mri repalcement
TRANSCRIPT
![Page 1: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/1.jpg)
12163191216319FMC Seaman's Centre IMRIS FMC Seaman's Centre IMRIS
InstallInstall
Special Projects
![Page 2: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/2.jpg)
Building BuildingsBuilding Buildingsandand
Building RelationshipsBuilding Relationships
![Page 3: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/3.jpg)
The Ledcor TeamThe Ledcor Team
• Steve Neidermayer, Superintendant
• Karra Bridger, Project Assistant• Matt Heske, Project Coordinator• Linda Eisbrenner, Project
Accountant• Neil Elford, Project Manager
![Page 4: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/4.jpg)
Project FactsProject Facts
• Contract Value $1,100,000• MRI (total costs) $5,400,000• Old 1.5T Magnet 16,000 lbs (7
tonne)• New 3.0T Magnet 20,000 lbs (9
tonne)
![Page 5: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/5.jpg)
"This is truly a first, there is not another movable three tesla magnet attached to ceiling rails on the
entire planet.
This is a marvelous achievement and representsa considerable innovation for Calgary and the
Centre"
Dr. Garnette Sutherland
![Page 6: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/6.jpg)
Preconstruction visit
![Page 7: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/7.jpg)
Removal of the old 7 tonne MRI out of the building
![Page 8: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/8.jpg)
Here is another way to look at 7 tonne
![Page 9: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/9.jpg)
![Page 10: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/10.jpg)
New MRI brought in through the McCaig Tower before the building was closed in.
![Page 11: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/11.jpg)
Ledcor – Safety first (lead by example)especially when lifting 20 000 lbs
![Page 12: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/12.jpg)
So HOW heavy is the new MRI(maybe this helps)
![Page 13: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/13.jpg)
![Page 14: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/14.jpg)
Demolition of theOperating Room
![Page 15: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/15.jpg)
Negative Air units running
![Page 16: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/16.jpg)
Framing for RFRail support plates shielding
![Page 17: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/17.jpg)
Copper shielding for Radio Frequency (RF) interference
![Page 18: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/18.jpg)
![Page 19: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/19.jpg)
![Page 20: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/20.jpg)
![Page 21: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/21.jpg)
MRI ready for move to the OR
![Page 22: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/22.jpg)
![Page 23: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/23.jpg)
Lifting 20 000 lbs to hang from the “magnet mover”
![Page 24: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/24.jpg)
![Page 25: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/25.jpg)
![Page 26: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/26.jpg)
![Page 27: MRI repalcement](https://reader038.vdocument.in/reader038/viewer/2022102816/55c2b41cbb61ebe1768b463e/html5/thumbnails/27.jpg)