under Progress

EE PRED, Bangalore

0.00 5.00

2013-20144

Concrete work , From Main road to Yallappa home, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-20145

Road development work, from Venkataswamy home to Chikkavenkatappa home, Maruthi Nagara, Bangalore north Talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-20146

Road development work, from Ganapathi nagara Main road to Narasimhayya home, Bangalore north Talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-20147

Concrete Road work, Chikkabanavara village, Bangalore north Talluk, 5.00

Under Progress

EE PRED, Bangalore

0.00 5.00

2013-20148

Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk5.00

Under Progress

EE PRED, Bangalore

0.00 5.00

2013-20149

Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk5.00

Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201410

Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk5.00

Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201411

Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201412

Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201413

Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201414

Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201415

Road development road, Sadguru Layout, Bangalore North Layout5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201416

Road development work, Main road, Shiradi Layout, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201417

Road development work, 1st cross road, Shiradi Layout, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201418

Road development work, 2nd cross road, Shiradi Layout, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201419

Road development work, Netravathi Layout, Bangalore north talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201420

RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201421

1 Borewell digging work for Bagaluru village, Bagalur Gramapanchayath, Jala hobli, Bangalore north taluk

2.00Under Progress

EE PRED, Bangalore

0.00 2.00

2013-201422

Road development work, Kodigehalli mainroad to borewell, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore NorthYears 2009-2014

Page 47

Page 48: MPLADS DB Chandregowda 2014-2009

Raw data Final2013-2014

23Road development work, Kudalasangama Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201424

Road development work, Nanjundeshware layout Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201425

Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201426

Road development work, Commnity hall mainroad, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201427

Road development work, Kuvempu Nagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201428

Road development work, Kodigehalli main road to Kodigehalli lake road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201429

Road development work stage - 1, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201430

Road development work stage - 2, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201431

Road development work Stage - 1, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201432

Road development work , from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201433

Road development work Stage - 3, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201434

RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north Talluk,5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201435

Road development work from Lakshmipura village to Lakshmipura Janata colony, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201436

Road development work stage - 1, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201437

Road development work stage - 2, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201438

Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201439

Road developent work, From Kalkere Graveyard to Patalappa home, Kalkere village, Bangalore north MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201440

Concrete road work and road development work, Agara colony, Agara Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201441 Concrete road work and road development work, from Amrutanarayana swamy majjana bavi

road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201442 Concrete road work and road development work, from Amrutanarayana swamy mountain road ,

Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201443

Student hostel constructio work, KR Puram vidhanasabha constituency, Shri ramakrishna vivekananda sadhana kshrethra ® Bangalore north MP constituency

5.00Under Progress

Nirmithi Kendra 2.50 2.50

2013-201444

Road development work, from Karubele Mainroad to Panchayath, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201445

Concrete road construction work, from K.gollahalli main road to Dairy Krishnappa home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201446

Concrete road construction work, from Beerappa home to Papanna home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201447

Concrete road construction work, from dalappa home to gramapanchayath new building, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

Page 48

Page 49: MPLADS DB Chandregowda 2014-2009

Raw data Final2013-2014

48Cement concrete road construction work for rest of the village roads, chagalahatti village, Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

0.00 5.00

2013-201449

concrete road construction in SPG colony, Tavarekere illage, Tavarekere hobli, yashwanthpra vidhasabha constituecny, bangalore south talluk

15.00Under Progress

Nirmiti Kendra 7.50 7.50

2013-201450

RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, Kodigehalli gramapanchayath, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201451

Road development work, Aniketana nagara mainroad, Kodigehalli gramapanchayath, Bangalore north taluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201452

Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201453

Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn5.00 Completed

EE PRED, Bangalore

5.00 0.00

2013-201454

Road development work, from Kannalli Sigehalli gate to Banashankari Layout, Kodigehalli Gramapanchayath, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201455

Concrete road construticon, till suvarnamma home, Dasappanapalya, Yashwanthpura hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201456

Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk

4.00 CompletedEE PRED, Bangalore

4.00 0.00

2013-201457

Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk

4.00 CompletedEE PRED, Bangalore

4.00 0.00

2013-201458

concrete road work, from Kempapur main road to Palani home, Somashettihali gramapanchayath, Yashwanthpura hobli, Banglaore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201459

Concrete road work, from Palani home to vishwanath home, Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201460

Cement concrete road work, to 1st & 2nd crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201461

Cement concrete road work, to 3rd and 4th crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201462

Road development work, 1st cross, Maruthi Nagara, Somashettihalli gramapanchayath, Yashwanthpura hobli

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201463

Formation and metalling the roads from kalkere pond road to Mr.Rajendra's house in K.R Puram Hobli Bangalore urban District

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201464 and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli 5.00

Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201465

Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma's House in K.R,.Puram Hobli Bangalore

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201466

Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201467

Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201468

Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201469

Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201470

Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201471

Formation and metalling the roads of Mr. Shashidhar's house in varanasi layout at K.R.Puram Hobli Bangalore Urban District

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201472

improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201473

Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore

5.00 CompletedEE PRED, Bangalore

5.00 0.00

Page 49

Page 50: MPLADS DB Chandregowda 2014-2009

Raw data Final2013-2014

74Road development work, 1st & 2nd Cross, richard layout, Kalkere village, Bangalore north MP constituency

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201475

Road development work, 3rd & 4th Cross, richard layout, Kalkere village, Bangalore north MP constituency

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201476

Jalli work, from Paradise home 2nd cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201477

Jalli work, from Paradise home 2st cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2013-201478

Borewell digging work, Jagalahatti village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore north talluk

2.00Under Progress

EE PRED, Bangalore

0.00 2.00

2013-201479

pump motor and Pipeline implementing work, Chagalahatti village, Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201480

compound wall construciton, Daradahalli village temple, Mudigere talluk, Chikkamagaluru Dist5.00 Completed DC Chikkamagalur 5.00 0.00

2013-201481

Lingeshwara Lake development work, Daradahalli, Mudigere talluk, Chikkamagaluru dist5.00 Completed DC Chikkamagalur 5.00 0.00

2013-201482

formation of metalling the roads Mr.Krishnamurthy's house roads in kalkere Village, Bangalore North Bangalore

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201483

Improvement and metalling the roads of Mr.Puttaswamy layout roads in Channasandra Village Bangalore North Parlimentary Constituency Bangalore

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201484

formation of Metalling the roads of Richard's layout water Tank roads in Kalkere Village Bangalore North Parlimentary Constituency Bangalore

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201485

Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201486

Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk

5.00Under Progress

EE PRED, Bangalore

0.00 5.00

2013-201487

Borewell digging work in New layouts of Tippenahalli and doddabidarakallu villages, Doddabidarakallu ward

4.00Under Progress

EE PRED, Bangalore

0.00 4.00

2013-201488

UttaraKhand Floods rehabilatiton fund10.00 - - 0.00 10.00

Total 446 253 193

2012-20131

Borewell digging work, Coffee Board Layout welfare association ®, Hebbala Kempapura2.00

Under Progress

EE PRED, Bangalore

0.00 2.00

2012-20132

Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-20133

Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-20134

Road development work, from Backword community colony to Main road, Kannuru village, Yalahanka

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-20135

1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-20136

3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-20137

Road development work Stage - 1, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-20138

Road development work Stage -2, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-20139

Road development work, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201310

Road development work, Cross road, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

Page 50

Page 51: MPLADS DB Chandregowda 2014-2009

Raw data Final2012-2013

11from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201312

Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, Kengeri Hobli, K.gollahalli

6.00 CompletedEE PRED, Bangalore

6.00 0.00

2012-201313

Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201314

Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201315

Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201316

Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201317

Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201318

Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201319

Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201320

Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201321

Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201322

Road development work, Ganesha Temple road, Dasappanapalya, ChikkaBanavara village, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201323

3 Borewell digging, Motor pump & Tank work, Ward 39, Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout,

12.00 CompletedEE PRED, Bangalore

12.00 0.00

2012-201324

Busstand construction, Tavarekere village, Tavarekere hobli, Bangalore South Talluk5.00

Under Progress

EE PRED, Bangalore

0.00 5.00

2012-201325

CC road construction work, from Main road to till Amir saab home, Kengeri main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201326

CC road construction work, Bank colony, Tavarekere village, Tavarekere Hobli, Bangalore south talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201327

Drinking water overhead Tank construction work, Vinayaka Nagara, Ramohalli Gramapanchayath Limits

10.00 CompletedEE PRED, Bangalore

10.00 0.00

2012-201328

Concrete road work, from Murugesh home to Hanumantappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk

4.90 CompletedEE PRED, Bangalore

4.90 0.00

2012-201329

Concrete road work, from Chennaveerayya home to Nanjappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk

4.90 CompletedEE PRED, Bangalore

4.90 0.00

2012-201330

Concrete road work, from Indramma home to Anganavadi, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk

4.90 CompletedEE PRED, Bangalore

4.90 0.00

2012-201331

1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore2.00 Completed

EE PRED, Bangalore

2.00 0.00

2012-201332

1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore2.00 Completed

EE PRED, Bangalore

2.00 0.00

2012-201333

Drinking water supply work, ChannaVenkatappa home street, Tagachaguppe Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk

4.00 CompletedEE PRED, Bangalore

4.00 0.00

2012-201334

Concrete road work stage - 1, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201335

Concrete road work stage - 12, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201336

Orphanage home, Cultural hall construction in 3 acers of land, Shree bhavana rushi padmapeeta mahasamstana ® , Ullala, Yashwanthpura hobli, Bangalore north talluk,

5.00 CompletedEE PRED, Bangalore

5.00 0.00

Page 51

Page 52: MPLADS DB Chandregowda 2014-2009

Raw data Final2012-2013

37Tar road work, 790-948, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201338

Tar road work, 948-1106, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201339

Tar road work, 1106-1264, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201340

Tar road work, 1264-1422, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201341

Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201342

Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201343

Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201344

Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201345

Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201346

Road development work, 1 & 2nd cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201347

Road development work, 3rd &4th cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency,

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201348 Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara,

Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201349 Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi

Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201350

Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201351 Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara,

Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201352 Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara,

Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201353

Concrete construction work for cross roads, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201354 Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura

village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201355 Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura

village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201356 Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura

village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201357

Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201358

Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

Page 52

Page 53: MPLADS DB Chandregowda 2014-2009

Raw data Final2012-2013

59Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201360

Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201361

Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201362

Road development work, from Maragondanahalli mainroad lake main road to Kachaaramma temple road, Bangalore north MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201363

Road development work, from shivaramegowda home to MWS borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201364

Road development work, 2nd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201365

Road development work, 3rd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201366

Road development work, 4th cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201367

Road development work, Kannur main road to Kannuru Lake road, Hosuru, Yalahanka, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201368 Parkinsons Agencing research foundation Indira nagar Bangalore 2.84 Completed Nirmithi Kendra 2.84 0.00

2012-201369

2 Borewell digging work in Bhuvaneshwari Nagara layout4.00 Completed

EE PRED, Bangalore

4.00 0.00

2012-201370

Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201371

Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201372

Road development work Stage - 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201373

Road development work Stage - 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201374

Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore4.00 Completed

EE PRED, Bangalore

4.00 0.00

2012-201375

Drinking water supply to Saptagiri layout, Doddabidarakallu village4.00 Completed

EE PRED, Bangalore

4.00 0.00

2012-201376

Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201377

Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201378

Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201379

Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201380

Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201381

Borewell digging work for drinking water, BHEL layout welfare assocation, Rajarajeshwari Nagara Bangalore

2.00 CompletedEE PRED, Bangalore

2.00 0.00

2012-201382

water supplying work, Amrutha halli Mainroad to Shobha piper mart opposite, Byatarayanapura BBMP, Bangalore

2.00 CompletedEE PRED, Bangalore

2.00 0.00

2012-201383

Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency

13.00Under Progress

EE PRED, Bangalore

0.00 13.00

2012-201384 Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward No.7 Bangalore 2.00 completed

EE PRED, Bangalore

2.00 0.00

Page 53

Page 54: MPLADS DB Chandregowda 2014-2009

Raw data Final

2012-201385 Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree),

Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south tallku5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201386

Road development work from, AK colony to Devegere village, Devagere village, K.Gollahalli village, Kengeri Hobli, Bangalore South talluk

3.00 CompletedEE PRED, Bangalore

3.00 0.00

2012-201387

Concrete road development work, from Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore south Talluk

1.00Under Progress

EE PRED, Bangalore

0.00 1.00

2012-201388

Road development work from Main road to Ankappa home, Kalkere village, Bangalore north talluk5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201389

Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli Gramapanchayath, Bangalore north Talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201390

2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, Jala Hobli

4.00 CompletedEE PRED, Bangalore

4.00 0.00

2012-201391

Building construction for councelling center and other activities, Mahila Dakshata samiti Bengaluru,

10.00 Completed Nirmithi Kendra 10.00 0.00

2012-201392

Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba Veerashaiva Sanhga ® 5.00 Completed

EE PRED, Bangalore

5.00 0.00

2012-201393

Gutter construction road, ST colony, Dinnepalya, Kaggalipura Gramapanchayath, Uttarahalli hobli, Bangalore south talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-201394

PU college building work, Janasave trust, Channenahalli, Tavarekere hobli, Bangalore south talluk

10.00 CompletedEE PRED, Bangalore

10.00 0.00

2012-201395 1 Borewell digging, Vayunandana Layout, Bangalore north MP constituency 2.00 Completed

EE PRED, Bangalore

2.00 0.00

2012-201396 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village 2.00 Completed

EE PRED, Bangalore

2.00 0.00

2012-201397

Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk2.50 Completed

EE PRED, Bangalore

2.50 0.00

2012-201398 Concrete road work, Turahunase Village, Jala Hobli, Bangalore north Talluk 2.50

Under Progress

EE PRED, Bangalore

0.00 2.50

2012-201399 1 bore digging work, ward no.6, Thanisandra, Byatarayanapura Constituency, Bangalore 2.00 Completed

EE PRED, Bangalore

2.00 0.00

2012-2013100

Road development work, Cross road, Brothers colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-2013101

Road development, Masjid road, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-2013102

Road developmentwork, from Mahalingam home to Ganganna home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-2013103

Road developmentwork, from Harish Home to Manohar home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

2012-2013104

Road developmentwork,1st cross, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk

5.00 CompletedEE PRED, Bangalore

5.00 0.00

Total 505.54 482.04 23.5

2011-20121 Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore 2.00

work completed

EE PRED 2.00 0.00

2011-20122

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 1st Cross

5.00work completed

EE PRED 5.00 0.00

2011-20123

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 2nd Cross

5.00work completed

EE PRED 5.00 0.00

Page 54

Page 55: MPLADS DB Chandregowda 2014-2009

Raw data Final2011-2012

4Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 3rd Cross

5.00work completed

EE PRED 5.00 0.00

2011-20125

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 4th Cross

5.00work completed

EE PRED 5.00 0.00

2011-20126

Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 5th Cross

5.00work completed

EE PRED 5.00 0.00

2011-20127

Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village, Maruthi Nagara, Dwaraka Nagara Road development work

5.00work completed

EE PRED 5.00 0.00

2011-20128

Maruthi Nagara subroad (cross) road Development work5.00

work completed

EE PRED 5.00 0.00

2011-20129

Maruthi Nagara New Layout Road development work5.00

work completed

EE PRED 5.00 0.00

2011-201210

Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village BET School Road Development

5.00work completed

EE PRED 5.00 0.00

2011-201211

Road Development work 1 & 2nd road, from Hesaraghatta road to Dwarakanagara, Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201212

Road Development work, 1st Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201213

Road Development work, 2nd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201214

Road Development work, 3rd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201215

Road development work 250-500, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli

5.00work completed

EE PRED 5.00 0.00

2011-201216

Road development work 500-750, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli

5.00work completed

EE PRED 5.00 0.00

2011-201217

Cement Concrete road construction work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North tAlluk

5.00work completed

EE PRED 5.00 0.00

2011-201218

Cement concrete road construction work, near Ashwathkatte, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201219

Cement concrete road work, from Rajanna home to till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201220

Cement concrete road work, till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201221

Cement concrete road construction work, for Bipass road, Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201222

Borewell digging, Motor implimentation & Getting power supply form KEB, M.Hosahalli village, 5.00

under progress

EE PRED 2.50 2.50

2011-201223

Borewell digging, Motor implimentation & Getting power supply form KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli

5.00under progress

EE PRED 2.50 2.50

2011-201224

Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli

5.00under progress

EE PRED 2.50 2.50

2011-201225

Borewell digging, Motor implimentation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli

5.00under progress

EE PRED 2.50 2.50

2011-201226

Road development work, Cross -1, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku

5.00work completed

EE PRED 5.00 0.00

2011-201227

Road development work, Cross -2, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku

5.00work completed

EE PRED 5.00 0.00

2011-201228

Road development work, Cross -3, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku

5.00work completed

EE PRED 5.00 0.00

2011-201229

Road development work, Cross Roads, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North tallku

5.00work completed

EE PRED 5.00 0.00

Page 55

Page 56: MPLADS DB Chandregowda 2014-2009

Raw data Final2011-2012

30Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk

5.00work completed

EE PRED 5.00 0.00

2011-201231

Road development work (0-100) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201232

Road development work (100-200) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201233

Road development work (200-300) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201234

Road development work form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201235

Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk

5.00work completed

EE PRED 5.00 0.00

2011-201236

Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201237

Road development work and Jalli work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201238

Road development work and Jalli work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201239

Road development work and Jalli work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201240

Road development work and Jalli work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201241

Road development work and Jalli work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201242

Road development work and Jalli work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201243

Road development work and Jalli work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201244

Road development work and Jalli work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201245

Road development work and Jalli work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road

2.50work completed

EE PRED 2.50 0.00

2011-201246

Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.

5.00work completed

EE PRED 5.00 0.00

2011-201247

Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division.

5.00work completed

EE PRED 5.00 0.00

2011-201248

Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk

5.00work completed

EE PRED 5.00 0.00

2011-201249 Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near

muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk5.00

work completed

EE PRED 5.00 0.00

2011-201250 Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli

village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk5.00

work completed

EE PRED 5.00 0.00

2011-201251 Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli

village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk5.00

work completed

EE PRED 5.00 0.00

2011-201252

Gutter construction work, from Acharappa home to Mahimaraju home, K.Gollahalli Village, Kengeri Hobli

3.00work completed

EE PRED 3.00 0.00

2011-201253

Road development work from Gudimavu main road to Devagere Harijana Colony, K.Gollahalli Gramapanchayath village, Bangalore south talluk

4.25work completed

EE PRED 4.25 0.00

Page 56

Page 57: MPLADS DB Chandregowda 2014-2009

Raw data Final2011-2012

54Road development work form Kenchanapalya village to Paadri colony, K.Gollahalli Gramapanchayath, Bangalore South Talluk

1.50work completed

EE PRED 1.50 0.00

2011-201255

Pipeline implementation and Getting power supply from KEB, Maralukunte village, Marenahalli Gramapanchayath, Jala Hobli

5.00work completed

EE PRED 5.00 0.00

2011-201256

Road Development work from H.Gollahalli main road to Kabbalamma Temple, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201257

Library construction, Gonipura vilage, Yashawanthapura limits5.00

work completed

EE PRED 5.00 0.00

2011-201258

Women empowerment Building work (streeshakti bhavana) Gonipura village, Yashawanthapura limits

5.00work completed

EE PRED 5.00 0.00

2011-201259

Gutter construction work from Mallappa home to Narayanaswamy home, Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk

4.00work completed

EE PRED 4.00 0.00

2011-201260

Improvement and Asphalting to roads in sonnappa layout at bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage -2.

4.00work completed

EE PRED 4.00 0.00

2011-201261

Improvement of Asphalting to roads in sonnappa layout at bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage -2.

4.00work completed

EE PRED 4.00 0.00

2011-201262

Formation and metalling the roads of siddappa layout 1st cross, K.R.puram hobli Bangalore North Parlimentary Constituency

2.50work completed

EE PRED 2.50 0.00

2011-201263

Formation and metalling the roads of siddappa layout 2st cross, K.R.puramhobli Bangalore North Parlimentary Constituency

2.50work completed

EE PRED 2.50 0.00

2011-201264

Formation and metalling the roads of Motappa Layout 1st cross, K.R. Puram hobli, Bangalore north, Parliamentary constituency.

2.50work completed

EE PRED 2.50 0.00

2011-201265

Formation and metalling the roads of Motappa Layout 2st cross, KR Puram hobli, Bangalore north, Parliamentary constituency.

2.50work completed

EE PRED 2.50 0.00

2011-201266

Formation and metalling the roads of Motappa Layout 3rd cross, KR Puram hobli, Bangalore north, Parliamentary constituency.

2.50work completed

EE PRED 2.50 0.00

2011-201267

Formation and metalling the roads of Motappa Layout 4th cross, KR Puram hobli, Bangalore north, Parliamentary constituency.

2.50work completed

EE PRED 2.50 0.00

2011-201268

Chainlink Compund construction work, ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201269

Concrete road development work, Beside ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201270

Primary School Building construction, Gonipura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore South Talluk

4.00work completed

EE PRED 4.00 0.00

2011-201271

Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No. 22 Ganganagar, Bangalore North

18.62work completed

Nirmithi Kendra 18.62 0.00

2011-201272

Community hall construction work Stage -1, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.

5.00work completed

EE PRED 5.00 0.00

2011-201273

Community hall construction work Stage -2, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.

5.00work completed

EE PRED 5.00 0.00

2011-201274

Community hall construction work Stage -3, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village.

5.00work completed

EE PRED 5.00 0.00

2011-201275

Road Development work, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk5.00

work completed

EE PRED 5.00 0.00

2011-201276

Road Development work Stage-1, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk5.00

work completed

EE PRED 5.00 0.00

2011-201277

Road Development work Stage-2, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk5.00

work completed

EE PRED 5.00 0.00

2011-201278

Road development work, Anjeneya temple road, Veerashettihalli village, Yashawanthpura hobli, Bangalore North talluk

5.00work completed

EE PRED 5.00 0.00

2011-201279

Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

Page 57

Page 58: MPLADS DB Chandregowda 2014-2009

Raw data Final2011-2012

80Gutter Work, From chikkaBanavara to Kempapura Road, Yashwanthpura hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201281

Gutter work, From Dwarakanagara Cross to Kodohalla, Yashwanthpura hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201282

Road Development work, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201283

Concret road work, from Dasappanapalya main road to Kereguddadahalli, Bangalore north talluk5.00

work completed

EE PRED 5.00 0.00

2011-201284

Concrete road work from Chowdeshwari layotu borewell to mini water tank, Kereguddadahalli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-201285

Road development work and jalli work Stage - 1, Siddappa layout, Kalkere village, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-201286

Road development work and jalli work Stage - 2, Siddappa layout, Kalkere village, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-201287

Road development work and Jalli work Stage - 1, Kariyappa Layout, Kalkere village, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-201288

Road development work and Jalli work Stage - 2, Kariyappa Layout, Kalkere village, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-201289

Road development work and Jalli work Stage - 1, Motappa ayout, Kalkere village, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-201290

Road development work and Jalli work Stage - 2, Motappa ayout, Kalkere village, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-201291

Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage-1

5.00work completed

EE PRED 5.00 0.00

2011-201292 Formation of concrete road Development near Sri.Anjaneya swamy temple, Tippur village

K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 25.00

work completed

EE PRED 5.00 0.00

2011-201293 Formation of concrete rod development near sri.Anjaneya swamy temple Tippur village,

K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 35.00

work completed

EE PRED 5.00 0.00

2011-201294

Road development work, Muneshwara Layout, Kalkere Village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00

2011-201295

Road development work, 2nd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00

2011-201296

Road development work, 3rd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00

2011-201297

Road development work, 4th cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk2.50

work completed

EE PRED 2.50 0.00

2011-201298

Road development work 0 - 250, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-201299

Road development work 250-500, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-2012100

Road development work 500 - 750, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-2012101

Road development work 750-1000, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk

2.50work completed

EE PRED 2.50 0.00

2011-2012102

Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00

2011-2012103

Rock Guttor construction, Brothers colony, Chikkabanavara, Yashwanthpura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012104

Concrete road development work, Tirumalapura Village, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00

Page 58

Page 59: MPLADS DB Chandregowda 2014-2009

Raw data Final2011-2012

105Development work in New Layout, Banapathi nagara, GanigaraHalli village, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012106

5th Concrete Road Development work, Maruthi Nagara, Bangalore north Talluk5.00

work completed

EE PRED 5.00 0.00

2011-2012107

Concrete road development work, 6th cross, Gulbarga Slum, Newlayout, Ganigarahalli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012109 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli

village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts)2.50

work completed

EE PRED 2.50 0.00

2011-2012110 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli

village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts)2.50

work completed

EE PRED 2.50 0.00

2011-2012111 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli

village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts)2.50

work completed

EE PRED 2.50 0.00

2011-2012112 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli

village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts)2.50

work completed

EE PRED 2.50 0.00

2011-2012113

Improvement and metalling the road in sunny layout 1st cross in ward No. 54, Bangalore North.2.50

work completed

EE PRED 2.50 0.00

2011-2012114

Improvement and metalling the road in sunny layout 2st cross in ward No. 54, Bangalore North.2.50

work completed

EE PRED 2.50 0.00

2011-2012115

Improvement and metalling the road in sunny layout 3st cross in ward No. 54, Bangalore North.2.50

work completed

EE PRED 2.50 0.00

2011-2012116

Improvement and metalling the road in sunny layout 4st cross in ward No. 54, Bangalore North.2.50

work completed

EE PRED 2.50 0.00

2011-2012117

Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)

2.50work completed

EE PRED 2.50 0.00

2011-2012118

Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs)

2.50work completed

EE PRED 2.50 0.00

2011-2012119

Improvement and metalling of roads at 1st cross Udaya layout, Kodige halli, Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district.

5.00work completed

EE PRED 5.00 0.00

2011-2012120

Improvement and metalling of roads at 2nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.

5.00work completed

EE PRED 5.00 0.00

2011-2012121

Improvement and metalling of roads at 3nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district.

5.00work completed

EE PRED 5.00 0.00

2011-2012122

Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara, Byatarayanapura, Bangalore South Talluk

13.00work completed

EE PRED 13.00 0.00

2011-2012123

Road development work, 1st cross, Ganesha Layout, Bangalore Talluk5.00

work completed

EE PRED 5.00 0.00

2011-2012124

Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk5.00

work completed

EE PRED 5.00 0.00

2011-2012125

Road development work from 1 stage to 2nd stage Bhavani Layout, Tirumalapura Village, Yashwanthpura hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012126

Concrete road development work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012127

Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012128

Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012129

4 Rooms construction work, 1st floor, Govt Higher Primary School, Chikkabanavara village22.50

work completed

EE PRED 22.50 0.00

Page 59

Page 60: MPLADS DB Chandregowda 2014-2009

Raw data Final2011-2012

130 To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout 2.00work completed

EE PRED 2.00 0.00

2011-2012131 To dig Borewel in Amrutha Nagar 2.00

work completed

EE PRED 2.00 0.00

2011-2012132 Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore 10.00

work completed

KRIDL 10.00 0.00

2011-2012133

Community Hall construction, Near BDA Park, Opposite VaiyalliKaval education trust, Bangalore north MP constituency

10.00work completed

EE PRED 10.00 0.00

2011-2012134

Road development work form Kempapura mainroad to Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012135

Road development work from Basavaraju home to Nagaraju home, Kempapura Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012136

Gutter work Stage - 2, Gonipura village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore South Talluk

5.00work completed

EE PRED 5.00 0.00

2011-2012137

Concrete road construction work, 4th A, B, & C corss, ward no. 102, Vrushabhavathi Nagara, Vinayakanagara

10.00work completed

EE PRED 10.00 0.00

2011-2012138

2 % Administration expinditure10.00 DC 10.00 0.00

Total 624.87 614.87 10

2010-20111

Concrete road construction work Stage -1, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli,

5.00work completed

EE PRED 5.00 0.00

2010-20112

Concrete road construction work Stage -2, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli,

5.00work completed

EE PRED 5.00 0.00

2010-20113

Road development work Stage - 1, Malurappa mane, K.R. Pura Hobli5.00

work completed

EE PRED 5.00 0.00

2010-20114

Road development work Stage - 2, Malurappa mane, K.R. Pura Hobli5.00

work completed

EE PRED 5.00 0.00

2010-20115

Road development work from Doddagollarahalli Banian tree road to Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2010-20116

Road Development work, from Doddagollarahatti Pipeline road to Govt Primary school, Yashavantapura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-20117

Concrete Road construction work for all the (cross) subroads, Doddagollarahatti village, Yashavanthapura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-20118

Culvert and Road development work for Doddagollarahatti (cross roads) Subroads, Yashavanthapura hobli

5.00work completed

EE PRED 5.00 0.00

2010-20119

Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt)

5.00work completed

EE PRED 5.00 0.00

2010-201110

Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt)

5.00work completed

EE PRED 5.00 0.00

2010-201111

Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt)

5.00work completed

EE PRED 5.00 0.00

2010-201112

Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt)

5.00work completed

EE PRED 5.00 0.00

2010-201113

Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt)

5.00work completed

EE PRED 5.00 0.00

Page 60

Page 61: MPLADS DB Chandregowda 2014-2009

Raw data Final2010-2011

14Road development work Stage - 1 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-201115

Road development work Stage - 2 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-201116

Road development work Stage - 3 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-201117

Road development work Stage - 4 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-201118

Road construction work, MM Road, Chikkabanavara, Yashawanthapura Hobli5.00

work completed

EE PRED 5.00 0.00

2010-201119

Road Construction work Stage - 1, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-201120

Road Construction work Stage - 2, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-201121

Road Construction work Stage - 3, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-201122

Road Construction work Stage - 4, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-201123

Road Construction work Stage - 5, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli

5.00work completed

EE PRED 5.00 0.00

2010-201124

Construction of sky light roofing for the park at Kethamaranahalli in Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore.

8.00work completed

EE PRED 8.00 0.00

2010-201125

One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North Talluk1.50

work completed

EE PRED 1.50 0.00

2010-201126

Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side)

5.00work completed

EE PRED 5.00 0.00

2010-201127

Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk - from Chainage 98.00 to 196.00 (left side)

5.00work completed

EE PRED 5.00 0.00

2010-201128

Borewell digging work, Bagalahalli village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore North Talluk

1.50work completed

EE PRED 1.50 0.00

2010-201129

Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201130

Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh Temple main circle, K.R.Puram assembly constituency (6 Nos solar street Lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201131

K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201132

K.R Puram Bus stand, K.R.puram railway station front gate K.R. puram assembly contituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201133

Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. puram assembly contituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201134

Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201135

Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201136

Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201137

Dasarahalli main road, Byatarayanapura assembly constituency. (6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

Page 61

Page 62: MPLADS DB Chandregowda 2014-2009

Raw data Final2010-2011

38 Saraswathipura Main road, Byatarayanapura assembly constituency (6 No's solar street lights) 4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201139

Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No's solar street lights)

4.41work completed

Nirmithi Kendra 4.41 0.00

2010-201140 R.T. Nagar main road, Hebbal assembly constituency (2 No's solar street lights) 1.47

work completed

Nirmithi Kendra 1.47 0.00

2010-201141

Borewell work, for Drinking water to Parimala Nagara, Nandini Layout, Mahalakshipuram ward no. 43

1.50work completed

EE PRED 1.50 0.00

2010-201142

Oldage Home building construction work, Sy no.113, Shree Shankara Balaga, New Park road, Malleshwaram, Bangalore

1.00work completed

EE PRED 1.00 0.00

2010-201143

Road Development work Stage - 1, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2010-201144

Road Development work Stage - 2, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2010-201145

Road Development work Stage - 3, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk

5.00work completed

EE PRED 5.00 0.00

2010-201146

Road Development work, from Kempapura Maruthi Nagara Mainroad, Bangalore North Talluk5.00

work completed

EE PRED 5.00 0.00

Total 208.48 208.48 0

2009-20101

Providing cement concerte payment from Bandrappa's house to samashitti halli Road at Kenigadda halli village, Bangalore North Taluk,Bangalore Dist.

4.50work completed

EE, PRED, Bangalore

4.50 0.00

2009-20102

Construction of RCC Drain from Kiveguddahalli Village, to Banmddappa's Garden at Bangalore North Taluk, Bangalore District.

7.99work completed

EE, PRED, Bangalore

7.99 0.00

2009-20103

Providing concerte Road at Ganigarahalli Village, Samashutty halli Grama Panchayath, Bangalore North Taluk, Bangalore District.

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-20104

Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist.

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-20105

Providing concerete to roadrata chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-20106

Cement concrete road construstion work stage -1, Hosahalli village, Jaalahalli Hoobli, Bangalore North Talluk

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-20107

Cement concrete road construction work, Kodagalahatti Village, Jalahalli Hobli8.00

work completed

EE, PRED, Bangalore

8.00 0.00

2009-20108

Road Development work, from Tarahunase to Bettenahalli village joining road, Jaalahalli Hobli10.00

work completed

EE, PRED, Bangalore

10.00 0.00

2009-20109

Road Development work, Marenahalli Joining road, Jaalahalli Hobli4.00

work completed

EE, PRED, Bangalore

4.00 0.00

2009-201010 Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti Nagar,N.G.O colony,

Bangalore. ( Stage 1)3.49

work completed

EE, PRED, Bangalore

3.49 0.00

2009-201011

Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2)

7.10work completed

EE, PRED, Bangalore

7.10 0.00

2009-201012 Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa

home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli8.00

work completed

EE, PRED, Bangalore

8.00 0.00

2009-2010

13Community hall construction for Margadarshi Mahila Samaja ® , No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore

1.00work completed

Project Manager, Nirmithi Kendra Urban

1.00 0.00

Page 62

Page 63: MPLADS DB Chandregowda 2014-2009

Raw data Final2009-2010

14Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.

5.00work completed

EE, PRED, Bangalore

5.00 0.00

2009-201015

Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District.

5.00work completed

EE, PRED, Bangalore

5.00 0.00

2009-201016

Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-201017

Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-201018

Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-201019

Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-201020

Concrete Road Construction work from Shivalingayya home to Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-201021

Concrete Road Construction work from Shankara Home to Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72

8.00work completed

EE, PRED, Bangalore

8.00 0.00

2009-201022

Road development chain 0-500, from Vidya Nagara Main road to Hosahalli village side, Bangalore North Talluk

5.00work completed

EE, PRED, Bangalore

5.00 0.00

2009-201023

Cement Concrete road from ChikkaBasavaraju Home to Bhimarav road, Uttanahalli Village, Bangalore North Talluk

5.00work completed

EE, PRED, Bangalore

5.00 0.00

2009-201024

Cement Concrete Road from Venkobarao home to Anjanappa home, Sonnappanahalli Village, Bangalore North Talluk

5.00work completed

EE, PRED, Bangalore

5.00 0.00

2009-201025

Cement Concrete Road from Rajanna Home to Sampangappa Home, Kadiganahalli Village5.00

work completed

EE, PRED, Bangalore

5.00 0.00

2009-201026

Cement Concrete Road from Main road to Virajappa Home, Ukkenahalli village, Bangalore North Talluk

5.00work completed

EE, PRED, Bangalore

5.00 0.00

2009-201027

Cement Concrete road from Muniraju home to Krishnappa home, Uttanahalli Village, Bangalore North Talluk

5.00work completed

EE, PRED, Bangalore

5.00 0.00

2009-201028

Cement concrete road till Palakammanagara Home, Chikkajaga village, Bangalore North Talluk5.00

work completed

EE, PRED, Bangalore

5.00 0.00

2009-201029

Road development work (500-1000 meter) Bangalore North Talluk, Vidyanagara, Bagaluru Mairn road to Hosahali village

5.00work completed

EE, PRED, Bangalore

5.00 0.00

2009-201030

Cement concrete road behind Mutyalamma temple, Doddajaala, Bangalore North Talluk5.00

work completed

EE, PRED, Bangalore

5.00 0.00

Total 189.08 189.08 0

Page 63

Page 64: MPLADS DB Chandregowda 2014-2009

Number

AmountNumbe

rAmount

Number

Amount

1 2009-10 30 189.08 29 189.08 0 0.00 0.00 200.00 16.75 216.75 189.08 27.672 2010-11 47 212.89 47 212.89 0 0.00 27.67 200.00 1.05 228.72 212.89 15.833 2011-12 138 624.87 134 614.87 4 10.00 15.83 500.00 81.85 597.68 614.87 -17.194 2012-13 104 505.54 99 482.04 5 23.50 -17.19 500.00 8.09 490.90 482.04 8.865 2013-14 88 446.00 50 253.00 38 193.00 8.86 250.00 0.50 259.36 253.00 6.36

407 1978.4 359 1751.9 47 226.50 1751.8810.0010.00 1742.29246.50 1675 9.59

1.59

2% Adiministation Charges for the Year 2013-14Grand Toatl

Interest/Amount on

DistributionTotal

Amount Released

to IABalance

Total2% Adiministation Charges for the Year 2012-13

Physical and Financial Status for the year 2009-10 to 2013-14

Sl No

Physical Status Financial Status [In Lakhs]

Year

Works Sanctioned

Works Completed

Works Under Progress

Opening

Balance

Amount

received by GOI