mrr ppt may2011

Upload: anon260146169

Post on 07-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 Mrr Ppt May2011

    1/30

  • 8/6/2019 Mrr Ppt May2011

    2/30

    Welcometo your New Home

  • 8/6/2019 Mrr Ppt May2011

    3/30

    Experience the verve of living by the banks and drift throughthe historic and scenic beauty of Pasig River.

    Project lot area composed of 14,000 square meters with 62

    percent of the area allotted for roads, landscaped areas andamenities such as playground, swimming pool , and water-featured landscapes.

    Comprised of 9 buildings ranging from 10 14 floors.

  • 8/6/2019 Mrr Ppt May2011

    4/30

    Nile Building

  • 8/6/2019 Mrr Ppt May2011

    5/30

    Location

    Along the historic and scenic banks of PasigRiver in Sta. Ana, Manila

    Surrounded by the nations busiest economiccenters of Makati, San Juan, Mandaluyong andManila

    Close to school areas

    Accessible to public transportation

  • 8/6/2019 Mrr Ppt May2011

    6/30

    Location Map

  • 8/6/2019 Mrr Ppt May2011

    7/30

    Site Development

  • 8/6/2019 Mrr Ppt May2011

    8/30

    PROPOSED SITE DEVELOPMENT @

    REARPORTION OF YANGTZE BUILDING

    FRONTING PASIG RIVER

  • 8/6/2019 Mrr Ppt May2011

    9/30

    Amenities

  • 8/6/2019 Mrr Ppt May2011

    10/30

    Site Features

    Proposed environment friendly features:

    - Solar Panel

    - Rain water catch basin

    - Waste segregation

    Elevated to safe levels Gated Community with 24-Hour Security

    Swimming Pool

    Landscaped Park

    Pavillion

    Childrens Playground Water featured landscaping

  • 8/6/2019 Mrr Ppt May2011

    11/30

    Typical Building Floor Plan

  • 8/6/2019 Mrr Ppt May2011

    12/30

    Building Features

    Elevator

    1.5 meter-wide corridors

    Roof deck with landing area

    Service stairs

    Overhead tanks with water pump

    Standby generator for common areas

  • 8/6/2019 Mrr Ppt May2011

    13/30

  • 8/6/2019 Mrr Ppt May2011

    14/30

    Unit Finishes

    RESIDENTIAL AREA

    A. Floor Finishes

    Living, Dining & Kitchen Vinyl Planks

    Bedrooms Vinyl Planks

    Toilet Unglazed ceramic tiles

    Utility Area Plain cement finish

    B. Wall Finishes No partition walls for bedroom/s

    Interior walls 1-coat paint on concrete wallsToilet 1-coat plain cement finish above tile

  • 8/6/2019 Mrr Ppt May2011

    15/30

    C. Ceiling Finishes

    Living, Dining & Kitchen 1-coat paint on plain cement finishBedrooms 1-coat paint on plain cement finish

    Toilet 1-coat paint on ficem board finish

    D. Kitchen Kitchen counter top with sink & faucet. Undercounter cabinet door & overhead cabinet arenot included.

    E. Door

    Entrance & Bedroom door Solid finger jointed wood with sheet

    laminated and solid wood core door

    jambs plus casing

    F. Windows Aluminum windows

  • 8/6/2019 Mrr Ppt May2011

    16/30

    G. Finishing Hardware Cylindrical lockset for main

    Privacy lockset for T & B door.

    H. Toilet & Kitchen Fixtures

    Water and Closet Lavatory Complete set of water closet and

    lavatory with fittings & accessories.

    Shower faucet Complete set of shower with faucet

    and fittings.

    I. Electricity Complete outlet and lighting devices

    with circuit breaker.

  • 8/6/2019 Mrr Ppt May2011

    17/30

    Typical Unit Floor Plan

    Studio Unit

    21.05 sq. m Provision for 1BR Unit

    28.1 sq.m

  • 8/6/2019 Mrr Ppt May2011

    18/30

    Typical Unit Floor Plan

    Provision for 2BR Unit B

    43.25 sq.m

    Provision for 2BR Unit C

    44.35 sq.m

  • 8/6/2019 Mrr Ppt May2011

    19/30

    Construction Updates

    Nile Building

    100% Complete

  • 8/6/2019 Mrr Ppt May2011

    20/30

    Blue Danube Building100% Complete

  • 8/6/2019 Mrr Ppt May2011

    21/30

    Dnieper Building

    100% complete

  • 8/6/2019 Mrr Ppt May2011

    22/30

    Colorado Building

    Structural works completed

    As of May 2011

  • 8/6/2019 Mrr Ppt May2011

    23/30

    Interior ofColorado Building

  • 8/6/2019 Mrr Ppt May2011

    24/30

  • 8/6/2019 Mrr Ppt May2011

    25/30

    Euphrates Building

    Structural works

  • 8/6/2019 Mrr Ppt May2011

    26/30

  • 8/6/2019 Mrr Ppt May2011

    27/30

    Kumagawa

    Structural works

  • 8/6/2019 Mrr Ppt May2011

    28/30

    Development

    Permit

  • 8/6/2019 Mrr Ppt May2011

    29/30

    Certificate of

    Registration

  • 8/6/2019 Mrr Ppt May2011

    30/30

    Payments & Financing

    As low as PHP 1.1M for a studio unit

    As low as PHP6,000 per month

    Flexible payment scheme (down payment payable up

    to 24 months; balance payable up to 30 years throughPag-IBIG)

    Available financing through in-house, bank or Pag-IBIG