m/s. n.v. exports -...

18
Environmental Management Plan 0 M/s. N.V. Exports [Quarry Lease Area - 0.615 Ha.( 1.52 Acres)] Sy. No. : 11/1 Village : R.L. Puram Mandal : Chimakurthy District : Prakasam State : Andhra Pradesh ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY 6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | Hyderabad- 82 | E mail: [email protected] , pelcpl@ gmail.com |www.pioneerenvirolabs.com | PEOPLE WHO CARE FOR ENVIRONMENT | SAVE ENVIRONMENT | Accredited by ISO 9001: 2008 Certified

Upload: hathuan

Post on 26-Mar-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

0

M/s. N.V. Exports

[Quarry Lease Area - 0.615 Ha.( 1.52 Acres)]

Sy. No. : 11/1

Village : R.L. Puram

Mandal : Chimakurthy

District : Prakasam

State : Andhra Pradesh

ENVIRONMENTAL MANAGEMENT PLAN

PREPARED BY

6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | Hyderabad- 82 | E mail: [email protected], pelcpl@ gmail.com |www.pioneerenvirolabs.com

| PEOPLE WHO CARE FOR ENVIRONMENT | SAVE ENVIRONMENT |

Accredited by ISO 9001: 2008 Certified

Page 2: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

1

INDEX

S.NO ITEM PAGE NO

1. INTRODUCTION 2

2. DETAILS ABOUT THE QUARRY LEASE AREA 3

3. MINING ACTIVITY 4

4. ENVIRONMENTAL MANAGEMENT PLAN 14

Page 3: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

2

1.0 INTRODUCTION

M/s N. V. EXPORTS, represented by its Mg. Partner: Sri N. Venkateswara Reddy,

have applied for grant of quarry lease for Black Galaxy Granite over an extent of 0.615

Hectares (1.52 Acres) in Sy. No. 11 / 1 of R. L. Puram Village, Chimakurthy Mandal,

Prakasam District, Andhra Pradesh State.

The Asst. Director of Mines and Geology, Ongole, has submitted proposals

recommending for grant of quarry lease for Black Galaxy Granite over an extent of 0.615

Hectares (1.52 Acres) in Sy. No. 11 / 1 of R. L. Puram Village, Chimakurthy Mandal,

Prakasam District, Andhra Pradesh State, in favour of M/s N. V. EXPORTS, represented by

its Managing Partner: Sri N. Venkateswara Reddy.

After careful examination of the proposals of the Assistant Director of Mines

and Geology, Ongole, it is decided in principle to grant a quarry lease for

Black Galaxy Granite over an extent of 0.615 Hectares (1.52 Acres) in Sy. No. 11 / 1 of R. L.

Puram Village, Chimakurthy Mandal, Prakasam District, Andhra Pradesh State, in favour

of M/s N. V. EXPORTS, represented by its Managing Partner: Sri N. Venkateswara Reddy,

for a period of (20) years vide notice No.13655/R2-2/2015 dated07/07/2015.

Profile Of The Project Proponent:

Sri. N. Venkateswara Reddy, is the managing Partner M/s. NV Exports at Sy. No. 11 / 1 of

R. L. Puram Village, Chimakurthy Mandal, Prakasam District, Andhra Pradesh. The

company will operate the quarry under the supervision of well experienced Mining

Consultant.

Brief Description Of The Quarrying Activity:

Nature:

This project involves quarrying of Black galaxy granite. This mineral will be quarried by

open cast Semi-mechanized mining method.

Size Of The Project:

The quarry lease will be operated at maximum production capacity of 6069.60 m3/Annum

in Quarry Lease Area of 0.615 Hectares (1.52 Acres)at Sy. No. 11 / 1 of R. L. Puram Village,

Chimakurthy Mandal, Prakasam District, Andhra Pradesh. The proposed project cost is Rs.

10.0 Lakhs.

Page 4: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

3

2.0 DETAILS ABOUT THE QUARRY LEASE AREA

The Quarry lease area of 0.615 Hectares (1.52 Acres) in Sy. No. 11 / 1 of R. L. Puram Village,

Chimakurthy Mandal, Prakasam District, Andhra Pradesh. The following are the

environmental settings of the QL area within 10 Kms.

Details of water bodies / lakes /

rivers / nallahs

Nagarjuna sagar RBC- 0.2 Kms.

Musi river – 4.6 Kms

Ramateertham Reservoir- 2.2 Kms

Pedda cheruvu -4.9 Kms

Gadi vagu -4.3 kms

Wildlife Sanctuaries /Bird

Sancturies/ National Parks

There are no Wildlife Sanctuaries/Bird Sanctuaries

/ National Parks within 10 Km radius.

Reserve Forests Devarapalem RF, Chimakurthi RF and Errakonda

RF are present with in 10 Kms radius from QL area

R & R Not applicable

Nearest habitation Ramateetrham Village – 0.11 Kms

Rail Head Nil

Airport Nil

Inter State Border No interstate boundary with in 10 Km. radius.

Defence Installations Nil

Forest land in the project site No Forest land is involved in the mine.

Site Services:

Office room , Rest Rooms, Shelters, Lavatory, and drinking water will be provided in the

quarry lease area.

The topographical map showing quarry lease area and surrounding 10 km. radius area is

shown below.

Page 5: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

4

3.0 MINING ACTIVITY

Details of the Area:

District

State Village Mandal Sy. No. Extent

Ownership

of

Occupancy

Prakasam

Andhra Pradesh

R.L.

Puram Chimakurthy 11/1

0.615 Ha.

( 1.52 Acres) Patta Land

Geology:

Physiography:

The quarry lease area is located on a part of plain land. The area is unfit for agriculture and

surrounded by black galaxy granite quarries. The drainage network is due West & SW.

Musi river flows at the distance of 4.6 Km due SW of the quarry lease area.

Topography:

The quarry lease area is a part of plain land raised about 1 m above ground level within the

quarry lease area with topo relief in South direction. The lowest contour is 200 M and

highest contour is 201 M in topo plan.

Regional Geology:

The quarry lease area constitutes a part of Granite and Granitic Gneissic terrain of Archean

age. Pink and Grey Coloured Granites, Pink Alkali - Feldspar Granites are the important

litho units in the area. Grano - Diorites with basic enclaves of Supra - Crystals like

Horneblend Schists, Biotite Schists also occupy the area. These rock types are exhibiting

various landforms like Domes, Inselbergs, Castle -Koppies, Whalebacks and Linear Ridges.

Pink Alkali Feldspar is the most dominant rock type in the area with variations in grain

size, scattered outcrops of Migmatites containing Neosomes of medium to Coarse -Grained

Grey Alkali Feldspar Granites occurs at many places. A number of Quartz, Grey and Pink

Pegmatites and Epidote Veins are criss crossing the host rock. Basic dykes of Dolerite,

Gabbro & Pyroxenitic Composition traverse the granites in NW-SE, NNW-SSE, E-W & NE-

SW directions. Thin veneer of alluvium is found limited to streams.

Page 6: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

5

Local Geology:

Regionally the area constitute a part of Peninsular Gneissic complex of Archean, and

occupied by Porphyritic granite, white, grey and pink colour alaskitic granite, with patches

of amphibolites, hornblend schist bonded magnetite quartzites as enclaves in both

prophyritic and alaskitic granite.

The major litho units are extensively invaded by younger quartz, pegmatite, epitode, calcite

veins and also by dykes basic rocks.

The porphyritic granite along with intermixing of pink alaskitic granitie forming as

mounds, ridges and hillocks in the area; contact of the rocks clearly indicate intrusive

relationship, young alaskites intruded into older porphyritic granite; which is locally

showing poorly developed foliation trending NW - SE.

The older basic enclaves of amphibolites hornblend schist shows signs of metasomatism in

the form of flakes of biotitic. Number of acidic veins like pegmatite, quartz is traversing the

porphyritic granite trending in NNE - SSW, NE - SW to NNW - SSE to NW - SE.

Reserves:

The Geometry of the Deposit:

The geological traverses on the outcrops and the exploratory mining was facilitated to have

shape and size of the deposit in quarry lease area. The black galaxy granite deposit is

occurring as in the form of large boulders and sheets below ground level.

Method of Estimation of Reserves:

The deposit is exposed in 4 m below surface and hence cross sectional method is adopted

for Estimation of Geological Reserves. 4 Sections A-A1 & D-D1 were drawn across the

quarry lease area in the strike direction of the dyke to estimate the reserves.

The cross sections were drawn perpendicular to the strike direction, the cross

sectional area of the individual sections are calculated to arrive at sectional area

multiplied by the appropriate sectional influence of 40 M (Average) to arrive the

volume of rock mass. A conservative recovery of 30% rough blocks is considered in

estimation.

Page 7: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

6

Categorization of Reserves:

As no detailed exploration is conducted by boreholes, only exposed resources are

considered for Reserve Estimation upto RL 150 M.

Hence, only G1 (Proved) scale category as (111) code is calculated. No resources are

considered under G2 & G3 (Probable & Possible) scale of exploration.

Hence, the exposed deposit is proved category of reserves as 111 coding (Proved) under

UNFC guidelines.

The deposit upto RL 150 is considered as Proved Reserves.

Total Geological Reserves:

Sections Litho-Unit Sectional Area

Sectional Influence

Volume Recovery of @ 30%

(M2) (M) (M3) (M3)

A - A1 Soil Overburden

217.00 40.00 8,680.00

Granite 1,603.00 40.00 64,120.00 19,236.00

B - B1 Soil Overburden

220.00 40.00 8,800.00

Granite 1,631.00 40.00 65,240.00 19,572.00

C - C1 Soil Overburden

224.00 40.00 8,960.00

Granite 1,660.00 40.00 66,400.00 19,920.00

D - D1 Soil

Overburden

228.00 50.00 11,400.00

Granite 1,689.00 50.00 84,450.00 25,335.00

TOTAL PROVED RESERVES 3,18,050.00 84,063.00

Reserves In UNFC Code:

S. No. Category of Reserves

UNFC Code Reserves in M3 Reserves in Million M3

1 Proved 111 84,063.00 0.084

2 Probable 122 Nil Nil

3 Possible 333 Nil Nil

Page 8: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

7

Reserves Blocked Under 7.5 M Buffer Zone:

Sections Litho-Unit Sectional Area

Sectional Influence Volume

(M2) (M) (M3)

A - A1 Soil

Overburden

91.00 40.00 3,640.00

Granite 680.00 40.00 27,200.00

B - B1 Soil Overburden

91.00 40.00 3,640.00

Granite 679.00 40.00 27,160.00

C - C1 Soil

Overburden

91.00 40.00 3,640.00

Granite 679.00 40.00 27,160.00

D - D1 Soil Overburden

91.00 50.00 4,550.00

Granite 679.00 50.00 33,950.00

TOTAL RESERVES BLOCKED 1,30,940.00

Reserves Blocked Under Safety Slopes:

Sections Sectional Area Sectional Influence Volume

(M2) (M) (M3)

A - A1 554.00 40.00 22,160.00

B - B1 556.00 40.00 22,240.00

C - C1 558.00 40.00 22,320.00

D - D1 559.00 50.00 27,950.00

TOTAL RESERVES BLOCKED 94,670.00

Total Mineable Reserves:

Considering the recovery of the dimensional stones from the quarry is around 30% and

as the sheet exposed from the bottom of the QL area exhibit better quality, conservative

estimation is made with 30% recovery.

Page 9: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

8

Total Geological Reserves = 3,18,050.00 M3

Proved Reserves:

Reserves Blocked under 7.5 M Buffer Zone = 1,30,940.00 M3

Reserves Blocked under Safety slopes = 94,670.00 M3

Total Reserves Blocked = 2,25,610.00 M3

Reserves available for Exploitation = 92,440.00 M3

Extraction of Market Grade Reserves

@ 30% Recovery (Proved) = 27,732.00 M3

Life of the Mine = 27,732.00 M3 / 4,231.00 M3

= 6.55 OR SAY 7.00 YEARS

Method of Mining (Open Cast other than fully Mechanized / Semi Mechanized):

The Black Galaxy Granite in the quarry lease area is exposed sub-surface. (Hence, it is

proposed to mine sheet by open cast, semi-mechanized methods, by developing the

benches of 6 M height in 2 phases of 3 M each). Wire Saw cutting will be deployed based

on the favourable conditions. The development of benches in the sheet rock will be

maintained @ 60° safety slopes.

The separation of blocks from the mother rock will be carried out by drilling, wedge

cutting, blasting and excavation will be done by the machinery.

The secondary splitting, dressing of blocks will be done manually. Therefore,

mining operations have to be carried out in this area in 2 stages.

1) Development

2) Production

Stage - 1

The sheet will be subjected to drilling, blasting and splitting from mother rock.

Rock Splitting / Wedging:

Thus 20' x 20' to 40' x 20' to 40' mass will be separated from mother rock by drilling the

slotter holes on both sides of the mass and a top hole intersecting these two holes and

wiresaw rope is passed through and cutting is done horizontally and vertically and by this

there will be mass opening on all the sides from the mother mass

Stage - 2

After removal of weathered and under sized boulders.

Page 10: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

9

• The large boulders will be subject to splitting into required sizes of blocks by

using Jack Hammers by drilling series of deep holes at right angles at regular

intervals, later by inserting feather and wedges in these holes and hammering

with sledge hammer will release the blocks.

• The boulders will be splited to the required sizes with drilling and if

required by using chemical compound at the source only. The boulders

separated will be brought to the dressing yard for dressing.

• If the boulders, which fit into the required market grade size will be transformed

into cuboids.

Secondary Splitting:

After separation from the mother rock, it is properly checked by washing with water to

identify defects and cracks. Based on this observation, the size is decided and the blocks

are marked and separated by drilling and wedging.

The separated pieces will be examined for defects and lines, then the block or blocks are

marked in clear area and holes are drilled along the line of marking, with the help of

feathers and wedges and the waste portions are separated forming rectangular blocks.

Any bulges will be removed by drilling and wedging making it perfect blocks. A perfect

block is that all the sides shall make with each other 90°.

Dressing:

Dressing of dimensional rough blocks for export:

Dressing is final phase of mining operation, wherein the secondary rough blocks are

squared into regular perfect rectangular sizes, thereby avoiding uneven bulge or cavities

and other defects. Jackhammers with compressor, feather end wedges and sledgehammers

are equipments generally used for dressing the block.

Dressing of rough blocks for domestic processing plant:

Dressing by means of squaring and splitting will be done for rough blocks of the size

varying between 120 x 90 x 80 Cm and 300 x 200 x 190 Cm.

Drilling & Blasting

Drill hole pattern for smooth blasting: Holes of 3 M depth will be drilled in a single

row with spacing of less than 0.3 M and burden of 1.6 M or more shall be maintained

uniformly. This arrangement will yield rock size of 3 M x 2 M cross section. A bench

height of 3.5 M will be tackled.

Page 11: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

10

Drilling Parameters :

i) Drill Hole Diameter 32 MM up to 3 M long.

ii) Depth and Inclination of Drill Hole:

Generally drilled vertically in an alignment. However in primary cutting in the

absence of sheet joints horizontal holes also are drilled to develop bottom level.

iii) Spacing and Burden

The spacing shall be about 0.1 M to 0.3 M from hole to hole and burden goes up to 1.6 M for

the splitting of the rock.

iv) Stemming & Charging of Bore Hole

Gun Powder is used. The blast hole will be charged with 150 Grams of explosives by

stemming with smooth strand.

v) Explosive Type

For primary blasts pre-splitting 8 - 10 inches spacing 32 mm dia. Jackhammer holes

perfectly aligned along the desired plane are drilled. They are charged with gun

powder and detonating cord or gelatins with detonating cord with sufficiently packed

stemming column that gives a cut plane along the desired one. (Nitrate Mixture &

Detonators are used).

Production Proposed for the five years:

The applicant proposes to take up quarrying operations between the Sections A-A1 to D-D1

in the grids N 00 - 75 & E 00 - 175. The mining operations will be initiated from West of the

quarry lease area. The mining advance Eastwards.

1st Year

In the first year mining will be initiated from West of the quarry lease applied area

between the grids N 00 - 75 & E 00 - 175 covering an area of 3,372.00 M2 a bench of 6 M

height will be formed.

The mining advances Eastwards. An area of 3,372.00 M2 will be excavated producing

20,232.00 M3 of Rock Mass, 30% (6,069.60 M3) of Market Grade Rough Blocks and 70%

(14,162.40 M3) of Waste Rock will be generated.

2nd Year

In the second year mining will continue below 1st year workings between the grids N 00

- 75 & E 00 - 175 covering an area of 2,843.00 M2 a bench of 6 M height will be formed.

Page 12: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

11

The mining advances Eastwards. An area of 2,843.00 M2 will be excavated producing

17,058.00 M3 of Rock Mass, 30% (5,117.40 M3) of Market Grade Rough Blocks and 70%

(11,940.60 M3) of Waste Rock will be generated.

3rd Year

In the third year the mining will continue below 2nd year workings covering an area of

2,332.00 M2 between the grids N 00 - 75 & E 00 - 175 with an average bench of 6 M height

will be formed.

The mining advances Eastwards. An area of 2,332.00 M2 will be excavated producing

13,992.00 M3 of Rock Mass, 30% (4,197.60 M3) of Market Grade Rough Blocks and 70%

(9,794.40 M3) of Waste Rock will be generated.

4th Year

In the fourth year the mining will continue below 3rd year workings covering an area of

1,840.00 M2 between the grids N 25 - 75 & E 00 - 175 with an average bench of 6 M

height will be formed.

The mining advances Eastwards. An area of 1,840.00 M2 will be excavated producing

11,040.00 M3 of Rock Mass, 30% (3,312.00 M3) of Market Grade Rough Blocks and 70%

(7,728.00 M3) of Waste Rock will be generated.

5th Year

In the fifth year the mining will continue below 4th year workings covering an area of

1,367.00 M2 between the grids N 25 - 75 & E 00 - 175 with an average bench of 6 M

height will be formed.

The mining advances Eastwards. An area of 1,367.00 M2 will be excavated producing

8,202.00 M3 of Rock Mass, 30% (2,460.60 M3) of Market Grade Rough Blocks and 70%

(5,741.40 M3) of Waste Rock will be generated.

The year wise production proposed is shown in the following table.

YEAR WISE PRODUCTION FOR 5 YEARS Year Area

(M2)

Bench

Height

Volume Production

@ 30%

Waste

@ 70% (M) (M3) (M3) (M3)

1st 3,372.00 6.00 20,232.00 6,069.60 14,162.40

2,843.00 6.00 17,058.00 5,117.40 11,940.60

Page 13: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

12

3rd 2,332.00 6.00 13,992.00 4,197.60 9,794.40

4th 1,840.00 6.00 11,040.00 3,312.00 7,728.00

5th 1,367.00 6.00 8,202.00 2,460.60 5,741.40

TOTAL 70,524.00 21,157.20 49,366.80

AVERAGE 14,104.80 4,231.44 9,873.36

Machinery: The will be the machinery will be used in QL area.

S.NO. MACHINERY BUCKET CAPACITY NO'S

1. Hydraulic Excavator 1.50 M3 1

2. Jack Hammers - 3

3. Dumpers 35 MT 2

4. Compressor 600 Cft 1

5. Wire Saw & Slotter Sets - 2

6. Pumps 60 Hp 2

Organizational Chart: The following will be the Man Power requirement:

S.NO. MAN POWER NO'S

1. Mines Manager 1

2. Asst. Managers 1

3. Mine Foreman 1

4. Engineers 1

5. Mine Mate Cum Blaster 2

6. Mine Supervisors 2

7. Excavator / Loader Operators 3

8. Dumper Operators 2

9. Wire Saw / Slotter Operators 2

Page 14: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

13

10. Compressor Operators 1

11. Mechanics / Welders etc. 1

12. Helpers 2

13. Semi Skilled Workers 10

TOTAL 29

Page 15: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

14

4.0. ENVIRONMENTAL MANAGEMENT PLAN

AIR ENVIRONMENT

The pollutant emitted from quarrying activity will be dust; and major sources of dust will be

due to Quarrying operations and vehicular movement. The following measures will be

adopted in quarrying to eliminate the fugitive dust emission.

PROPOSED MITIGATION MEASURES

Wet drilling.

Water sprinkling on Quarry haul roads & approach road for dust suppression.

The dust rising due to drilling will be controlled by covering the drill rods with

cloth, dust extractors will also be employed.

WATER ENVIRONMENT

WATER REQUIREMENT

The Granite Quarrying activity requires 4.0 KLD of water. Water required will be sourced

from bore well. The following is breakup of it.

S. NO. ITEM WATER REQUIREMENT IN KLD

1. For Dust Suppression in QL area 0.9

2. For Dust Suppression in approach road 0.6

3. For Domestic Use 0.7

4. For Drilling and identification of cracks 1.0

5. For plantation in Ml area 0.7

6. For plantation in approach road 0.1

Total 4.0

WASTE WATER

The wastewater generated during identification of defects/cracks in granite blocks will be

recycled back. The only source of waste water generation will be sanitary waste water of

0.56 KLD, which will be treated in septic tank followed by subsurface dispersion. No

further processing of Colour Granite is envisaged. It will be directly sold to outside parties.

Page 16: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

15

NOISE ENVIRONMENT The main source of noise generation will be vehicular movement and the drilling of

boreholes. In the Quarry lease area silent blasting will be done by using Chemical

Compound. The following will be noise control measure:

The machinery will be maintained properly to reduce the noise.

The protective noise reducing gear like earplugs.

Plantation.

SOLID WASTE

During mining in next 5 years a total of 49,366.80 M3 of waste will be generated and

dumped at the dumping yard, on an average of 9,873.36 M3 per annum

Average waste generation per Annum will be 9873.36 m3.

Total Waste generation for in Lease Period (20 Years) – 9873.36 x 20 = 197467 Cum

The lesse is holding a quarry lease along the Southern boundary of the QL area

over an extent of 2.65 Hectares in Sy. No's 11 / 2 & 11 / 4 (P). The waste generated

will be hauled to the quarry lease area and dumped on the existing dumps.

GREEN BELT DEVELOPMENT

The plantation will be taken up in the Buffer zone of the QL area and along the

approach road.

In buffer zone 120 saplings will be planted and 20 sapling will be planted in

approach road.

The sapling to be planted will be Neem, Mango, Kanuga etc.,

PLANTATION COST DETAILS:

Cost of garden soil+ compost for filling hole @0.5 cum : Rs. 100

Cost of sapling : Rs. 60

Total capital cost per sapling : Rs. 160

Total plantation area proposed : 150 m x 7.5m

No of plants @ 10 m spacing in each row : 60 nos.

Page 17: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

16

No. Of Rows : 2

Total no. Of Plants : 60 x 2 = 120 nos.

Total capital cost for plantation in QL area : 160 x 120

: Rs 19,200

Length of approach road to QL area to be developed with plantation : 100 m

Total length for avenue plantation on both sides of approach road : 200 m

Number of plants to be planted : 20

Cost per sapling with garden soil & compost : Rs 160

Total cost for avenue plantation :160 X 20

: Rs 3200 /-

No. of Tree Guards required : 20 nos.

Cost per each Tree Guard : Rs. 200 /-

Total cost for Tree guards : 20 x 200

= Rs. 4,000

TOTAL COST FOR PLANTATION : Rs. 19200 + 3200 +

4000

: Rs. 26,400 /-

OCCUPATIONAL HEALTH & BUDGET:

• Dust masks (to reduce 29 nos.) will be provided for control of dust.

• Ear plugs (29 nos.) will be provided to employees to reduce the Noise impact..

• Health check-up will be carried out for all employees in an external hospital yearly

once and medical records will be maintained

• Rs. 3000/- per person/year will be allocated employee occupation health. So total

budget for occupation health will be 29 x 3000=Rs.87,000/-

Periodicity of health checkups done for yearly for workers working in Quarry.

• Blood test (once in a year)

• Urine test (once in a year)

• Complete Physical examination (once in a year)

• X-ray of chest (once in a year)

Page 18: M/s. N.V. Exports - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/... · [Quarry Lease Area - 0.615 Ha.( 1.52 Acres ... is the managing Partner M/s. NV

Environmental Management Plan

17

• Lung/Pulmonary function test (once in a year)

• Sputum Examination (once in a year)

COST FOR ENVIRONEMTAL MAGEMENT:

S. NO. DESCRIPTION ITEM CAPITAL

COST IN RS.

RECURRING

COST IN RS.

1 Air pollution Dust masks 30 nos. Nil 8,700

Cloth for drillers- 3 nos. 1

m each

Nil 300

Gunny bags for covering

the surface of jack hammer

holes

Nil 1,000

Dust Suppression Nil 27,000

Plantation in Quarry lease

area and buffer zone

26,400 8,400

2 Noise pollution Maintenance of machinery

suitably

Nil 20,000

Ear plugs (29 nos.) Nil 7,250

3 Environmental

monitoring

Ambient Air Quality

monitoring

(PM10

& PM2.5

)

Nil 48,000

Noise level

4 Occupational health Nil 87,000

Total 26,400 2,07,650