mrp1 prsntation-slides-1226827392037035-8
DESCRIPTION
i am student od MBA at iqra university...this is material resource planning ppt...i hve some more ppt on different topic if someone wants help from me so u can contact at this number...03343649958.TRANSCRIPT
Material Requirement Planning (MRP-1)
Material Requirement Planning (MRP-1)
Types Of Techniques
PUSH PULL
MRP1 JITMRP2 KANBANDRP1DRP2
HAPPY CUSTOMER. HAPPY SUPPLIER…..
Major Problem
Dependent on Accurate Forecasting
Only Solution…
Buy ‘Just Enough’ Stock
Material Requirement Planning (MRP-1)
Introduction of MRP in 1960’s by Dr Joseph Orlicky.
Definition :MRP is a software based production, planning
and inventory control system used to manage the manufacturing process.
It is a computer based system in which the given Master Schedule is exploded with Bills Of Material, into the required amount of raw material, parts and subassemblies needed top produce the final products in each tome period of say a week or month (called as “Buckets”)
MRP 1 - Functions
ForecastingOrder, Planning and ControlPriority Planning and ControlPlanning Capacity Requirement and Development of Broad Business Plans
Objectives
Ensure The Availability of Material Components and Products For Planned Production and Customer Delivery.Maintain The Lowest Possible Inventory Level.Plan Manufacturing Activities, Delivery Schedules and Purchasing Activities.
Key Elements Of MRP 1
Demand Forecasting:-It is the quantity demanded per year or per unit time which indirectly helps in knowing quantity to be supplied.
Master Production Schedule (MPS):-MPS is a series of time phased quantities for each item that a company manufactures. It gives the details of the products to be manufactured over the given space of time.-
Forecast requires10 desks in May
20 desks in June
Example of MPSMaterial Required
880 screws40 handles240 planks10 tops and 40 legs 5.55 tubes of glue
1760 screws80 handles480 planks20 tops and 80 legs 11.1 tubes of glue
Bills Of Material (BOM):-BOM is the document generated at design stage. It gives the details of the structure of the product by dividing the final assembly into major assemblies and sub-assemblies. BOM provides details such as part name, part no., description, quantity required material, etc.
88M e ta l S c re w s
4H a n d les
24P la n ks
4 d ra w e rsR e q u ire
1top
4le gs
5 /9tu be o f g lue
M a in D e skR e q u ires
O ff ic e D e skO a k F in ish4 d ra w e rs
Inventory Status File (ISF):-ISF reports the inventory on hand. It allows the company to subtract existing inventory from gross requirements, so net requirements can be ordered. The ISF also reports on safety stock needs and lead times for each item.
MRP Program:-This is a computer software programme. First, it explodes the finish product’s demand into gross requirement for parts. Second, the package determines net requirements based on the ISF. Third, it place orders to meet the net quantities needed and lead times.
Material Requirements Planning MRP1
MasterProductionSchedule
MRPMaterial
requirement planning
Material plans
Customer orders
Bill of materials
Purchase orders
Demand forecast
Inventory records
Works orders
Outputs And Reports:- The MRP 1 package generates many
reports such as action notices, priority reports, inventory status information.
Advantages of MRP 1
Improved Business ResultsImproved Manufacturing ResultsMore Accurate And Timely InformationLess InventoryLess Materials ObsolescenceTime Phased Ordering Of Materials
Higher ReliabilityMore Responsiveness To Market DemandReduced Production Cost
Disadvantages
Increase In Material Acquisition Cost
Higher Transportation Costs And Higher Unit Cost
Potential Hazard Of A Production Slowdown Or Shutdown
Use Of Standardized Software Packages
Does not Take Into Account Plant Capacity And Distribution Capacity
High Stock-Out Costs.
Manufacturing Requirement Planning(MRP II)
Manufacturing Resource Planning (MRP II) is defined as a method for the effective planning of all resources of a manufacturing company. Ideally, it addresses operational planning in units, financial planning in dollars, and has a simulation capability to answer "what-if" questions and extension of closed-loop MRP.
MRP• Manufacturing-centric/Push mgt.• Master production schedule• Final production schedule• Inventory management• Bill of materials• Gross requirement generation• Net requirement generation• Reorder point calculation• Automatic replenishment
MRP I I• Capacity requirement. planning• Production control• Marketing interface• Accounting interface• Financial interface• Personnel interface• Supplier interface• Customer interface
Major Developments From MRP
Feedback
Allocating reserves
Matching the requirements
Software extension programmers
Data accuracy
Significant Payback Achieved By Coca-cola
Coca Cola: "Always" Class A MRP IIInventory levels: downProductivity: upCustomer delivery performance: improvedSupplier delivery performance: betterBusiness Processes: improvedData integrity: highCost of goods: downTeam Spirit: high
Benefits In Different Levels
For ManagementAn accurate, consistent and effective way to run the whole business
The ability to manage orderly growth
The ability to cope with difficult economic conditions
For Management Information
Quicker, better information on which to base decisions
Consistent information at all levels, in all departments
Accurate records for internal and external use
For Sales / MarketingImproved on-time deliveries to customers
Faster, more accurate delivery promising
Improved responsiveness to customer needs
For ProductionImproved productivity and resource utilization
Increased through output
Better reliability of production plans
For Materials ManagementBetter control of inventories
Improved scheduling
Productive relationships with suppliers
For Design / EngineeringImproved design control
Better quality and quality control
For Financial and CostingReduced working capital for inventory
Improved cash flow through quicker deliveries
Accurate inventory records
Timely and valid cost and profitability information
For And Against MRPII
FORLong term planning tool for complex products
Can give accurate completion date at time of order
Fits in with conventional accounting
Progress of manufacture available at all times
Inventory size available at all times
Control of work orders and changes is tight
Many types of software available
AgainstFile/database accuracy must be maintained
Inventory accuracy is vital (99% accuracy is a typical requirement)
Highly computer based
Does not affect quality management, line balancing, or other production management issues
Inflexible and relies on forecast. Temptation exists to over-ride and go manual
Distribution Requirements Planning (DRP – I)
Distribution Requirements Planning (DRP I)
DRP is the application of MRP principles to the distribution environment. It integrates the, special needs of distribution. It is a dynamic model which looks at a time-phased plan of events that affect inventory.
What is DRP?
DRP provides the basis for integrating supply chain inventory information and physical distribution activities with the Manufacturing Planning and Control system.
What is DRP?
Managing the flow of materials between firms, warehouses, distribution centers.DRP helps manage these material flows. Just like MRP did in Manufacturing.Links firms in the supply chain by providing planning records that carry demand information from receiving points to supply points and vice versa.
DRP Menu Items Component Description Purpose in DRP
Material Master Creates stock items and controlling elements of items, locations and policies that are used in the deployment process.
Inventory Management Tracks inventory availability in all stock categories and supply and demand for an item.Also allows for the physical movement of inventory.
Sales Planning, Forecasting and Demand Management
Creates forecasts of customer demand which results in the creation of independent requirements at the distribution center.These independent requirements are later consumed by actual customer orders.
Purchasing Creates quota arrangements that control the supply relationships in the network.
Materials Requirements Planning Determines net supply and demand resulting in a proposal for the transfer of inventory from the plant to the distribution center.
Marketing Benefits
Increases service level and decrease customer complaints.Improve inventory coordination.Enhances ability to offer customer a coordinated inventory management service.
Logistical Benefits
Reduces freight costs.Reduces inventory level.Decreases warehousing space.Reduces customer freight cost.Enhances budgeting capitability.
Constraints of DRP
Inventory planning systems require accurate and coordinated forecasts for each distribution center. Integrated planning is subject to system nervousness and frequent rescheduling, because of production breakdowns and delivery delays. DRP is not the universal solution for inventory management.
Distribution Resource planning(DRP-II)
Distribution Resource planning
Distribution resource planning [DRP II] is an extension of DRP I.Distribution resource planning applies the time phased logic of DRP I to replenish inventories in multi echelon warehousing systems.Distribution resources planning extends DRP I to include the planning of key resources in a distribution system – warehouse space, equipments, labors, transport capacity [e.g trucks,rail cars] and financial flows
Objectives Of DRP II
The objective of Distribution Resource Planning are, To improve customer service levels by anticipating customer demand at distribution centers and providing finished products at the correct location when customer needs arise.To provide an accurate requirements plan for manufacturing. To optimize the distribution of available stock in the distribution network using the deployment function.
DRP II Provides a framework
Distribution resource planning provides a framework for determining the need to replenish inventory by:
Linking market requirements with manufacturing and demand management.
Relating current inventory positions and demand forecasts to production scheduling.
Matching material supply to manufacturing demand, and customer demand to product supply.
Factors needed for Implementing DRP II
Before the use of DRP for planning and deployment, we must set up a distribution network. A distribution network represents possible delivery relationships between the supplying plants and the distribution centers. DRP entails planning the supply chain from sales planning through delivery to the distribution centers, assuming there are sales orders or that sales forecasts are available. The primary aim of planning is to determine the quantities required on specific dates,including the lead times of the distribution lanes. The distribution network defines the normal supply method for execution.
CUSTOMERS
DISTRIBUTION CENTER
DISTRIBUTION CENTER
DISTRIBUTION CENTER
DISTRIBUTION CENTER
REGIONALWAREHOUSE
DISTRIBUTION CENTER
DISTRIBUTION CENTER
REGIONAL WAREHOUSE
PLANT WAREHOUSE
FINAL ASSMEBLY(MANUFACTURING)
SUB ASSEMBLY B SUB ASSEMBLY C SUB ASSEMBLY D
SUB ASSEMBLY A PART C PART D PART E
PART A PART B
RAW MATERIALS
Difference between DRP and MRP MRP DRP
Scope Inbound logistics Outbound logistics
Guiding factor Guided by production schedules
Guided by customer demand
Control of the firm Under control of the firm
Not under control of the firm
Demand situation Operates in dependant demand situation
Operates in independent demand situation
Area of operation & coordination
Coordinates scheduling & integration of materials into finished goods
Coordinates demand between outlets & supply sources
Stage of functioning Controls inventory until manufacturing & assembly is complete
Controls inventory after manufacturing & assembly of finished goods
Planning availability of stock at?
Market[retailers] & warehouses
Raw materials stores,conversion process & finished goods store