  • 8/18/2019 MS for Grounding and Cadwelding Work

    1/34

    08.Feb.2011   V.H.PHONG J.Y.JEONG K.J.LIM

    26.Dec.2011   V.H.PHONG J.Y.JEONG K.J.LIM

    Date Drawn Checked Approved

    Owner :

    Project : PC : T10206

    UAS : DD09

    Unit : PO

    Title :KKS : BAU

    Reg. No.

    Revision : 1

    Drawing No. : Page-No :T10206-DD09-POBAU__-14001

    MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER

    PROJECT

    1 of 34

    1

    Owner's Engineer :

    For Information

    Rev.

    T10206-DD09-POBAU__-14001 Method Statement for

    Grounding and Cad welding Works

    Details of Revision

    0

      AES-VCM MONG DUONG POWERCOMPANY LIMITED

    Revised incorporating the comment made by Owner via "Unifier System" on SB-

    1053 dated 23.Jan.12

    Contractor :

    14001

      oosan Heavy Industries

    Vietnam

    Dung Quat Economic Zone,

    Binh Thuan, Binh Son, Quang Ngai,

    Vietnam

    T +84 55 5618 900

    F +84 553 618 950

    http://www.aes.com/aes/index?page=homehttp://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    2/34

    PURPOSE

    SCOPE

    REFERENCE DOUCMENTS

    MACHINERY AND EQUIPMENT AND TOOL

    RESPONSIBILITIS

    HEALTH AND SAFETY 

    PROCEDURE AND SEQUENCE

    QUALITY INSPECTION

    EXHIBITS

     ACTIVITY FLOW CHART

    INSPECTION AND TESTING FORM

     Attachment

    1. Storage Procedure

    2. Exothermic Welding system

    3. Material safety data sheet

    PAGE NO.

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    3

    3

    I N D E X 

    DESCRIPTION

    AES-VCM

    5.0

    4~106.0

    3

    4

    2.0

    SI NO.

    7.0

    1.0

    10.0

    4.0 3

    3.0

    14

    11~12

    9.0

    8.0 13

    12.0 17~34

    13

    11.0 15~16

     Page 2

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    3/34

    1.0 PURPOSE

    The purpose of this Method Statement is to describe the methodology involved in excavation, installing earthing material

    and backfilling works and to details out the steps to be taken in meeting the technical standards and EHS requirements of

    Mong Duong II Coal Fired Power Plant.

    2.0 SCOPE

    The purpose of this method statement is to provide the minimum requirements for the

    installation of above ground Earthing and cad welding. This method statement defines the methods

    and processes to be adopted in ensuring that activities regarding the work activities are

    done in convenience and accordance to specification.

    This documents also describes details of EHS Requirements, Equipments and Methodology Requirements

    3.0 Reference Doucments

     A. Issued For Construction Drawings

    B. Approved Contract Quality Plan

    C. Project EHSS Management Plan

    4.0 Machinery and Equipment and Tool

    Equipment and Tools to be used for Installation and Erection of Grounding (Earthing) and Cad Welding System.

    . prior to using any machineries / equipment at site ,it will be inspected and certified by qualified person.

    . periodic preventive Maintenance will by made on all equipment and machineries.

    . all operators and drivers are to be equipped with valid drivers license/operators license or permit fromconcerned government agency.

    . only authorized drivers and operators are allowed to operate equipment and machinery

    . only authorized signalman will be assigned together with the driver or operator.. all lifting equipments as well as i ts accessories such as sling wire, nylon sling, shackles,chain blocks crane hook and latch shall be inspected periodically.

    - Truck 11ton - Cable drum Jacks 5ton - Hand Crimping Tool

    - Truck 1ton - Welding Machine - Cad Welding Tool for Mould

    - Forklift 7ton - Hand Cable Cutter - Ground Resistance Tester

    - Machine Excavator - Hydraulic Crimping Tool - Electrical hand tools

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

     AES-VCM

     Page 3

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    4/34

    5.0 Responsibilities

    . It is overall responsibility of Project Manager to organize resources prior to perform construction activities

    as per project specification in compliance with the quality, schedule and safety Requirement.

    . EHS Manager will ensure incoordination with Site Engineer that all measure/construction

    taken shall be maintained till completion of job.

    . It is the responsibility of Construction Manager/Site Engineer that construction activites are executed

     According to the relevant project specification in compliance with the quality, schedule and safety requirements.

    . Doosan will ensure that all works are performed safely according to the attachment.

    . The relevant Doosan supervisor will ensure that the work is carried out in accordance with this method

    Statement and project specification.

    . The QC inspector will ensure that the work is executed according the requirements

    of quality dossier are fulfilled.

    6.0 Health and Safety

    6.1 General

    It is the intention of “Sub-Contractor” that all test inspection procedures are carried out as per “Inspection and Test Plan”

    in a safe manner in accordance with the Health and Safety at Work act and any other relevant legislation.

    6.2 Risk Assessments

    General Hazards

    6.3 Site Safety

    1) There are various risks associated with working on any site and site

    Regulations as laid down by the site owner / operator should be observed

    2) PPE The minimum personal protective equipment is as follows:

    - Safety helmet- Ear defenders / earplugs

    - Safety footwear

    - Eye protection

    - Leather apron and arm guards

    - Fire blanket

    - And any other equipment required by the site operator or deemed necessary by the task.

    3) Working in excavation

    - Unless absolutely necessary, it is preferable that personnel do not enter any Excavations, regardless of

    depth can be dangerous and there is No “safe” working

    depth. If the work cannot be completed without entering the Excavation then must be provide proper ladder certain

    area Under no circumstances should a person working alone enter Excavation .There must always be someone

    outside the excavation to Raise the alarm in case of emergency

    6.4 Safety Precautions

    1) Compress gas cylinder shall be kept away from welding location

    2) Barricade the working area

    3) All safety precautionary signboards must be visibly posted

    4) Ensure that only authorized personnel are within the affected area.

    5) Daily Toolbox Meeting

    Supervisor shall initiate daily toolbox meeting to educate his work crew on

    Safety hazards involved in their work and the preventive measures that shall be undertaken .

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

     AES-VCM

    Page 4

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    5/34

    6.5 Emergency Action Plan

    1) Fire & Security Protection / Prevention

    Sub-Contractor shall ensure that Fire Watch assigned during the execution of Hot work activity and all of its

    employees have given a basis induction Course on fire fighting and aware of the existing safety standards set

    forth by Client Fire Department.

    2) Sub-Contractor shall ensure that necessary fire preventive measures are being religiously performed by different

    level of organizations.

    3) Fire fighting equipment such as Extinguisher, Hose and fire blanket are subject to evaluation and approval by

    Client Fire Department.

    4) All Fire Extinguishers are to be inspected prior to the work period.

    5) All fire watchers will be identified.

    6.6 Emergency Procedures

      Sub-Contractor shall follow clients emergency procedure during the period of work and shall ensure that its staff

    and personnel are fully familiar with the use and location of the essential emergency equipment such as BA, Fire

    Extinguishers, fire exits, muster points and plant alarms.

      - Actions In The Event of Plant Emergency.

    1) General and Evacuation alarm.

    2) All works must stop and switch off all welding machines and compressor.

    3) All personnel must proceed to safe location upwind or across wind to muster stations

    4) Use of breathing apparatus if necessary.

    5) Sub-Contractor personnel who detected a fire , toxic, flammable or asphyxiating gas leak must initially ensure their own

    safety and report immediately to key personnel about the incident.

    6) Direct person to person or by messenger by proving pertinent information to the Fire Station.(location, problem, name and staff position).

    6.7 First Aid

    1) Sub-Contractor shall use first aid provided by Doosan in the project site.

    2) Horseplay is Fools Play :

    - There have been some incidents or horseplay on the process plant and the people

    involved have been pulled up and warned about their future conduct

    - A process plant is not a place for this kind of childish behaviour and can have devastating consequences.

    - All employees must ensure that their ACTS and OMISSIONS do not endanger any other person working on site.

    They are also responsible for their own safety and must co-operate with the employer and SAFETY at all times.

    - Sub-Contractor require that all personnel report UNSAFE ACTS and CONDITIONS. They are also expected to

    suggest methods to improve the workplace.

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    Page 5

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    6/34

    3) Safety Awareness :

    The underlying cause accidents, injuries and incidents is invariably a lack of Safety Awareness linked with

     unsafe behaviour.

    Safety awareness is;

    - Being alert to what you are doing and what is going on around you.

    - Identifying potential hazards and taking the appropriate precautions to minimise and eradicate the risk.

    - Something everyone has to learn if he or she is to stay injury free

    - Part of every employees job, Everyone should carry out a Self Assessment and use Total Observation to;

    - Think about how you have done similar jobs in the past.

    - Think about how you are doing or planning to do the job now.

    - Compare the two operations with how the job should be done safely.

    - Look at everything that is taking place around you and anything that could pose a hazard to you.

    - Look above, below, behind and inside. Use the questioning Attitude to ask.

    - Have any people been injured doing this particular job ?

    - What injuries could occur if the unexpected happens ?

    - On, what I am doing will it affect other people ?

    - Do I have the authority, have I been trained, am I capable of doing the job ?

    - Do I need to wear or am I wearing the correct Personnel Protective Equipment ?

    Eye Injuries :

    - There have been a few entries in the accident books that relate to injuries to the eyes.

    - Most of these injuries could have been avoided if the operatives had been wearing

    goggles as proposed to safety glasses

    - With immediate effect, Sub-Contractor Management insists that all personnel working inside the Process Plant wear

    Safety Goggles /Glass at all times.

    - If the housekeeping at the worksite is poor or if there is a long standing dust hazardoperatives are encouraged to report the matter to their supervisor.

    6.8 Personnel Protective Equipment (PPE) :

    The minimum standard of Personnel Protective Equipment is

    - Head Projection,

    The Process Plant is a designated Hard Hat site so safety helmets must be worn in all

    the plant area. You must change your helmet if it is damaged in any way.

    - Body Protection.

    Protective clothing that is the right size, suitable for the job and properly maintained

    must be worn all time at the Process Plant. Overalls must be made from 100% cotton.

    - Safety FootwearSafety Footwear must be worn at all times in al l plant areas. The most common type of safety footwear is the safety

    boot or shoe. It is recommended that they are fitted with at least a 200 joule toe-cap.

    - Eye and face Protection (Note : eye injuries)The wearing of eye protection is mandatory on all Process areas, workshops, Fabrication

    yards and fire training ground. Eye protection is also recommended on roadways adjacent to process units.

    Face shields or visors and/or specialist equipment (such as air-fed welding hoods) must be worn depending on the

    application or as dictated by Client Operation/Work Permit..

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    Page 6

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    7/34

    - Hearing Protection

     Adequate hearing protection must be worn at all times in the designated high noise areas.

     Audits are finding lots of people not wearing ear defends in the high noise areas. There are two types of ear defenders

    available for use i.e muffs fitted to the helmet and ear plugs which fit inside the ear canal.

    - Hand Protection

    Personnel working on site are likely to be expose to a number of hazards i.e. thermal, mechanical, chemical and vibration.

    Where there is a risk of contact with one or more of these hazards then the appropriate protective gloves must be worn.

    - Good Housekeeping.

    Poor housekeeping and untidy working is a MAJOR source of accidents and injuries.

    Sub-contractor is expected to clean up and debris created and after every job. Stop work and tidy up if the work area

    is becoming cluttered and ensure that you take time out at the end of every work period to do some housekeeping.

    Persistent untidy workers cannot be tolerated.

    Housekeeping audits are being conducted on a daily basis by both Sub-contractor and CLIENT managementand the auditors will be looking at the following area.

    - Hose and cable discipline i.e. trailing hoses and cables that do not restrict access egress, passage ways or roadways.

    - Oil and process spill. Any liquid should be contained in dams or soaked up with proprietary absorbent materials suchas ”Spillsorb or soak-up” before disposal in the approved manner. Solids and dusts should be either dampened

    down or vacuumed up as soon as possible.

    - Insulation and scaffolding debris. This material should be removed as soon as possible and disposed of in the approved

    area.

    - Engineering and General Debris. To be removed as soon as possible and disposed of the approved area, meanwhile, it

    must be stored in a tidy manner.

    - Elevated platforms, stairways, and access ways free from debris and/or obstruction. Tools and equipment must be positioned

    so that they cannot be fall onto people working below.

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    Page 7

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    8/34

    Emergency Flow Chart

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    Sub - Contractor

    First Finder

    Site Manager

    Sub - ContractorSub-contrator Sub-contrator

    Project Manager Safety Manager  Admin Manager

    DoosanDoosan Labour Office

    site ManagerSafety Manager

     AES-VCM AES-VCM

    Social Security

    Safety Manager Safety

    Site First aidPolice Station Fire Dept,

    Hospital

    Page 8

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    9/34

    L S Risk L S Risk  

     A. Survey 1.1 Instrument falling down and Injury 2 3 M 1.1 Area where the 2 2 T

    1. Survey Instrument hit the workmen. instrument is to be set must

    be well compaction

    1.2 Camera dropping to ground by accident Breaking 2 1 A 1.2 Be concentrate all time 1 1 A  

    during work execution

    B. Erection Work 1.1 Saw injure hand/fingers on cutting.Injury 3 3 M

    1.1 Worn leather gloves2 2 T

    1. Preparation 1.2 Dust from timers injure eyes.Injury 3 3 M

    1.2 Worn safety glass.2 2 T

    1.3 Person injure from work Injury 3 3 M

    1.3 Work in a correct and way precaution2 2 T

    2. Installation 2.1 Hand/Fingers trapping between work Injury 3 3 M 2.1 Worn leather gloves 2 2 T

    2.2 Work injure feet on sliding down Injury 3 3 M 2.2 Worn safety shoes 2 2 T

    2.3 Person injure from turning overwork Injury 3 3 M 2.3 Support withstands to strengthen 2 2 T

    2.4 Tripping and falling Injury 3 3 M 2.4 Housekeeping area and concentrate work 2 2 T

    2.5 Rough surfacing work and support Breaking 2 3 M 2.5 Worn leather gloves 2 2 T

    injure hand.

    2.6 Persons falling from height Injury 3 3 M 2.6 Always worn safety full body harness. 2 2 T

    3. Welding 3.1 Fire Occure Burn 5 3 M 3.1 Area where the welding is to be set 2 2 T

     watchman & Extinguisher3.2 Spark Burn 5 3 M 3.2 Are where the welding point is to be set 2 2 T

     Asbestos.

    3.3 Injure hand (skin burn) Burn 5 3 M 3.3 Worn welding gloves 2 2 T

    3.4 Injure eye then spark Burn 5 3 M 3.4 Worn welding glasses 2 2 T

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    Risk Assessment

    L (Low)

    5 : Almost Certain

    4 : Likely

    3 : Probable

    2 : Occational

    1 : Unlikely

    S (Serious)

    4 : High

    3 : Moderate

    2 : Low

    1 : Very Low

    Risk 

    S : 10~15

    M : 6~9

    T : 3~5

     A : 1~2

    Note:

    RESIDUAL RISK

    (with controls)Task/ Job Step List all Known Hazard

    Type of

    DamageMitigating Control

    BASE RISK(without

    controls)

    Page 9

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    10/34

    Other safety Equipment Required :Remarks :

    Describe Job on General: Survey, Panel Local Electrical devices Cable Tray, Conduit ,Cable/ground cable Installation, work

    splice & Termination, Grounding work .Support work.

     A. Survey 1.1 Instrument falling down and 1.1 Area where the

    1. Survey Instrument hit the workmen. instrument is to be set must

    be well compaction

    1.2 Camera dropping to ground by accident 1.2 Be concentrate all time

    during work execution

    B. Erection Work 1.1 Saw injure hand/fingers on cutting. 1.1 Worn leather gloves

    1. Preparation 1.2 Dust from timers injure eyes. 1.2 Worn helmet mounted face sheild

    1.3 Person injure from work 1.3 Work in a correct and way precaution.

    2. Installation 2.1 Hand/Fingers trapping between work 2.1 Worn leather gloves

    2.2 Work injure feet on sl iding down 2.2 Worn safety shoes

    2.3 Person injure from turning overwork 2.3 Support withstands to strengthen

    2.4 Tripping and falling 2.4 Housekeeping area and concentrate work  

    2.5 Rough surfacing work and support 2.5 Worn leather gloves

    injure hand.

    2.6 Underground live cables 2.6 Get the clearence from the client regarding the

    location of the cable and apply LOTO procedure while

    working in the area.

    3. Welding 3.1 Fire Occure 3.1 Area where the welding is to be set

     watchman & Extinguisher

    3.2 Spark 3.2 Use fire retardant blankets where is welding work  

    is to be done.

    3.3 Injure hand (skin burn) 3.3 Worn welding gloves

    3.4 Injure eye because of welding fumes 3.4 Worn welding glasses

    How to eliminate HazardsList of All Job Steps List all Known Hazard

    Barricade

    Needed YES

    Lock out No

    Tack out No

    Safety

    Harness YES

    Long

    Sleeves YES

    Hearing

    Protection YES

    Revision Date : Revision : A

    Others:

    Goggles Gloves

      YES  YES

    Face

    Shield YES

    Task : Grounding Work(Electric Work)

    Approved by :Prepared by :

    Original Dated :

    Reviewed by :

    Revised by:

    (Developing a habit of analyzing methods to identify hazards & unsafe practices than developing hazards.

    Ground Fault

    Interrupter

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    JOB SAFETY ANALYSIS

    MONG DUONG II 2 x 560MW (NET) COAL FIRED POWER PROJECT

    solutions that control, minimize or eliminating)

    Page 10

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    11/34

    7.0 Procedure and Sequence

    7.1 Storage Procedure

    The storage procedure must be followed the manufacture procedure (Samsung E&L co.,ltd)

    please see attachment procedure.

    7.2 Preparation work 

    1) All existing facilities, which are within the construction area to obstruct any work activities shall be removed or be provided

     with protection against damage, dust and dirt.

    2) The safety and integrity of the excavation and elevation work shall be thoroughly checked before commence the work.

    3) Prepare, check and submit the verified construction drawing of installation area to be attached in addition to this method

    statement. These information to be distributed to all consumed parties as required.4) The tool is suitable and safe to use.

    5) Suitable fire extinguishers are available in the area.

    6) Restrict inventory of materials in the point of installation to one-day supply. This will assist with housekeeping and

    reduce the risk of damage and loss of products.

    7.3 Underground Earthing system Installation Procedure Summary

    1) Confirmation of the location where the underground earthing system is to be installed. Visit the site where the

    underground earthing cable is to be installed and confirm the site condition if is ready for the said installation.

    If there is any problem which interrupts underground earthing system installation at site, inform to DOOSAN engineer

    or supervisor.

    2) Preparation of Underground Earthing system Material and tool shall be confirm size, type, etc. of earthing system to be installation by drawing and prepare required material.

    3) Installation and Connection of underground earthing system Rods, Bare, Plates and Wires. To confirm installation earthing

    system material at level as required drawings and before connect all bare copper surface must be cleaned to bright surface and

    and to confirm when connect earthing system material by thermit or compression type connector as per drawing

    indication.

    4) Installation the grounding wire

     According to design, the earthing gird will be 1 m in depth. The excavator will be used to excavate with the depth of 1.1m

    the hole will be made with sufficient slope (the width is 1.2m). See below figure

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    1.1 m

    1m

    1.2 m

    1m

    Excavation work for earthing wire

    Earthing wire

    GL

    Page 11

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    12/34

    5) Installation the grounding rod

    Excavate with 2m in depth and 3m in width and then the earthing rod will be driven to earth by harmer with more 2m.

    If the soil is too hard, the more excavation shall be made in order to dirve the earthing rod properly. See below figure

    7.4 Cad Welding Work 

    1) Qualified Cadwelder resume should be submitted to Onwer for review

    2) Cadweld work process should be strictly followed the manufacture's instruction (Welding manual). Please see attachment.

    3) In addition to project safety requirement, more safety precaution should be provided depend on the location and the

    nature of the job, such as

    - Fire bucket/extinguisher (if working near flammable materials)

    - Heat resistant board.

    4) Sample Cadweld should be done and tested by qualified welder and should be approved by Onwer's team

    5) Cadweld material should not mix with different material.

    6) The inspection must be carried out before backfilling the soil.

    7) Test instrument should have valid calibration date prior to use

    Instrument test certificate shouldbe enclosed with the report.

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    GL

    2m

    2m

    3m

    1.1m

    3m

    Page 12

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    13/34

    8.0 Quality Inspection

    The Site Inspection and Test plan (ITP) for this work summarizes various characteristics to be checked. the concerned

    Site Engineer/Foreman will be responsible to ensure stage wise compliance for these operation and the Site QA/QC

    Engineer/Inspector will carry-out quality control checks and report the inspection results

    9.0 Exhibits

    Exhibit A-INSPECTION & TEST REPORT FOR GROUND SYSTEM

    (See sample Next Page)

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    Page 13

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    14/34

    10.0  Activity Flow Chart

    (8) Client : AES-VCM One Incharge Person

    (9) Back Fill By Electrical

    Installation

    (4) Direct Worker (Incharge Foreman)

    (5) Sub - Contrator : Incharge of Grounding Work 

    (6) Doosan Eng, or S/V : Incharge of Grounding Work or

    Doosan QA/QC of Electrical

    AES-VCM

    METHOD STATEMENT FOR GROUNDING (EARTHING) AND CAD WELDING WORKS

    (1) Excavation by Electrical

    (7) Sub - Contrator S/V : Incharge of Grounding Work 

    (2) Doosan Eng, S/V : Incharge of Grounding Work 

    (3) Sub - Contrator : Incharge of Grounding Work 

    Page 14

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    15/34

    AES-VCM

     Project : Earthing System Ref. No.

     Drawing No. : Date :

    Specific Location :

    Yes No N/A

    1

    2

    3

    4

    5

    6

    DOOSAN Electrical Dept.

     Name & Signature Name & Signature Name & Signature Name & Signature

     Position Position Position Position

     Date Date Date Date

    Inspection Check List

    CHECK ITEM

     No Inspection elementserification & Approva Observed

    Result

     

    Checked by : (Subcontractor) DOOSAN QA/QC Dept. AES-VCM

    Material Check 

    Excavation work 

    Check Earthing Cable Size, Earthing Rod and Type correct

    Earthing wire and Earthing Rod installed with designed depth and

    location

    Electrode inspection pits satisfactory

    Check earthing connected to equipment, steel structure, frame, etc.

    satisfactory

    Page 15

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    16/34

    AES-VCM

     Project : Earthing System Ref. No.

     Drawing No. : Date :

    Specific Location :

    Test Equipment :

    1

    2

    3

    4

    5

    6

    7

    8

    DOOSAN Electrical Dept.

     Name & Signature Name & Signature Name & Signature Name & Signature

     Position Position Position Position

     Date Date Date Date

    Testing Sheet

    CHECK ITEM

     No Location Earthing resistanceObserved

    Result 

    Test Person :

    Cadwelder Person :

    hecked by : (Subcontracto DOOSAN QA/QC Dept. AES-VCM

    Page 16

    http://www.aes.com/aes/index?page=home

  • 8/18/2019 MS for Grounding and Cadwelding Work

    17/34

    CONDUIT & ACCESSORIES

    EARTHING & LIGHTNING MATERIALS

    ENL-Q-005 Rev 0.0

    Rev.

    No.

    DATE

    ( 개 정 일 )

    PAGE

    Rev. No.

    Doc. No.

    0.0

    MONG DUONGPROJECT NAME :

    ITEM NAME :

    1 OF 6

    0.0

    ENL-SP-0001

    Storage Procedure( 보관 절차서 )

    STORAGE PROCEDURE

    Title

    (제목)

    APPROVED

    BY

    REVIEWED

    BY

    PREPARED

    BY

    DESCRIPTION

    ( 개 정 내 용 )

    S.H.PARK K.H.LEE2011.03.28 First Issue

    A4 ( 210 * 297 )SAMSUNG E&L CO.,LTD

    K.M.LEE

  • 8/18/2019 MS for Grounding and Cadwelding Work

    18/34

    Doc. No.

    - Contents ( 목 차 ) - 

    1. Scope ( 범 위 )

    2. Purpose ( 목 적 )

    3. Storage ( 보 관 )

    ENL-SP-0001

      Attachment 1 ( 첨부 1 : 영문본 ) - 5 page

      Attachment 1 ( 첨부 1 : 한글본 ) - 6 page

    STORAGE PROCEDURE

    PAGE 2 OF 6

    Rev. No. 0.0

    ENL- -004 Rev 1.0 SAMSUNG E&L CO. LTD A4 210 * 297  .   .,

  • 8/18/2019 MS for Grounding and Cadwelding Work

    19/34

    This procedures describes storage methods to prevent supplied equipment and materials from corrosion,

    chemical damage or any effect of deteriorating quality.

    Every product shall be classified into indoor or outdoor storage and stored according to detailed storage

    본 절차서는 전기배관 및 접지 , 피뢰설비의 제품 보관방법에 적용한다.

    부터 제품을 보호하기 위한 보관방법을 기술한다.

    3. Storage ( 보 관 ) 

    본 절차서는 공급 기자재에 대한 부식 , 화학적 손상 또는 품질이 저하될 수 있는 어떤 영향으로

    This procedure shall be applied to storage methods of electric conduit, grounding and lightning products.

    2. Purpose ( 목 적 ) 

    STORAGE PROCEDURE

    PAGE 3 OF 6

    Rev. No. 0.0

    Doc. No. ENL-SP-0001

    1. Scope ( 범 위 ) 

    method based on its material and characteristics of use structure.

    모든 제품은 실내보관 , 실외보관으로 보관 방법이 나뉘며 , 제품의 재질 및 사용 구조상의

    특이사항을 토데로 세부보관방법에 따라 보관되어야한다.

    ( 실외보관은 별도 빗물에 노출되지 않도록 천막 또는 기타 그에 동등한 보관방법을 말한다. )

      with other items.

    ENL- -004 Rev 1.0

    3.2 Shall be stored and handled considering packing volume and frequency of carry-in/out.

    포장부피 및 입출고 빈도를 고려하여 보관 관리 하여야 한다.

    3.3 Keep clean in the storage area and do not store the products under tough corrosive environments.

    보관구역 내 청결을 유지하여야 하며 , 가혹한 부식환경에서의 제품보관은 하지 않는다.

    ( Outdoor storage refers to that with canopy or equivalent to prevent exposure to the rainwater. )

    SAMSUNG E&L CO. LTD A4 210 * 297

    관련 , 보관사항에 대하여 첨부1 의 내용을 기준으로 보관방법을 이행한다.

    타 품목과 구별 및 혼합되지 않도록 장소를 지정하여 보관한다.

    3.1 Shall be stored by designating location so as to be identified from and not to be mixed

    For the concerned storage, perform the sorage method on the basis of contents on Attachment 1.

      .   .,

  • 8/18/2019 MS for Grounding and Cadwelding Work

    20/34

      be sunken, but periodic checkup is required.

    종이 box 로 포장된 제품들은 하단 box 가 내려앉지 않을 정도로 상단 box 적재가 가능하나

      모든 나사가공부 제품에 대하여선 나사의 부식을 막기위한 방청작업이 우선시 되어야 하며 ,

    관련 제품의 보관에 대하여선 재부식이 발생하지 않도록 습기가 없는 건조한 지역에 보관되어야 한다.

    3.6 Those products packed within carton box may be stacked to the extent that the lower box shall not

    3.5 Every threaded products shall be treated with anticorrosive process first to prevent corrosion on the

    thread, and the related products shall be stored on dry place without moisture so as to prevent

    re-corrosion.

    3.4 Thinner, paints and other inflammable hazrdous materials shall be stored on the separately designated  place , and avoid the storage place around fire and explosion hazrds scattered.

    신나,페인트 및 기타 화기성 관련 위험물들에 대하여선 별도 지정장소에 보관하여야 하며 ,

      주위 화재 및 폭발 위험이 산재하여 있는 보관장소는 회피한다.

    STORAGE PROCEDURE

    PAGE 4 OF 6

    Rev. No. 0.0

    Doc. No. ENL-SP-0001

    ENL- -004 Rev 1.0 SAMSUNG E&L CO. LTD A4 210 * 297

      주기적인 확인이 필요하다.

    .   .,

  • 8/18/2019 MS for Grounding and Cadwelding Work

    21/34

    Class

    A

    A

    B

    A

    C

    A

    A

    C

    C

    C

    C

    C

    A

    Chromate Plating

    Nickel Plating

    As original Material

    As original Material

    As original Material

    As ori inal Material

    Bronze

    SUS304

    Galvanized steel plate

    Brass

    As original Material

    Steel

    Carbon steel

    Zinc Alloy

    As original Material

    ●Hot-Dip Galvanized

    Plating Specification OutdoorIndoor

    SUS316

    As original Material

    ●Hot-Dip Galvanized / Threaded product

    Electro-Galvanizing

    ATTACHMENT 1.

    Electro-Galvanizing

    Materials

    STORAGE PROCEDURE

    PAGE 5 OF 6

    Rev. No. 0.0

    Doc. No. ENL-SP-0001

    C

    B

    A

    D

    D

    C

    E

    E

    E

    E

    A

    B

    C

    D

    E

    - -

    Hot dip galvanized products available for outdoor storage ( However, white rust shall not be

    regarded as quality defect. )

    Products without deterioration from oxidation (rust), available for outdoor storage.

    Products without deterioration from oxidation (rust). However, as their deflection may occur,

    excessive stacking shall be avoided.

    Inflammable materials or other explosive materials that shall be isolated indoor and avoid

    the storage place around fire and explosion hazrds scattered.

    As original Material

    As original Material

    As original Material

     Storage Class 

    Materials vulnerable to oxidation (rust) that shall be stored indoor and avoided storage under

    high humid area as possible.

     

    Cast Iron

    Aluminum

    Hot-Dip Galvanized

    *

    ●Graphite Compressive

    Inflammable

    As original Material

    Adhesives

    paint/Thinner

    Copper

    PVC

    Concrete

    Tinned Coating

    Hot-Dip Galvanized / Threaded product

    As original Material

    As original Material

    As original Material

    - - ev .   .,

  • 8/18/2019 MS for Grounding and Cadwelding Work

    22/34

    등급

    A

    A

    B

    A

    C

    A

    A

    C

    C

    C

    C

    C

    A소

    스테인리스(SUS304) 원소재 ●

    황동

    스테인리스(SUS316) 원소재 ●

    크로메이트 도금 ●

    청동 원소재 ●

    니켈 도금

    아연합금 전기아연도금 ●

    원소재 ●

    아연도금강판 원소재 ●

    용융아연도금 / 나사가공품 ●

    탄소강

    원소재 ●

    전기아연도금 ●

    용융아연도금

    ATTACHMENT 1.

    재질 도금 사양 실내보관 실외보관

    STORAGE PROCEDURE

    PAGE 6 OF 6

    Rev. No. 0.0

    Doc. No. ENL-SP-0001

    C

    B

    A

    D

    D

    C

    E

    E

    E

    E

    A

    B

    C

    D

    E

    - -

    용융아연도금 제품으로 실외보관 가능함. (단, 백청발생은 품질적 불량으로 간주하지 않는 조건임. )

    산화(녹)에 의한 변질이 없는 제품군으로서 실외보관이 가능함.

    산화(녹)에 의한 변질이 없는 제품군이나 , 원형의 변질이 발생될 수 있는 소재이므로 상단 과적재 보관은

    회피하여야 함.

    화기성 자재 또는 기타 폭발위험이 있는 자재로 실내 격리 보관이 되어야 하며 , 주위 화재 및 폭발 위험이

    산재하여 있는 보관장소는 회피한다.

    *

    페인트/신나 원소재 ●

     보관 등급 

    산화(녹)에 약한 재질로서 실내보관이 되어야 하며 , 습도가 높은 지역의 보관은 회피한다.

    화기성자재 원소재 ●

    접착류 원소재 ●

    콘크리트 원소재 ●

    흡연압축품 원소재 ●

    알루미늄 원소재 ●

    PVC 원소재 ●

    주철용융아연도금 ●

    용융아연도금 / 나사가공품 ●

    동주석도금 ●

    - - ev .   .,

  • 8/18/2019 MS for Grounding and Cadwelding Work

    23/34

  • 8/18/2019 MS for Grounding and Cadwelding Work

    24/34

  • 8/18/2019 MS for Grounding and Cadwelding Work

    25/34

  • 8/18/2019 MS for Grounding and Cadwelding Work

    26/34

  • 8/18/2019 MS for Grounding and Cadwelding Work

    27/34

  • 8/18/2019 MS for Grounding and Cadwelding Work

    28/34

  • 8/18/2019 MS for Grounding and Cadwelding Work

    29/34

  • 8/18/2019 MS for Grounding and Cadwelding Work

    30/34

  • 8/18/2019 MS for Grounding and Cadwelding Work

    31/34

  • 8/18/2019 MS for Grounding and Cadwelding Work

    32/34

    OSHA-Meets29CFR1910.1200Standards

    HAZARDOUSCOMPONENTS

    (PECIFICCHEMICALIDENTITY;COMMONNAME(S)) PPM MG/M3 PPM

    MATERIAL SAFETY DATA SHEET 

     ACGIHTWA

    MG/M3

    HMISHAZARDRATINGS

    HEALTH1*=ChronicHealthHazard2=MODERATE

    FLAMMABILITY00=INSIGNIFICANT3=HIGH

    PHYSICALHAZARD01=SLIGHT4=EXTREME

    CARCINOGENICITY NTP?NoIARCMONOGRAPHS?NoOSHAREGULATED?NoCaliforniaProp65,SafeDrinkingWaterandToxicEnforcementActof1986-therearenoreportablechemicalspresentknowntothestatetocausecanceror

    reproductivetoxicity.

    MEDICALCONDITIONSGENERALLYAGGRAVATEDBYEXPOSURE:Preexistingskin,eye,orrespiratorydisordersmaybecomeaggravatedthrough

    prolongedexposure.

    EYES:Contactwitheyesmaycauseirritation. Removecontactlenses.Flusheyeswithclearrunningwaterfor15minutes

    whileholdingeyelidsopen;ifirritationpersists,seekmedicalattention.

    INGESTION:Maycausegastricdistress,stomachpains,vomitinganddiarrhea. Givetwoglassesofwaterfordilution;inducevomitingasdirectedbymedical

    personnel;nevergiveanythingbymouthtoanunconsciousperson;seek

    medicalattention.

    INHALATION:Breathingairborneparticlesordustfrommixing,spraying,

    sanding,grinding,etc.maycauseirritationtorespiratorytract.Contains

    substanceswhichareconsiderednuisancedustswhichrequireaNIOSH

    approvedrespiratorwhenairborneparticulateexceedsmaximumallowablelimit.

    Removeaffectedpersontofreshair;ifsymptomspersistseekmedical

    attention.

    SKIN:Noneexpected,however,prolongedcontactmaycauseirritation. Removecontaminatedclothing;washaffectedareawithsoapandwater;

    laundercontaminatedclothingbeforereuse;ifirritationpersists,seekmedical

    attention.

    RQLBS

    (c)Theexposurelimitsofthisproduct,whenallowedtoentertheenvironmentasdustparticulate,arecoveredundertherulesof29CFR1910.1000,TableZ-

    3,"Allinertornuisancedusts,whethermineral,inorganicororganic."

      SECTION 3 HEALTH HAZARD DATA

    ROUTESOFENTRY-SIGNSANDSYMPTOMSOFEXPOSURE EMERGENCYANDFIRSTAIDPROCEDURES

    CalciumSiliconMixture1~3

    (a)A"Yes"intheSARATITLEIIIcolumninSection2indicatesatoxicchemicalsubjecttoannualreportingrequirementsofSection313oftheEmergency

    PlanningandCommunityRight-To-KnowActof1986andof40CFR372.

    (b)TheComprehensiveEnvironmentalResponse,Compensation,andLiabilityAct(CERCLA)hasnotificationrequirementsforreleasesorspillstothe

    environmentoftheReportableQuantity(RQforthismixture>24000lbs)orgreateramounts,if

  • 8/18/2019 MS for Grounding and Cadwelding Work

    33/34

    FLASHPOINT(METHODUSED)

    Notapplicable

    WASTEDISPOSALMETHOD:DisposeofinaccordancewithLocal,State,andFederalRegulations.Donotflushtosanitarysewerorwaterway.Referto"40

    CFRProtectionofEnvironmentParts260-299"forcompletewastedisposalregulations.Consultyourlocal,state,orFederalEnvironmentalProtectionAgency

    beforedisposingofanychemicals.

    Theinformationcontainedhereinisbelievedtobeaccuratebutisnotwarrantedtobeso.Dataandcalculationsarebasedoninformationfurnishedbythemanufacturerofthe

    productandmanufacturersofthecomponentsoftheproduct.Usersareadvisedtoconfirminadvanceofneedthatinformationiscurrent,applicableandsuitedtothe

    circumstancesofuse.Vendorassumesnoresponsibilityforinjurytovendeeorthirdpersonsproximatelycausedbythematerialifreasonablesafetyproceduresarenotadhered

    toasstipulatedinthedatasheet.Furthermore,vendorassumesnoresponsibilityforinjurycausedbyabnormaluseofthismaterialevenifreasonablesafetyproceduresare

    followed.AnyquestionsregardingthisproductshouldbedirectedtothemanufactureroftheproductasdescribedinSection1.

    HAZARDOUSPOLYMERIZATIONMAYOCCUR:

    WILLNOTOCCUR:X

    CONDITIONSTOAVOID:None

      SECTION 10 DISPOSAL CONSIDERATIONS

    CONDITIONSTOAVOID:Avoidgeneratingairbornedust

    INCOMPATIBILITY(MATERIALSTOAVOID):Strongoxidizers,strongacids

    HAZARDOUSDECOMPOSITIONORBYPRODUCTS:Decompositionwillnotoccurifhandledandstoredproperly.Incaseoffire,smoke,oxidesofcarbon;

    fumesofcopperandaluminum.Smallamountsoffluoridefumeorhydrofluoricfumemaybereleasedunderignition.

    Gray/silvergranules,characteristicodor

      SECTION 9 STABILITY AND REACTIVITY

    STABILITYUNSTABLE:

    STABLE:X

    %VOLATILE(BYWEIGHT)

    None

    APPEARANCEANDODOR

    Notapplicable

    EVAPORATIONRATE(WATER=1)

    Notapplicable

    SOLUBILITYINWATER

    Insoluble

    Notapplicable

    pH

    Notapplicable

    VAPORDENSITY(AIR=1)

    Notapplicable

    SPECIFICGRAVITY(WATER=1)

    Approximately6.0

    VAPORPRESSURE(MMHg)

    OTHERPROTECTIVECLOTHINGOREQUIPMENT:Safetyeyebathnearby

    WORK/HYGIENICPRACTICES:Practicesafeworkplacehabits.Minimizebodycontactwiththis,aswellasallchemicalsingeneral.

      SECTION 8 PHYSICAL / CHEMICAL PROPERTIES

    BOILINGPOINT

    SPECIAL:None

    OTHER:None

    PROTECTIVEGLOVES:Neopreneorrubbergloves. EYEPROTECTION:Protect iveeyeglassesorchemicalsafetygoggles.

    PRECAUTIONSTOBETAKENINHANDLINGANDSTORAGE:StorageofThermoweldExothermicmaterialsshouldbeinacleandryareaandrestrictedto

    accessbyauthorizedpersonnelonly.Donotsubjecttoroughhandlingorphysicaldamage,norexcessivevibration.Storeinaccordancewith"ThisSideUp"

    labels.Protectfromweatherandmoisture.DONOTUSEPRODUCTSTHATHAVEBEENEXPOSEDTOMOISTURE.BeforeusingThermoweldExothermic

    Process,personnelshouldbetrainedbyaThermoweldrepresentative.Readandunderstandtheinstructionsheetpackagedwiththemold,andobserveall

    eneralandsafet instructions.

      SECTION 7 EXPOSURE CONTROLS / PERSONAL PROTECTION

    RESPIRATORYPROTECTION(SPECIFYTYPE):NIOSHapprovedrespiratordesignedtoremoveairborneparticulatepresentinexcessofmaximumallowable

    concentrationsduetosecondaryoperationssuchasmixing,spraying,sanding,buffing,etc.Referto29CFR1910.134orEuropeanStandardEN149for

    VENTILATIONLOCALEXHAUST:Recommended

    MECHANICAL(GENERAL):Yes

    UNUSUALFIREANDEXPLOSIONHAZARDS:Thermoweldcopperbasewelding/joiningmaterialsareexothermicmixtures,whichwhenreacted,producehot

    moltenmaterialswithtemperaturesinexcessof4000°Fandalocalizedreleaseofsmoke.Thematerialsarenotexplosive,ignitiontemperaturesareinexcessof 

    850°Fforstartingmaterialand1750°Fforbasematerial.Theyarenotshocksensitive,noraretheysubjecttospontaneousignition.Shouldthematerialbe

    accidentallyignited,theimmediateanddirectapplicationoflargevolumesofwaterwilleffectivelyretardthespreadoffireandcontrolit.Largeamountsofdense,

    dustysmokewillbeliberatedduringanaccidentalfire.

      SECTION 5 ACCIDENTAL RELEASE MEASURES

    STEPSTOBETAKENINCASEMATERIALISRELEASEDORSPILLED:Confineandsegregateproductforreuse;placematerialintoapprovedcontainersfor

    disposal;forspillsinexcessofallowablelimits(RQ)notifytheNationalResponseCenterrefertoCERCLA40CFR302fordetailedinstructions;refertoSARA

    TitleIII,Section313,40CFR372forreportingrequirements.Donotdischargeintolakes,ponds,streamsorpublicwaters.

      SECTION 6 HANDLING AND STORAGE

    EXTINGUISHINGMEDIA

    Usedrysand,graphite,dolomite,sodiumchloride,watersprayorchemicalfoam.

    SPECIALFIREFIGHTINGPROCEDURES

    Firefightersmustwearfullfacepieceself-containedbreathingapparatusinpositivepressuremode.

      SECTION 4 FIRE FIGHTING MEASURES

    NFPARATING

    None

    FLAMMABLELIMITS

    LEL:NotapplicableUEL:Notapplicable

    MATERIAL SAFETY DATA SHEET IDENTITY(ASUSEDONLABELANDLIST)

    RailWeldMetal 34-6622-03Rev.A

    Page2of3

    Date:October20,2009

  • 8/18/2019 MS for Grounding and Cadwelding Work

    34/34

    Wastefromresiduesandunusedproducts:

    Contaminatedpackaging:

    HazardClass:

    FlammableSolidInorganicNOS

    PackagingGroup:

    None

    RecommendedUse:

    FurtherInformation:

    MATERIAL SAFETY DATA SHEET 

      SECTION 15 INSTRUCTIONS

      SECTION 16 MISCELLANEOUS

    Forformingexothermiccoppertocopperandcoppertosteeljoints

    ContacttheSuperweldTechnicalDepartment

    Pleaseensurethatitispassedtotheappropriateperson(s)inyourcompany,whoarecapableofactingontheinfirmation.

    Theinformationgiveninthissafetydatasheetisbasedoncurrentknowledgeandexperienceandisintendedtodescribetheproductsin

    termsoftheirhealthandsafetyrequirements.itshouldnotthereforebeconstruedasguaranteeingspecificproperties.

    Thisdataisbasedonourpresentknowledge.howeveritshallnotconstituteaguaranteeforanyspecigicproductfeaturesandshallnot

    establishalegallyvalidcontractualrelationship.

    Toxicity:NonToxic Page2of3

    Emptycontainerscanbelandfilledwhenincompliancewithlocalregulations

      SECTION 14 TRANSPORTATION DATA

    UN30890Metalpower,flammable,N.O.S4.1;PackingGroupII

    4.1

    II

      SECTION 11 TOXICOLOGICAL DATA

      SECTION 12 ECOLOGICAL DATA

    Ifpowdershouldenterawatercourseorsewer,itisnontoxicandnonpolluting.

      SECTION 13 DISPOSAL DATA

    Canbelandfilledwhenincompliancewithlocalreaulatiions