mrr ppt aug2011

29

Upload: manila-condo

Post on 30-Jun-2015

298 views

Category:

Real Estate


0 download

DESCRIPTION

high level of security & perimeter walls.Very affordable.Business districts,schools,hospitals,commercial establishments & the like are very accessible.More amenities that you & your family can enjoy!!!

TRANSCRIPT

Page 1: Mrr ppt aug2011
Page 2: Mrr ppt aug2011

Welcometo your New Home

Page 3: Mrr ppt aug2011

• Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River.

• Project lot area composed of 14,000 square meters with 62 percent of the area allotted for roads, landscaped areas and amenities such as playground, swimming pool , and water-featured landscapes.

• Comprised of 9 buildings ranging from 10 – 14 floors.

Page 4: Mrr ppt aug2011

Nile Building

Page 5: Mrr ppt aug2011

Location• Along the historic and scenic banks of Pasig

River in Sta. Ana, Manila

• Surrounded by the nation’s busiest economic centers of Makati, San Juan, Mandaluyong and Manila

• Close to school areas

• Accessible to public transportation

Page 6: Mrr ppt aug2011

Location Map

Page 7: Mrr ppt aug2011

Site Development

Page 8: Mrr ppt aug2011

PROPOSED SITE DEVELOPMENT @REAR PORTION OF YANGTZE BUILDING

FRONTING PASIG RIVER

Page 9: Mrr ppt aug2011

Amenities

Page 10: Mrr ppt aug2011

Site Features

• Proposed environment friendly features:

- Solar Panel

- Rain water catch basin

- Waste segregation• Elevated to safe levels• Gated Community with 24-Hour Security• Swimming Pool• Landscaped Park• Pavillion• Children’s Playground• Water featured landscaping

Page 11: Mrr ppt aug2011

Typical Building Floor Plan

Page 12: Mrr ppt aug2011

Building Features

• Elevator• 1.5 meter-wide corridors• Roof deck with landing area• Service stairs• Overhead tanks with water pump• Standby generator for common areas

Page 13: Mrr ppt aug2011

Building FeaturesMain Lobby Entrance

Page 14: Mrr ppt aug2011

Unit Finishes

• RESIDENTIAL AREA

A. Floor Finishes

Living, Dining & Kitchen Vinyl Planks

Bedrooms Vinyl Planks

Toilet Unglazed ceramic tiles

Utility Area Plain cement finish

B. Wall Finishes No partition walls for bedroom/s

Interior walls 1-coat paint on concrete walls

Toilet 1-coat plain cement finish above tile

Page 15: Mrr ppt aug2011

C. Ceiling Finishes

Living, Dining & Kitchen 1-coat paint on plain cement finish

Bedrooms 1-coat paint on plain cement finish

Toilet 1-coat paint on ficem board finish

D. Kitchen Kitchen counter top with sink & faucet. Under counter cabinet door & overhead cabinet are

not included.

E. Door

Entrance & Bedroom door Solid finger jointed wood with sheet

laminated and solid wood core door

jambs plus casing

F. Windows Aluminum windows

Page 16: Mrr ppt aug2011

G. Finishing Hardware Cylindrical lockset for main

Privacy lockset for T & B door.

H. Toilet & Kitchen Fixtures

Water and Closet Lavatory Complete set of water closet and

lavatory with fittings & accessories.

Shower faucet Complete set of shower with faucet

and fittings.

I. Electricity Complete outlet and lighting devices

with circuit breaker.

Page 17: Mrr ppt aug2011

Typical Unit Floor Plan

Studio Unit21.05 sq. m Provision for 1BR Unit

28.1 sq.m

Page 18: Mrr ppt aug2011

Typical Unit Floor Plan

Provision for 2BR Unit –B43.25 sq.m

Provision for 2BR Unit – C44.35 sq.m

Page 19: Mrr ppt aug2011

Construction UpdatesNile Building100% Complete

Page 20: Mrr ppt aug2011

Blue Danube Building100% Complete

Page 21: Mrr ppt aug2011

Dnieper Building100% complete

Page 22: Mrr ppt aug2011

Colorado Building100% complete

As of August 2011

Page 23: Mrr ppt aug2011

Interior of Colorado Building

Hallway areas Stair Railing works

Parking Entrance

Entrance to Colorado

Parking Areas

Page 24: Mrr ppt aug2011

Kitchen cabinet installation

T&B Tiling works

Aluminum Window’s installation @

Colorado

Elevator Installation

Page 25: Mrr ppt aug2011

Euphrates BuildingStructural works

As of August 2011

Page 26: Mrr ppt aug2011

Kumagawa BuildingPile Driving

COMPLETED PILE DRIVING (157piles driven out of 157 piles)

Page 27: Mrr ppt aug2011

DevelopmentPermit

Page 28: Mrr ppt aug2011

Certificate ofRegistration

Page 29: Mrr ppt aug2011

Payments & Financing

• As low as PHP 1.1M for a studio unit• As low as PHP6,000 per month• Flexible payment scheme (down payment – payable up

to 24 months; balance – payable up to 30 years through Pag-IBIG)

• Available financing through in-house, bank or Pag-IBIG